Hi,
We have a requirement where for assets having less than say 5000$ we want to have 100% depn  in one period, how to achieve this and what configuration is required.

Hi Ravi,
Long time, hope you are doing well. you can achieve 100% depreciation by specifying
Base method as stated percentage. Have all the three options as no
Declining balance as 001
Prd control 003
Multilevel method - create a custom method which calculates 100% depreciation
Thanks,
Zaid

Similar Messages

  • BIA/BWA - sizing with one period data?

    Hi All,
    We have already a system that is about to go-live in 2 weeks.
    We realized that some of the reports are running slow and need to boost the performance.
    Now, we need to add BWA on that.
    We have 21 cubes. But, we want to choose 5 cubes to be part of BWA.
    We have only one period of data in the each of the 5 cubes.
    The question is:
    To size the BWA system, if we size the memory & Disk Space by using the program RSDDTREX_MEMORY_ESTIMATE, by multiplying the program result based on the one period of data, by 2 and 3, respectively, would that be enough?
    Or do we need to multiply the result by the number of periods that we are going to store in the cube, e.g., by 12, for one year, by 24 for 2 years, by 36 for 3 years, etc...?
    Also, let's say for cube 1: it's 300 GB memory required, and 500 GB Disk space required, and for cube # 2, it's 400 GB memory required, and 700 GB disk space required, then can I say the total requirement of BWA server is just add the two numbers, which is  700GB RAM and 1.2 TB Disk space?
    Thanks in advance,
    Best Regards,
    - Shashi

    Hi Shashi
    Please note Cube Size and Index size Ratio will be 5:1 .
    That is for 500 GB Cube , 100 GB memory will be required.
    Please check the below link
    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/e05a68a8-83d6-2c10-0b8e-85823f352eea?QuickLink=index&overridelayout=true
    and OSS note 917803.
    Best Regards
    Anindya

  • Envy 100 eAll-in-One D410a (US) doesn't work with cartridge HP300 (Europe)

    Hi all,
    I bought a HP Envy 100 eAll-in-One (CN517A) D410A in 2011 when I was living in the US. I always used HP60 cartridges without any problems while in the US.
    In 2013 I was relocated to Europe (Luxembourg), and recently my last supply of US-bought HP60 cartridges run out, so I went out to buy new ones. HP60 is not available where I live, so I bought HP300 which explicitly says on the box that it is suited for "HP ENVY ENVY100 D410a". However, when I put them in the printer I get a "The cartridges listed above are not intended for use in this printer as it is currently configured." error on the printer.
    I tried the eight solutions as explained here:
    http://h10025.www1.hp.com/ewfrf/wc/document?docname=c02436437&tmp_task=solveCategory&cc=us&dlc=en&la...
    None worked. I put back in my old HP60 cartridges and did no longer get the error message and I can print (but poorly because these cartridges are almost empty).
    Could it be that the HP300, by design, does not work with the US-built printer that I have even though the HP300 packaging box clearly says it should? Is there a way to make it work (firmware update?), or do I need to either buy HP60s from the US or get a new printer here in Europe?
    Any clues or pointers to a possible solution would be greatly appreciated!
    Kind regards,
    Paul

    Hello pvgelder76, and welcome to the HP Forums.
    I understand you are having ink compatibility issues.  To have your printer regionalized, I would suggest contacting HP directly.  You can utilize this website to learn how to contact HP appropriately, based on your region: Contact HP Worldwide.
    Thank you for posting on the HP Forums.
    Please click “Accept as Solution " if you feel my post solved your issue, it will help others find the solution.
    Click the “Kudos, Thumbs Up" on the right to say “Thanks" for helping!
    Jamieson
    I work on behalf of HP
    "Remember, I'm pulling for you, we're all in this together!" - Red Green.

  • How can I use the RMS.vi over more than one period?

    Hi everyone,
    I am using the Cycle average and RMS.VI to get the RMS value of a alternative voltage (2kHz). To acquire this signal I am using a differentiel AI of a 6225 card (at 250kS/s) and the RMS value is correct, it works fine. However from what I have understood, this VI calculates the RMS value according to only one period no matter how many samples I have acquired (2000 samples in the VI I have attached). Is this correct? If so, is ithere a way to use it over all of the 2000 samples to get a more averaged value? Or does another VI exist?
    I could repeat several time an acquisition of a short number of samples (a period) and make an average but it would take some time and I have to do this with 39 other Inputs on the same card one after the other...
    Thank you for your help,
    User
    Attachments:
    Forum.vi ‏76 KB

    User_1979 wrote:
    ....could you tell me if this VI sends a rms value of X compleat periods (even if I have send X periods and a half for example)?
    It gives the RMS value of only the newest set of data.
    The RMS and RMS Pt. By Pt. work for me, but it depends on how you break out that Dynamic Data from the Express VI, which was why I suggested you didn't use it - mainly because you can't tell what happens to that data when you wire it to a function and it coerces. Actually, I should say, I can't tell what happens to it. You may know, but I don't.  
    In the attached screenshot, I have "made" a 2k sine wave with an amplitude of 5. The indicators show RMS value.
    Richard
    Attachments:
    rms.gif ‏14 KB

  • BPC 10.0 NW - How do I make Business Rules run one Period at a time

    I was wondering if anyone has a way to make business rules run one period at a time before moving on to the next to the next time period (i.e. January 2014 calc prior to moving on to February 2014).  In past SQL this could be achieved with a piece of script *CALC_EACH_PERIOD.  Is there anything like this that can be applied in the NW platform for Business Rules?  I have some logic that I want to run through a package on multiple periods at once.  Part of this logic contains a Business Rule that uses a value from the preceding period.  the Business rule appears to be calculating all time periods selected in the package at once so it is missing the piece that is supposed to come from the prior month unless the package is run one period at a time.  I need the logic to run sequentially by time period (oldest first) when more than one time period is selected.
    thanks,
    Keith

    Hi Vadim,
    Script for the business rule is below, it runs along with the FX_Trans rule in the same package  ( I have also attached a screen shot of the actual Business rule its self)
    *RUN_PROGRAM CALC_ACCOUNT CATEGORY = %CATEGORY_SET% ENTITY = %ENTITY_SET% CURRENCY = USD //GROUPS = %GROUPS_SET% TID_RA = %TIME_SET% //OTHER = [AUDITTRAIL=%AUDITTRAIL_SET%] CALC = CALC_HIST_USD *ENDRUN_PROGRAM
    Thanks, Keith Carlson

  • If one period is selected,Report is working fine, not for  range of periods

    Dear All,
    i have a problem in nearly 3 reports of Finance
    1)  <b>Working Capital Requirement Report,</b>
    if one period is selected, Report is working fine, but when range of periods is
    given in selection screen, amount is showing wrong value.
    2)<b>Balance_Sheet and  3) P&L_Statement report</b>Same problem
    E.g Mar07 period will give the results for March08 period and Mar06 period will give the results for Mar07.
    Ur valuable suggestion is rewarded.
    Regards
    venu

    Hi,
    check for your variable restrictions in the report key figures.
    It will show up according to the rsctriction put there.
    Try to verify the vlaues with the key figures and if they are amtching then you have some issues with the data loads.
    But with your explanation it seems its just the you are looking at the wrong key figure( for actuals you are looking at previous year values)
    Or you are using wrong restrcition values at the key figure level( indicators indicating prior values used for actual values).
    Hope it helps
    Thanks
    Ajeet

  • I have 9,046 emails in my inbox. I was messing with the setting to try to empty the inbox (100 emails) in one hit and somehow .... how do I remove them all.

    I was messing with the setting to try to empty the inbox (100 emails) in one hit and somehow I managed to get 9,046 emails in there.... how do I remove them all?

    Hans M wrote:
    If there is no other solution this Problem should be forwarded to the developers.
    Feel free to do that:
    http://www.apple.com/feedback

  • Open 100 files in one photoshop file

    Hi,
    I need to open 100 files in one Photoshop file.
    I would like to have those 100 files on a different layer.
    Is there a way to do this faster than opening each of them and copying them one by one in a file?
    thanks

    Hi Dedinne.
    A simple action should do it. It is run as a batch on your source images.
    1. Select All.
    2. Copy.
    3. Close
    4. Paste.
    The target image is created and left open before the action is run on the source images.
    Batch opens the source image.
    1. & 2. Copy the source image.
    3. Closes the source image.
    4. Pastes into the target image, which remains open during the process receiving each image in turn.
    FWIW.
    Peace,
    Lee

  • Itunes 8 using 100% CPU on one core.

    Hi Guys,
    Since today Itunes seems to be using up 100% CPU on one of the two cores. This happens shortly after i started it - for example when i play a song.
    After a few minutes it will be reactive again and then i can choose another song - after which it will hang again. It also hangs when changing for example from Films to Music. I have the idea that it happens when i click the Music library - but am not sure. I disabled AV for the itunes library folder - but that didnt change anything. This has been working fine until today. I even uninstalled and re-installed version 8. The only thing that might be related is that when i upgraded to ver. 8 i used the update function in itunes - which didnt work as well - left me with some unusable shortcuts etc. But the app itself was working.
    OS is vista.
    Just saw that this is for the store only - Moderators please move if possible.
    Message was edited by: Dave20007

    wilberfan wrote:
    Dual-core, 32-bit Intel machine.   Did an -Syu two nights ago.  A dozen or so packages upgraded--including (I remember) the latest nvidia (302.17-1).
    When I first boot-up, I get 100% CPU on one of the cores.   htop reveals that it's the X session that's running away (?)   Rebooting seems to take care of it--although I don't understand why yet...
    Anyone experiencing this--or have any suggestions on what I could look at to see what the problem might be? 
    Thanks in advance...
    I had this problem with mount. In fact asking the system for shutdown would set a live lock on a mount process taking one core.

  • Sort more sine periods in one period

    Hi everyone. I would like to sort more periods of sine waves into just one. I'm having problem with programming it.
    I've attached .vi wich does not work correctly.
    Help, please.
    Attachments:
    Sort To One Period.vi ‏33 KB

    Seems like your strategy is to sort the values of the rising and falling slope...
    How is your data generated and what is the reason why you want to do it this way?
    Do you have a constant period?
    Here is a way to merge to a fixed period (that can even be a fraction of the sample period)
    But beware that the output doesn't have an equal timestep. That would need a resampling.
    Greetings from Germany
    Henrik
    LV since v3.1
    “ground” is a convenient fantasy
    '˙˙˙˙uıɐƃɐ lɐıp puɐ °06 ǝuoɥd ɹnoʎ uɹnʇ ǝsɐǝld 'ʎɹɐuıƃɐɯı sı pǝlɐıp ǝʌɐɥ noʎ ɹǝqɯnu ǝɥʇ'
    Attachments:
    Merge to fixed period lengh.vi ‏34 KB

  • My apple ID security questions are my problem ,, yesterday I've tried to answer them but wrong answers and I'm sure 100% that no one changed them because no one really knows about it

    My apple ID security questions are my problem ,, yesterday I've tried to answer them but wrong answers and I'm sure 100% that no one changed them because no one really knows about it

    If you hav a veified rescue email assigned to your Apple ID you can get an email sent to reset the security questions. Follow the link below to do this:
    http://support.apple.com/kb/HT5312
    If you do not have a verified rescue email then you will need to contact AppleCare for assistance. Follow the link below to find the number in your country:
    http://support.apple.com/kb/HE57

  • Multiload for one period only.

    Can you run the multiload process for just one period? We're receiving a file with 1 period and another with 12 periods all to run through the same location. These would have to run through different FDM batch processing (Open Batch and OpenBatchML) requiring different file names and formats. I want to standardise these extracts and process both through ML.
    When I try it seems to load OK but fails when running validation. No error message produced.
    Has anybody else had this issue or developed a solution to get round it?

    Thanks for confirming this. I'll just have to create a seperate routing to handle the Standard load files. Bit of a pain, given the POV values are determined by the file name and not a header as in multiload.
    Appreciate your quick response.

  • KEPM more than one period

    Hi All,
    In CO-PA planning KEPM, I would like to use period in row instead of header.
    At the same time I want to plan more than one period.
    Is it possible and how?.
    Thanks
    Regards

    Hi,
    If you have too much data, then you can try uploading the plan data using KEFC transaction (Planning functions>Weekly planning).
    You can upload alternative period Week (ALTPERIO) value through uplaod file.
    Hope this helps.

  • How can I sync more than 100 ibooks at one time.  The new IOS killed my legal collection of 4000 books and now I cant sync.

    How can I sync more than 100 ibooks at one time.  The new IOS killed my legal collection of 4000 books and now I cant sync.
    <Edited by Host>

    How can I sync more than 100 ibooks at one time.  The new IOS killed my legal collection of 4000 books and now I cant sync.
    <Edited by Host>

  • Copy from one period to period range in Integrated Planning

    Hi ,
    Looking for help:
    Scenario:
    Copy the planned data  from one period to period range:
    From,
    Calendar Year (Varaible)=2010
    Caledar Month (Variable)=01
    Version (Variable)=XYZ
    To
    Calendar Year (Varaible)=2010
    Caledar Month (Variable)=02 to 12 (Created multi single value variable, **Interval  variable is not available in Planning Function)
    Version (Variable)=XYZ
    Used Copy in Planning Function: created 3 variables for From and 3 variables for To, created planning sequence tried to insert in the Workbook.
    VAR_NAME_1 -1 - Caledar Year variable from
    VAR_VALUE_1 - 1 - 2010
    VAR_NAME_2 - 1 - Calendar Month From
    VAR_VALUE_2 - 1 - 01
    VAR_NAME_3 - 1 - Vesion Variable From
    VAR_VALUE_3 - 1 - XYX
    VAR_NAME_4 - 1 - Caledar Year variable To
    VAR_VALUE_4 - 1 - 2010
    VAR_NAME_5 - 1 - Calendar Month To
    VAR_OPERATOR_5 - 1 - BT
    VAR_VALUE_LOW_EXT_5 - 1 - 02
    VAR_VALUE_HIGH_EXT_5 - 1 - 12
    VAR_SIGN_5 - 1 - I
    VAR_NAME_6 - 1 - Vesion Variable To
    VAR_VALUE_6 - 1 - XYZ
    Getting error message:
    Parameter VAR_Value(_EXT)_5 is missing for variable "Caledar Month To"  -
    Reading the records in period 01 but failed to generate/ write to period 02 to 12
    Please advise.
    Thanks

    Hi Deepti,
    Great.... thank you very much for your help. FOX code is working perfect,  I eliminated only  FOREACH S_KFNAM (I have only one KF in the Cube)
    Now the req. changed a little bit:
    User want to select the Cost Center- to copy data with above scenario. (CalYear, calendar month and version)
    I created a Filter - with Cost center and Controlling Area (Compounding), restricted Controlling area with Hierarchy and created Multiple single value Hierarchy Node variable for cost center.
    Created a planning sequence with the Filter and PF.
    I created a Work book for User to use this copy function (by Planning Sequence)
    SCENARIO;
    USER want to copy data in COSTCENTER:CC100000
    From: caledar year=2010, calendar month=01 and version=ABC
    To: calendar year=2010, calendar month = 02 to 12 and version=ABC
    VAR_NAME_1 1 FROM CAL YEAR
    VAR_VALUE_1 2010
    VAR_NAME_2 1 FROM CAL MONTH
    VAR_VALUE_2 1 01
    VAR_NAME_3 1 FROM VERSION
    VAR_VALUE_3 1 ABC
    VAR_NAME_4 1 TO CALYEAR
    VAR_VALUE_4 2010
    VAR_NAME_5 1 TO CALMONTH
    VAR_VALUE_LOW_EXT_5 1 02
    VAR_VALUE_HIGH_EXT_5 1 12
    VAR_NAME_6 1  TO VERSION
    VAR_VALUE_6  1 ABC
    VAR_NAME_7 1 HIERARCHY NODE VARIABLE
    VAR_VALUE_EXT_7 1 CC100000
    VAR_NODE_IOBJNM_7 1 0COSTCENTER
    Got Error:
    Please enter a valid value for 0COSTCENTER 
    Check the value"CC100000"(parameter: VAR_VALUE_EXT_7, variable ZMSV_CC)
    But reading the data and generating the data for all the cost centers.
    Issue:
    How to pass the variable values  to the Filter. Is my definition is wrong in the workbook?
    VAR_NAME_7 1 HIERARCHY NODE VARIABLE
    VAR_VALUE_EXT_7 1 CC100000
    VAR_NODE_IOBJNM_7 1 0COSTCENTER
    Thanks

Maybe you are looking for