hi all
is it possile to create 2 separate bom of same material for one wbs element ?
e.g.
i have material " M " and wbs element is " W "
so now i want to create 2 boms for this wbs .

Hi,
You can't create more than one WBSE BOM for a Unique conmination of WBS Element/Material/Plant/Usage.
Hope this clears you.
Regards,
Hari.

Similar Messages

  • Materials for Single wbs Element from project/Plant stock

    Hi to all,
    I would like to have the following scenarios for the single Project.
    1) Some  Activities  in the single WBS Element will be using the Materials for specific to the Project. So MRP will be generated for the Project and PR,PO,Goods receipt will be done.
    2) In the same WBS Element of some activity, wants to consume materials from the Plant stock. For  this we donu2019t want to run MRP. From the reservation no, we want to take the materials for project use.
    I have a single Network profile and I donu2019t want to create anymore.
    Understand from movement type 411, we can take the materials from unrestricted Plant stock to project.  Is there any other way/any config I need to check in account assignment category to fulfill the requirement to consume from Plant stock and also to use Project stock in a single profile.
    Regards
    N.Raju

    Hi,
    that is the only option, Std. SAP does not support for unrestricted plant stock ( for Project MRP or availability check).
    same option-
    1) transfer free stock( plant stock)  to respective WBSE
    2) Run MRP
    3) Consume material.
    Venkatesh

  • Tables for Budget allocated and spent for a WBS element

    Dear experts,
    I am new to PS domain, kindly tell me the table names where I can find the Budget allocated to a WBS element and Open budget for a WBS element.
    Thanks & Regards,
    Murthy.

    Hi,
    I think by conversion cost you mean Production cost of the turbine.
    Since you do both the actvities Material procurement and production under the same WBS. The budget cannot be tracked separelty.
    Have 2 different WBS strucute one for procurement and one for production. However you can add the existing Nwk activities to these WBS.
    Regards,
    Ramesh-

  • FM for standard WBS element change - CJ92

    Hi all,
    Is there any function module to make changes in standars WBS element/proj.def tocde- CJ92.
    If any knows, please provide me the same.
    Thanks much!
    Chandra.
    Edited by: Sekhar on Apr 7, 2010 1:10 PM

    Thanks... Is this work for standard WBS elements ?

  • Header WBS for two WBS elements

    Dear All,
    Is it is possible to create a Header WBS for two WBS elements which were
    triggered by Two different line items in a sales document.Please detail the process
    if a possibilty for the same exists.
    Award points are assured for valuable replies.
    thanking you
    Best regards,
    R.Srinivasan

    Dear Sunil,
    I am using the Standard project with same structures only.I am not able to get the header WBS for Two WBS elements triggered from the same sales order.what are other possibilities for this problem.
    Can you please elobrate your reply
    Thankingyou,
    Best regards,
    R.Srinivasan

  • Vendor wise/Invoice wise consumption for each WBS element

    Any standard report from SAP, which provide details of Vendor Purchase order / Contract, details of SES with WBS no. and details of Vendor invoice in columnar form.
    SAP system can not generate standard reports giving vendor wise/Invoice wise consumption for each WBS element of particular asset.
    Please help me to get this report.
    Thanks in Advance.

    Hi
    Your starting point should be CJI3 report or any PS report... Here you get the FI Doc no
    If this FI Doc No is generated from MM, check the Header segment of the document.. It would have MM Doc NO + Fisc Yr populated in the ref key... This gives you the link between FI & MM
    From here on, you can take it forward... You can look up this doc no in MSEG Table and find the PO no... Then go to EKBE table for other PO details....
    br, Ajay M

  • Reversing TECO status for Multiple WBS elements

    Hi,
    Question on setting and then reversing TECO status for a WBS element.
    When a project is closed technically in project builder, all underlaying items (wbs, network/activity) are technically closed as well.
    When you try to undo this, only the status of the top element is changed, not the underlaying items.
    Is there any way in which we get the underlaying items changed as well (mass change is not an option)
    Regards,
    Jatinder Bansal

    You can try two methods :-
    1.  Open project in project builder, Select project definition and then go to WBS Overview under project definition, now select all WBS Element and then undo TECO status. Now all the WBS status will be updated. But, this will not have any effect on network and its activities.
    2. Open the project in planning board, now select all the objects, now undo the TECO status. This will change the status of all selected objects like WBS,Network and activites....

  • BOM Explosion with WBS Element

    Hii
    I have a requirement where in I have to display explosion of BOM through my report. The problem is that it could be a Project BOM also, so WBS Element is also required. Anyone knows any FM or BADI with WBS Element also as its import parameter?
    Please Help!!!

    Found myself!

  • How to carry forward budget next year for single wbs element

    Hi,
    i want to carry forward budget next year for single wbs element.
    pl suggest me.
    Thanks & Regards
    Purna.M

    Hi,
    Go to CJCO click on Dynamic Selection and in master data of WBS element select No of person responsible and give the person responsible and execute.before that maintain no of person responsible in that specific WBS element.
    hope it will solve ur problem.
    Regards
    Avinash

  • How do we get complete hierarchy for a WBS element??

    Hi All,
    Is there any FM to get complete hierarchy for a WBS element??
    Or any other method that would achieve this requirement ??
    Eg:
    C.00103.1
    C.00103.1.1
    C.00103.1.2.3
    C.00103.2
    C.00103.2.1 etc
    If i give C.00103.1, all the WBS elements in the hierarchy should be displayed.
    Any pointers are of  great help.
    Regards
    Prathima

    Hi,
    Available Methods
    Getinfo : Read detailed information about WBS [ BAPI_PROJECT_GETINFO ]
    Maintain : BAPI: Project maintenance [ BAPI_PROJECT_MAINTAIN ]
    SaveReplica : Replicate work breakdown structure (ALE) [ BAPI_PROJECT_SAVEREPLICA ]
    The WBS hierarchy object type defines the hierarchy of the WBSelements. A project definition always has exactly one hierarchy. If theposition of a WBS element changes, the whole hierarchy has to berebuilt. Therefore, the WBS hierarchy object type has only one command:
    Create. Every WBS element receives exactly one entry in the table parameter IWbsHierarchieTable with which it defines its position.
    Command: Create
    Use this command to create or change a WBS element hierarchy for aproject definition. Enter the WBS hierarchy object type and the Create
    command in the table of the IMethodProject parameter. The commandrefers to all entries in the table of the IWbsHierarchieTable parameterthat contains the data for the data for the hierarchy. Each entry inthe IWbsHierarchieTable refers to a WBS element that describes its position relative to the other WBS elements.
    Example
    - Positioning WBS elements TRAINING , TRAINING.1 and TRAINING.2 . (WBS elements TRAINING.1 and TRAINING.2 are subordinate toWBS element TRAINING. WBS element TRAINING1 is positioned on the left of TRAINING.2.)
    IMethodProject
    OBJECTTYPE = WBS-Hierarchy
    METHOD = Create
    OBJECTKEY =
    REFNUMBER =
    OBJECTTYPE =
    METHOD = Save
    OBJECTKEY =
    REFNUMBER = I
    ProjectDefinition
    PROJECT_DEFINITION = PD-TRAINING
    IWbsHierarchieTable
    WBS_ELEMENT = TRAINING
    PROJECT_DEFINITION = PD-TRAINING
    UP =
    DOWN = TRAINING.1
    LEFT =
    RIGHT =
    WBS_ELEMENT = TRAINING.1
    PROJECT_DEFINITION = PD-TRAINING
    UP = TRAINING
    DOWN =
    LEFT =
    RIGHT = TRAINING.2
    WBS_ELEMENT = TRAINING.2
    PROJECT_DEFINITION = PD-TRAINING
    UP = TRAINING
    DOWN =
    LEFT = TRAINING.1
    RIGHT =
    Notes
    Further Information
    For more information, see the R/3 Library under PS Project System -> Structures -> EPS Interface
    Regards,
    Vijetha.

  • How to find Annual Budget for a WBS element ?

    Hi All ,
    Is there any way by which i can find the annual budget for a WBS element ?
    I have been working on this for a long time , but couldnt get the answer .
    So getting back to this place .
    Thanks in advance .
    Regards,
    Ambar .

    Hi,
    This link may help you.
    how to get the budget amt and commited amt and available amt?
    Regards,
    Shamma

  • Settlement to cost center posted for statistical WBS element

    We have the following scenario
    Statistical WBS elements with assigned Cost center posted for actual postings
    Network assigned to statistical WBSE and settlement rule on the same WBSE
    On settlement run CJ88  the network costs are transferred from network to Cost Center posted in the WBSE.
    Issue:
    While analysing the active availability control the assigned value is doubled. This happens only of the networks are settled. System considers the Actual values from network + Statistical value from WBSE to caculate the assigned values.
    Simulation details as under.
    SP-SET-02-3  (wbs element)
        COSS 2011 11 0007101000     0001240704 KOAO D INR                 100.00  INR
        NWA 500000002408 0010
            COSS 2011 04 0007101000     0001240704 KOAO O INR                 100.00- INR   S  -- does not contribute to assigned value
            COSP 2011 04 0007101000     0001240704 COIN D INR                 100.00  INR
            COSP 2011 01 0007101000     0001240704 KPPP D INR                 100.00  INR   M   -- does not contribute to assigned value
    Hence the assigned value gets doubled and eating up the budget.
    Anyone encountered similar issues pls share the possible solutions.

    Hi Mohit
    It is against SCN's rules to post the same discussion thread twice. You have already posted a similar question in the below thread. Please refrain from doing this and close one of the threads.
    Initial balance upload of revenue GL accounts with wbs
    Regards
    Sowmya

  • No costs visible for statistical WBS element

    Hi,
    The followin steps are the setup:
    - Project with a statistical WBS element and a network below
    - Create a PO with Account category "Fixed Asset"
    - Fill in a fixed asset, but also a (statistical) WBS element (put field 'project' optional in customizing)
    - execute a MIGO to book costs
    Now when I run the cost report for this project using transaction CJI3 then I do NOT get the costs visible on this statistical WBS element.
    HOWEVER when I do the same steps, but instead of putting a statistical WBS element I put the network (next to the fixed asset) then I do get the costs visible.
    Is this normal or do I have to change something in order to get the costs visible for my statistical WBS element?
    kindest regards
    bert

    Is this necessary?
    Because in the end I want to book these costs as actual costs on my fixed asset...

  • Auto Run Program not updating Settlement Rules for few WBS elements

    Hi,
    Addition of settlement rules for OPEX WBS.
    In producion system, two jobs are running daily for generating settlement rules of WBS elements but, all WBS elements are not updating with Settlement rules.
    It is becoming a problem in the Period end while doing the settlement. Currently we are updating the settlement rule manually.
    We have investigated and found the following WBS element with Profile name  are not updating Settlement rule.
    H-U0DU0204DE-EX-J0  - HHDC01
    H-N0U00ULD01-P1-D1-W2 - 000090
    H-U0DU0204DE-EX-U0-T1-OB - HHDC01
    H-U0DU0204DE-EX-U1-W1-ON - HHDC01
    H-U0DU0204DE-EX-U2-W1-ON - HHDC01
    H-U0DU0204DE-EX-I0-E1 - HHDC01
    H-U0DU0204DE-EX-I0-B1 -HHDC01
    H-U1DU0204DE-EX-U0-W1-ON - HHDC01
    Job Names :
    ZFPD_UK_SETTLEMENT_RULE_GEN
    ZFPD_NO_SETTLEMENT_RULE_GEN
    Please suggest on this issue
    Regards

    Hi,
    I suppose these are background jobs. Usually there is an issue with background jobs that are run for a custom developed program. Not sure why that happens. Even i faced this issue with a couple of jobs in my system. I have still not found out the reason as to why this happens. There might be a possibility that these projects were being processed in the foreground by some user and hence they were omitted from the run.
    I would suggest you to consult your technical guys on this.
    Regards,
    Gokul

  • Wrong commitments value for a wbs element

    H Experts
    I have a WBS element and entered a PO commitment with subsequent partial GR and IRs.
    But my cooitment report does not get reduced with subsequent IRs and it got updated with first IR only.
    Please suggest what would be the reason for wrong commitment report.
    Thanks
    ramSiva

    run the programs RAKNBU01and  there is a note  for incorrect committments........... 1491430     Incorrect Commitments for Service Items and
    1492317     Incorrect commitments after posting service entry sheet
    Edited by: reena ghadge on Nov 25, 2011 12:54 PM

Maybe you are looking for

  • I can't use my applications now without a subscription. Thats wrong.

    Below is a recent conversation transcript. I was trying to get a CLEAR answer as to what would happen after my 1 year "promo" subscription ran out - or if there was an avenue to simply just use the versions I downloaded. What I received was scripted

  • How to view stills as individual rather than sequences in file browser

    i have a lot of stills, which happen to be numbered, and i need to browse them for use in motion 3. the file browser is showing them as numbered sequences. how can i defeat that behavior so i can see each individual image for import? thanks, BabaG

  • [JAXM] Several call to same servlet does not work

    I have a working jaxm client, which works fine. But for test purpose I wanted to send several requests to my server using the same connection. If I do // Send the message reply = connection.call(message, endpoint); it works fine. But if I try this://

  • Interactive Analysis error when using BW BEx query as data source

    Hello, When we try to create a new report based on a BW BEx with the "Interactive Analaysis" tool in the BO 4.0 Launchpad, for all the BEx queries created under one of our multiproviders, we get the following error: The DSL Service returned an error:

  • Printing playlist cd covers---artwork prints black

    I always create playlists in itunes..... but I haven't in a few months.  I did upgrade itunes, and then went to print my playlist cd cover.... and the title/artist prints, but the area where all the artwork should be, doesn't print, it's just a big b