2 Step pick procedure for Transfer Requirement

Hi Gurus,
Can I have 2 step picking process for TR's. For our internal WH movement I wanted to have 2 step picking to optimize physical movement of material. I cant have a delivery for doing this, therefore trying to with Transfer requirement. Is this possible.
thanks
G

You can use two-step picking to pick goods fo:
- deliveries
- production / process orders
in standrad system.
That's all.
http://help.sap.com/erp2005_ehp_04/helpdata/EN/c6/f842674afa11d182b90000e829fbfe/frameset.htm
Regards,
Csaba

Similar Messages

  • User Exit / BADI for Transfer Requirement Create

    Hi All,
    I have looked into the system and i could not find any User Exit or BADI for creation of Transfer requirement. This is for manual creation through LB01 and not interface with PP or IM. I am aware of the Userexits available for those, but i could not find any for WM TR Manual creation.
    Let me know if you are aware of any.
    Thanks
    Jithin

    When you create a transfer requirement, i want to make it mandatory to enter the destination bin, for example. The Transfer Requirement should not be saved if it is not entered.
    I know we can do this by creating multiple movement types for each destination, but i want to know if there is a way where the user can enter the destination when creating a TR with a single movement type.
    Jithin

  • Is there a Step By Step download procedure for CS4??

    Wondering if there is a step by step procedure for downloading CS4 from the Adobe site??
    Yes- I have tried the following link,  http://kb2.adobe.com/cps/402/kb402065.html  
    however, what folder is best to download it too??
    It also says that both the EXE file and the 7z file must be in the same folder to operate the download.
    Which folder gets opened first after download? Where are the the above files located? Does the EXE go into the same folder as the 7z file or the other way around??
    Most of the FAQ is centered around Akamai... I have removed my anti-spy programs completely and turned off Macafee.
    The download FAQ does not address a step by step procedure. Anyone know if Adobe has one??

    Now, I have not downloaded any Adobe programs, but for the rest, I download to a special folder in my C:\Download Files for each program. I then will Extract with full folder structure to a sub-folder beneath that program's folder. I will install from there, with all AV, pop-up blockers and spy sweepers off.
    Tom's suggestion seems to be a good one for Adobe programs. though I have not use that path - remember, I am NOT downloading and installing any Adobe programs. Still, many have expressed full success with Tom's location.
    Be sure that you ARE logged-in as an Administrator. This is very important to most Adobe programs. Also, allow the installation to locate on your C:\. I do choose C:\Adobe, and not the default C:\Program Files\Adobe, but that is just the way that I manage my Adobe programs. Default is fine.
    Good luck, and do NOT forget to Extract with full folder structure for the installation.
    Hunt

  • Procedure for transfer data between clients using ALE

    Hi all ,
       I am new to this concept .
       I want to transfer the material master data from quality client (200)  to  Development Client(100) using ALE and IDOC, how to do ?
    What would be the procedure ? plz let them explain step by step of definition along with screenshot / process ....
    Regards
    Deepa.

    T.Code: BD54
    Step 1:create a logical system qaout in quality system
    Step 2:create a logical system devin in quality system
    Step 3:create a logical system qaout in development system
    Step 4:create a logical system devin in development system
    T.Code: SCC4
    Step 5:Assign qaout to 200 client in quality system
    Step 6:Assign qaout to 100 client in development system
    T.Code: SM59
    Step 7: Create R/3 type (or ABAP type in ECC)RFC destination RFCDEV in quality system
    T.Code: WE21
    Step 8: create Port with above rfc reference in quality system
    T.Code:BD64
    Step 9:Create distribution Model (use matmas message type) in quality system
    then  Environment ->Generate Partner profiles
    Then Edit ->modelview -> distribute
    T.Code: BD10
    Step 10: select the material for distribution in Quality System.

  • Procedure for transfer pic memory card to pc

    After procedure complete I just remove memory car from slot. I've noticed a message appears saying something about eject to complete but do not know what that means. So far had downloaded a few times and no problems do far, but I have heard that someone did the same and her pc crashed.
    Can someone please conform correct procedure. Will put any further downloads on hold for the time being.

    You should always eject the card (and other external storage devices) before unplugging them from your computer to help prevent corruption if the computer is writing to the devcie when you unplug it.
    To eject go to Finder and then to the device on the left hand side. Click on the up arrowhead with the line underneath to eject

  • HT1386 step four waiting for transfer to complete does not stop?  i cant get music to sync from my PC onto my i phone?

    cant sync music from my pc to the phone step 4 gets stuck

    Thanks for the help Rudegar but I still have the issue. Itunes does not recognize the phone in the Sync process. While I understand your original point that "what default behaviour one set the computer to do with usb devices connected don't have anything to do with itunes syncing". Do you know how to change the default setting so when I connect my phone via USB, I get the dialoug box to choose what action to take?

  • 2 Step Picking For Replenishment.

    Hello Experts
    We would like to implement 2 Step Picking for our replenishment process.  I have looked at the posts in this forum and have found some answers but I still do not have the whole story.
    Our scenario is this.  Within a specific storage type BKP we have some materials that we want to replenish in a single step from a secondary storage type BSC.  These would be bulky items that we would take from high storage using a forklift and move directly to primary storage.  We also have smaller items where it would make more sense to first pick and place in an interim storage area and then in a second step put them away in the primary storage area.
    I have enabled 2 step picking and created 2 movement types 850 and 851.  850 moves items from a dynamically assigned source bin in the interim storage type  (200) to the primary storage area BKP.  I have configured the replenishment to use this movement type.  The second movement type moves items from secondary BSC to the interim storage area 200 and is used to create the requirement for step 1 of the pick.  I turned on 2 Step picking for the warehouse and configured it to use 851 for the removal phase of the pick.  I also checked the box to make the 2 Step process material dependent.  In the material master warehouse management view I selected option 2 in the step-picking field for those items which are to be relevant for 2 Step picking.
    My execution process is as follows :
    1) I run LP21 to create the replenishment  requirements.
    2) I run LT41 to group the requirements.  This process correctly identifies which items are relevant for 2 Step picking and which are not.
    3) I run LT0E to create the picks for those items which are relevant for 2 Step picking.  The process correctly prompts me to to create TOs for the 2 Step items and I am able to create the TOs to move product from BSC(Secondary Storage) to 200(Interim Storage)
    4) I confirm the TOs.
    5) I run LT42 to create the TOs to put all the items whether 1 Step or 2 Step into Primary storage.
    Here's where I hit a problem.  The 2 Step items are fine.  The TOs are successfully created to move items from the Interim Storage area to BKP (the primary location)  But now SAP also tries to use the Interim Storage area as the source for the 1 Step picks instead of getting them from their original location in BSC.
    I cannot see how to get SAP to use a different movement type for the one step picks than the 2 step picks ?
    Should it be possible to use a mix of 1 Step and 2 Step picks for the same replenishment ?  If so how do you get SAP to correctly separate them ?
    Thanks in advance.

    Hi
    I hope the below clarification would make you understand the scenario in a simple way.
    In Inventory Management (MM) whatever you do, it will have its effect in WM.
    This is done thru movement type. Every movement type of MM is linked with WM.
    In inventory management the movement type is used to determine the G/L account and has some other functionalities. Likewise in WM the movement type is used to identify the Source and Destination storage types.
    When you make GR in IM, it creates the accounting document in MM and subsequently triggers a TR (Transfer requirement) in WM. If you make a transfer posting(material to material) in IM, then the TR generated in WM is called as Posting Change Notice.
    The replenishment will happen when you maintain the maximum and minimum level and the replenishment qty details in Material Master.It is nothing but it will trigger a TR specifying the a destination bin where the material level has gone low.
    Each IM movement type is linked with WM movement type with the help of Reference movement type..
    Hope this clarifies your doubt.
    Reward if useful.
    Regards
    edwin

  • About  second step picking  in Transfer orders

    Hi Guys!!!!
    Does anybody know some function or BAPI that confirm transfer orders with second step picking ? i found one that maybe could works fine "L_TO_CONFIRM_SU" .
    I  promise to Reward.
    Regard...

    Hi Aktar,
    I am looking to implement the 2 step picking process for my Production line. My warehouse is in a different building and i want to stage the materials/components for the production orders of the day in the morning.
    I have activated the 2 step picking for the warehouse and also changed the material movement 850 to have a destination storage type as 200. But i am unable to complete the process.
    Do you have a step by step guide which could help me do this?
    Your help shall be appreciated.
    thanks and regards
    Vikram

  • Warehouse Managment (Two-Step Picking)

    Hi,
    This is with reference to Two-Step picking procedure, which is not getting activated. Though we have done all customization required for TR and Delivery’s as well, as referred in the documentation provided by the SAP. The settings done are as follows.
    01)     Activation of Two-Step picking at WM Global level.
    02)     Transfer Requirement control
    03)     Transfer type control
    04)     In article master, relevant for two step picking.
    05)     At Storage type search level.
    Now when try to initiate the process with transaction LT41 putting shipment type i.e. A (Stock Removal) system displays a message “No data available for the specified criteria” or if thru LT0E, system asks for a group in WM.
    But when we go and try to create the single TO thru Delivery using t_code (LT03) system displays an information message, i.e. Two step picking relevancy will be lost.
    Regards,
    Aquil Husain

    Hi Aquil
    Have you set up Group processing for TR and Deliveries?
    In order to manage 2-step picking you have to work with groups / collective picking
    http://help.sap.com/saphelp_erp2005vp/helpdata/en/c6/f85c504afa11d182b90000e829fbfe/frameset.htm
    http://help.sap.com/saphelp_erp2005vp/helpdata/en/c6/f85c504afa11d182b90000e829fbfe/frameset.htm
    Have a look at the help to review the process
    Regards
    Steve

  • Combining Transfer requirements into a Single transfer order

    Hello all,
    Is there any SAP functionality that allows to combine Transfer requirements of various materials into a sinlge Transfer order with various transfer requirements as line items in the transfer order. Pl. reply at the earliest,as this information is much needed.
    Thanks,
    Maxx

    I solved this requirement using wave pick. The steps are explained below:
    Wave Pick:
    1.     LP21 – Replenishment planning for fixed bins – Enter the requirement type as P – Production supply and also enter the requirement number
    2.     This helps to combine the Transfer requirements with the same requirement type and requirement number into a single Transfer order. This can be achieved by enabling the wave pick strategy.
    3.     Wave pick is useful for generating group of deliveries by having time as the basic criteria. Hence while executing LP21- replenishment for fixed bins enter the planned date and time under the section “additional info for transfer requirement”
    4.     Finally, by creating a wave pick with the timeslots, we would be able to group the transfer requirements in to a single transfer order
    5.     We can monitor the wave picks and their status using wave pick monitor.
    Reward points if helpful.
    Regards,
    Maxx

  • ABAP Guidelines for transfer rules & Update rules

    Is there any guidelines for abap when using it for transfer rules and update rules? I am looking for some best practise in this area.
    Thank you,

    There is no specific differences in the standards/coding procedure for Transfer Vs. Update Rulse.
    This can only come from a combination of requirement, design and experience! (in no particular order)
    for e.g.
    If the converions are the same for all data targets, you would use the transfer routine, start routine in the Transfer rules.
    If the converions are different for different data targets, you would use the update routine, start routine in the Update rules.
    Key concerns being performance, modularization, reduced effort and ease of maintenance.
    Not sure I have answered you question! Please get back if there is something specific you are interesed in (a scenario perhaps!)
    Rishi

  • Transfer Requirement (LB01)   ERROR

    Dear All,
    When I am creating TR ,at the time of saving its giving an error
    "Maintain number range interval "" for transfer requirment"
    Can anybody tell me how to define it in SPRO.
    Thanks in Advance
    Shuva

    Dear Ramesh,
    I have maintained it but still same error is coming ,should I put in the initial screen.
    If so then what  will be the type.  there are many  option eg.  "D" "F"  etc.
    then the number field.
    What shoud I do?
    Thanks in advance
    Shuva

  • 2 Step Picking in SU Managed Whse

    Hi,
    We are implementing SAP WM solution for AFS industry..
    Currently we are planning to activate SU management in thw warehouse and I have questions related to 2 step picking (for out bound deliveries) in SU managed warehouse
    Scenario is:
    We would like to group multiple deliveries and have one combined pick list to minimise the travel time to bn locations multiple times. Since it wil be a SU pallet, we might even bring a whole pallet to pick the necessary qty and return the remaining qty.
    Here are questions:
    Do we need to implement 2 step picking for this scenario? If so.., then intermediate storage type is 200 (in which you can't activate the SU management) If I bbring the SU pallet into 200, will the SU be lost??
    Can we use the Pick Point Storage type to simulate 2 step picking? In this case how can I group multiple deliveries into one group (with combined pick list)
    Please advise

    Hi Aktar,
    I am looking to implement the 2 step picking process for my Production line. My warehouse is in a different building and i want to stage the materials/components for the production orders of the day in the morning.
    I have activated the 2 step picking for the warehouse and also changed the material movement 850 to have a destination storage type as 200. But i am unable to complete the process.
    Do you have a step by step guide which could help me do this?
    Your help shall be appreciated.
    thanks and regards
    Vikram

  • Procedure for Clearing Open Transfer Requirements & Posting Changes

    Dear All,
    With my present SAP System, both IM & WM Stocks are zero for a given Sales Order / Line item. But there are pending Transfer requirements & Posting changes due to the fact that the users have not completed up until the TO Confirmation Stage. Now that the stocks are in harmony in both IM & WM, what do we do to the open transfer requirements and posting changes. What is the best practice procedure for the above scenario.
    Appreciate an advice for the above scenario
    Thanks
    Shabeen Buhary

    Hello,
    Write a program which will call transaction LB02 for TR & LU02 for Posting change notice (PCN).This program will make status of these TR & PCN complete.
    I already used the same.
    Regards
    Prashant

  • Update Transfer requirement for partially picked Transfer Order

    Hi,
    I am looking for a functionality to update a transfer requirement for a partial picking.
    For example, we have a TR for quantity 100 pieces and we have 80 pieces in stock, so we create a TO for 80 pieces and the remaining quantity on TR would be 20. Now we dont want to pick for the rest of the 20 pieces, instead we want the TR to be updated for  the quantity which will be picked i.e 80 Pieces.
    Also, is it possible to put some kind of a rule which govern that the TR should be updated only if we are picking for atleast 80% of the quantity originally mentioned in the TR.
    Thanks in advance,
    Mike

    Hi Frenchy,
    Thanks for the answer. I have one more question.
    Is it possible to automate it based on a movement type, so that every time we create a Transfer Order for this movement type the relevant TR will be automatically marked for 'final delivery'. This would help us, because then we would not have to go to WAM everytime to mark it as complete.
    Or some kind of configuration that will dictate that only one Transfer order will be allowed for a Transfer Requirement and the TR will be set to complete as soon as the TO is confirmed.
    Thanks,
    Mike

Maybe you are looking for