311 mvt should not genearte Inspection lot in production

Hi,
I have strange issue in QM:
In quality When I am doing stock transfer with mvt 311, no Insp lots are getting generated, where as in Production When I am doing stock transfer with mvt 311, Insp lots are getting generated.
I have checked Settings for MVT 311 ( Deactivate QM), Here in Quality as well as in Production for Mvt 311, QM deactivated check box is unchecked.
I donu2019t know why inspection lots are getting generated in Production.
Can you please help me in this regards.
Thanks
Utsav

hi dear
first of all against 311 it is the standard seeting, that when ever u go for a stcok transfer against this mvt type. inspection lot genrated with 08 type.
in your dev server, if u checked in Quality Management--> Quality inspection-> Goods movement node--> Activate /Deactivate quality lot node and check for 311 mvt type, than u will find the Quality Not Active indicator . it is sure that particular that indicator in set. while on PRD it may not be there that's why u have a lot against ur posting.
If that indicator is not set than lot will be their otherwise no lot. secondly if u activate 08 in your material master than during stcok transfer definitely a lot is there.
so check it properly.
regards

Similar Messages

  • In QA16 i given material doc no ,i am not getting inspection lots for UD

    iam using QA16 for quality inspection .
    Iam given material doc no in QA16,but iam not getting inspection lots for UD(usage decession).its comming empty screen in QA16.
    iam using multiple UD at a time.

    Dear check this below points.
    1. Check if Material Master Auto usage decision has been checked.
    2.All characteristics should be optional if not make all the char as "Optional " through control indicator This can be done for next lots only.
    3.All chracteristics must be calculated and status should be 5 completed and no defect recording done.
    4. Check mic indicator activated in material master and you have to do RR for this inspection lot or u can force fully complete all MICs and male IL status INSP and check again in QA16
    5.Did you selected releavant UD selected set for inspection lot in QA16.
    Cheers
    KK

  • Inspection lot with Production Order

    Hi friends,
    I am PP consultant and need some help in setting up a scanario of Production order with inspection lot.
    I need to setup a scenario where a inpspection lot is created from production order manually (not at the time of release). The purpose is to post few quantity of production order to scrap storage location. Inspection lot needs to be created only in certain production orders where some of the quantity has to be declared as scrap and that needs to be rejected with usage decision.
    can any one please suggest the overview of such scenario.
    Regards,
    Rohit

    Dear Rohit,
    You want to create a manual inspection lot only for the purpose of Scrapping and also want it to be done with Usage Decision.
    You can not use inspection type 89, as it is not stock relevant (Inspection type for Miscellaneous inspection),
    There is one another solution with inspection type 08( inspection for Material Movement), but it might look Lengthy.
    1. Release a Production order. say 100 qty.
    2. If during process, 10 is scrap, then perform Partial Confirmation of 10 Qty.;  Stock will be in Unrestricted.
    3. Now, through MB1B, transfer 10 qty from Unrestricted to QI.
    4. As you have inspection type 08 active, System will create an Inspection lot for 10 Qty.
    5. You can post this whole 10 qty to Scrap while giving Usage Decision.
    I think, in your process, Scrapping is not done frequently, that is why you do not want inspection lot at every production order.
    in that case this solution may solve your problem.
    regards,
    Amol
    Edited by: Amolbook on Jan 12, 2012 3:13 PM

  • Inspection type 04 should not generate Insp.lot for specific Process orders

    Hi Guyes,
    I Want to skip the Inspection lots generation for specific process orders of a particular material during Goods Reciept and stock should be directly posting in to Un-restricted stock.
    In the material master assigned with Inspection type 04.
    Please advise me the possible options to map this scenario.
    regads,
    Rao

    In  QDR1
    stage 10-click on insp stage
    stage 10
    no. of insp : 5
    new insp stage : 20
    rej : 1
    new insp stage : 10
    stage 20 - tick on skip
    stage 20
    no. of skip : say "5"
    new insp stage : 10
    rej : 1
    new insp stage : 10
    Now use this DMR in Header of inspection plan of material of process order.
    what this will do is after 5 inspections it will skip the next 5 inspection lots.
    Make sure :
    You can maintain setting for "maximum skip duration in plant level.
    In QM view click on Skip & auto UD
    Create variant in QA16 & run through QA17
    Here in QA17 maintain the duration after which you want to take UD
    Also make sure that in selected set maintain stock posting proposal for unrestricted.

  • Not created inspection lot

    hi,
    please give me idea. i given inspection type oi  and activated in material master. then i done migo for external procurement against po. when i checked in mmbe stock shows in quality stock. but in qa 32 i am not getting any inspection lot. please explain and give me idea.
    bhakta

    Yes, I think that Prasobh opinion can also be valid.
    Take this into account:
    a) if the material master QM view has some error or lacking of the inspection type you are interested into or "Active" flag not checked, then the inspection lot is not created.
    b) if all the previous stuff is OK, the inspection lot is created but still we have to find a valid inspection plan to assign the characteristics and sample size. In this case, the status of the lot is different and you were not able to find it in QE51 transaction.

  • Inspection lot for production order lot and not for single pieces

    Dear all,
    I have a production order , for example, for 12 pieces / serial number . Material is produced in lot , in this case 3 lot of 4 pieces.
    Pieces in a lot are linked toghether in a grap.
    Production order create an inspection lot where I can store quality data for every pieces / serial number.
    I need to store quality data at lot level ( for example the grap weight );
    Is it possible ?
    Regards

    Can you not create Char/MIC like weight & attach the task list to the inspection lot?

  • Inspection Lot on Production Orders using HU

    Hi Experts:
    I'm trying to notify using production orders some HU. I was reading the help.sap.com and it says:
    1. An inspection lot is never created, if the indicator Inspection for HU is not set in the Inspection setup of the material master (Quality Management view) for storage locations requiring HUs.
    2. In general, it is not possible to create the inspection lot at goods receipt in storage locations requiring HUs.
    That's confuse me.
    In the system I have the following information:
    a. Create my order and release.
    b. My material have inspection 04. I marked the indicator Inspection for HU on Quality Management view.
    c. I used Tx COP1 to create my HU
    d. I notify my production using COWBHUWE
    If I checked my MMBE the quantity is on Quality Status. But I don't have my inspection Lot.
    I create my Inspection plan with indicator 5.
    Someboday can tell me why the inspection lot isn't create?
    I checked the configuration:
    In Customizing for Handling Unit Management (Inventory Management), the respective movement type is not deactivated for quality inspections. The indicator QM not active is not set.
    In the (respective) material master record, the corresponding inspection type is created and activated for the respective goods movement, and the indicator Inspection for HU must be set.
    Thxks

    Sorry firefighter I'm going to explain more in detail.
    1. I tested my integration process QM-PP-HU on a Storage Location without HU.
    The results were:
    a. Hu created
    b. Inspection Lot Created
    But when I did the DE the units from the HU were moved, but the HU still in Q status.
    So I changed my test.
    2. I tested my integration process QM-PP-HU on a Storage Location with HU
    The results were:
    a. Hu created
    b. Inspection Lot Not Created
    In this case, I marked on Material Master the HU Indicador on 04 Class (Quality Management View)
    That's my problem.
    Addittional I tested a MM-HU process using 01 Inspection Class.
    1. I create a Purchase Order Me21N to a Storage Location with HU
    2. I create the Delivery using HU
    3. The system create the Inspection Lot and made the DE (reference to the HU)
    My problem is stilling the PP-QM-Hu on Storage Location with HU

  • MFPR - Processing Inspection Lots for Production versions issue

    Hello,
    User are not able to seeing line item to create inspection lot for a specific part number.
    I checked inspection set up in  material master, rate routing, and compared with similar part numbers.It all looks good to me.
    Any help would be greatly appreciated!!
    Regards,
    Owais

    In REM Inspection lot for Inprocess is generated for header material for which you actually define "production version".
    Line items can not be seen in MFPR.

  • Not creating inspection lot for STO

    Hi ,
    I have two plants X(Supplying) and Y (Receiving).
    In material master in quality 01 and 08 (inspection type) for plant Y active.
    Process as folllow:
    1)STO with U (acc assignment) created.
    2)VL10B ,created delivery.
    3)Vl02n PGI
    4)Migo GR for STO did in plant Y.
    but stock is not going in quality instead of this it is going in unrestricated.
    Guys please throw some light ,why system is behaving like this.
    Regards
    Sowmya

    Hi,
    In your STO purchase order in Delivery tab check if  stock type is " X Quality Inspection"
    Check in Material master updated inspection types 01 and 08 are checked as active
    In material master quality view Post to inspection stock check box is active
    Thanks
    Diwakar

  • Inspection lot should be created only for particular vendor

    Hi
    Can anyone please help in achieving the below scenario:
    *Material  has been assigned to the inspection type A (one time inspection) has been set as preffered and active  in the inspection set up in the material master.
    *Quality level has been created for material and vendor  such that inspection should be carried out when next stage is 1 and no inspection should carried out when next stage is 2.
    *Tasklist   has been assigned with material and vendor .
    Material can be supplied by different vendors,For this material,  inspection should be done only for one vendor  and for other vendors there should  not be any inspection to be done and no inspection lot should be created.i.e Inspection lot should be created only for one vendor say AA whereas now inspection lot is getting created when  goods receipt is done for the purchase order  with other vendor BB.
    My requirement is  the inspection lot should not be created when goods receipt is done with other vendors say BB  except AA.
    Is there any other way other than using quality info record to achieve this.
    I can try with DMR  but the thing is there should not be inspection lot created  while posting GR.
    can anyone suggest me any other way to achieve this requirement.

    There are user exits when you create an inspection lot.  One of those could be used to suppress the inspection lot.  Have you looked at these?  Have you researched any QM user exits yourself yet?  This isn't the first time this specific question has been asked over the years.
    It's not hard and there are lists of QM user exits available all over the internet.
    Please do some research.
    You can also assign vendors to inspection plans with a DMR that requires one inspection, and than after that creates all skip lot inspections which you automatically close by a batch job.  The first lot can be manually forced closed.  Thereaftter all receipts would be skipped.  Not 100% but pretty darn close.  This requires that you know which vendors to assign to which plan.  Probably as much data maintenance as maintaing the Q-info records.
    And yes.. your client needs to come up with better reasons than "I don't wanna..".  It's part of a consultants job to convince them.
    Craig

  • Inspection lot for stock transfer

    Hello All,
    My requirement is that when i will do movement 301 from plant A to B then system should create inpsection lot. System should not create inspection lot instead of 301 mov type. If i assigned inpsection type 08 in material master it will create lot for each stock transfer posting. My requirement is that system should create lot for mov type 301 when i transfer from plat A to B.
    Also it should not create lot if I transfer stock from A plant to C.
    Please guide me on this issue.
    Regards,
    Mayura

    should create lot for mov type 301 when i transfer from plat A to B.
    Also it should not create lot if I transfer stock from A plant to C.
    Well If you do not maintain 08 inspection type in plant C for that material it will not create lot in plant C.whereas in plant B if you maintain it will create.
    Apart from this there is one more way
    Copy 301 in OMJJ say Z31. Now for this inactive QM in customization.Whenever you do 301 from A to B it will create lot.
    but when you do A to C with mvt type Z31 it will not create inspection lot.
    I hope this makes sense

  • User exit for deactivating inspection lot

    Hi expert,
    I have two plants X and Y,in plant Y for material inspection type 08 is activated.
    While doing stock transfer of any kind like storage lo to storage loc (MOV type311) and plant to plant (mov type301) and plant to plant throgh delivery Sd route(Mov type 101) system is genrating inspection lot.
    My requirement is I want that system should genrate inspection lot with inspection type 08 for mov type 101 only.
    And for others like 301 and 311 it should not genrate any lot.
    I dont want to deactivate those mov type for QM in spro as it will block it at client level.
    this functionality i want it for only at one plant.
    Any user exit is there by which we can activate?
    Thanks in advance
    Regards
    Vilas

    Dear,
    QM can control the inspection type and activation at plant level only through the material master. And movement type at plant level. So there is no solution for this in standard SAP.
    But you can do this with  User Exit QAAT0001
    Or second option is you need to define the Z movement type by coping the 301 and 311 and then You can activate and deactivate QM in QCCO > Quality inspection > Inspection lot creation > inspection for goods movement.
    Use these new Z movement with inspection type 08 so you can control over the lot creation.
    Hope clear to you.

  • Inspection lot creation

    Dear Experts,
    Reqiurement as follow :
    We have four plant like 1000,1001,1002,1003,1004
    System creates inspection lot when we do GRN against in stock transfer PO when STO from
    1000 to 1004, 1001 to 1004, 1002 to 1004, 1003 to 1004, as we have activated inspection type 08,01 in MMR.
    My requirement is system should not create inspection lot when STO from 1003 to 1004 only.
    We can not deactivate inspection type as we need inspection lot when STO from other plant.
    Please help in this scenario.

    In QM, we can deactivate the quality for certain movement type.That means though QM is active in material master, if we are using any movement type for which QM is not active, it will not generate the inspection lot. For STO from plant 1003 to 1004, use the movement other 101 i.e copy of 101.
    Copy 101 movement say as 901.Using following path deactivate QM for this new movement type 901.
    SPRO - QM - Q. Insp - Insp lot creation - Insp for goods movement - Deactivate insp for movement type. Select the indicator "QM not active".
    Now use movement type 901 for STO from plant 1003 to 1004.
    Vishal Jonnalwar

  • Issue in inspection lot creation

    Hi All,
    We have to map the following scenario and we are finding it difficult to MAP this in Standatrd SAP
    The scenario is as follows,
    We have distribution center defined as plant where we purchase materials from our manufacturing plant or other vendors. We have activated quality management with inspection Type u201801u2019 (GR from purchase order) for some materials. Due to capacity constraints at our manufacturing plant sometimes we are not able to fulfill our customer demands. So, we purchase this material from our other vendors. We use drop shipment process for this.  We ask our vendors to supply the materials to our customers directly. We create a third party sales order and for that sales order,  purchase order having item category u2018Su2019 (Third party) and account assignment u2018Xu2019 () is created.
    Vendor directly supplies the material to our customer but we have to make logical GR for this purchase order. When we make GR for this drop shipped PO (item category S) system creates inspection lot as quality is activated for this material. As we donu2019t receive any material to inspect  (item category S) system should not create inspection lot for this type of purchase order.
    We receive a large number of POs everyday and it is very hectic for us to make GR for this inspection lot.
    However, we need inspection lot should be created when we receive the material from our manufacturing plant or any other vendor which donu2019t have drop shipped purchase order(account assignment X and item category S).
    We have tried with deactivating quality inspection for movement type 01 and consumption indicator u2018Vu2019 but it affects inspection type 0130.
    Can you please look into this issue and advice.
    Thanks
    Sanket

    Hello,
    Incase if you want to perform Quality inspection then do the following
    set the Inspection type for the Material as 89
    Create manual inspection lot maintain relevant Master data in the inspection plan keep usage as 9 and status as 4
    and sampling Procedure  and finish your testing
    Come back if you have any doubts
    JayaVimal

  • Inspection for HU: inspection lot not created upon packing

    Hi All,
    I want to inspect a material by Handling Unit, I have set "Inspection for HU" within the Inspection Setup of the material master. I created PO and inbound delivery, in the inbound delivery I did packing, but inspection lot is not created after packing. When I go on with MIGO, system throws error message "Change the inspection stock of material in QM only", according to this message, there should be an inspection lot already created, but I cannot find it in QA32.
    Regards
    Danny

    Hi,
    There are two prerequisition:
    1) Check configuration setting : SPRO --> Logistics - General --> Handling Unit Management --> Basics --> Technical Basics--> Materials Management--> Inventory Management --> Set QM Check and Delivery Type for Each Movement Type. the respective movement type is not deactivated for quality inspections. The indicator QM not active is not set.
    2) In material master, Handling unit should be active for inspection type.

Maybe you are looking for

  • How do I find and remove specific text in a PDF document?

    hi. sorry for my english (i am from russia)) there is the problem - how do i find specific text in a document (in my case, it - all numbers (0-9)) and delete it, using javascript?? And I would like to know also - is the a search function with regular

  • Reading using UTF-8 coding

    hi I am trying to read an Arabic text from textfile and copy it to another file, using UTF-8 coding, I saved the file in UTF-8 conding , but I get a result with strange charachters. this is the code * @Program that returns a Unicode string. * ReadUTF

  • I tunes, cloud, match help

    I recently purchased a new MacBook Pro. I have used I tunes match before quit successfully, However, I have unsuccessfully tried to get music on the new computer. The icon for "matched" shows up but I can not download any of the music. I have searche

  • Cost of Using WLAN with X6

    I'm still the delighted owner of an X6! In the first month of using my device I've used the internet via my own wlan and a nearby access point (BTFon) so that when I go on holiday I'll know how to check emails etc at no cost to me. I've just got my O

  • InDesign document setup dialog

    Hi All, In Indesign we have a document setup dialog ( you can found this under File > Document Setup ) In this dailog we have Ok/Cancel button and other fields. Now I want to  know how I could get a call in my plugin when user click Ok button. Should