3500 Operational Status = Downloading

Hi, I got a WLC and I log to the Web Interface, when trying to setup the AP I see there is a kind of status that reads: Operational Status: Downloading, what's supposed to be downloaded.
Thanks

When a new WAP is plugged to the network, it searches for the WLC.  Once the WAP finds the WLC it will synchronize with the WLC.  One of the things it will synchronize is whether or not the WAP is running the correct IOS.  If not, the WLC will "push" the correct IOS to the 3500.
This is what you are seeing.  Depending on your WLC and the firmware you are running, this will take around 5 minutes before the WAP will reboot and operate the new IOS.
Hope this helps.

Similar Messages

  • AP Operational Status "Downloading"

    I have 2 AIR-AP1232AG-A-K9, and their operational status show as "Downloading". They are not connected to the network anymore. How can I remove these two APs from the WLC (5508, Software Version 7.0.98.0) so that they no longer appear in the controller?
    Thanks
    Ercan

    Hi Ercan,
    I have seen this issue once.. not sure if you have tried to upgrade the WLC software and after that we are facing this issue.. when we are using 1231 converted APs, then there is chance of APs losing the SSC.. the SSC gets corrupted while upgrade..  i saw this issue on one of the customer scenarios.. so we converted the 1231 AP to autonomous and then reconverted the AP to LWAPP and it joined without any issues.. (WLC used in my case was 4404)
    Regards
    Surendra

  • How to change operational status of a WLC-connected AP?

    Hello everybody.
    I'm noticing two of my 30+ APs having the 802.11a radio with "Operational Status = DOWN". The Admin Status is ENABLED, but I don't know where to act to put the op. stat. UP!
    WLC is running 7.5.102.0, as well as the APs. The affected ones are 3502 models.
    Any help will be much appreciated.
    Thanks and regards,
    Flavio.

    Hello Sandeep.
    (Cisco Controller) >show sysinfo
    Manufacturer's Name.............................. Cisco Systems Inc.
    Product Name..................................... Cisco Controller
    Product Version.................................. 7.5.102.0
    Bootloader Version............................... 1.0.16
    Field Recovery Image Version..................... 7.0.112.21
    Firmware Version................................. FPGA 1.7, Env 1.8, USB console                                               2.2
    Build Type....................................... DATA + WPS
    System Name...................................... VXWLC1
    System Location.................................. Ibach, Serverraum 2
    System Contact...................................
    System ObjectID.................................. 1.3.6.1.4.1.9.1.1069
    Redundancy Mode.................................. Disabled
    IP Address....................................... 172.30.0.100
    Last Reset....................................... Software reset
    System Up Time................................... 36 days 21 hrs 46 mins 1 secs
    System Timezone Location......................... (GMT +1:00) Amsterdam, Berlin,                                               Rome, Vienna
    System Stats Realtime Interval................... 5
    System Stats Normal Interval..................... 180
    Configured Country............................... Multiple Countries:CH,US
    Operating Environment............................ Commercial (0 to 40 C)
    --More-- or (q)uit
    Internal Temp Alarm Limits....................... 0 to 65 C
    Internal Temperature............................. +44 C
    External Temperature............................. +24 C
    Fan Status....................................... OK
    State of 802.11b Network......................... Enabled
    State of 802.11a Network......................... Enabled
    Number of WLANs.................................. 9
    Number of Active Clients......................... 144
    Burned-in MAC Address............................ 50:3D:E5:AE:92:A0
    Power Supply 1................................... Present, OK
    Power Supply 2................................... Present, OK
    Maximum number of APs supported.................. 37
    ap52#sh inv
    NAME: "AP3500", DESCR: "Cisco Aironet 3500 Series (IEEE 802.11n) Access Point"
    PID: AIR-CAP3502I-E-K9 , VID: V01, SN: FCZ1553W027

  • MRS (Multi Resource Scheduling) - Show operation status in Planning Board

    Because the current MRS thread is some long and complicated I chose to move this question into a seperate thread:
    Initial question:
    Like many companies, it is not unusual at my customer for their Planners to create orders with multiple operations, particularly since many orders require different crafts to perform the work. When the Planning Board is launched and Planners lok at work scheduled for the past week they want to be able to see at a glance which operations have been completed and which operations, perhaps from the same order, have not and may need to be rescheduled. Their preference is to select "final confirmation" when using transaction IW41 and thereby set the operation system status to CNF when the work on an operation has been completed. They then want to somehow use this CNF operation status to drive something visual in the graphical Demand layout display and Resource layout display to enable the Planner to see at a glance that the operation has been completed. I've tried several approaches with configuration of abstract statuses and the user interface profile without success. My customer's interest in being able to see the completion status of an operation in the MRS Planning Board makes a lot of sense to me. I'm hoping someone can help me with a technique for modifying the Planning Board so that it displays the completion status of an operation in a visual way.
    Response from Varun Verma:
    Hi Mark,
    The problem at your customers end is nothing new.
    What you can do ( many other customers have done it in similar way ) is:
    1) you integrate the status CNF into MRS.
    Check the customizing: Basic Settings -> Assign ERP Objects -> Status
    2) configure in MRS that for status CNF, the assignments and demands (only in item work list or Hotlist) is colored to GREEN (or any other color)
    Check customizing: Set Up Scheduler Workplace -> Workplace Profiles -> Define User Interface Profiles
    Thus the users will know visually, that the green colored assignments are already completed.
    By the way, in your work list you can also filter the demands based on their status
    Regards
    Varun.
    Followup question:
    Varun,
    Thanks for the response.  I thought I had tried this but perhaps it's because in the UI profile I had not entered something in both the status groups for assignments and the status groups for demands.  I have a bit more testing to do but it appears that the demand status now gets updated from the operation status of PCNF (linked to abstract status WORK_START) and CNF (linked to abstract status WORK_STOP).  I also get a red bar (C4) for PCNF and a green bar (C1) for CNF.  Do you have a better status group I should be using in place of C1 and C4?  Status groups C1 and C4 give me a bar but it doesn't look like the demand bar with a outline and alphanumeric description of the demand, it's just a colored bar.
    I know the work list can be filtered based on their MRS "planning" status, however, it doesn't appear to permit filtering by the status of the operation unless I add the operation status as an additional field in the worklist.  Is there something I'm missing here?  And even if it did, my customer wants to be able to see the CNF status indication in the Demand layout and schedule using the work centers so the worklist is not being shown like it is in the Resource layout.
    Mark
    Edited by: Mark Scott on Aug 10, 2009 3:35 PM

    Hi Mark,
    Well I assumed that you have confirmations integration active !! But I guess not because you say that the status is not integrated always.
    What you need to do:
    1) I assume you have SP05 or later.
    2) Implement the user exit: CONFPM05. In the implementation of this exit you need to call FM: /MRSS/RSG_PM_ORDER_CONFIRM
    3) Go to customizing: Basic Settings --> Assign ERP Objects --> Status
      -- Here, define an abstract status (MRS Status) for confirmed and partially confirmed
      -- map it to R3 status CNF and PCNF.
    After this, whenever you enter confirmation for PM order from transaction IW41, the status will be integrated.
    Now you can use the MRS statuses defined in step 3 to configure the colors.
    Implementing the user exit CONFPM05 might require some technical input. But it is easy. Just a few double clicks and copy paste.
    Contact an ABAP developer for the same.
    This should solve your issue.
    Regards
    Varun

  • Difference between AP Operational Status and Registered Controller

    When reviewing the AP Details page in Prime there are two fields I'm not sure what they mean specifically:
    1) Operational Status - Registered
    2) Registered Controller - Not Associated
    Any clarity or document references would be greatly appreciated.           

    This is in CPI viewing the AP Details tab.
    The only valid values for Operational Status are Registered/Not Registered.
    The only valid values for Registered Controller are Associated/Not Associated
    The IP address is not a valid input.
    It is still unclear to me what the specific and fuctional differences and impacts are between Operational Status and
    Registered Controller? How do the values of each impact the client device?
    Thank You.

  • Operation status 'Fixed' in Production order

    Hello all,
    We are facing an issue with Operation Status 'Fixed'. If we go to transaction /sapapo/rrp3 and double click on Production Order (R).  Then clcik on Operation , say 0100, at right side you will see multiple Operation status. One of them is 'Fixed'. We can make this indicator active ny fixing the order in planning board (right click=> Fix).
    Here we are facing an issue. We are not fixing any order through planning board and still I see Operation status 'Fixed'. Even I unfix it, next day it gets fixed automatically. I suspect that either any job in APO or R/3 do this activity. Please note that in this case 'Date_Fixed' indicator is not checked. Like when you fix the order from planning baord, system check the checkbox for 'Date_Fixed" and for operation status 'Fixed'. In our case only Operation status becomes 'Fixed.
    Please let me know what are the different ways to fix the operation status.
    Regards,
    Nitin

    Thanks for the reply.
    As you mentioned, if the operation is scheduled at non-working hours then it gets fixed. I checked with the user and they confimred that they are not using the non production hour while rescheduling the order. It means they are not using the check box of non-working hour from DS startegy or Heuristic.
    Please let me know what are the different possibilities which can schedule the operation in non-working hours.

  • 3750 Integrated WirelessLAN Controller: Operational Status:resetting

    Hi there!
    A customer has a WS-C3750G-24WS-S50 WLC-Controller with exactly 50 APs. But those 50 Accesspoints are never completely registered to the WLC. Mostly there are 48-49 accesspoints registered but never 50.
    The WLC is losing them randomly. It is never losing the same Ap. When looking via GUI it says "All APs 50" , "Total 49".
    First of all I thought that I have the following problem:
    The 4402-50 controller supports a maximum of 50 access points and has two ports. To support the maximum number of access points, you would need to create two AP-manager interfaces (see Figure 3-15) because a 4400 series controller can support only 48 access points on one port.
    But this is not for the 3750  Integrated WirelessLAN Controller, because you have LAG enabled by default and you cannot change this. Therfore you are not able to create a second AP-Manager interface.
    So let´s forget about this.
    Then I tried some things on CLI an I noticed the following:
    sw-mr-01-01#sh platform wireless-controller 6
    Wireless Controller in Switch 6
    Operational Status of the Controller : resetting
    Service VLAN                         : 4095
    Service Port Mac Address             : 0025.8420.8e8f
    Service IP Address                   : 127.0.1.6
    Management IP Address                : 192.168.150.220
    Management VLAN                      : 0
    Software Version                     : 5.2.193.0
    Keepalive Version(controller/switch) : 1/1
    Keepalives Missed                    : 16
    Controller accepts http/https        : 0/1
    Controller's Status Line             : up
    Watchdog resets of Controller        : 1
    Controller resets total              : 0
    Unacknowledged control messages      : 27
    I guess it is not normal that the status is "resetting" although the WLC is running. I can work on GUI and CLI, so it is not really "resetting"
    According to the Config Guide status should be "operational".
    Is this maybe my problem? The customer is not able to do a good WIPT because the WLC is maybe resetting somehow internaly or something like this.
    In traps I got every minute "Lost heartbeat with supervisor" which normaly should be solved in earlier releases. I have 6.0.199.4
    HELP!!!
    Thanks in advance.

    Ok.
    1) Assing an IP address for a subnet you are sure you don´t use. for example 192.168.200.5 /24; GW 192.168.200.1 (via WLC GUI).
    2) I suppose (because I have not configured any 3750 WLC) that the service port uses the vlan ID 4095 (This is I saw in any capture). then you have to create a int vlan 4095 in the Switch and assing the GW ip address of your WLC service-port.
    3) Ping to verify conectivity between devices.
    I´m suppose you have the service port via DHCP (it could be the reason you have an IP 0.0.0.0), this is not a best practice; Cisco recommends that assing an IP to this interface and never let to DHCP, specially if you don´t have any dhcp server in this VLAN.
    Good Luck and sorry for my english.
    Best Regards.

  • Operational Status Unknown on Cisco WiSM

    Hello,
    I have a pair of WiSM 2's managing our wireless AP's but i have a couple of access points that show their operational status as unknown on one controller but are happily working away on the other at the same time. Some settings are missing eg IOS ver and Regulatory Domains when viewing the info on this controller for that particular AP almost as if it failed during its initial setup?.
    How can i remove it from the database on this controller?
    Thanks,
    Mat

    A bit of further info, i've tried to force the ap to associate with the controller where its already in an unknown state and seen this
    Discovery phase statistics
    - Discovery requests received.............................. 132
    - Successful discovery responses sent...................... 0
    - Unsuccessful discovery request processing................ 132
    - Reason for last unsuccessful discovery attempt........... Discarding LWAPP Discovery Request from AP Since entry exists in CAPWAP
    - Time at last successful discovery attempt................ Not applicable
    - Time at last unsuccessful discovery attempt.............. Feb 08 12:20:00.935

  • DPS DSCC doesn't show operational status

    I have DPS 6.3.1 running against 4 6.3.1 directory server instances. On the data sources page of DSCC, the 'operational status' column shows 'Could Not Retrieve Status' for all 4 instances. I've tried upping the log level on the DPS server to see if I could figure out what is causing this. Does anyone know how DPS (or DSCC) goes about figuring out what should be in that column?
    Thanks

    We don't have a single dscc for all instances. This is because of a strict 3 tier network architecture we are required to have (to the point that tier 1 dps is not allowed to talk directly to tier 3 ds so we have a tier 2 dps pass-thru). So are you saying that dscc in our tier 2 dps environment has to be able to talk to cacaoadm in tier 3 to show operational status of the ds on the dps screens? I was definitely under the impression that the monitoring as configured in dscc, has the dps instances monitoring the ds instances and the dps instances would let dscc know the status. To me, I don't care if dscc in tier 2 knows that the tier 3 ds instances are up, I want to know that the dps servers can talk to ds.

  • I ordered the download of Photoshop 13. It's giving me 2 options. 32-bit or 64- bit operating system download. Which do I choose?

    I ordered the download of Photoshop 13. It's giving me 2 options. 32-bit or 64- bit operating system download. Which do I choose?

    The one that is the same as your operating system.
    See #2:
    32-bit and 64-bit Windows: frequently asked questions - Windows Help

  • Inconsistency of order header and operation status

    Hi guru.
    I did final confirmation of the production order.
    This production order has one operation.
    So..the operation status was changed to  'CNF MILE REL'.
    But Order header status was not changed to 'CNF DLV'.
    It's status was still  'REL MSPT PRC GMPS SETC'.
    I did final confrimation again with 0 qty.
    So it was changed to 'CNF DLV'.
    But i want to know why first 'final confirmation' could not change the order header status.
    Please help me.
    Thanks.

    Dear Jong,
    1) CNF and DLV are two different status
    2) If Auto GR is not maintained then you only get status CNF after doing final confirmation in CO11N or in CO15
    3) So in your case i guess after doing final confimation you checked the status and found CNF but not DLV
    4) after user doing GR in MB31 or in MIGO you might have got status DLV, and mean while again you might have
    done final confirmation with zero qty and seeing both status CNF and DLV
    Regards
    Madhu

  • 3702E-Operational Status DOWN

    Hi All,
    When we tried connecting ap, its registering to the WLC 5508 with version 7.6.120.0. But it shows operational status as DOWN in WLC and blinking in red,green continuously. If i admin disable it, then it is coming UP and instantly goes DOWN. 
    Any Suggestion.

    see whether you have correct country code configured on your WLC & connected AP is in the right regulatory domain.
    Wireless LAN Compliance Status
    Post the AP console output to see what's exactly happening.
    HTH
    Rasika
    **** Pls rate all useful responses ****

  • IW32 After business closer  operation status not showing CLSD

    Dear Friends,
    I have a query here. For PM orders system status gets updated as per business transaction. Operation status also gets changed as per header status. But  it is okay till technical completion and operation staus gets set as TECO. But after  business closer  of the order still operation showes TECO  status in place of CLSD .
    Any clues on this please?  Is this the standard feature or  I need to search for OSS notes to be applied?
    Regards,
    Siddhartho Raha

    Hi,
    That note is no longer released so you cannot see it.
    Note 675240 contains an alternative repair report, at end of page 13 you can see similar update following the comment:
    *    begin of TECO / CLSD handling
    the following section does the update:
    IF update = 'X'.                                   
    *  create an entry in jest that the operations are TECO     
       CLEAR wa_jest.                                   
       wa_jest-objnr = <wa_jest_ov>-objnr.              
      wa_jest-stat  = 'I0045'.
    -Paul

  • Fru Operational Status "MB/SC", Definition Please

    i ran a 'prtdiag -v' on a Sunfire V240 and the results showed "MB/SC" faulty.... what does that mean?
    (Additionally, there is a flashing amber light on the front of the server... i'm guessing these are associated?)
    =========================== FRU Operational Status ===========================
    Fru Operational Status:
    Location Status
    MB/SC                   faulty  <-----------------------------
    PS0 unknown
    HDD0 present
    HDD1 present
    HDD2 present
    HDD3 present
    PS1 unknown
    Edited by: ssstonebraker on Feb 2, 2009 11:40 AM

    My first thought would suggest that you inspect the MotherBoard, which some might name as the SystemController.
    Is the System Configuration Card fully seated into its slot?
    Perhaps you could use your service contract and open a support case with Sun. If hardware components have failed, the support case would be how you would get them replaced.

  • WCS difference between "admin status" and "oper status"

    Can anyone explain what the difference is between admin status and oper status within the WCS GUI. It appears that disbaling either on effectively disables the radio...is that correct?

    I think I got it figured out...thanks for lookin....

Maybe you are looking for

  • Need to send a mail to group of users when sales order saved

    Hi user requirement is send a mail to group of users when sales order is saved

  • I can't uncheck "leave all attributes" in the precompose window

    Hi guys, I can't uncheck "leave all attributes" box in the pre-compose window. even after I double check it, I check the other option, I've tried with Crtl+Click over the check box, and so on and nothing works cause the option remains checked. Somebo

  • Late 2007 MacBook Pro intermittent black screen

    I have this very odd issue with an intermittent black screen on a late 2007 MacBook Pro (4GB/320GB 7200rpm) Mac OS X 10.6.8 v1.1 Apologies for the length of the post. In cycles separated by a few days to a week, the screen will flicker to black, init

  • Creation date of Purchase Document

    Hi, While creation of PO, system picks current date by default but we can change the date or give back date. Can you tell me , we can fix some check where system does not accept back date PO creation. Thanks, Dharmveer

  • Which set of LayoutManagers?

    I have a JPanel (ListPanel) in a JScrollPane. The ListPanel can contain any number of JPanels (NodePanel). Each NodePanel contains a JTextPane as well as other JComponents (JLabel, etc). I want each NodePanel to be displayed with word wrap for the JT