4.6C to ECC 6.0 Upgrade Transaction codes?

I am involved in an upgrade.  I have a list of t-codes used on 4.6C.  I want to compare these t-codes with ECC 6.0 and find out which ones are gone and the ones that have changed.
Is there any easy way or any one document that can help me acheive this?  I would appreciate the input from the experts here.  Will award points to any help provided.

In my previous project 4.6C to ECC 6.0, which was a technical upgrade, we have done it manually, here is what we followed:
1) In Unit Level T-Code testing, in technical upgrade, you are only expected to check the working of T-Codes in ECC 6.0 compared to 4.6C, this is on DEV server, with available data. Just execute the T-Code.YOU WILL KNOW WHICH T-CODE IS IN AND WHICH IS OUT(RARELY) IN DURING THIS ACTIVITY. SCOPE REMAINS THE TCODES USED BY YOUR CUSTOMER.
2) In Integration Level Testing, User Acceptance Testing and Critical Transactions Testing in technical upgrade, you need to test the scenarios with a copy of production data on QAS server.
Now, the comparision of the T-Codes can be -
1) Functionallity point of view (refer link provided by Naveen)
2) GUI
In Technical Upgrades the focus remains on GUI only. Hence the comparision is done manually between from 4.6C and ECC 6.0. The scope should always remain the Test scripts signed off by customer. The reason is that the user's need to get trained on the changes in GUI for which we captured screen shots wrt 4.6C and ECC 6.0 wherever changes have been encountered within the scope of the test script steps.
Was well received by the customer.
Lastly, just focus on the approach to take to make things simpler for you.Check the context of your Upgrade Project and move accordingly.

Similar Messages

  • What are the difference in transaction codes in 4.6 C and ECC 6.0 HCM syste

    Hi
    What are the difference in transaction codes in 4.6 C and ECC 6.0 in HCM SAP.
    Regards,
    Sanjay

    Believe there will not be any change in Tcodes.
    check these links
    http://solutionbrowser.erp.sap.fmpmedia.com/
    http://www.sap.com/solutions/business-suite/erp/pdf/BWP_ERP2006_Upgrade.pdf
    http://service.sap.com/releasenotes
    http://service.sap.com/upgrade for functional
    https://websmp105.sap-ag.de/upgrade

  • How to process for an ECC 6.0 upgrade for different objects (RICEF)?

    Hi eaxperts,
    I am new to upgrad project. Can anyone pls. tell me in details things that need to be undertaken in an ECC upgrade project for different objects e.g. RICEF and How should I process for the same?
    Please also tell me the important T-codes for the same and how to use them.
    Thanks a lot in advance,
    Sandy

    Hi,
    Please read below lines.I think u can get some knowledge about UPGRADE.
    u2022     System preparation and stack level patch upgrade u2013 Basis Team
    First of all, the basis team installs the Latest SAP version on the hardware and they apply all the general patches up to the latest stack level. All the stack levels of various patches u2013 Basis, ABAP, XI etc should be brought up to the latest level by the basis team. In case, all the stack levels are not the latest, it might create problems like new objects coming into the SPAU during the upgrade or thereafter u2013 these will be explained in sections below.. So it is a good practice to get the system to the latest stack level.
    u2022     SPDD Phase u2013 ABAP and Functionals
    This transaction code SPDD is the core step in an upgrade project. The system compares all the dictionary objects u2013 data elements, database tables and structures of the latest system (say ECC) with the previous or the old system (Say 4.6c). These all elements are present under two nodes u2013 with modification assistant and without modification assistant. Objects present under with modification assistant have the modification assistant u2018ONu2019 and we can see the modification logs.
    u2022     Up gradation of the system u2013 Basis Team
    After the SPDD phase is complete, the basis team prepares the system for an UPGRADE u2013 i.e. the old system would be replaced by the new system. In this phase, the system asks for the SPDD request u2013 the single request which generates and activate all the dictionary objects present in SPDD phase in the new system u2013 ECC. If the request do not contains the same objects which were present in SPDD, the system shows a danger alarm u2013 stating that this SDPP request do not contains all the desired objects and it might make the system unstable. In case any other objects are missing, there and then it should be put in the SPDD request.
    u2022     SPAU Phase u2013 ABAP and Functionals
    The SPAU transaction contains the objects u2013 Programs, Reports, Screens, Messages, Notes, Function Modules etc. which have difference in the Latest SAP request and the previous ones. This SPAU phase can be done either just after SPDD or after the Up gradation of the system by the Basis team.

  • Load balancing after ECC 6.0 upgrade

    Hi
    I we this configuration on ECC 6.0 upgrade:
    SAPGUI 7.10
    SAP_BASIS  700  Patch level 15
    SAPportal ESS
    Webdispatcher Installed
    Internal ITS
    Single sign-on
    Can somebody assist as with identifying the problem with load balancing (PUBLIC) E.g. When running ESS remuneration package via the Sapportal. we have configured ITS-Based GUI Services on transaction SICF for customised ZESS_PZ11PDF service.
    When we have load balancing group on the load balancing does not work, because  I  see somebodyu2019s payslip
    but when using one app server I see my own payslip. Please help.

    Hi PR,
    Please take a look at the following link:-
    http://help.sap.com/SAPHELP_NWPI71/helpdata/EN/28/75153a1a5b4c2de10000000a114084/frameset.htm
    "You can only use the SAP message server for HTTP load distribution if 
    the browser is the direct client of the message server. If another     
    component lies between the client (browser) and the message server, (for
    example, the portal), you cannot use the message server to distribute  
    the load."                                                             
    When using the External ITS you could balance the load using the message server and logon groups. In 700 this functionality is not present if there is not a direct connection to the client (Firefox or IE). So you will have to install the webdispatcher to balance the load.
    Hope this helps
    Michael

  • Screens not working in ECC 6 after upgradation from 4.6c.

    Hi,
    The custom developed screens which where developed in 4.6c version is not working properly in ECC 6 after upgradation.Do i have to make any more changes for this .? If anyone have an idea please help me in this issue.The custom developed things are an extended functionality we have done to r/3.
    Regards,
    jinesh kumar c.

    Hi,
    Check the Transportatation Logs in STMS for the programs/screens and check whether they are successfully tranported or not?
    Because some times we get Dynpro errors for transportation of the screens.
    Reward if useful.
    regards,
    Anji

  • SAP R/3 4.6 C to ECC 6.0 Upgrade using CU &UC method- Unicode conversion

    Basis Gurus
       I am working on upgrade from R/3 4.6C to ECC 6.0.
    ECC 6.0 upgrade completed( still in non Unicode).  Now I am in the process of Unicode conversion.
    I have used following methods for the upgrade.
    1. Combined Upgrade & Unicode conversion(CU & UC)
    2. Resource minimized( as I am doing it in Sandbox).
      As I understand I need to perform the DB export and Import now for the unicode conversion.
      According to the Upgrade document, First I need to run Export using R3load in ECC6.0(Non unicode)
      and then install Unicode system and import the same data file.
      My understanding was, when I choose, Resource minimized, I need to run Export and import
      in the same system.
      Can you please help me , whether I need another Unicode system for import ??
    Graham

    Hi,
    Dont get confused with upg strategy and unicode conversion.
    In general Upgrade strategy (either downtime-minimized/resource minimized)
    In unicode conversion you have export/import(exp/imp) of data concept
    In CU&UC approach you have to do in a streach to complete migrate from old release to new realease ECC 6.00.
    Using database independent (sapinst only) or Using database dependent (migration monitor or Distribution monitor)
    It can be done in 2 ways.
    If you dont have addtional server for unicode conversion
           1)you can either do exp on same hardware and take bakup and do import using the exp dump.
           2)Do exp on one server and prepare your target empty database on another server and complete imp of data.
    Hope this is clear.
    Regards,
    Vamshi.

  • ECC-600 EHP4 upgrade with VIRSAHR 520 700 - PREP_EXTENSION/ADDON_QCALC

    Hi
    We are getting following error at phase PREP_EXTENSION/ADDON_QCALC in the ECC 6.0 upgrade:
    3 ETN256 You want to install the following add-on components:
    3 ETN248 Component: "VIRSAHR" rel. "520_700", Support Package
    level: "0" (component type "A")
    3 ETN248 Component: "VIRSANH" rel. "520_700", Support Package
    level: "0" (component type "A")
    2 ETN085X"2. Adding Add-on Installation Queue" " " " " " "
    3 ETN262 Calculating queue part for add-on "VIRSAHR" rel. "520_700"
    3 ETN490 Use the Add-On installation package "SAPK-523EXINVIRSAHR"
    (type &4"AOX") for Add-On &2"VIRSAHR" rel.&3"520_700"
    3 ETN245 The following import prerequisites of OCS Package "SAPK-
    523EXINVIRSAHR" have not been met:
    3 ETN264 In the (alternatively) Requirement set "01":
    3WETN491 Required software component "SAP_HR" rel."600" is not installed2WETN543 OCS package "SAPK-523EXINVIRSAHR" does not match the current
    software component vector
    1 ETN214X."**************************************************"
    We have alreacy checked note 1002147, which clearly states that we have to include SAPK-523EXINVIRSAHR in the upgrade. SAP_HR is part of the upgrade.
    We have included SAP_HR and other Support Package as per the queue generated by Solution Manager, but we did not include VIRSAHR & VIRSANH Packages until we got to this phase. We then included these support packages in eps\in directory, but we are now getting this error now.
    Any ideas?
    Regards
    Chandu

    Hi
    This is what the solution provided by SAP Support:
    Quote:
    we have finally found the problem, it's a bug in the package upload
    functionality used by the upgrade. The consequence of this bug is that
    Support Packages whose EPS files (.PAT files) have a certain string in
    the name, namely the string 0000000 after the _ and before .PAT
    extension, are not properly uploaded to the ABAP system and hence are
    not visible or known to the upgrade.
    This bug will be fixed in the next upgrade tool fix, but in the meantimeyou can use the following workaround:
    Check your EPS/in directory after the CAR/SAR Archives of the SPs are
    extracted and rename all .PAT and .ATT files, which have a name like
    *_0000000.PAT (or *_0000000.ATT), by changing the string 0000000 to
    9000000. For example, for the VIRSANH SP SAPK-52302INVIRSANH rename the
    file VS30020106486_0000000.PAT to VS30020106486_9000000.PAT
    Afterwards, the upgrade will upload the informations about the SP
    properly and the SP can be included into the upgrade.
    Files:
    31/01/2007 07:32 329 VS30020106486_0000000.ATT
    31/01/2007 07:32 554,073 VS30020106486_0000000.PAT
    If these two files are renamed to e.g.
    VS30020106486_9000000.ATT
    VS30020106486_9000000.PAT
    the affected VIRSANH SP2 is uploaded correctly by the upgrade
    functionality and the SP inclusion of the VIRSANH SPs works.
    Sorry, as of now I cannot promise you a date when the tool fix will be
    available. I have found this bug only today in the evening (german time)and will discuss this with the responsible colleagues tomorrow.
    Afterwards, I will know more...
    Unquote:
    Hope this helps. We have decided against upgrading to 530_700 as it will involve upgrading GRC system and also new version has lot of new functionalities, which we like explore it after the ECC upgrade.
    Also, I would not suggest deleting VIRSAHR as all the config and customising done for VIRSAHR will be lost.
    Regards
    Chandu
    Edited by: Chandu Cheeti on Jan 17, 2010 11:19 AM

  • Error in WBS Element Hierarchy load after ECC 6.0 Upgrade

    Hi All,
    After ECC 6.0 Upgrade in R/3, we are doing test load in a Test server. While doing, we have encountered an issue with 0WBS_ELEMENT Hierarchy load. The message in the monitor is like below.
    "Node ID 00014240 has not been included in the hierarchy
    Message no. RH207"
    When I run the same hierarchy in another system which is not upgraded , it works fine.
    Anybody has faced similar kind of issues and can throw some light on this issue?
    Thanks,
    Mohan

    Try activating the Heirarchy in R/3 and re-trigger the load, error is very specific to structure of the hierarchy. there is a possibility that this Hierarcy could have got inconsistent after the upgrade.
    Thanks,
    Amit

  • 4.6 C to ECC 6.0 Upgrade Project Timeline Sheet in MPP format

    Dear all,
    We are now proposing our customer for the 4.6c to ECC 6.0 Upgrade.
    Our customer is currently in 4.6c/oracle 9i/HPUX 11 i. He wants to move to ECC 6.0.
    If you have the project timeline for the above Technical Upgrade, can you pl send it to me.
    If you don't have in MPP format atleast send me the Work Breakdown structure with timelines.
    I shall modity the same to our customer and submit
    Thanks & Regards
    Senthil
    [email protected]

    Preparation Phase* 6 days
    Kick Off Meeting 1 day
    Upgrade Project Procedures Preparation 1 day
    Prepare Upgrade Project Plan 1 day
    Technical Requirements Assessment 3 days
    Assess Training needs of Key-users & End-users 1 day
    Prepare Detailed Basis Activity List for DEV, QA & PRD 1 day
    Business Blueprint Phase 6 days
    Develop System Landscape Upgrade Plan 1 day
    Functional Requirement Checklist 1 day
    ABAP Development check list 1 day
    Develop detailed Training Procedures & Documentation for Key Users & End Users 1 day
    Identify Testing Scope & Scenarios 1 day
    Identify Authorizations Conversion to Roles for SAP ECC 6.0 2 days
    Develop Documents as per Basis Activity List 1 day
    Develop Authorization Matrix for Activity Groups to Roles Conversion 2 days
    Prepare Upgrade Deliverables Checklist 1 day
    Realization Phase 28 days
    Installation of Solution Manager 3.2 System 1 day
    Creation of New Development System for Upgrade Project (Homogenous System Copy - PRD) 2 days
    Upgrade to AIX & Oracle 10g, SAP ECC 6.0 on New Development Server 3 days
    Upgrade Frontend Software 4 days
    Perform SPAU & SPDD Corrections 5 days
    Perform ABAP Development & Corrections 10 days Perform Authorizations Conversions and corrections after upgrade 8 days
    Perform Upgrade Testing for each Application Module 7 days
    Perform Unit & Integration Testing 6 days
    Perform Training to Key Users & End Users (Generic & Specific) 3 days
    Upgrade to AIX, Oracle 10g, SAP ECC 6.0 on Quality System 1 day
    Homogenous System Copy of PRD to New Quality & Upgrade to AIX, Oracle 10g & SAP ECC 6.0 2 days Perform Testing in Quality System 3 days
    Testing by end users on Quality System 1 day
    Production Realization & Go-Live Phase 6 days
    Upgrade to Production System Operating System to AIX (after close of business hours - 23:00) 1 day
    Oracle Upgrade to 10g (after close of business hours - 23:00) 1 day
    SAP Release Upgrade to ECC 6.0(Downtime Minimized - Downtime occurs in non-business hours) 2 days
    User Acceptance Testing 1 day
    Production System Go-Live 1 day
    Post Go-Live Support 14 days
    Post Go-Live Support 14 days Note: This is high level plan subject to change during Business Blue Print Phase 0 days
    This is taken from a post in Ittoolbox, May be this is generic. Hope you can tailor this to meet your requirements.

  • Transaction code to find modules in ECC 6.0

    Hi gurus
    I installed ECC 6.0 with windows and oracle. I want to know the transaction code that tells me what are the modules ( SD, FICO..etc) which are present in my ECC 6.0.
    Pllzzz help me

    Hi,
    Goto --> SE93 
    Suppose u want all the Tcodes for Material Mangement then type MM* in the box.It will show u the all the Tcodes for MM.
    In this way u can go ahead with other modules.
    Thanks,
    Spandan

  • Hardware requariment for ECC 6.0 upgrade from ECC 5.0

    Hello
    I am on ECC 5.0 with oracle 9.2.0.7.I need to upgrade this to ECC 6.0.
    I have already implemented MM,PP,FICO,QM and HCM.My current data base size is 900GB.This has 30GB monthly growth.
    With this ECC 6.0 upgrade i am planing to implement PM,EP.
    I know converting none Unicode system to unicode system is required some more hardware resources than the none Unicode.
    Some document says 40-60% more disk space and 35% more processing speed from current system.
    Can any one give me the correct information about the hardware requirement for ECC 5.0 to ECC 6.0 upgrade.
    Thanks
    Roshantha

    Check with the Links
    https://websmp102.sap-ag.de/sizing
    https://websmp208.sap-ag.de/quicksizer
    http://www.4soi.de/
    http://www.easymarketplace.de/
    Kanagaraja L

  • DB Migration and ECC 6.0 Upgrade

    I have a number of questions, we have a SAP R/3 4.7x200 landscape that is currently Windows 2003 and SQL2000 both 32 bit, we want to do the following, move to Windows 2003 and SQL2005 64bit, perform a Unicode and ECC6.0 Upgrade.
    here are the steps I am planning on new hardware
    1. Migrate to 64bit
    -install 64bit OS and SQL2006 64bit on new hardware
    -export db from current 32 bit and import into 64 bit system
         a. I am confused, I have seen threads where it appears this was done in house, do we need an SAP certified      person to complete this task, this is a hetergenous copy? Note 82478
         b. can we do this inhouse if we follow the SAP documentation and checklists provided and have their signoff      with checks
    - Run tests and then confirm process before real migration
    2. Perform Unicode Upgrade
    - run this on sandbox, test and verify
    3. Perform ECC 6.0 upgrade
    - run this on sandbox a no. of times confirm
    - freezing development and starting with DEV (this is a small landscape, we can do this)
    p.s can steps 2 and 3 be combined in one step, I have broken that out, to in my mind make it simpler to fix if anything breaks.

    Hi,
    DB Migration
    1. MS SQL Server 2000 is based on BIN collation and MS SQL Server 2005 is BIN2 collation. SO you need to first convert BIN to BIN2 collation.
    Note 960769  Windows Migration from 32bit to 64bit x8664
    Note 799058 - Setting Up Microsoft SQL Server 2005
    2. can steps 2 and 3 be combined in one step?
    Yes. check with link http://service.sap.com/erp-upgrade
    Regards,
    Srini Nookala

  • Any Specific Guide for Ecc 5.0 upgrade to ECC 6.0 (linux/oracle)?

    Hi Gurus
    Is there any  specific guide available for the Upgrade of ECC 5.0 to ECC 6.0 from service market place.
    for the linux operating system and oracle database. or atleast , I want to know what are the mimimum checks to be done (prerequisities) in the ECC 5.0 system which need to upgrade into ECC6.0.
    Thanks in advance
    Balaji

    Hi,
    There is not an specific guide for ECC 5.0 upgrade, just the guides specific for your OS/DB combination, they can be downloaded in https://websmp204.sap-ag.de/instguides but you should use the Unix/Oracle document,

  • ECC 6.0 UPGRADE - BW 3.10

    We are planning to upgrade our source system from 4.6C to ECC 6.0.  We are on BW 3.10 ( But planning to upgrade to BI 7.0 once after ECC 6.0 upgrade)
    Would like to know,
    1. Do we need apply any plug-in requirements to accommodate the ECC 6.0 compatibility?
    2. Will the existing BW 3.10 work without any issue with ECC 6.0?
    ( We are not going to do any change with new Business content available with ECC 6.0)
    3. What are the other precautions, we need to take in order to work BW 3.10 with ECC 6.0?
    Advance Thanks.

    refer replies here:
    Re: ECC 6.0 Upgrade with BW 3.5

  • ECC 6.0 Upgrade from 4.7 - EDI Interfaces

    Hi Gurus,
    Need your inputs on what are the precautions to be taken during ECC 6.0 Upgrade related to EDI Interfaces.  with SAP upgrading from 4.7 to ECC 6.0, do you see any precautions need to be taken considering the middle ware involvement.  Also, is there any changes in IDOC Structures in ECC 6.0 which my cause issues related mapping with middleware.
    Please suggest.
    Thanks & Regards,
    C.L. Narasimhan "CLN"

    Hi,
    generally, a release upgrade, delivers new idoc/message types or new releases of existing idoc/message types.
    So, taking this in mind, you shouldn't have problems for the mapping of the messages, because the versions of the basic idoc, once released, cannot be changed.
    You might have some application problems related to the inbound interfaces, but this is part of the game...the testing phase will highlight whether the problem exists.
    A known problem is that the upgrade removes all the customer specific entries in the system table EDIFCT.
    Further details are provided in the OSS note [https://service.sap.com/sap/support/notes/865142]
    Regards,
    Andrea

Maybe you are looking for

  • How can i update my Mac OS X software?

    before i start im the newbiest newbie with macs. Im currently Using a powermac G4 with 10.5.8 I've tried installing programs like Google Chrome and Spotify but when i put them in the applications folder theres a crossed circle over it and wont let me

  • Can I use the SX20 remote with an SX80?

    SX80 has front panel LED labelled IR. Does it support the hand-held IR remote control that ships with the SX20?

  • Saving photo folder order

    Can NO ONE suggest a way to keep photo folders in order on an  iPad after sync?  I can fin d NO rationale for the chaos every sync throws my albums into.

  • Why dosen't h:messages work well under Facelets?

    My code looks as follow: <h:messages layout="table" showDetail="true" style="color: red; font-family: 'New Century Schoolbook', serif; font-style: oblique; text-decoration: none" id="errors" /> This means, the error message will be shown in red and i

  • Can we expect Ciri on iPod touch

    I am sure that many of us would like to see ciri on iPod either in a IOS 5 update or a new iPod being sold I am wondering if maby iPod users should have ciri too maby not as good a of one but a special iPod version I don't know just an question