655 Movement: No Inspection lot created.

Dear Expert's,
My End user are doing 655 for a Return delivery, In Material Master "05", inspection type is Set, but it is not active.
No inspection Lot has been Generated , but in MMBE , the Stock is in Quality.
1) Now, how can i do result recording for the same .
2) Even though "05", is not active how did it allow to do 655 Movt.
<<Text removed>>
Edited by: Matt on Jul 6, 2011 2:42 PM

Hi Sandy,
Getting stock posted to quality inspection without inspection lot generation is possible in standard SAP. Firstly I try to explain why this happens.
1.     Go to material master in QM view
2.     You must have ticked on u201CPost to inspection stocku201D tick
3.     And you have not activated 05 inspection type.
As a result of which, system is posting the stock to quality inspection without generating lot. For this case you need to carry out 321 movement through MB1B transaction for transferring stock from quality to unrestricted.
1.     Regarding your first question, that how you can carry out result recording.
a)     In order to carry out result recording inspection lot must exist. And for that inspection type 05 must be activated in material master.
b)     You must have valid inspection plan with appropriate usage also.
c)     Inspection type activation has no co-relation 655 movement. Movement typeu2019s customization is associated with delivery type.
d)     Hence it doesnu2019t matter whether you have activated or deactivated 05 inspection type in material master.
e)     Inspection type activation is useful only for lot generation.
2.     Regarding second question that how you can carry out 655 movement
a)     This is automated movement with respect to outbound delivery and generally done through VL02N and not in VA01.
b)     I donu2019t think this movement is possible through MIGO. Better if you consult with good SD consultant.
Regards,
Anand Rao

Similar Messages

  • No inspection lot created for new inspection type created

    Hi all,
    We create a new inspection type which is based on a copy-version of an existing inspection type. These inspection type has a inspection type origin of standard SAP 04 (i.e. Goods Receipt from Production).
    Question 1 - we bumped into problem when come to testing in which when perform goods receipt, there is no inspection lot created, may I know why?
    The following fields of this new inspection type are all checked; those not specified, are not flagged.
    1 - Insp with task list (flagged); Automatic Assginment (flagged); Check Chars (flagged); Skip Allow(flagged); Automatic UD(flagged); Serial Number Poss (flagged).
    Question 2 - for this kind of inspection type with origin 04, do i need to perform a goods receipt against a production order or purchasing order? How do I perform a GR against a production order?
    Thanks.

    Hi Tuffy,
    Possibly you might not have ticked on preferred inspection type in material master. This could be one of the reasons. Try to do GR after ticking this.
    The setting you have mentioned (flagged parameters)are seems to be correct. But lot generation is governed by preferred inspection type.
    If you have assigned this newly customized inspection type to lot origin 04, then it would be used against production order and not the purchase order.
    There are several ways to carry out GR against production order. It depends on the scenarios which you follow
    1.     MB31 101 movement
    2.     You may use backflush so while confirming order through CO11N auto GR is posted
    3.     In case of repetitive manufacturing scenario generally GR is done by MFBF transaction
    Regards,
    Anand Rao

  • SAP QM Default Inspection Plan for all Inspection Lots created in the Plant

    Scenario: We have a Proto type plant in which Daily 15 to 20 materials are created every day. We have only one inspection plan for all the materials.
    Problem: We don't want to do material assignment in the Inspection Plant header every time a new material is created
    Requirement: Is there any way to default the inspection plan for all the inspection lots created in the Plant by Standard Configuration or User Exit.
    Your answers will be much appreciated and rewarded.
    Thanks in advance,
    Thiyagu

    Hi,
    In our case Creation of Inspection lots are controlled by QM View of Material Master. Our problem is to find alternative for assignment of New Materials in the Plan header in Tcode QP02, as we have only ONE INSPECTION PLAN. So our expection is all QM Inspection Lot created in the Plant should always get assigned to the SINGLE INSPECTION PLAN, with out doing any assignment of material in the Plan.
    Thanks,
    Thiyagu.

  • Inspection Lot Created but not shown in QE72, and cannot input result or UD

    Hi Exports,
    I have  Inspection Lot Created by 04-production goods receive, but not shown in QE72, and cannot input result or UD
    Inspection Lot status: CRTD CHCR SPRQ,
      in Business Process of inspection lot showing:
    *Cancel inspection lot
    Assign RMA proc. to insp. lot
    Assign notification to lot RMA
    Batch log indicator required
    Certificate missing
    Change inspection lot
    Change planned lot quantity
    Choose task list for insp. lot
    Confirm Receipt of Certificate
    Create part. lot for insp. lot
    Flag cancellation
    Inventory posting required
    Lock
    Lot for process documentation
    Lot reset allowed
    What is going wrong? 
    BTW, the sampling procedure in Inspection Plan is a read-only field, but empty inside.
    Daniel

    Dear in your case there is no Inspection plan was attached to the lot so attach the plan and make lot status to REL then only you can do Results Recording.
    Inspection plan gets auto assigned to availble inspection plan on respective date if you enabled the inspction with tasklist and automatic assignment boxes in relevant inspection types in MM QM view for this Inspction plant should be made avaialble in stsyem before any lot created which can be created QP01.
    If it is not getting assiged automatically then you can assign it manually by QA02 here go to inspection specification tab click on Task list assignment the go to sample tab and click on sample and SAVE Inspection plan will be attached to inspection plan.
    Once inspection plan is the lot status you can see REL before assignment of a plant it would be CRTD.
    Cheers
    KK

  • PROBLEMS CANCELING MOVEMENTS WITH INSPECTION LOT

    We have this situation:
    We need to reset the GD returns but this GD returns was posted by QM and when we try to cancel in VL09 we meet the next message Message no. QA046.
    So we tried to cancel in other ways with the inspection lot and the usage decision but it has not been possible to restore movement.
    We found the note 175842 and we have implemented the program RQEVAC50 but, when we useit we meet the message M7226
    We checked the movement Z55 and its opposite Z56. I suppose its standard movement is the 651 and 652 and I compared the customizing of them. They can be similar it just the movement Z55 and Z56 are prepared to be posted by QM and special stock E and Q.
    The movement that we need to reset with the program RQEVAC50 is:
    We have tried to use the program for a movement 101 and it worked well (5000795975).
    We tried to test with a return delivery with Z55 movement in another environment and the program worked correctly so we think the customizing of the movement Z55 is correct.
    We think the problem is when the usage decision creates some movements or we use some of the next fields in the usage decision:
    In our case the movements are 321 and Z56.
    But when the movements are the standards 321 and 553 program doesn’t work because we meet the next message again M7096
    Program doesn’t work because we meet the next message again:
    What can we do? could you check thi situation and tell us anything, please?
    Kind regards

    hi,
    check these tables for <b>results</b> entered through lot
    QAKL
    QAMR
    QASE
    QASR
    if they have used <b>inspection points</b> check this table QAPP
    for i<b>nspectionlot</b> check table QALS
    hope this helps !!!
    Cheers
    Alfred

  • Using 05 inspection type, all the materials moves to inspection lot

    Dear SAP Gurus,
    Using the 05-inspection type in material master for by product material, all the material goes to inspection lot.
    how to control the inpection lot movement, i have set a plan that the inspection will be carried through  a workcenter,but it moves all the materials to inspection lot.
    Since all the materials are moving to inspection lot, i have changed my inpsection type to 02 (goods issue), but the problem is,  i couldn't able to record the results for the created inspection lot.
    Kindly guide me and correct my process flow,
    Thanks in advance
    Thanks and Regards,
    R.Diwakar

    Dear Guru,
    Thanks for your response
    Sorry for not so clear ....
    My scenario is that, the user requires to have a inspection lot for their By-Product. during the production order, after manufacturing say 30000 material, for them the 30000 material should directly posted to the unrestricted usage and a sample maerial should go to inspection lot, where same will be inspected and transfered to unrestricted usage, through QA32.
    Based on their requirement, i have set the inspection type -05 in material master and a workcenter specifically created for the quality testing, so that a sample quantity can be produced and flows to the inpection lot,
    but it doesnt works,the produced materials are all going to inspection lot.
    Kindly guide me on this,
    Thanks in advance
    R.Diwakar

  • Goods movement with Inspection Lot

    Hi
    We would like to do a Material to Material posting including the earlier created inspection lots for the initial material?
    Is it possible in QM to transfer /link an inspection lot with batch from one material to another material?
    Ex: one material has inspection stock with assigned inspection lot/batch. we would like transfer posting this stock to other material. Is it possible by transfer the inspection lot from one material to other material with inspection lot/Batch?

    Hi,
    We can trasfer the stcok from one material to another material from Quality lot itself , but we cannot assign one lot to two materials. If you want inspection lot in receiving plant then activate 08 inspection type in Material Master and maintain inspection settings for 331 M.Type in SPRO.
    Regards,
    Vikas.

  • No inspection lot create in PM

    Dear PM Grue
    I am trying to create Inspection lot. I did all efforts but I am unable to create it. I assigned task list with order along with notification. Maintained 300 for inspection point for inspection Characteristic along with sampling. Also inspection type was attached 14. Assigned inspection type to order type Order was released and inspection lot was clearing (not gray). When I am creating it says No inspection could be generated for order xxxxxx. Is there any thing left over or any one helps me to find this error. MIC was maintained too
    Appreciated
    JA

    Hi Jamal Abro
    Please check whether you have maintained Master inspection characteristice. If yes please check it whether you have maintained it correctly.
    This will resolve your query. if not please let me know.
    Makarand

  • Cancel 101 movement with Inspection lot of closed financial period

    Hi experts,
    we are having the following problem.
    We have a 101 movement with creation of Inspection lot, which was done in a finance period which is already closed.
    Now I have to cancel this movement, but I get the error M7021 with VOR, which means that I am not allowed to cancel it, because of the period is already closed.
    But we also can not open the period.
    Which possibilities do I have?
    Maybe MI10 movement?
    Kind regards

    Hello Jürgen,
    thank you for your help.
    I am confused now.
    Becasue normally I am logged on in german and now I did check the english one.
    Deficit of BA St. in QI prev. 127 M2 : "material number" 0001 "sloc" "batch"
    But here I get QI prev, but in the F1 help there is no QI or prev.
    In german I get VOR and there in the F1 help it is written, that VOR is previous period (so I think equal to PR in english).
    Now I am a bit confused.
    But anyway, the thing is that we have to empty the stock.
    Kind regards for every help, I think there is no possibility to cancel that booking as the period is closed.
    @ Biju K, to be honest your way would really be the only correct way, but at the current situation it is a bit special.
    I will do a MI10 booking.

  • Identifying the Inspection lot created automatically and manually

    Dear all,
    An Inspection lot can be created automatically or manually. Can anyone please tell how the Inpection lot can be identified as manual created or automatically created one? Please advice, thanks.
    Regards,
    Brijesh

    Hi,
    You can  create inspection lots manually for all inspection lot origins except
    the following
      10   Delivery to customer with sales order
      11   Delivery to customer without sales order
      12   General delivery
      13   Repetitive manufacturing
      14   Plant maintenance
    When you create an inspection lot manually, you cannot reference an original document (for
    example, a goods receipt document, an order, or a delivery note)
    Regards
    Hari

  • Inspection lot created for expense material (IQC)

    I have a material active in QM (inspection type 01).
    When I use this material in expense PO (account assignment K) and do a GR, there is a inpsection lot created.
    Is this normal? If it is normal, is there any way to avoid?
    And after that, I reverse my GR material document, inspection lot WAS NOT cancelled.
    Why is that?
    When I reverse a GR for stock material, inspection lot will be cancelled automatically. Why expense material didn't?
    Please help me, I am so confused. Thankds a lot.

    When I use this material in expense PO (account assignment K) and do a GR, there is a inpsection lot created.
    Is this normal? If it is normal, is there any way to avoid?
    Yes As QM view is active Inspection lot will be created.
    And after that, I reverse my GR material document, inspection lot WAS NOT canceled.
    Why is that?
    When I reverse a GR for stock material, inspection lot will be canceled automatically. Why expense material didn't?
    As it is against the account assignment K is is already consumed against the account.So reversing of the consumed material will not be possible.UD is just a formality.

  • Inspection Lot created before Post Goods Recept of Inbound Delivery

    Does anyone have experience of an inspection lot being created before a Post Goods Receipt is performed for an Inbound Delivery. This is preventing me from receipting the stock as
    1. When you try to post goods receipt, I receive a warning that the stock can only be moved in QM only
    2. When I try to apply a UD in the inspection lot and post the stock, the stock cannot post as the Handling Units are linked to the Inbound delivery
    Any help would be welcome

    Hi,
    Please clarify whether you want to modify th efield at item or header. Please check the Badi names Starting with LE_SHP* .These BADI' are for Delivery.find the Suitable BADI and Apply it. For custom tab at header BADI is  LE_SHP_TAB_CUST_ITEM
    LE_SHP_TAB_CUST_OVER
    The BADI does not allow the update of data. There is a common trick used to perform the job ...
    - in the BADI, export the data to memory (e.g. in TRANSFER_DATA_FROM_SUBSCREEN)
    - in the old-fashion exit like USEREXIT_MOVE_FIELDS_TO_LIPS, import the data and map it.
    I hope this will resolve your issue. Thanking you.

  • Bapi- inspection lot create

    hi everyone
    i look for a BAPI to create inspectionlot anybody knows this badi
    thanks
    Eyal_Rosenfeld

    Hi , The BAdI: INSPECTIONLOT_UPDATE is called when inspection lots are created and changed, and usage decisions are made and changed.
    Please do let me know wether you were able to proceed or not .I hope you can do it .
    cheers
    kp

  • Creating a manual inspection lot

    Hi,
    I have to create a manual inspection lot for a batch of material in inspection stock. However is there any way to move the stock into QI stock even though there is no goods receipt document to reference?

    Hi,
    Refer the help provided by SAP.
    QM cannot manage stock movements for insp lots that were created manually.
    The QM component cannot manage stock movements for inspection lots that were created manually.
    If the Materials Management (MM) and Inventory Management (MM-IM) components are active in your system, you can use the functions in QM to manage the materials while they are in
    inspection stock. When an inspection lot is created automatically as a result of a goods movement, the QM component can:
      Record and track the material stock in an inspection lot
      Make the necessary stock postings to move the materials out of inspection stock
    Regards
    K.M.Arun

  • Create Inspection Lot for Serial Number

    Hello,
    Is it possible to create an Inspection Lot and associate it to a Serial Number right away.
    I've done a process were I've change the Material and Serial Number of my equipment, so now the old inspection lot is not usefull no more and I would need to have a new inspection lot so that the movement to place the stock on unrestricted is cone for the new inspection lot.
    Or is that any other way to do this???
    Thanks in advance.
    BMO

    Atul,
    The inspection lot is created when the mobile is delivered from client and dismantled, and my stock gets increased for the returned material - that stock remains in Quality.
    Later when the Usage Decision for the Inspection Lot is given (depending on the selection) my stock passes from quality to unrestricted, and this is the normal process without issues.
    Possible exception:
    If in the midle of the process I've to change the serial number for this mobile or to change the Material + serial number, the first Inspection Lot created is not helpfull to me because I can´t change there the Material or serial number. So the Usage Decision would be given for the old serial number, isn't it?
    Today I found a Ztransaction that is used to create Inspection Lot. In the first step the material, goes in the warehouse in Quality and in the second step, when the Usage Decision is given, the stock passes from Quality to Unrestricted.
    For the substitution Material / Serial number everything is correct, but for the first one it's not, should this obsolete stock goes to scrap?
    Thanks,
    BMO.

Maybe you are looking for

  • To show all employees in Napesco Staff Ledger

    hi when the report Napesco staff ledger olap report is run in erp simultaneously Napesco Staff Ledger Details Report(exec file name is 'NPSTALEDDTLS') is also run Both are PL/SQL Stored Procedures when i checked the pl/sql stored procedure i found th

  • Video export not showing up

    i'm a novice at editing software and after creating some title slides and to go along with .wav file sound effects i started importing mpg movie files and jpeg pictures from my hard drive that went along with an mp3 song.  when i went to export the v

  • Creating INCLUDE, just like REPORT prog.?

    Hi Experts, One simple question, pls. clarify ma that, In the process of VA01-Sales Order creation, I need to do not allow to create/save that doc. if PO#, MATNR, Batch r already existing in DB! in this case, I need to write logic in SAPMV45A, I foun

  • How to achieve synchronization after DCP connection string changed via sdk

    Hi guys, i have modified the DCP connection string using method: metaDataProperties.setProperty("SI_METADATA_BVCONN_ATTRIBUTES", new string here) via BOE SDK for java,  and then checked it  through Query Builder :select * from CI_APPOBJECTS where SI_

  • Org.osmf.media::MediaPlayer could not be found

    Hi all, I'm using Win 7, Flash Builder 4 with Flex 4.5 SDK (manually upgraded). I'm creating a video viewer, which streams from a Flash Media Server. Sometimes, when you reload the app, the video is not showed: audio is fine, duration, seek, everythi