A Possible Bug in MS Project Prof. Regarding Inactive Tasks

     One of the projects in our EPM portfolio has encountered a problem with “Inactive Tasks”. I did an experiment with a sandbox project, and here is what I find:
     If you “Inactivate” a task, or group of tasks, and then do “Update Project/Update Project through <date>” operation on the entire project, the inactive tasks are ALSO
updated. Trying to subsequently reactivate one or more tasks results in an error message about “Tasks with existing actuals cannot be inactivated”. Thus the inactive tasks are now useless!
I have searched the MS KB the best I know and find no reference to this problem.  Our MS Project Pro clients are at Service Pack 2, no subsequent CUs or hotfixes.
JAckson T. Cole, PMP, MCITP

JacksonCole --
I did a quick experiment and can confirm your findings.  What we are seeing is a design inconsistency with how Inactive tasks work with the Update Project functionality.  The workaround is to use the Update Project functionality on selected
tasks versus the entire project.  But given the behavior you see, I would not recommend using the Update Project functionality with the entire project, as it leads to the undesirable results you have already seen.  Hope this helps.
Dale A. Howard [MVP]

Similar Messages

  • Possible bug found in Mac Os X Tiger 10.4.11 in conjuction with iPod Touch

    Dears,
    I think I've found a possible bug in Mac Os X version 10.4.11 in conjunction with iPod Touch.
    When the iPod is connected during boot, my Bluetooth hardware fails to be detected. When I restart the portable without the iPod connected, my Bluetooth hardware is recognised & activated again. It is reproduceable.
    1. Attach iPod Touch before starting the MacBook Pro
    2. Boot the Macbook
    3. Bluetooth hardware should be rendered inoperative
    Restore functionality:
    1. Detach the iPod Touch
    2. Reboot the portable
    3. Bluetooth hardware is restarted / recognised.
    Regards
    Cedric

    wrong category

  • Possible Bug with Drag-and-Drop Being Published via HTML5 - Getting "Undefined" Error When Dragging Object

    Hello,
    I came up with a way to use drag-and-drop interactions that will take advantage of file input so that I may create a drag-and-drop interaction that uses one draggable object over and over allowing multiple scoring/tracking possibilities.  Example use...is having the draggable object be dynamic in that it randomly changes its text so that a learner can drag a term it's possible classification.........thus allowing the possibility of having many terms easily loaded without having to redo a drag-and-drop interaction for each needed terms/classifications updates/changes.
    My Issue: When using a variable to represent the text for a draggable Smart Shape object, I'm getting the error message "undefined" when, clicking/pressing on the object, as well as during the drag of the object. This issue occurs when publishing the project in an HTML5 format.  Flash interestingly enough seems to work perfect...but we are not interested in publishing via Flash any longer.
    To better help you explore this error message, I've set up a test project so that you can see when and how the "undefined" message shows up during a drag-and-drop interaction.  I've also included the Captivate 8 project file used to make the exploration project I'm sharing in this post.
    Link to Captivate project I created for you all to explore "undefined" error message": http://iti.cscc.edu/drag_and_drop_bug/
    Link to this Captivate 8 Project file: http://iti.cscc.edu/drag_and_drop_bug.cptx
    It's pretty interesting how things react in this demo, please try the following actions to see some interesting happenings:
    Drag the Yellow (or variable drag box) to the drag target.
    Drag Black Hello square to Drag target and click undo or reset - watch the undefined message come up on the Yellow (or variable drag box).
    Drag the Yellow (or variable drag box) to the drag target and then use the undo or reset.
    Move both draggable boxes to the drag target and use the undo and reset buttons...
    Anyhow, I know you all are sharp and will run the demo through its paces.
    I'd really be very honored if anyone help me figure out how I could (when publishing out to HTML5) no longer have the "undefined" error message show up when using drag-and-drop with a variable for shape text. This technique has been well received at the college I work at...and I have many future project requests for using such an idea on a variety of similar interactions. I'd love see a solution or see if this might be a bug Adobe may be able to fix!
    I tried to find a solution to the issue documented here for quite some time, but I was not able to find anyone with this problem much less attempting the idea I'm sharing in the help request -  save the darn "undefined" message that comes up!
    Many thanks in advance for any help and/or direction that you all may be able to provide,
    Paul

    Hello,
    I just wanted to supply a minor update related to my drag-and-drop question/issue stated above:
    I did another test using Captivate 7, and found that the undefined error (publishing as HTML5) does not appear and the variable data remains visible - except the variable data turns very small and does not honor any font size related settings.
    I did go ahead and submit this to Adobe as a possible bug today.
    Thanks again for any help related to this issue.  If the issued documented above is solved, it will allow many amazing things to be done using Captivate's drag-and-drop for both regular type projects as well as interaction development for iBooks! 
    Matter of fact if this issue gets fixed, I'll publish a Blog entry (or video) on way's I've used Captivate's drag-and-drop to create dynamic learning activities for Higher Ed. and for use in iBooks.
    ~ Paul

  • Is it possible to build a project with Labview 2010 on a Windows XP system, that is useful for a system with windows 7 on it?

    Hi there,
    I am planning to use Labview 2010 in a short time.
    But before I'm going to use it I have some questions.
    I know it is possible to run Labview 2010 in an XP environment. But is it also possible to, when running Labview 2010 on a XP system, to build a project to a version that is useful in a Windows 7 environment?
    Or do I have to run Labview 2010, when I want to build a project that is useful on a Windows 7 system, on a system with Windows 7?
    Please give me some information.
    I hope to hear from one of you soon.
    Regards,
    Kenny
    Solved!
    Go to Solution.

    Is it possible to build a project with Labview 2009 on a Windows XP system, that is useful for a system with windows 7 on it?
    Thanks.
    Philippe B.
    Certified Associate Developer / Dépt Moyens d'essais
    www.ingenia-system.com

  • Possible bug: Saving array with extended and double precision to spreadshee​t

    If one concatenates a double precision array and an extended precision array with the "build array" vi and then saves using "Write to Spreadsheet File" vi any digits to the right of the decimal place are set to zero in the saved file. This happens regardless of the format signifier input (e.g. %.10f) to the  "Write to Spreadsheet File" vi.
    I am on Vista Ultimate 32 bit and labview 9.0
    This is a possible bug that is easily circumvented by converting to one type before combining arrar to a spreadsheet. Nonetheless, it is a bug and it cost me some time.
    Solved!
    Go to Solution.
    Attachments:
    Spreadsheet save bug.vi ‏9 KB

    Hi JL,
    no, it's not a bug - it's a feature
    Well, if you would look more closely you would recognize the "Save to Spreadsheet" as polymorphic VI. As this polymorphic VI doesn't support EXT numbers internally (it only supports DBL, I64 and String) LabVIEW chooses the instance with most accuracy: I64 (I64 has 64 bits precision, DBL only 53...). So your options are:
    - set the instance to use as DBL (by right-click and "Select type...")
    - make a copy of this VI, save it with a different name and make it support EXT numbers (don't rework the polymorphic VI as you would break compatibility with other LV installations or future revisions)
    And yes, those coercion dots always signal some conversions - you should atleast check what's going on there...
    Message Edited by GerdW on 05-21-2010 10:01 PM
    Best regards,
    GerdW
    CLAD, using 2009SP1 + LV2011SP1 + LV2014SP1 on WinXP+Win7+cRIO
    Kudos are welcome

  • Project Prof - setup error

    I successfully downloaded the project prof and mounted by double clicking (using Win 8) - found the setup.exe file and launched.  I receive the following error.
    "Setup can't find or validate an installation file.  Please try reinstalling Office from your installation source, or if you installed from a downloaded package, please re-download and re-install, if you continue to have problems, please contact
    Microsoft or your system administrator" 
    The mounted image named itself "15.0.4420.1017" the following folders unzipped during the mounting: catalog, office.en-us, office32.en-us, osm.en.us, prjpror.ww, project.en-us, proofing.en-us, updates.  The following files were in the root
    of the mounted image: autorun, readme, setup.dll, setup.exe
    I have re-downloaded several times and have downloaded 64 bit as that is what I have for my office software.
    Other office software installed: outlook, word, excel, visio, one note, powerpoint
    Please advise as to what I am missing and how to resolve.
    Thanks in advance.
    L

    hi Paul,
    My overall budget is 100000 the project is been  planned  on the overall basis and not on annual basis
    my assigned value in tcode Cj30 is 98000 so i have only 2000 remaining But in information system tcode s_alr_87013558 it is showing me that mine assigned value is only 70000 and remaining is 30000 but however  i  could not make any purchase req or any services activity even though i have 30000.
    What is this Assigned Values is there any report for me to see this assigned values.
    The solution which i did is in tcode cjbw i have deactivated the availability control for the project. Now the 30000 which was available it is absorbing and my problem is now solved but now this available budget is also going in minus values how can i stop this.
    How Again can i Reactivate the availability control. In my budget profile (OPS9) i have put availability control status as 1 (activate at the time of budget allocation)
    And also can u give me the ps community name.
    Regards,
    Abraham

  • Possible Bug In Apex 4.0.2

    Hi Everyone.
    I would like to report what I think is a bug in Apex 4.0.2.
    If you go to my workspace on apex.oracle.com:
    Workspace = EEG
    Username = [email protected]
    Password = galaxy (all lowercase)
    Run the application: 37796 - Elie_Various_Goodies [no credentials are required]
    This app was imported from my 4.0.1 workspace at my job. On the page I created two Date Picker items, P1_BEGIN_DATE and P1_END_DATE. I set them up so that whenever a user selects a begin date, a dynamic action "MANAGE_DATES" fires and automatically sets P1_END_DATE to this selected begin date value. Now when a user goes to select an end date, the displayed calendar starts at the previously selected begin date rather than the default of "Today".
    All of this worked fine on my office (4.0.1) workspace. However, after exporting this app and then importing onto apex.oracle.com, none of this functionality would work. Even worse, whenever I try to select a begin date or even an end date, the selected dates never make it into the date picker fields. Displaying the "Session" window shows these fields as empty.
    It was only after I copied the two date picker fields and also re-created my dynamic action (P1_BEGIN_DATE2, P1_END_DATE2, MANAGE_DATES) did my functionality return.
    This behavior is quite strange. I can only think this is some sort of bug attributed to the export/import process when exporting a 4.0.1 app into a 4.0.2 workspace. I am not sure if this bizarre behavior happens with non-date picker items. Nor am I sure if this beavior would be repeated if I export/import from 4.0.2 into the another 4.0.2 environment.
    Another strange thing I noticed. If I change my date picker items to be "date picker (classic)" type items, the dynamic action does not work at all. This is true in both 4.0.2 and 4.0.1. I'm not sure if this a bug or not. It could be that the classic date picker is just not "javascript" enabled so to speak. If that is true, then it would have been nice if the docs would have warned us about this.
    Has anyone else seen this behavior?
    Thank you.
    Elie

    Hi Joel.
    First let me thank you for the warning about allowing "everyone" access to my workspace.
    You're correct, of course. Anyone could destroy anything within my workspace. I guess I was too trusting especially as I have seen many posts on the Forum where others have given access to their workspace so that responders can offer help. I really should be more discreet about this. Again, thank you. Needless to say, I have changed my password.
    With respect to the possible bug, the MANAGE_DATES dynamic action is intended to be a submit page because that is the only way I can see to get BOTH the P1_END_DATE date picker item as well as the end date textual field to be assigned the selected P1_BEGIN_DATE. I tried to use a dynamic action in which javascript sets the value of the end date textual field to the selected P1_BEGIN_DATE value. This works without the need to submit the page. Unfortunately, this does not cause the P1_END_DATE date picker item to default to this value. Instead, the default remains at today's date. This is why I finally resorted to a dynamic action that submits the page whenever a new value is selected (that is, a "change" event) from the P1_BEGIN_DATE date picker item.
    All of this works in my office 4.0.1 environment. However, I was puzzled when this fails under 4.0.2 on the hosted web site at apex.oracle.com. This is why I posted a "possible" bug in 4.0.2.
    I hope this all makes sense.
    One more thing, as already mentioned in my original post, this "defaulting a date picker" functionality does NOT work at all for the "classic" date picker items in both 4.0.1 nor in 4.0.2. I realize one can implement this functionality (I' guessing) my using, say, a "onChange" javascript call to submit the page. It's just funny that the "classic" date picker items are not acted upon by the dynamic action MANAGE_DATES that submits the page.
    Thank you.
    Elie

  • Is this a bug in JDK1.4.1 regarding JDesktopPane

    Is this a bug in JDK1.4.1 regarding JDesktopPane, when i drag my JInternalFrame in JDesktopPane it becomes little bit sticky and flickery, but when i run same application with JDK1.4.0, works fine, any idea/comments why ?

    Is this a bug in JDK1.4.1 regarding JDesktopPane, when i drag my JInternalFrame in JDesktopPane it becomes little bit sticky and flickery, but when i run same application with JDK1.4.0, works fine, any idea/comments why ?

  • In Premiere Pro, is it possible to change the project aspect ratio once started?

    In Premiere Pro, is it possible to change the project aspect ratio once started?

    On a side note, 'projects' do not have as aspect ratio, sequences and footage do.  And a project can contain any number of sequences or footage.

  • Possible bug? formatted number 0 displays as  4,294,967,295

    This is really two questions in one. First, I have a routine
    that sometimes provides a result of 0, which is *sometimes*
    displayed in an AdvancedDataGrid column as 4,294,967,295, which I'm
    assuming is somehow a meaningful number (largest int?). Anyway, I
    have an ADG with a column defined as:
    <mx:AdvancedDataGridColumn headerText="Remaining work"
    labelFunction="rem_work_fmt" textAlign="right" />
    The labelFunction called is shown below:
    private function rem_work_fmt(item:Object,
    column:AdvancedDataGridColumn):String
    var num:String =
    numberFormatter.format(item.get_remaining_work());
    trace ("result: " + num);
    return num;
    The trace output prints: "result: 0" as expected, but the
    number displayed in the grid is sometimes 0 and sometimes
    4,294,967,295.
    More weirdness, this only happens to the last column in the
    ADG. I call the same format logic on a different column and have
    never seen the wrong result. Also, the same underlying function
    "get_remaining_work()" is called elsewhere on the same data and the
    result is correctly displayed in a text field as 0.
    Second question, I've run into some other possible bugs,
    which I haven't reported because I found a work around. How does
    one do that in the beta program?

    lw1001,
    Bugs can be filed in the public bug base at
    http://bugs.adobe.com/flex/
    You'll need to sign up before you can submit bugs.
    Also, if you can attach the bug files to the bug report, it
    makes it a lot easier for Adobe to investigate.
    Let me know if you have any further questions/problems.
    Peter

  • A possible *bug* in java jcombobox

    Hi all,
    I think i found a possible bug in java jcombobox .. i am sure some of you must have already experienced it..
    supposedly you put a jcombobox in a jpanel
    returned the panel from a method to a calling method..
    and that method adds it to another panel that it had created to a frame..
    and if this happens dynamicaly at runtime, as only after u click a button..
    meaning : without adding the combobox or the immediate parent panelto the contentpane .. directly..
    Then,
    your combox's keylistener may not catch events fired.
    .. this has happened to me many times.. and always i could only find a way out
    .. by adding the combobox to panel that is loaded during startup itself and is
    .. not returned through a method call.
    Your opinions please ?
    'Harish.

    All components in a UI are created at run-time.
    When you create your JFrame you call pack() to align and resize the UI. This validates all the components, and sets the default focus on what ever component should have the focus at start up.
    When you create components and add them as children of another component you have to validate the child and parent. This can be done by calling JComponent.validate()
    As for keylisteners not getting called, this might be fixed if you call grabFocus on the new combobox. I can't see a reason why any listener would stop working.
    For me to really understand what your talking about. I'd need to see source code reproducing this problem.

  • A bug in the warehouse builder regarding mappings of dimensions

    Hi there
    I do not know if this is the right place to submit a possible bug. Anyways - here goes.
    Warehouse builder client: 10.1.0.2.0
    Warehouse builder repository: 10.1.0.1.0
    I'm creating a dimension, having one level attributes property as a varchar2(30). Thus it has a length of 30. Now, later on I decide this was an error. I update the property to a number, deploys, and reconcile the dimension inbound in the mapping. From now on, it will give an error, since it remembers the length. And a number has a size, not a length. If I remove the dimension from the mapping, and inserts it again, the error still occurs.
    By the way, I am able to reproduce this.
    Anyone who has experienced this, and can blame the stupid user (me) or classify this as a bug?
    Yours
    Kim Andersen

    Hi Igor
    The "error" is actually a "warning":
    Warning: VLD-1004: Column length of ASD_ASDASD is longer than the target column length.
    where ASD_ASDASD is the dimension property, which I altered. It is annoying, though, to have warnings on the list, that aren't needed. And I also spent considerable time thinking that was the error in a mapping, whereas it was a stupid mistake made by me somewhere else :)
    If it's a registered bug, do I get to win some branded Oracle candy?! :)
    Yours
    Kim

  • Is it possible to make my project exe

    dear members
    my project is composed of 30 fmx file in addition to
    60 rdf file
    my question is
    is it possible to make my project executable package (setup file that runs under winows98 or xp)
    and how?

    You will have to contact Wise about getting their software. See the link provided.
    We have the clients install the forms runtimes before installing our application.
    As an alternative, you can use the Oracle installer to install both the Forms Runtime and the forms files. You need to search Oracle TechNet for the Oracle Installer documentation. The oracle Installer does not build a single executable, but can handle installing both the Forms Runtime and the Application in one step.

  • Whether PO Creation,GRN & MIRO Possible for material w/o Profit Center ?

    Hai SAP Gurus,
    Whether PO Creation,GRN & MIRO Possible for material w/o Profit Center ?
    1) I want control it. So no user can create a Master without profit Center even select Basic Data 1 & Basic Data 2..
    kindly Guide me clearly

    You asked a similar question in your previous thread
    Re: Is it possible to Create Material Master without Profit Center ?
    You can make the profit center field Mandatory , steps have been specified in the above thread.
    Profit center field comes in "General plant data storage 2"  view and "sales plant data"  views only.  so if a material is made with basic 1,2 views only , it wont come into the picture.  But that shouldnt be a problem  , coz  its not Possible to create PO.GRN and MIRO  for a material with only Basic views.
    Raviraj

  • Can someone confirm a possible bug with Universal Access?

    Can someone confirm a possible bug with Universal Access?
    I have a Mac Pro 3,1, 10.7.1 but if you could confirm or not this possible bug with any model.
    In Energy Saver preference pane:
    Set Mac to never sleep.
    Set Display Sleep to ~2 minutes.
    In Desktop & Screen Saver:
    Set screen saver to start at ~1 minutes.
    In Universal Access:
    Check Enable access for assistive devices.
    Check radio button Zoom to On.
    Zoom in window not checked.
    Confirm that Zoom works by pressing:
    ⌥⌘= (option, command, =).
    Set screen back to normal by pressing ⌥⌘-.
    Let screen sleep after screen saver starts.
    Wake screen and see if ⌥⌘= still works.
    Thanks … Ken

    Other than the time intervals (smallest Screen Saver kick-in is 3 minutes), it works fine for me - at least I can still zoom in/out after waking the display.
    Tested on two different MacBook Pro models in 10.7.1

Maybe you are looking for

  • IChat AV problems with Comcast as ISP

    I've been a user of iChat AV for several years, and in the past 6-8 months it's stopped working as well as it used to. I routinely used it to connect from California to Florida and Indiana, and now I get about one minute or less of decent audio and v

  • 3G - IOS 4 locked up on backup, Instead restored. Not connecting to I tunes

    Downloaded new ITunes. Tried to install IOS4. On installation, and after 12 hrs of not completing the backup, I followed advice on a forum and did a restore. Now IOS4 is installed and working ok with just a few of my apps. Notes and contacts are all

  • I have a macbook the aprostrophe keeps filling in data fields

    i have a macbook. In safari, word, excel, and help, the aprostrophe keeps being repeated in the data fields. I have cleaned the keyboards. Would the face cover need to be replaced? Is this a motherboard issue? Thanks

  • To show the release status of the transport request

    Hello Experts, I am having a requirement like the following: I need to list the transports along with the release status of the transport request in a View. Release status means that transport request imported into Development system, Quality system

  • Adding "author" name in iWeb

    I mistakenly omitted the Author name when I submitted my feed.  I am using garageband-to iWeb and then publishing to iTunes.  How do I get the iTunes store listing to show my author name instead of "Unknown".  I know how to make the changes in garage