About production order change historic records

The users want to know about production order change historic records.how can I get it, please do me a favour. Thanks.

Hello ,
Look into:
SAP NOTE: 1407961 and
History of production order changes
Please search the forum first for such questions.
- Pushkar
Edited by: Pushkar Patil on Aug 6, 2010 9:56 AM

Similar Messages

  • AFTER IMPLEMENTING OSS NOTES 390635 HOW TO SEE PRODUCTION ORDER CHANGE

    Hi Experts...
    Requirement: AFTER IMPLEMENTING OSS NOTES 390635 HOW TO SEE PRODUCTION ORDER CHANGE HISTORY?
    I have seen many threads about implementing OSS NOTES 390635, but hardly any one narrated the process in detail as to how to see 'Change History'..
    I just would like to know 'how' and 'from where' to find Order Change History in detail (i.e Prod .order Comp. change history, Prod. Ord. Operation Change History, Prod. order header change history etc..)
    In general this isssue might sound old one..but 'POST IMPLEMENTING OSS NOTE 390635' is rare one.
    Folks need your expert comments and valuable suggestions....
    Thank You...
    Lucky

    Dear
    You should goto CO02-Enter Production Order -Goto -Change Management -Here it will list down all the chages with relevent information .
    Refer : Re: Production order changes history
    Production orders
    Regards
    JH

  • User exit to populate profit center in production order change (CO02)

    Hello,
    The requirement is to populate the profit center in production order change (Tcode CO02). I know the user exit that can populate profitcenter in CO01 but it's not called in CO02. Ther other user exits that I found are for checking but not for changing
    Is there a user exit /BADI that can acheive this requirement?
    Thanks a lot for your advise.
    Joe

    Hi,
    Use the user exit PPCO0007 ,function module EXIT_SAPLCOZV_001
    HEADER_EXP-PRCTR
    Thanks,
    Shailaja Ainala.

  • Regarding Production order changes work flows

    Hi to all,
    I activated WS20000387 work flow template. its regarding the production order changes .
    briefly: i created one production order, immediately assigned person will get a message in his SAP inbox.
    he has to double click/execute on that mail, then system will take u directly to the production order screen. there is no need to enter that Order no.
    but here, after double clicking, system is asking The Order no.
    we have clients 300,500 and 700.
    i executed same work flow in 300 successfully,
    700 is not modifiable. thats y i did all the settings in 500 and copied the request to 700.
    i am getting  the problem in 700,, i compared all the settings in 300 and 700, but no use,,,all are same,,,but not executing in 700.
    anybody can help me in this regard.

    You Can use below FM to confirm Production order and it is very simple BAPI.
    BAPI_PRODORDCONF_CREATE_HDR -> just check in where used list.
    Thanks
    Seshu

  • Production Order Changes...

    I need the ability to identify changes made to a production order and the user that made the change.  There are instances of incorrect changes being made to production orders with no way to identify the user that made the change.  As examples, components are being 'final issued' but no one knows who set the 'final issue' indicator.  Labor hours are changed with no traceability to the user who made the change.
    SAP contains the capability to track changes to material master data, BOM data, and routing data.  Is there the same capability for production order data?

    Dear ,
    You need to activate Order Change Managment-SPRO-Shop Floor Control -System Modification  in case to trak production order change :
    A.Enhancements for Order Maintenance
            1.Enhancement for the Display/Change of Order Header Data
            2.Check Changes to the Production Order Header
            3.Checks Changes to Order Operations
    B.Enhancements for Order Change Management (OCM)
             1.Check Conflict for Change Step
             2.Definition of Comparison Fields for Order Comparison
    C.Enhancements for Order Confirmation
    Otherwise , from Basis side you can trak by
    1.ST03
    2.STAD-Provide  SAP T-code , user id , Client .Here you can find out what are the changes user did for any production order based on SAP Trxn .
    Regards
    JH

  • Send production order changes to external system IDOC

    Hi,
    I need to send production order changes to an an external system. I understand that I can trigger idocs using t-code POIT.
    but my requirement is when a order is changed, i want to trigger an IDOC to external system with the new PO data...how can I achieve this

    Hi Swathi,
    A very high level idea.
    You can use the user exit..."LXCO1U06" and call the transaction POIT in back goround and submit the idoc. This exit is used @ save of TA code CO02. Moreover as the production order can be changed through several transactions like COHV, CO40, COOIS etc....you have to check whether this exit would be applicable for all transaction.
    Regards,
    Chinna

  • Deactivating production order changes after 1st operation is confirmed

    Hi,
    I want to deactivate production order changes after 1st operation is confirmed through CO11n.Ie. production order qty should not be allowed to change after 1st operation is confirmed.
    Expecting ur immense help on this.
    Regards,
    JS Karthi

    Dear ,
    PPCO0007
    EXIT_SAPLCOZV_001 Exit when saving production order
    Provide the restrictions in coding, so that when saving the order check for the order status PCNF or CNF and quantity change.
    Check thread
    first operation confimed - after system allowed changed order qty
    Regards,
    Ishwar

  • Production order change

    Dear All,
                      I want to restrict  the changes made to the order once it is released how can i do it?
    Vinit

    Dear ,
    What are  you looking for in production order changes ? Is it qty ? Is it Component ?
    I think you don't have to use OCM, you can also use the modification which is provide by SAP in SAP note 390635
    I hope you can restrict at user level changes in various screen variant  by appling User exit .You need to take the help of ABAPer to utilise the user exit in CO02.
    1.You may use user exit EXIT_SAPLCOBT_001 -(PPCO0007).You can make use of the exception NOT_ALLOWED_WITH_ERROR in this exit
    2.PPCO0012 Production Order: Display/Change Order Header Data
    3.PPCO0018 Check for changes to production order header
    4.PPCO0019 Checks for changes to order operations
    For farther information , you can goto  T code CMOD - Project Managment of SAP Enhancements- Click on Utilities in the menu bar - SAP Enhancements - under Exit name Give  * ,remove maximum number of hits value from 500 and execute.Select one which suits to your requirement.
    Hope this will be useful to you
    Regards
    JH

  • Production order changes Tracing

    dear all,
    in the production order how can i find out who make changes like delete materials if there are many people can use co02 , I need to make a tracing to a particular order , is there's any log to do this?
    thanks in advance
    Milad

    There is no std T code available for check the changes made in production order
    IF you want you need to activate the OCM or apply the note 390635
    please refer below thread
    Process Order Change Log history
    Re: Production Order Change Management

  • Function about production order component material

    WHO can tell me the function about  production order component material?
    When import production order number , the function export tables about component material.

    Hi!
    you can use FM CO_SF_RESB_READ
    or directly from RESB table
    select single rsnum  into lv_rsnum from AFKO where  aufnr = aufnr.
        SELECT * FROM resb INTO TABLE lt_resb WHERE  rsnum =lv_rsnum AND xloek NE 'X' .

  • Production order changes tracking

    Hello All,
    How can one track the changes made in the production order such as component add/deleted, qty changed, operation added/deleted?
    Except OCM.
    Regards,
    Mayur

    Hi Frind,
    Plant maint & custmer services -- Maintenance and service order -- functions and settings for order type -- define change doce, collpurchase req indeciator operation Ho
    here select u r plant and order type  and tick on MatStatchange Doc
    now go to u r production order  GOTO tab-- change manangement
    here all change made got recorder , but if u made recording on it will give huge lode on system,concern with BASIS people before changing , it work for me try this
    Regards,
    Girish

  • Open production order issue in recording

    Hi,
    I am doing an LSMW recording of the transaction CO02 for the release of open production orders.If i try to release an order which has a missing part list a pop up appears which has the following three options
    1. Release order
    2.Mising part list
    3.Cancel.
    I need my LSMW to handle the release of production orders even when there is a missing part and hence i need to record the pop up screen.
    Can anyone let me know how it can be done ??
    Regards
    M

    Hi,
    Check whether yours lot size in routing is greater then 1.
    If yes then make it zero then i think it should work.
    Regards,
    Vishal

  • Add a new field to Co02 ( production order change )

    Hello, I need to add a new field to the transaction Co02. I've found the following customer exit, but don't know which is the proper one. Maybe none of them can meet my requirement. Does anybody has any idea or experience?
    Exit name     Short text
    PPAPO002     Publication of APO Data in Transfer from APO to R/3
    PPAPO003     Production Order R/3->APO: Check if Operation is APO-Relev.
    PPAPO004     Planned Order Conversion from APO: New BOM Explosion?
    PPAPO005     Enh. of Relationships in Proc. Order during Transfer to APO
    PPAPO006     Influencing Initial Supply of Manufacturing Orders
    PPAPO007     Overriding Checkbox Fields for Production Order APO -> R/3
    PPAPO008     Override Order Type for Planned Order Conversion
    PPAPO009     Customer Exit for Addition of Components and Items
    PPAPO010     Filtering Components out of Quantity Propagation
    PPAPO011     Performance-Related Adjustment of Remaining Duration
    PPCO0001     Application development: PP orders
    PPCO0002     Check exit for setting delete mark / deletion indicator
    PPCO0003     Check exit for order changes from sales order
    PPCO0004     Sort and processing exit: Mass processing orders
    PPCO0005     Storage location/backflushing when order is created
    PPCO0006     Enhancement to specify defaults for fields in order header
    PPCO0007     Exit when saving production order
    PPCO0008     Enhancement in the adding and changing of components
    PPCO0009     Enhancement in goods movements for prod. process order
    PPCO0010     Enhancement in make-to-order production - Unit of measure
    PPCO0012     Production Order: Display/Change Order Header Data
    PPCO0013     Change priorities of selection crit. for batch determination
    PPCO0014     Select process orders for external relationships
    PPCO0015     Additional check for document links from BOMs
    PPCO0016     Additional check for document links from master data
    PPCO0017     Additional check for online processing of document links
    PPCO0018     Check for changes to production order header
    PPCO0019     Checks for changes to order operations
    PPCO0020     Process order: Display/change order header data
    PPCO0021     Release Control for Automatic Batch Determination
    PPCO0022     Determination of Production Memo
    PPCO0023     Checks changes to order components
    PPCP0001     P.Cost Planning: Additional Cost Elements for Person
    PPEACT01     Customer Fields at Mode D
    PPECMP01     Customer Fields: CMP Nodes
    PPECMP02     Customer Fields: CMP Variants
    PPEGEN01     General Engineering Node: Customer Fields
    PPERES01     Customer Fields at RES Node
    BTW, if this is impossible, can I rename a field (field name on the screen) of Co02 that I don't need, and add my own values to it?
    Thanks.
    Nuno

    Hi Nuno,
    how did you solve this problem?
    tks

  • BAPI or FM for Transaction CO02 (Production Order Change)

    Hi I have to change fields(CHARG,LGORT,RGEKZ,MENGE,EWAHR) in sap transaction (CO02-Change Production Order) in COMPONENT LEVEL
    Can anyone suggest one BAPI or FM for this.

    Hi Ravi
    Thanks for your Suggestion.
    I tried with BAPI <b>'BAPI_ALM_ORDER_MAINTAIN'</b>.
    It is updating in the transaction CO02 also.
    Actually it is using for Internal Orders.Can i use this one for <b>PRODUCTION ORDER</b> Also.
    Umashankar

  • Production Orders Changes Log

    Hello,
    I would like to know if there is any Standard way in SAP to be able to see the modifications for a production order. I would like to see modifications in quantities or components.
    Does anybody knows if it is possible to retrieve that information in a standard way?
    Thanks

    Dear
    Changes in Production Order can be  traced through following ways :
    1.Order Change Management :
    Frist a Overall profile should be configured in SPRO > PRoduction>Shop Floor Control > Operations>Change Management for Production Orders-->Define Overall Change Profile.
    Create a Change Number CC01 with Release Key
    In Object Types select/tick "Actv", "object", "MgtRec",
    You get the Change Number by Saving .
    Use this Change Number to Change BOM or Routings
    Then Release the Change Number useing Release Key till then you don't find the Change of BOM in Production Order.
    Then go to Oder Change Process T Code :- COCM
    Tick Change Number and Select the Change Number & Execute
    Select the Production Order, click on Procurement element icon you get another screen select and execute again.
    You get an Pop-Up screen. "Determine changes, Check changes, Change Original Order.
    you see the changes in BOM for Production Order i.e. after COCM.
    Then Confirm the Changes in Production Order then New changes will be Active in production Order.
    Use COCM1 to find out the details or CO03--Extra --change
    Please check link  : http://help.sap.com/printdocu/core/Print46c/en/data/pdf/PPSFC/PPSFC.pdf
    2.To  get the changes in Production Order apply SAP Note 390635.
    3 .You can use T.code AUT10 to check the changes made to production orders in specified period.
    Regards
    JH
    Edited by: Jiaul Haque on Nov 28, 2010 2:11 PM

Maybe you are looking for

  • "Learn" no longer working with Euphonix?

    I've been messing around some more with Euphonix hardware. It seems that since there was 'native support' with Eucontrol 2.5.5 and with LP 9.1.1 there is no ability to assign values to the controls. This means that Command-L no longer appears to work

  • Download Button in Web Report

    Hi Experts, I want to Add a Click Button on my Web Template. Which would let me download the report in Excel File. On click of the button it should show my target place as desktop or download folder. Do anyone know whether we have any option in Bex W

  • Multiple email accounts, sending issues

    Hi, I have two email accounts on my iphone, one personal, one work.  When I reply or start an email from my work account, when it's received it's always come from my personal account.  I have double checked the 'from' box when composing emails and it

  • How to include income codes on 1042S reporting

    I am configuring 1042 S processing. The different rates of withholding for treaty countries are being properly deducted. My real question is: Do I need to have different withholding tax codes? I am using 42 with a tax wh type of 03. However, the paym

  • Print Engine in Crystal XI

    I development software in Visual Basic 6.0, it isn´t NET. I have a application what use Crystal Report 5 through Print Engine, I want upgrade to Crystal Report XI. I have try to launch a report from Visual Basic 6.0 with the API "crpe32.dll" of the v