Account Assignment Category & Test material combination

Hi,
   Please look into this issue
   System allowing me to create the PO with combination of Account Assignment category"Q" and "Test material(With out Material code)",but it is giving error message while posting the GR(Account determination error)
In this scenario I am expecting the error message should appear while creating the PO it self,how to block this combination?
Regards
Hari

Hi Hari
check in SPRO what account modifier is assigned to Acc Assn categ. Q, then in OBYC check in GBB if a G/L account is assigned against selected account modifier.
i have got this idea from a solution provided by YOGESH and STEVE in the below thread:
Re: PO
Anjajn

Similar Messages

  • PO: Default Account assignment category per material?

    Hello,
    The requierement of my company is that some materials are purchased for stock and some others for Cost center. But at some point they want to move some of the materials of "cost center" into "stock". So materials will be  "looking" the same in questions of views created, etc.
    So it would be good if there is a way to default the account assignement category by material. Any idea? User-exit?...any possibility totally standard of doing this (withouth enhancemnet/user-exit)?
    Release 4.6c

    Hi,
    It can be done by having two doc. types in the PO one for the stock and the other one for the consumption.No need for the two material types.
    In doc type xy -account assignment is disabled, in the other doc type XZ the account assignment is enabled.
    Also using the user exit ME_PROCESS_CUST, you can define the condition against the doc type.
    Regards,
    velu

  • Purchase Requisition / Order: Account Assignment Category for material type

    Hi,
    When creating a PR or PO for one specific material I would like the system to propose a specific account assignment Category for this material. It shouldn't allow the user to change this account assignment category.
    Is it possible? How should I proceed?
    Thanks in advance.
    Luis.

    I dont think there is any standard procedure for doing this.
    My idea would be to use a user exit say EXIT_SAPLMEREQ_010 for PR and a similar exit for PO and code a Error message check for Material type and account assignment combination.
    For ex : EXIT_SAPLMEREQ_010 is a exit which is called during check in a PR . SO when the user enters a combination of Material type and Acc assignment u can check for the requirements.

  • How to enter an account assignment category for a material.

    Hi guys:
       I am facing following error prompt,please tell me how to enter an account assignment category for a material.
    thanks
    Account assignment mandatory for material 0000000N6451 (enter acc. ***. cat.)
    Message no. ME062
    Diagnosis
    There is no provision for value-based inventory management for this material type in this plant. Account assignment is thus necessary.
    Procedure
    Please enter an account assignment category.

    HI Shyam :
    Go to transaction type OMS2. Check whether the material type u are using is ticked for Value update.
    If not,
    a. Use a different material type
    b. or Use an account assignment category.
    How to use B,that is hot to enter an account assignment cateogory

  • Account assignment category F not showing in PR & PO for stock material.

    Dear All,
    I have created one breakdown maintenance order in that i have planned one stock (L) material, for this reservation is created.
    Then i have run mrp by using tcode md03 for that material.......pr is generated.
    Now when i am going to convert this pr into po, system dosen't show account assignment category for this pr as "F"
    Also when i see in change pr tcode me52n.........._system dosen't show account assignment category as "F"_
    Actually system must show account assignment cateory as* "F" in pr & while converting pr to po.*
    How i can resolved this issue. Any config setting is to be done kindly give the step by step procedure.
    Thanks & Regards,
    Sandeep

    Hi,
    When you select L stock Item that means the material will come under stock at stores. And then goods issue will be done against your reservation.
    Coming to account assigned PR as F order then when GR is done agaist PO the material is directley isued to the order. From MRP system only checks agaist that material what the requirement and what is available stock, if short fall exists then it will generate PR with out any account assignment based on material master setting.
    For ex if for the same material requirement has come from 4 orders then which order no system will consider to generate a PR.
    Hope it is helpful.
    Regards,
    N.Nagaraju

  • SC with combination of Limit and account assignment category as unknown(U)

    Hi,
    We are at SRM 5.5, Please let me know is it possible to create SC with combination of Limit and account assignment category as unknown(U) then PO with same combination and distrribution of cost to different cost centers at the time of confirmation from SRM side.
    Please guide me processs of the same in steps
    Many Thanks,
    Venkat

    It is for Extended Classic scenario

  • Material No. Mandatory with account assignment category K

    Dear,
    Can i make Material No. Mandatory with account assignment category K
    Please advise
    Rami

    Hi,
    It is not possible to make material number mandatory for Account Assignment Category.
    But you can make Account Assignment mandatory for a material if material is non-valuated (Mat Type - UNBW) or Non-stock (Mat Type - NLAG)

  • Account Assignment Category in Rework Order for non valuated material

    Friends,
    We created non valuated material for rework. I want to accumulate the rework cost. When i am trying in CO02 = Header = Settlement Rule where the category is MAT but I want it to be ORD.
    How that category is changed to ORD, so that I can able to accumulate cost with respect to order?

    Hi,
    Whether you are creating the rework order with material? Actually rework order is supposed to be created without material with transaction CO07. Here in this case you have to define the account assignment category ORD in settlement rule.
    In some cases to meet the requirement we can create the rework order with material also through transaction CO01/CO08, but in this case the account assignment category will be MAT by default. Therefore you cannot change it to ORD.
    Hence you need to create rework order to have account assignment category ORD w/o material only.
    Regards,
    Sandeep

  • Non stock material - Account assignment category Q

    Dear All,
    I have came across a strange situation.
    For non stock material, qty update and value update is un checked in configuration.
    When I am trying to create PR or PO for non stock material, system is giving an error for account assignment category.
    Upto this, everything is fine.
    Now when I am entering account assignment category - Q, system is allowing me. Further ahead, when I am doing GRN, stock is also generated which is against the SAP standard practise. Because stock should be consumed for non-stock material.
    However, for other account assignment category, system is not generating stock and directly consumes the material.
    Once stock is generated, system is also not allowing issue of this material, because qty update is unchecked.
    Would request you to please help me. Do I need to do any configuration in the system for this.?
    Please help.
    Thanks & Regards,
    MP

    Hello,
    Thank you ver much for your inputs.
    But the problem is, how come stock generated for a material of material type "non-stock material". As per standard practise, non-stock material should be directly consumed and can not come in stock.
    Problem comes only when we use account assignment category - "Q". For other account assignment categories, stock is getting consumed.
    Thanks & Regards,
    Mihir Popat

  • Material group & Account Assignment Category

    All,
    Whether we can make Material group and Accout assignment link in PR.?
    Suppose I am creating a PR and selecting a Account Assignment , only specific material groups I shoulb able to select , whether I can make that settings ?
    Kindly advise the best practices .
    regards

    Arif ,
    If I have selected a account assignment ,(for eg 'A') , in PR , then whether I can restrict the materiaL Groups , in such a way that , material groups which should be used for Asset only can be selected in PR ?
    Suppose I am having material groups A1, A2, A3, for asset .
    And M1,M2,M3 for Misc Non Stock .
    Then suppose if I am creating a PR with account assignment 'A' , then only I should be able to select A1 or A2 or A3 .
    If I am selecting M1,M2,M3 , then it shud give some error .
    This is possible ?
    Pls advise.
    regards

  • G/L Account default in purchase order with account assignment category K

    Hello gurus,
    when creating a new position in a purchase order with account assignment category K "Cost Center", the G/L Account No. is always filled with a default account.
    Where and how can I define, what account is used as default GL Account?
    The version is sap ecc 6.0.
    I will reward points all answer!!
    Thank you!

    Hi
    check the valaution class assigned to the material or the material group (if no material is being used)
    Now goto OBYC, Click on the transaction key GBB, for the account modifier VBR, & for the valuation clqass combination - check the G/L account.
    Based on this combination the G/L is determined auitomatically in the PO. if you chnage it here ... it will reflect in PO at the time of creation.
    Thanks & Regards
    Kishore

  • GR going to wrong GL account for PO Item with Account Assignment Category M

    Hi Experts,
    I need some help on GR posting for PO Item with M as AAC.
    PO1 for material ABC with M as  Account Assignment Category, when I book GR for this Item, the GL document generated as below.
    Dr: PRD  (Cost Price Differences)
    Cr: WRX (GR/IR)
    The material ABC price control is "S" and already have standard cost.
    For another material DEF which have ascetically same master data as  ABC and got a similar PO2 with M as Account Assignment Category.
    But the GR document as below.
    Dr: BSX (Inventory)
    Cr: WRX (GR/IR)
    How can be one same setting got so different results, is there any data in Material or PO make these differences?
    Actually the results for material DEF is what we want, how could I avoid the GR results for material ABC.
    Thanks~

    Thanks you Mukthar,
    I have checked all the information and porcess for both material and did a lot of testing in testing system.
    Here is what I found.
    Case
    Material ABC  SO: 1111   PO: 6666 (ACC:M)
    Material DEF  SO:2222    PO: 7777(ACC:M)
    All the information in material mast data, SO, PO are the same.
    The differences is that:
    PO:6666 post GR before Material ABC's standard price release. So the first GR document as below
    Dr: PRD  (Cost Price Differences)
    Cr: WRX (GR/IR)
    This is correct document without material stand cost.
    The problem we reverse the fist GR document, release standard cost for Material ABC. Then re-do the GR. but the GL document still book into  PRD instead of BSX.
    If I create a new SO:3333 and PO:8888 (with ACC M) for material ABC now.
    The GR could be book into BSX.
    It seem like once the PO got GR with 0 standard cost, even I relesed a new price for the material and re do the GR, it still take the previous 0 cost to book inventory which make all the amount into PRD.
    Quite Strange

  • Account assignement category for purchase requisition - error message

    Hi All!
    I created a new Item category in service order (IW31) "O" with the account assignment category "O". If I don't set the Consumption posting indicator to V for this category, when I set the account assignment category "O" to the purchase requisition in <i>Plant Maintenance and Customer Service-Maintenance and Service Processing-Maintenance and Service Orders-General Data-Define Account Assignment Category/Document Type for Purchase Requisitions</i>, I receive the message:
    <b>"Acct. assign. cat. "O" for purchase req. does not exist.
    Message no. CS 075"</b>
    The client request is not to charge immediately for the goods receipt with the relevant costs the service order. The client wants to create the goods receipt in a storage location for the plant and then confirm the components and charge the costs after the component confirmation (movement type 261) - similar to stock material.
    Any idea about what should I do?
    Thank you.

    Hi Everyone,
    The problem is solved now. The cause was that the test requisition that I was making was satisfying more than one rules and hence I end dated the remaining rules which solved the problem.
    Thanks!

  • PO with account assignment category F

    Hi Gurus,
    For PO with account assignment category F, the system is creating aaccounting documents during GRN for some POs & for some pOs it is not . What could be the reason.
    Regards,
    Kumar

    Hi SAPMM6,
    Check details of account category refernce 'F' whether tick is there for GR Valuated.
    Also when you are creating PO with multi-account assignment then also GR is non-valuated as per SAP standerds.
    Also check the both POs for material code and there valuation classes.
    Hope your problem gets resoled.
    Regards,
    Gitesh

  • A/c assignment category for material type

    Hi Gurus,
    1) Can I fix a/c assignmnet category for a material type? For example, I want a/c assignment category K for NLAG materials. If while creating PO for a NLAG material, somebody forgets to enter A/c assignment category, it should give an error msg "A/c assignment category is manadatory for the material type"?
    2) If Gr-based IV is not checked in ERS PO, then while running MRRL statement, what type of error should come and what will be the remedy at that stage?
    Thanks,
    Kumar

    > 1) Can I fix a/c assignmnet category for a material type? For example, I want a/c assignment category K for NLAG materials. If while creating PO for a NLAG material, somebody forgets to enter A/c assignment category, it should give an error msg "A/c assignment category is manadatory for the material type"?
    You Cannot Fix account assignment Category for a Material type.
    > 2) If Gr-based IV is not checked in ERS PO, then while running MRRL statement, what type of error should come and what will be the remedy at that stage?
    GR Based IV is an Optional. If you Activated this in Vendor MAster and PO then System wont allow to Post IR before GR.

Maybe you are looking for

  • AN ERROR OCCURRED WHILE SENDING MAIL.

    I RECEIVE THIS ERROR MESSAGE WHEN I CLICK ON THE TAB ATTACH TO EMAIL.  PLEASE HELP

  • How can I tell if iPhone 5s has clean imei?

    How can I check an emei number to make sure it's clean?

  • AutoFill Username and Password Question

    I've tried everything I can think of. Specifically, someone using my IPad logged onto Facebook and when they did told it not to save their username and password. Now my saved username and password is not showing up when I load the main Facebook page.

  • Runtime.exec() hangs with 1.4.1

    Hello altogether, I am trying to execute a command with Runtime.getRuntime.exec() I have already taken care of capturing the output and I observe that depending of the program I try to execute the process hangs. I am using JRE 1.4.1_02 under Redhat 7

  • Trouble to install iTunes on my Windows Vista 32-bit laptop. Please help!

    I am trying to install iTunes on my Windows laptop (vista- 32 bit), but at the end of the installing process it keeps saying that I am missing a program to complete installing (no error code). After this message it will de-install iTunes. How can I f