Accurate Exchange Upgrade Dates for BT Infinity?

Is there anywhere online that details the exact or most accurate information on when your local exchange will be upgraded for BT Infinity?
I've been patiently waiting for my exchange to be upgraded (STBSETT, Bassett, Hampshire) and was pleased to hear a rumour that it was happening for Southampton Sept 2011 which I'm assuming my exchange comes under. However when I check online at sites like Samknows it doesn't state anything. I'd like some accurate information please.

Hi All infinity install dates are estimates this link should help http://www.openreach-communications.co.uk/superfast/where-and-when/default.htm
If you want to say thanks for a helpful answer,please click on the Ratings star on the left-hand side If the reply answers your question then please mark as ’Mark as Accepted Solution’

Similar Messages

  • Exchange rate date for FI (VBRK-KURRF_DAT) on invoice

    Hello
    Where I will find Exchange rate date for FI (VBRK-KURRF_DAT) on invoice? Is it hidden field? I just see on header level exchange rate.
    Is exchange rate for postings taken from billing date or pricing date?
    Thanks in advance.
    Margaret

    SO VBRK-KURRF (exchange rate for FI)  is taken from "pricing date" in standard?
    Are you 100% sure? :
    FIrst of all: there is no pricing date (PRSDT) on invoice header level
    Second: I`ve got information from FI that VBRK-KURRF is taken from posting (billing date) VBRK-FKDAT
    I have found also programs, there is provided folloving calculation formula:
    LV60AA90
    Currency conversion (WAVWR is in local currency so far)
            ACTDATE = VBRK-KURRF_DAT.
            IF ACTDATE IS INITIAL.
              ACTDATE = VBRP-PRSDT.
            ENDIF.
            DA_WAVWR_HW = VBRP-WAVWR.
            DA_WAVWR_KW00 = WAVWR_KW00.
            DA_WAVWR_PCVP = WAVWR_PCVP.
    LV60A036
    Determine date
        IF vbrk-kurrf_dat IS INITIAL.
          ld_kurrf_dat = vbrk-fkdat.
        ELSE.
          ld_kurrf_dat = vbrk-kurrf_dat.
        endif.
    So what is the verdict?

  • Exchange Upgrade Dates?

    Hi,
    This has probably been asked before but I could not find it in a search...
    My exchange (SAXILBY) currently does not have any dates for upgrade to either ADSL2+ or FTTC.  How do I find out when it is scheduled to be upgraded?  My ISP offers both services and I would like to take advantage of the extra speed gains without having to move house!  Unfortunately Virgin did not lay cable so I can't go that route either.
    If there is no scheduled date is there somewhere I can lodge a request?  OK, I know one person isn't going to make a difference, but someone has to start the ball rolling.
    Regards

    Hi Jedra,
    The scheduled upgrades are currently listed at 
    www.openreach.co.uk/exchange_plan.
    It does look like your exchange isn't scheduled for the roll out, but you can register your interest at www.bt.com/Infinity.
    Thanks,
    Stephanie
    Stephanie
    BTCare Community Manager
    If you like a post, or want to say thanks for a helpful answer, please click on the Ratings star on the left-hand side of the post. If someone answers your question correctly please let other members know by clicking on ’Mark as Accepted Solution’.

  • Fixing Exchange rate date for Purchase invoice

    Hello All,
    As per standard SAP the exchange rate in the PO is calculated based on the PO creation date. When the exchange rate is not fixed in the PO, then the exchange rate in the subsequent GR and IR documents is calculated based on the posting dates of these docs.
    Our requiremnt is that Posting date for GR/IR  should always the system date which is possible and but in this case system also takes exchange rate as on system date. *But we want the exchange rate should be taken as on last day of the previous month.*
    If anyone have worked on such a scenario or have any idea on how can this problem be answered please share the some info.
    Points assured.
    Thanks
    Warm regards.

    Hello,
    Thanks for the prompt update.
    We are not abel to fi nd any user Exit to attain this functionality, can you let us know what user exit can be used to achieve this.
    Warm Regards,

  • Provision date for BT Infinity for my number

    The Openreach 'When and Where' site is now telling me that my exchange (Basford) is 'Accepting Orders'. The fibre cabinet has been installed and there has been cabling activity in the area. The BT Infinity checker however, is still telling me that I can't have service on my number until 31 March 2012. Is there any way of finding out a more realistic RFS date or do I need to keep checking every day until the checker changes to 'Choose a package'?

    You got it in one. There are several reasons why it might not yet be ready. Typically the end of quarter dates are put there as a place hold and may be brought forward. Similarly though they can go back...it just all depends on if there are problems with the installation.
    If you want to say thanks for a helpful answer,please click on the Ratings star on the left-hand side If the the reply answers your question then please mark as ’Mark as Accepted Solution’

  • Exchange Rate date for Invoice posting for Slovak Republic

    Hi,
    We have a requirement wherein for Slovak Republic, Invoice should pick up ( at the time of Invoice Posting) the exchange rate from the Delivery Note date and not the Invoice Posting Date. This is applicable for all vendors which have a Slovak Republic VAT Registration number. I suppose this is some country specific requirement for Slovak Reublic.
    Do we have to apply some Notes to achieve this functionality. Any pointers to this issue is highly appreciated.
    Regards
    Anupam

    SO VBRK-KURRF (exchange rate for FI)  is taken from "pricing date" in standard?
    Are you 100% sure? :
    FIrst of all: there is no pricing date (PRSDT) on invoice header level
    Second: I`ve got information from FI that VBRK-KURRF is taken from posting (billing date) VBRK-FKDAT
    I have found also programs, there is provided folloving calculation formula:
    LV60AA90
    Currency conversion (WAVWR is in local currency so far)
            ACTDATE = VBRK-KURRF_DAT.
            IF ACTDATE IS INITIAL.
              ACTDATE = VBRP-PRSDT.
            ENDIF.
            DA_WAVWR_HW = VBRP-WAVWR.
            DA_WAVWR_KW00 = WAVWR_KW00.
            DA_WAVWR_PCVP = WAVWR_PCVP.
    LV60A036
    Determine date
        IF vbrk-kurrf_dat IS INITIAL.
          ld_kurrf_dat = vbrk-fkdat.
        ELSE.
          ld_kurrf_dat = vbrk-kurrf_dat.
        endif.
    So what is the verdict?

  • Target Dates for Switchover to 21CN

    Just thought I'd resuscitate a question I posed a few months back on the old forum - but which never got answered.
    The target dates for switchover to 21CN were announced, as far as I can see, back in October 2006.   These suggested that my own exchange would be upgraded in Q4 2009.
    As far as I know, it hasn't been upgraded and we have gone past the proposed date.
    Has BT updated these lists since 2006 and if so, where are they available?
    "To forbid us anything is to make us have a mind for it."
    -- Michel de Montaigne, Essays, 1559

    Hi Guys
    The exchanges upgrade dates arn't really something we have control over as these are all handled through Openreach and we generally have access to the same target dates that you can see.
    The probem really is that they are target dates and will be subject to change so I cant really shed much light on specifics however I do know that they plan to reach 2.5m homes by late summer 2010, 4m homes by the end of 2010 and at least 10m by the summer of 2012 with the new BT Infinity broadband.
    I hope this helps.
    Cheers
    Craig
    BTCare Community Mod
    If we have asked you to email us with your details, please make sure you are logged in to the forum, otherwise you will not be able to see our ‘Contact Us’ link within our profiles.
    We are sorry but we are unable to deal with service/account queries via the private message(PM) function so please don't PM your account info, we need to deal with this via our email account :-)”
    td-p/30">Ratings star on the left-hand side of the post.
    If someone answers your question correctly please let other members know by clicking on ’Mark as Accepted Solution’.

  • Changed upgrade date

    My son got sick of his Galaxy S4 and decided to switch to an iPhone 4 that we had at home. He cracked the lens and after trying to fix it, had a dead spot in the screen that was driving him crazy.  I have an iPhone4 that was used on another line.  (My daughter had her phone stolen. I locked her line,bought a new one to replace the stolen one and had the new phone activated on her line.  Then the parents of the little one who pilfered the first phone found it and returned it to us.)
    The problem:  I was looking through the upgrade dates of the devices on my account and noticed that the upgrade date for my son"s line had changed to 1/7/2016.  I know the original upgrade to this line happened in the July-Aug 2013 timeframe and the upgrade date was reflective of that being July-Aug 2015.  I don't know the exact date when we upgraded this line with the S4 but I'm sure that information is not too difficult to find.
    The question:  Why was the upgrade date changed when I didn't get a new phone or change the terms for this line? Just changed phones with one that i already had.

    Why would you go back to a subsidized upgrade? Anyway you;re not going to be able to do an Edge upgrade until the phone is at least 50% off and return in good working condition. If you want a subsidized upgrade you going to have to pay the ENTIRE cost of the phone off first then you can do a subsidized upgrade whenever you want. You don't have both and Edge agreement and a contract.

  • Need upgrade date moved up ( 3 years!!!)

    This is a complex issue about my account. I've gone back and forth about this with both Verizon stores and the customer service call center for YEARS with NO resolution. (There are a mere two phone lines and one tablet line.)
    In September 2011 I upgraded a Motorola (w755?) flip phone to a Motorola Droid phone. (Logic would've dictated my next upgrade date would be September 2013)
    Shortly thereafter my ex-wife experienced a manufacturer defect with her HTC Droid Eris - a widely documented one about the track ball malfunctioning because it was too close to the charge port (resulting in loss of use of the screen). Verizon denied there was a defect and would not offer any assistance in replacing the phone.
    As a result, my ex was forced to "commandeer" MY upgrade date for replacement for the failed HTC phone and subsequent phone (by upgrading my line with her new phone and then switching lines on the phone - an allowable maneuver).
    Fast forward to June 2014. I'm still stuck with my Motorola Droid from 2011 because Verizon won't allow me to upgrade it. It was still working okay when it dropped from a height of 2' onto vinyl tile and the screen shattered. At that point I was forced to use the $100 replacement independent contractor (forget the name). The replacement was the "next" available model, a refurbished Motorola Droid RAZR from 2012. It has been nothing but trouble since two weeks into ownership. After one month the speaker quit working (can't hear any notifications or incoming calls). It doesnt connect to wifi, apps work when they want, keyboard is miscalibrated, webpages don't load even with clear reception. The shell is also cracking and falling apart randomly and there is a bubble under the screen glass where it has decided to detach from the LCD.
    SO... my upgrade date for this worthless Droid RAZR phone is showing 11/26/14. Who, how, and when can I have that moved up to NOW? Hint: I can't use my ex's upgrade date because she already used that for new products via Verizon Edge. SO, I have zero options unless someone from Verizon physically steps in and HELPS me.
    Also, what kind of discount price can you get on an iPhone 6/plus when eligible?? I won't accept anything but an Apple product because the quality control on any other brand (except maybe Samsung) is shoddy at best. Atop these facts, if my upgrade date was moved up to NOW, I would technically have the new phone by my upgrade date because of the back-order nature of new products.
    So after two years of goofiness and 8 years as a VZW customer, I will not accept answers like "no", or "Verizon Edge" - not in my vocabulary. I deserve better and also a little fairness. I believe after 37 months I'm entitled to a) an upgrade at a discount and b) a NEW product. That is all I'm asking. If this was even worth filing suit I would've easily won. Please and thank you!!

    If this was even worth filing suit I would've easily won.
    you gave upgrade to ex, you dropped phone, you replaced another phone falling apart after 2 years. In each case you agreed to the terms, I do not see where Verizon went against the terms.   You drink the kook-aid (getting subsidized phones), you pay the price.   In future, get replacements outside of Verizon so there is no impact on contract date. 
    Good luck, you just missed the 11/15 early upgrade window that was recently offered.  

  • 11.5.10.2 to R12.1.1 upgrade: Error loading seed data for GL_DEFAS_ACCESS_SETS:  DEFINITION_ACCESS_SET = SUPER_USER_DEFAS,  ORA-06508: PL/SQL: could not find program unit being called

    Hello,
    EBS version : 11.5.10.2
    DB version : 11.2.0.3
    OS version : AIX 6.1
    As a part of 11.5.10.2 to R12.1.1 upgrade, while applying merged 12.1.1 upgrade driver(u6678700.drv), we got below error :
    ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
    ATTENTION: All workers either have failed or are waiting:
               FAILED: file glsupdas.ldt on worker  3.
    ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
    drix10:/fmstop/r12apps/apps/apps_st/appl/admin/FMSTEST/log>tail -20 adwork003.log
    Restarting job that failed and was fixed.
    Time when worker restarted job: Wed Aug 07 2013 10:36:14
    Loading data using  FNDLOAD function.
    FNDLOAD APPS/***** 0 Y UPLOAD @SQLGL:patch/115/import/glnlsdas.lct @SQLGL:patch/115/import/US/glsupdas.ldt -
    Connecting to APPS......Connected successfully.
    Calling FNDLOAD function.
    Returned from FNDLOAD function.
    Log file: /fmstop/r12apps/apps/apps_st/appl/admin/FMSTEST/log/US_glsupdas_ldt.log
    Error calling FNDLOAD function.
    Time when worker failed: Wed Aug 07 2013 10:36:14
    ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
    drix10:/fmstop/r12apps/apps/apps_st/appl/admin/FMSTEST/log>tail -20 US_glsupdas_ldt.log
    Current system time is Wed Aug  7 10:36:14 2013
    Uploading from the data file /fmstop/r12apps/apps/apps_st/appl/gl/12.0.0/patch/115/import/US/glsupdas.ldt
    Altering database NLS_LANGUAGE environment to AMERICAN
    Dumping from LCT/LDT files (/fmstop/r12apps/apps/apps_st/appl/gl/12.0.0/patch/115/import/glnlsdas.lct(120.0), /fmstop/r12apps/apps/apps_st/appl/gl/12.0.0/patch/115/import/US/glsupdas.ldt) to staging tables
    Dumping LCT file /fmstop/r12apps/apps/apps_st/appl/gl/12.0.0/patch/115/import/glnlsdas.lct(120.0) into FND_SEED_STAGE_CONFIG
    Dumping LDT file /fmstop/r12apps/apps/apps_st/appl/gl/12.0.0/patch/115/import/US/glsupdas.ldt into FND_SEED_STAGE_ENTITY
    Dumped the batch (GL_DEFAS_ACCESS_SETS SUPER_USER_DEFAS , GL_DEFAS_ACCESS_SETS SUPER_USER_DEFAS ) into FND_SEED_STAGE_ENTITY
    Uploading from staging tables
      Error loading seed data for GL_DEFAS_ACCESS_SETS:  DEFINITION_ACCESS_SET = SUPER_USER_DEFAS,  ORA-06508: PL/SQL: could not find program unit being called
    Concurrent request completed
    Current system time is Wed Aug  7 10:36:14 2013
    ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++

    Below is info about file versions and INVALID packages related to GL.
    PACKAGE BODY GL_DEFAS_ACCESS_SETS_PKG is invalid with error component 'GL_DEFAS_DBNAME_S' must be declared.
    I can see GL_DEFAS_DBNAME_S is a VALID sequence accessible by apps user with or without specifying GL as owner.
    SQL> select text from dba_source where name in ('GL_DEFAS_ACCESS_DETAILS_PKG','GL_DEFAS_ACCESS_SETS_PKG') and line=2;
     TEXT
    /* $Header: glistdds.pls 120.4 2005/05/05 01:23:16 kvora ship $ */
    /* $Header: glistddb.pls 120.16 2006/04/10 21:28:48 cma ship $ */
    /* $Header: glistdas.pls 120.4 2005/05/05 01:23:02 kvora ship $ */
    /* $Header: glistdab.pls 120.5 2006/03/13 19:56:21 cma ship $ */ 
    SQL> select * from all_objects where object_name in ('GL_DEFAS_ACCESS_DETAILS_PKG','GL_DEFAS_ACCESS_SETS_PKG')
      2 ; OWNER OBJECT_NAME SUBOBJECT_NAM OBJECT_ID DATA_OBJECT_ID OBJECT_TYPE CREATED LAST_DDL_TIME TIMESTAMP STATUS T G S NAMESPACE
    EDITION_NAME
    APPS GL_DEFAS_ACCESS_DETAILS_PKG 1118545 PACKAGE 05-AUG-13 05-AUG-13 2013-08-05:18:54:51 VALID N N N 1 
    APPS GL_DEFAS_ACCESS_SETS_PKG 1118548 PACKAGE 05-AUG-13 06-AUG-13 2013-08-05:18:54:51 VALID N N N 1 
    APPS GL_DEFAS_ACCESS_SETS_PKG 1128507 PACKAGE BODY 05-AUG-13 06-AUG-13 2013-08-06:12:56:50 INVALID N N N 2 
    APPS GL_DEFAS_ACCESS_DETAILS_PKG 1128508 PACKAGE BODY 05-AUG-13 05-AUG-13 2013-08-05:19:43:51 VALID N N N 2 
    SQL> select * from all_objects where object_name='GL_DEFAS_DBNAME_S'; OWNER OBJECT_NAME SUBOBJECT_NAM OBJECT_ID DATA_OBJECT_ID OBJECT_TYPE CREATED LAST_DDL_TIME TIMESTAMP STATUS T G S NAMESPACE
    EDITION_NAME
    GL GL_DEFAS_DBNAME_S 1087285 SEQUENCE 05-AUG-13 05-AUG-13 2013-08-05:17:34:43 VALIDN N N 1 
    APPS GL_DEFAS_DBNAME_S 1087299 SYNONYM 05-AUG-13 05-AUG-13 2013-08-05:17:34:43 VALIDN N N 1 
    SQL> conn apps/apps
    Connected.
    SQL> SELECT OWNER, OBJECT_NAME, OBJECT_TYPE, STATUS
    FROM DBA_OBJECTS
    WHERE OBJECT_NAME = 'GL_DEFAS_ACCESS_SETS_PKG'; 2 3 OWNER OBJECT_NAME OBJECT_TYPE STATUS
    APPS GL_DEFAS_ACCESS_SETS_PKG PACKAGE VALID
    APPS GL_DEFAS_ACCESS_SETS_PKG PACKAGE BODY INVALID SQL> ALTER PACKAGE GL_DEFAS_ACCESS_SETS_PKG COMPILE; Warning: Package altered with compilation errors. SQL> show error
    No errors.
    SQL> ALTER PACKAGE GL_DEFAS_ACCESS_SETS_PKG COMPILE BODY; Warning: Package Body altered with compilation errors. SQL> show error
    Errors for PACKAGE BODY GL_DEFAS_ACCESS_SETS_PKG: LINE/COL ERROR
    39/17 PLS-00302: component 'GL_DEFAS_DBNAME_S' must be declared 
    drix10:/fmstop/r12apps/apps/apps_st/appl/gl/12.0.0/patch/115/odf>cat $GL_TOP/patch/115/sql/glistdab.pls|grep -n GL_DEFAS_DBNAME_S
    68: SELECT GL.GL_DEFAS_DBNAME_S.NEXTVAL
    81: fnd_message.set_token('SEQUENCE', 'GL_DEFAS_DBNAME_S');
    SQL> show user
    USER is "APPS"
    SQL> SELECT GL.GL_DEFAS_DBNAME_S.NEXTVAL
      FROM dual; 2                         -- with GL.
      NEXTVAL
      1002
    SQL> SELECT GL_DEFAS_DBNAME_S.NEXTVAL from dual;               --without GL. or using synonym.
      NEXTVAL
      1003
    drix10:/fmstop/r12apps/apps/apps_st/appl/gl/12.0.0/patch/115/odf>strings -a $GL_TOP/patch/115/sql/glistdab.pls|grep '$Header'
    REM | $Header: glistdab.pls 120.5 2006/03/13 19:56:21 cma ship $ |
    /* $Header: glistdab.pls 120.5 2006/03/13 19:56:21 cma ship $ */
    drix10:/fmstop/r12apps/apps/apps_st/appl/gl/12.0.0/patch/115/odf>strings -a $GL_TOP/patch/115/sql/glistdas.pls |grep '$Header'
    REM | $Header: glistdas.pls 120.4 2005/05/05 01:23:02 kvora ship $ |
    /* $Header: glistdas.pls 120.4 2005/05/05 01:23:02 kvora ship $ */

  • The current iTunes 10.5 upgrade does not install on Windows 7 and indicates a faulty install package (error 2324). Advice or details on the release date for a proper fix?

    The current iTunes 10.5 upgrade does not install on Windows 7 and indicates a faulty install package (error 2324). Advice or details on the release date for a proper fix? I'm not able to roll back to the prior version, so I'm stuck in limbo.

    There have been a number of problems with installing the latest iTunes on Windows 7 64-bit machines during the last couple of weeks.  You might want to do a search on that topic and see if anyone has a solution.  There have been various versions of the problem but a lot related to errors in the download package or failure to download.

  • Translation date for exchange rate type 'M'

    Hello friends,
    How do I change the translation date for an exchange rate type, for a particular company code?
    My client wants the translation date for the exchange rate type 'M' to be document date instead of posting date. It is required as per Romanian Law of land.
    Regards,
    Mike

    Mike,
    I assumed your question is for an additional local currency for a company code (this can be changed in OB22).  For the first local currency, the translation date type in OB22 is always set to 3 (Translation Date) and cannot be changed (hence, greyed out).  Following that, in accounting entry transactions (for example FB01), you will see a field (Translation Date) where you can specify a date for which you want the system to fetch exch. rate from the exch. rate table.  In your situation, you will have to enter 'document date' there.
    PS: The reply above by Ravi applies only to tax items' translation, not for all items.  He is basically talking about the indicator that you see in OBY6.

  • BT Infinity date for my post code

    Hi,
    My post code is CH66 5PN, it looks like the exchange has been updated but Infinity is not available for my post code. Please can someone check the PCP? and let me know if it is planed for soon.
    Thanks,
    Bill

    Use this:
    http://www.coolwebhome.co.uk/fibre/checker.php 
    Postcode Exchange Service Type Probability Speed Increase Phase Cabinet
    CH665PN
    HOOTON
    FTTC
    75%
    2.9
    8a
    P18
    CH665PN
    HOOTON
    FTTC, but not available yet
    25%
    P23

  • Middleware technologies used for data exchange in Cloud for Customer system

    Hi Techies,
                     I would like to know what are the different middleware technologies like ALE,EDI and IDOC, Web Services or any other technology plays role in data exchange between SAP ERP and SAP Cloud for Customer system.
    My project includes implementation of SAP Cloud for Sales, I've read many documents and seen various videos for ERP Configuration and Cloud Configuration, I see that there is a standard report that we want to execute and specify the type of data to be exchanged between Cloud for Customer and SAP ERP via SAP NW PI system.
    When executing the report we select the IDOC Type and run the report, so once after execution all data is copied to SAP Cloud for Customer system.
    What about configuration of IDOCS ? Do we need to maintain port, partner profiles, logical system etc ? as usual we do when working on Interface between SAP to SAP systems ?
    Or is it maintained when we make all the communication settings between SAP ERP <-> SAP NW PI <-> SAP Cloud for Customer system ?
    Can anyone help to understand this better ?
    Thanks,
    Gowri Shankar

    Hi Gowri,
    The standard report does exactly that.
    It generates, the ports, partner profiles, RFC destinations and other objects required for communication configuration in SAP to connect to C4C.
    If you are not using HCI, you can directly connect to C4C, otherwise you will have to manually edit the RFC destination and provide the HCI worker node URL.
    Note that this report is part of an Add On which is applicable only after a specific SAP ECC version.
    If you are on lower version, you will have to create them manually.
    regards,
    Anirudh Vyas.

  • Is it possible to use an exchange rate of any date  for amounts of a cube

    Hello experts,
    Is it possible or not to use an exchange rate of any date (ex : 23/02/2009) for amounts of a cube where the time are ONLY Fiscal Period.
    Thanks in advance.

    Thanks for the immediate response.
    The situation is..
    We have the cube , that has only FISCAL PERIODS.
    The user want to apply an exchange rate of the date 23/02/2009 (which is NOT the last day of the period !).
    See here the values of the table TCURR,, for the dates between 20/02 and 05/03.
    Normally, the user wants to use the Rate of the 23.02.2009 --> 0.87800
    Currently all the queries gives a calculation based on the rate of 0.89330, which is related to the 1st day AFTER the posting period that correspond to the given key-date.
    1.There are 3 fiscal periods ; 001 / 002 / 003.
    2.The calculated rate (0.89335) correspond to the TCURR rate of 02.03.2009 (value 0.89330)
    which date correspond to the 1st day after the fiscal periods (002) in which the key-date (23/02/2009) was choosen.
    Hence, we can say that the key-date is u2018Recognizedu2019 by the system as a true referenceu2026 (the choosen period correspond to the choosen key-date) ;
    BUT, it seems impossible to get the rate of a specific date, for a cube that has only FISCAL PERIODS.
    I am looking for
    1.looking in the literature whether this case is explained clearly ;
    2.eventually, finding a way to respons to the useru2019s ,needs
    thanks in advance.

Maybe you are looking for

  • ITunes 7 cannot browse album covers on this computer error and crash

    Installed iTunes 7 yesterday, and now every time I try to go to certain pages in the iTunes store, such as movies or tv shows, I get an error saying "iTunes cannot browse album covers on this computer". Then iTunes immediately crashes. Has anyone els

  • MRP Run with User Exit key for Follow up material

    Dear Gurus, I want to run MRP only for followup materials by using User exit key. For example i have a material X(with discontinued Indicator as 1) and it's follow material is Y. So we have a user exit key as ZFL, with coding as shown below. Now when

  • How to get the filename of the active jsp page?

    how can i get the filename of the active jsp page?

  • Embedding images into servlets

    I have a problem with showing two png files (or jpg files) in the same servlet. I probably thought that I cannot. So I thought I will do the following: Load a html file as output to the user and include references to two servlets, each displaying one

  • Arabic fonts in InDesign CS6

    I¹m looking for some help regarding Arabic fonts on Mac InDesign CS6 (Adobe Creative Suite 5.5). I¹ve designed a company profile in English and they need it to be translated into Arabic for their Middle Eastern branch. They¹ve sent the correct Arabic