Activate by default inspection plan

Hi
i have a problem with inspectn plan
material have an 2 inspetion plans (group no are differtent 1001 and 1002)
both are valid upto 31.12.9999
when am i post the GR for material  goes to quality inspection mode..inspection lot has generated but there task list spection has not captured.. then i go to change inspection lot and assign manually...(1001 or 1002)..then do result regarding and UD
now i used insp plan 1002 .... how i configure to system ...system taken it self by default...1002 always how..
regards
ses

Its SAP default when you have two or more task list with same validity date & no vendor maintained in the "material assignment" in the task list header....no task list will automatically attached after lot creation...
now
1.Either put deletion flag to one task list.
2.use the user exit QPAP0002     Enhancement for material/plan assignment, plan selection

Similar Messages

  • SAP QM Default Inspection Plan for all Inspection Lots created in the Plant

    Scenario: We have a Proto type plant in which Daily 15 to 20 materials are created every day. We have only one inspection plan for all the materials.
    Problem: We don't want to do material assignment in the Inspection Plant header every time a new material is created
    Requirement: Is there any way to default the inspection plan for all the inspection lots created in the Plant by Standard Configuration or User Exit.
    Your answers will be much appreciated and rewarded.
    Thanks in advance,
    Thiyagu

    Hi,
    In our case Creation of Inspection lots are controlled by QM View of Material Master. Our problem is to find alternative for assignment of New Materials in the Plan header in Tcode QP02, as we have only ONE INSPECTION PLAN. So our expection is all QM Inspection Lot created in the Plant should always get assigned to the SINGLE INSPECTION PLAN, with out doing any assignment of material in the Plan.
    Thanks,
    Thiyagu.

  • Create Inspection plan at once for many materials through QP01. Possible?

    Dear Friends,
    Is it possible to create Inspection Plant for more than one material at onece through QP01 when operation activity and Characteristics are same. I will change the Characteristics specifications afterwards.

    As suggested in earlier reply you can assign multiple materials to one inspection plan.
    But you may still need more than one plan because of
    1. UOM is maintained in Inspection plan header. So you have to create different inspection plan if you receive materials in different Unit of measures.
    2. Usage is also at header level, so depending on configuration, usage for 01 inspection type may be different from usage for 0101 inspection type.
    If you like the user exit approach.
    1. Create a dummy material and assign default inspection plan to this material.
    2. In the user exit change the inspection plan assignment.  Assign inspection plan from this dummy material.
    Form us this was a very useful approach during testing or for new material where inspection plan was not created in time.
    Once this default inspection plan is assigned, inspection lot is released even without inspection plan. If we need,  we can always change the default inspection plan in QA02 transaction before RR
    AK Marwadi.

  • Automatic Results Recording for Inspection Plan

    I'm trying to activate automatic results recording, at the beginning I get this meassage: "In customizing for default value of inspection type(400) you have to activate the following check boxes, " check characteristics", "Inspection with task list" & "Automatic assignment", I've done that. Yet, it sill doesn't work and the lot status is "CRTD" however it should be updated to "REL" status.

    Hi,
    Did you search enough before posting this query? There is plenty of discussions over this matter.
    Based on the details given above, I don't think you have created an inspection plan.
    Automatic assignment will assign the task list automatically to the inspection lot once it is created. You didn't mention if you have created one or not. Pl check that.
    If the inspection plan is created, there could be possibility that material is assigned to more than one task list (inspection plan). If that is the case, you wouldn't get inspection lots with REL status but CRTD only.
    ntn

  • Inspection plan creation

    hi all,
    i am creating inspection plan using bapi 'BAPI_INSPECTIONPLAN_CREATE' . it is creating but the issue is in table 'INSPCHARACTERISTIC' there is a field 'SEL_SET1' which is getting populated automatically in transaction and i want that value to be replaced by the one i am passing in table
    'INSPCHARACTERISTIC' but it is not happening.
    Is thers any specific way to get it done through this bapi or is there any exit or badi to perform this task?
    Any pointer will be highly appreciated.
    regards
    vijay

    Yes, I have seen that field.
    You can enter a value for this field only if it is Qualitative characteristic.
    So while populating Qualitative or quantitative indicator values for
    IF INSPCHARACTERISTIC-QUANTITATIVE_IND = 'X'
    INSPCHARACTERISTIC-SEL_SET1 = 'Your value'
    ENDIF.
    If it's Quantitative Do not even pass any value for this field. Not even space.
    In debuggin you can check the INSPCHARACTERISTIC-SEL-SET1 value. It will have the value you passed.
    When I worked on it I remember that there are a whole lot of indicators which are specific to Quantitative or Qualitative. You will have to split the code for them to pass the values separately.
    Note: All the above can happen only if the SEL_SET1 is not defaulted to have a value in configuration.
    Thanks.

  • Procedure to Assign Inspection Plan and to Execute it

    Dear All,
    pls explain me the step by step procedure to ceate an inspection plan and assigning it to an manufactured item and also explain me how to clear the goods from QM after the production confirmation.
    Regards,
    Srini

    Hi muthu
    First include quality view in material master. There assign inspection type 04. Inspection during GR. Then activate this.
    Then in QA 32 assign inspection characterstics with UD code and set release to this.
    Once you do GR for production in MB 31 goods will be automatically posted to inspection stock.
    Then double click on that in MD 04 screen and do UD with good quantity and scrap qty with correct storage location.
    after savings this goods will be automatically posted to unrestricted stock.
    Hope this will clear
    Regards
    J . Saravan

  • Mass maintenance of inspection plan

    Hi,
    Guru,
    How to  replace  MIC's of some inspection plan through workbench CWBQM.
    Regards,
    Rakesh Patel

    Dear Rakesh,
    Even i was trying the same, could not find the reason for The "LOCK" symbol.
    I used MIC with Complete copy model, And i did not made any changes to that MIC while using it in inspection plan.
    by the way,
    If you want to replace MICs, which are locked
    Use user exit QPAA0004 with FM "EXIT_SAPMQPDA_001"
    Set E_LOCK_INDICATOR = 'X'
    in addition you have to activate EXIT_SAPLCQBM_002.
    regards,
    Amol

  • Digital Signature for Inspection Plan and Routing

    Hi,
    Can someone please help me on the topic of how to activate Digital Signature for inspection plan changes. I need to activate Digital signature functionality for inspection plan or routing. Please guide me to any link or shared documents on this topic.
    Thanks
    Vineeth

    Hi Vineeth,
    Standard SAP does not support this. Though I came across similar situation for maintenance plan, where we used BADI for this.
    Try to go through DIG_SIGNATURE_MAINT_PLAN. Consult with a good ABAPer if he can modify it some how for inspection plan.
    The links below may help you to understand the functionality [http://wiki.sdn.sap.com/wiki/display/SAPMDM/E-SIGNATUREforMaintenancePlants-MasterData(ECC6.0)] & [http://www.consolut.com/en/s/sap-ides-access/d/s/doc/YN-IF_EX_IPRM_DIG_SIGNATURE~~~~~~DIG_SIGNATURE_MAINT_PLAN]
    In SAP, check BADI_DIG_SIG_RES_REC_PROCESS, if anything can be done here.

  • Create Inspection Plan -LSMW -Direct Input -Error with Control Indicators

    Hi,
    I am creating Inspection Plans using LSMW-DIRECT INPUT Method.
    Although MIC's control indicator parameters are correct while creating a plan it is changing the control indicator parameters.
    how can we suppress this?
    I want to use MIC's default parameters.
    Regards
    Praveen

    have Lost Previous File
    what does that mean? did they lose the source that should be used to load the data from?
    without source you cannot load data.
    Had you ever got this source file? how? by mail, then check your old mails and take it from there, ask the sender to he/she checks the SENT folder in his mail system. Maybe someone has a local copy of this fille.

  • Create Inspection Plan -error in control Indicators

    Hi,
    I am creating Inspection Plans using LSMW-DIRECT INPUT Method.
    Although MIC's control indicator parameters are correct while creating a plan it is changing the control indicator parameters.
    how can we suppress this?
    I want to use MIC's default parameters.
    Regards
    Praveen

    Hi Naresh,
    QA32 screen shot suggests material has Revision level as "B".
    Now Check Revision level for Inspection plan.
    Amol.

  • Inspection plan expert advise rquired

    Dears
    as i don't want to have much more master data in my production server i was decide to work without inspection plan
    to achive this i have created 4 dummy material in the system and create inspection plan for these four material
    so when ever any GR happen to my real material system will created inspection lot with CRTD status
    so i will got to QA02 transaction and in  inspection specification tab i change material name with any one of the dummy material
    and click the task list button so system will assign the inspection plan
    Now i want to know if i work on these way what are the consequences will come to me later in production sever.and please tell me that these is a good method??
    i am expecting any expert advice on this
    Faisal

    Sure Faisal, I try to explain!
    1.     Basically letu2019s first of all understand why we need to create a task list (inspection plan).
    2.     Go to material master inspection set up. Double click on assigned inspection type there or click on detail view there.
    3.     Under detail information on inspection type (the below portion where you assign inspection types) you will observe that Insp with task list option is ticked default for 01 inspection type.
    4.     As a result of which you must have to create inspection plan. If you donu2019t lot goes to CRTD mode.
    An idea about Z01 is, it will be the copy of 01 inspection type. The only difference is u201CInsp with task list would not be ticked. So that there would be no compulsion to create task list eliminating the lot status CRTD. How to customize this?
    1.     QCC0 > Quality Inspection > inspection lot creation > Maintain inspection types > select 01 inspection type and press F6 to create Z01 type by copying 01.
    2.     Give the code as Z01 change the description as inspection without task list. Save it.
    3.     Now go to QCC0 > Quality Inspection > inspection lot creation > define default values for inspection type. Again here you can copy from 01. Make following changes there. Remove inspection with task list tick, remove record characteristic results and assign requirement automatically ticks. And save.
    4.     Finally go to QCC0 > Quality Inspection > inspection lot creation > Maintain inspection lot origins and assign inspection types
    5.     Select 01 lot origin and double click on Inspection types for the origin. Assign there Z01 and save.
    6.     You can save all these changes in a single request.
    Now assign this new inspection type Z01 to material master and click on preferred inspection type and active tick as well. You will notice that inspection lot would be generated with Z01 inspection type. Here directly proceed for stock posting or defect recording as no need to record results.
    Try if works for you!
    Regards,
    Anand Rao

  • Calibration vs Inspection Plan

    Hi QM Gurus,
    I have measured diameter by using Micrometer or any other instrument.
    My requirement is if the instrument is not calibrated that time system will not allow to carry the result recording for particular character which is measured be the Non - calibrated instrument.
    Please advice.
    Thanks in advance.
    Regards,
    Babusingh.S

    Hi,
    As suggested by Craig you can create equipment as PRT and assign it to operation in inspection plan but even though equipment calibration is expired , system will not stop the resulting reocrding as system does not check equipment status while result recording. you may need to user user exit to activate this functionality.
    Thanks
    Sanjay

  • Error while uploading Inspection plan

    Dear Friends,
    I am creating inspection plans using BDC. The MIChas 2 versions. When i am using version 1, the inspection plan is created. Whereas when i am using MIC version 2 i am getting error "error occured while checking type group".Kindly let me know how do i resolve this.
    Regards
    Vivek

    Hi,
    Thanks for the reply. when i am trying to create a inspection plan in other plant, we have 4-5 sampling procesures to select from. But for this perticular plant where we are having problem, its showing only one. How do i get more options?How do i extend a sampling procedure to a new plant.
    Vivek
    Edited by: vivek mankad on Feb 23, 2010 7:57 AM

  • Error while creating Inspection plan

    Hi,
    While creating inspection plan in QP01, system is showing error  "Material type ZROH is not defined for task list type Q''
    Please help me to solve the error.
    Thanks
    Prasant

    Hi,
    This is due to the configuration error,
    Just use T.Code OP50
    Create an entry for task list type "Q" with material type "ZROH" and save,
    Then try creating a Quality Inspection Plan, it will work
    Regards
    Merwyn

  • Sale Order / Project specific Inspection Plan

    Dear All,
    I want to create Sale order or Project specific inspection plan for a material. This is because, my  customers want some specific inspection requirements for individual materials, which are assigned to Sale order or project. I want to inspect the material after receipt for these specific account assignments. I do not want to assign the customer because, my single customer may give different sale orders with different inspection requirements.
    But in inspection plan, i can not see the assignment of sale order / project as i can see in Rate Routing.
    Can anybody tell me about this?
    Regards,
    Prashant Kolhatkar

    Create a Material ONE as Configurable Material. Assign 300 Class Type Class with Charcateristics created through CT04 Transaction which in turn linked to MICs.
    Create another Material TWO with same Class but not configurable but is a Variant of Material ONE (MRP 3 View)
    Maintain Configuration Profiles for both Materials.
    In Material TWO, for insp. type details click on Insp. by Config indicator.
    Whenever a Sales Order is created, maintain the requirements from the Customer in Characteristics and save the Sales Order. Against this Sales Order whenever a GR is made for respective Production Order inspection lot is created against the specifications given by Customer and not that maintained in inspection plan.
    Best Regards,
    K. Raghavendra Nayak

Maybe you are looking for

  • Need help to develop centralized web application

    Hello, Please correct me if i am posting thread in wrong area. I am going to develop web application for a university, a complete online portal for Teachers, Students and Administrators. There are more than 50 affiliated campuses of university in dif

  • Y wont my bank visa debit card register ?

    Ive tryed 3 times to use my new visa debit card but dont seem to b working keeps sayin its decline wen i no there is money in there can any one help before i switch phones x

  • View states for components

    Hi hoping someone could help. I understand view states and can use them. However in this situation I want to have a view state for a control bar but I already have 2 view states for another component (a panel component) in my Flex app and want to sep

  • Where is the tab strip located in FF10?

    Hi all. I am still on FF3.6. Went FF4 when released but quickly retroceded and stayed on since. In FF10, what is the default location of the tab strip, right above the display area or in the topmost part of the window (above the navigation bar) as in

  • HT201209 trying to buy film

    hi iam trying to buy a film and have already activated a gift card, but every time i try to buy the film and use the gift card money which is now in my apple ID account, it takes me to my debit card screen and asks me to use that to purchase the film