Is it possible to activate a CHaRM project against a landscape that
contains virtual systems?
We currently have a Development system (DEV) with a virtual Test system
(QAS) and virtual Production system (PRD).  These systems are marked as
Virtual in TMS and SMSY System Landscape.  We have added these systems t
o
the Logical Components and created a new Solution Manager project and
want to activate CHaRM against this scenario. .
The TMS routes are defined with Dev -> QAS(virtual) -> PRD(virtual).  Is
this scenario possible?  Do the standard CHaRM activation checks (RFC's,
Authorizations, etc) get bypassed because these systems are virtual?
When activating CHaRM, we still receive the error that no consolidation
system exists for our Dev system even though the TMS routes have been
defined properly.  However, since these systems are virtual, we cannot
add client information to them.
Thanks

Hi,
>
Thiago Luttig wrote:
> Is it possible to activate a CHaRM project against a landscape that
> contains virtual systems?
> The TMS routes are defined with Dev -> QAS(virtual) -> PRD(virtual).  Is
> this scenario possible? 
A virtual system cannot export any TR. So any request imported to QAS cannot be exported
So
>
Thiago Luttig wrote:
> The TMS routes are defined with Dev -> QAS(virtual) -> PRD(virtual).  Is
> this scenario possible? 
is not possible.
Hope this answers your question.
Feel free to revert back.
--Ragu

Similar Messages

  • ChaRM approach (virtual systems)

    Hi ChaRM-experts!
    We have a comprehensive SAP system landscape with several virtual systems and virtual transport routes.
    What is the best way to map such landscape into ChaRM approach (system roles) within SAP Solution Manager 7.0? 
    Thank you very much!
    regards
    Thom

    Dear Karl, Please use following documentation to configure CHaRM incase you have only one system present at this moment, Later you can alter the configuration once QAS and PRD are installed.
    How To - Configure ChaRM on Single Managed System with multiple client for PoC(Part1)
    How To - Configure ChaRM on Single Managed System with multiple client for PoC(Part2)
    Hope it helps.
    Regards, Amber S | CTS

  • ChaRM: Two Virtual Systems?

    Hi Experts,
    It is possible to have two virtual systems in a ChaRM three tier landscape? DEV -> Virtual System 1 -> Virtual System 2?
    This is because only DEV is available now with QAS and PRD following in the future. Thanks!
    Best Regards,
    Karl

    Dear Karl, Please use following documentation to configure CHaRM incase you have only one system present at this moment, Later you can alter the configuration once QAS and PRD are installed.
    How To - Configure ChaRM on Single Managed System with multiple client for PoC(Part1)
    How To - Configure ChaRM on Single Managed System with multiple client for PoC(Part2)
    Hope it helps.
    Regards, Amber S | CTS

  • CHaRM - Target group and Virtual System

    Hi,
    Could anyone let me know if Virtual System and target groups could be used with CHaRM?
    Current set up with three systems/clients works fine, however, for a new project with active STMS version with target group and virtual system, even the task list is unable to be created.
    Can you please help?
    Regards

    Hi,
    As far as i know, you can't use virtual system for ChaRM.
    Regards,
    Sanjai

  • How to setup Charms in a 2 tier landscape ?

    Hi All,
    We have a two tier landscape i.e only having development and production system so how to setup STMS and all other settings in this type of scenario.
    Can we use Virtual system in STMS as a Quality system ? If yes then please guide us and tell me how to proceed as if we dont know how to add virtual system in SMSY in solman. Please provide us with a clear picture and give us detail documentation if possible.

    Hi All,
    Please tell me as per the SAP standard recommendation is it necessary to have a cycle like DEV->QUAL-PROD for Charms as we are not having any Quality system or Client here in our landscape.
    Please suggest a way how to proceed in this case. Please help me out.

  • Warning: Problems occurred during synchronization in Charm with virtual sys

    Hi Team
    I have configured charm with virtual system --(Dev>V01>V02>) as client specific STMS , Where V01 is Quality and V02 is production system; When I do consistency check from solar_project_admin tcode for project created, it shows no errors ;
    but when i try to activate the charma and click on "refresh" button , it throws following error
    "Warning: Problems occurred during synchronization" ;I have checked the logs in SLG1 for object "/TMWFLOW/CMSCV" ; but
    there are no errors except warnings for BC Sets , Can you pl guide what might have gone wrong ?
    All the RFC's are working fine and there is no authorization issue in solution manager.
    Thanks
    Swati

    hi,
    for the CTS activation you must do all the below,
    1. SMSY --> landscape creation
    2. RFC Creations
    3. Client Specific TMS configuration
    4. Prj --> CTS activation.
    go through the below doc,
    [https://websmp209.sap-ag.de/sapdownload/011000358700000657692007E/eCTS_ChaRM_SP12.pdf|https://websmp209.sap-ag.de/sapdownload/011000358700000657692007E/eCTS_ChaRM_SP12.pdf]
    jansi

  • Change Request Management: virtual systems

    Hi!
    We would like to set up Change Request Management (ChaRM) approach for 3 +1 systems:
    DEV --> VT1 (virtual system) --> QAS --> PRD
    Questions:
    1) Are there some restrictions implementing ChaRM with virtual systems?
    2) We would like to use in parallel non-ChaRM transports and we have there
    an automatic transport twice a day.
    Will this approach be a problem for the ChaRM?
    3) Which transport routes will be used by ChaRM?
    a) one for transportof  the SAP objects (e.g. "SAP") and one standard transport route (e.g. Z<SID>) or
    b) do I have the possibility to choose the transport routes?
    Any helpful information will be very appreciated and awarded by points.
    H. Thomasson

    I am very sorry for the mess I did trying to post my message. I was not able to post it.
    Can you please give me any solutions to the problem reported?
    Thanks
    Antonello

  • TMS - Virtual system - Production Server

    Hi,
    I know that at the same time no need to install the all server and configure for TMS. So we are using Virtual system.
    My question is:  How  the production server is attached instead of Virtual system ?
    2. How the Domain controller is transferred from Devlopment server to Production server ?

    Hi,
    how to move the domain controller from dev to prod server ?
    for that you need to reconfigure TMS.
    first delete TMS configuration from DEV system 000 client.
    then reconfigure TMS.
    to setup three system landscape do following.
    prerequisites:
    -> set one system as domain controller. in your case it is PRD.
    -> Add SAP QAS system to domain controller
    -> Add SAP DEV system to domain controller.
    you can add QAS system to domain controller using following steps.
    login into QAS system client 000. ( stms is not configures that i assumed)
    run stms -> it's ask for set up STMS -> click on other configurition (F6)
    Target Host -> host name of domain controller ( host name of DEV system)
    System number -> Instance number of domain controller ( instance number of DEV system)
    same way add DEV system.
    now login into domain controller system in client 000 ( you are set PRD as domain controller)
    run STMS -> overview -> transport routes
    form configuration -> standard configuration -> three system in groups
    assign SID of DEV,QAS and PRD system.
    save and distribute the configuration.
    regards,
    kaushal

  • No Transport request in Virtual system

    Hi,
    I have setup the STMS , where we do not have production server hence i have used virtual system.
    All Transport request moved from Dev to Quality which appears fine the queue of QAS Server, but not appearing in Production Server which is virtaul.
    kindly advise.
    Thanks you
    irfan.

    Hi,,
    We do not have any QA Approval procedure, but all requests are assigned to one project.
    Seconldy i went into the Tcode SE01 entered the released transport number but i could not see any such logs which says waiting for QA approval.
    all it says is this..
    Log Overview for DEVK900421
           DEVK900421              MM-Release Strategy
             DEV        System DEV
                        Checks at Operating System Level         14.09.2010 02:14:24    (0) Successfully Completed
                        Pre-Export Methods                       14.09.2010 02:14:27    (0) Successfully Completed
                        Export                                   14.09.2010 02:14:33    (0) Successfully Completed
                 Import steps not specific to transport request
             QAS        Quality Server
                        Selection for Import                     14.09.2010 02:14:33    (0) Successfully Completed
                        -> Continue: Other Transport Ggroup      14.09.2010 14:53:51    (0) Successfully Completed
                 Import steps not specific to transport request

  • ChaRM implementation with virtual systems

    Hello Gurus,
    We have successfully installed and done basic settings for Solution Manager 7.0 EHP1 system, we are planning to implement ChaRM and I have already downloaded the guide for it.
    But I have few doubts regarding its setup like since we don't have DEV, QAS and PRD setup yet, so is it possible to configure ChaRM right now?? maybe with virtual systems ??
    Will it be better to configure ChaRM only after DEV installation ?
    Also, I am not clear about the transports which will be done from Solution manager using ChaRM, is it like you create transport request from Solman or from DEV ??
    Thanks for providing any valuable information !!
    Cheers !!
    Shobhit Garg

    Hi
    these will help you
    http://wiki.sdn.sap.com/wiki/display/SM/ChangeRequestManagement
    First steps to work with Change Request Management scenario in SAP Solution Manager 7.0
    Regards
    Prakhar

  • Virtual systems within Transport system landscape

    Hi!
    I should map the existing transport management system landscape into ChaRM approach within SOLMAN.
    The existing transport management system landscape has a lot of virtual systems with virtual transport routes.
    Can some one of you explain the usage of such virtual systems with their virtual transport routes?
    Thank you very much!
    regards
    Thom

    read,
    http://help.sap.com/saphelp_nw04s/helpdata/en/44/b4a0db7acc11d1899e0000e829fbbd/frameset.htm
    Regards
    Juan

  • System and landscape estiamte for SCM on Hana for Practice use

    Hi All ,
    We want to know the System and landscape estiamte for SCM on Hana for Practice use.
    Regards,
    Abhishek

    Hi,
    Perhaps this link could help
    http://wiki.sdn.sap.com/wiki/display/SMSETUP/MaintenanceofProductintheSystemLandscape
    Also check out the note :
    For SCM Add-On Products like SAP SNC, SAP EM, SAP F&R the basis component (SAP Netweaver Release) has to be also assigned as relevant Product Instance
    Might be helpful, if you check the product versions being reported for the system in the SLD.
    Regards,
    Srikishan

  • ChaRM in two system landscape

    Hello Everyone,
    I want to implement ChaRM for BIW systems which is a two system landscape: BIWDEV and BIWLIVE . Is it posible to implement ChaRm in a two system landscape /we need three system landscape only for it.I started the ChaRM configuration work but faced certain issues over which i was told tat Charm needs three systems for implementation. Kindly plz suggest and confirm.
    Regards,
    Somya

    Hey Somya,
    2 system landscape will also work with CHARM.
    CHARM can also be configured in single system landscape.
    But the bottomline is you require in all 3 clients to realize charm.
    These three clients can belong to same or diffrent systems altogether.
    For you i would say, u will require 2 clients in BIWDEV system ( Say BIWDEV:100 as development cleint and BIWDEV:200 as Test client ).
    Now you have BIWLIVE system which is our production system, so you require 1 client BIWLIVE system..
    So your 3 clients are ready and Change Request management can be realized..
    Please Reward with points if this postv was usefull..
    Revert For ne clarifications ..
    Regards,
    Suzzane

  • How to configure in Charm in three system landscape

    Hi Experts
    I want to configure the charm in the three system landscape system. Please help me to configure
    Thanks & Regards

    It is same whether it is two or it is three system landscape, i guess you already must have gone through the following
    charm setup
    Re: Can Any one Provide Step by Step Config of CHARM??
    http://sap.ittoolbox.com/groups/technical-functional/sap-basis/charm-in-2tier-system-1231210

  • How do i add Linux systems to be monitored using Virtual agent/SNMP in OLT?

    Dear All,
    I need to know the process to add Linux systems to be monitored using Virtual agent and SNMP in OLT ?
    I have added my details to Virtual agent and chosen ssh and all i get is cannot connect
    Appreciate if someone can give me the detailed screenshot by screenshot process.
    Regards
    Praveen

    On 05/13/2010 09:30 AM, Raja Vengala wrote:
    >
    Yes, the problem is with the old packaged PLINK.exe. Downloaded version is working smoothly. Any reason for shipping the old version ??
    From: Mikael Fries
    Sent: Wednesday, May 12, 2010 11:56 PM
    To: Praveen Arora; Drupad Panchal; Matthew Demeusy; Ashish Dave; Raja Vengala
    Subject: RE: OLT Linux system moniting issue
    Praveen
    I have set up LINUX and virtual agent configs a couple of times, and it has worked pretty ok.
    What I found was that you might have to download a newer version of PLINK.exe and put that onto your OLT system.
    (with the packaged version, I also had some communication issues)
    Try to download the lates plink.exe and see if that works…
    (you may want to restart you system after replacing plink.exe)

Maybe you are looking for

  • Multitouch drivers for Windows 8 using Bootcamp?

    Macbook Pro Retina, 15-inch, Late 2013 Processor  2.3 GHz Intel Core i7 Memory  16 GB 1600 MHz DDR3 Graphics  Intel Iris Pro 1024 MB Is there any drivers that will enable multitouch on Windows 8 using bootcamp? The problem I often run into occurs whe

  • Help - EXIF time and date not working correctly

    I am a long time Lightroom user and am trying out Aperture 2.1. I like it a lot but I just found a serious problem. I'm importing some old photos into my Aperture library, by referencing the files in an existing folder. The time and date for some of

  • Report with customer info for an Sales Order with batch details

    Hi Can any one please tell me the SAP REPORT with contains data of customers were shipped a specific product (material number) by batch number.  report with the name and address of the customer, the sales order number and the number of products that

  • I have two computers, can I download photoshop elements 11 to both computers

    I have two computers, can I download photoshop elements 11 to both computers?

  • Post a recurring document F.14

    Hi, I am trying to post a recurring document but it's not creating the batch session if I enter the 'Run Schedule'. Can anyone give me an idea on what's the importance of run schedule,why we need that and what will happen if I don't enter anything in