Activate Contracts in REFX
Hi,
how can i activate all migrated contracts in RE-FX?
can anyone help me?
thanks in advance.
Hi Tiago,
You can activate the contract while migrating only..
To Activate after migration use BAPI_RE_CN_CHANGE BAPI for mass Activations of contracts
in the IMPORT TAB
Pass "MCAK" to TRANS field.
and for doing manually for few records goto RECN Tcode under System status you can activate it.
Thanks
Veman.
Similar Messages
-
Dear RE experts
I want to enter an building disposition contract in REFX, which contract type i can use as reference for this type of contract?
After building was sold by disposition contract, if i link building to FI-AA, will the asset in FI-AA mark as disposal too?Hi Howard,
I would recommend you use F-92 for the asset disposition. There are a lot of subsequent entries and impact on accumulated depreciation, loss/gain etc. this scenario is better handled by this standard transaction.
I am not sure if this scenario is handled in RE sales intrinsically. You may check on that too, if you have RE Sales in your landscape.
Regds
Hardik Sharma -
Offline activate contracts.
I want to activate telco contracts offline. And for this purpose I'm currently using CRM_IST_XI_CONF_SIMULATE to activate documents. But I have a problem. To activate documents:
- I have to set In Distribution with XI on Item,
- run CRM_IST_XI_CONF_SIMULATE,
- create an XML and insert contract number and item number to it,
- and execute.
I want to make this a more simple process.. For example with a function with contract id as parameter. Do you have any idea how to do this?- I create an order from CRM user interface and save it. The provider order document has the <Open> status.
- When I submit it, provider contract document is created. Both Provider Order and Provider Contract documents have <In Activation>
- Then I open provider contract document from CRMD_ORDER.
- Set Items' status to "In Distribution at TSStart (XI)"
- Then run the "CRM_IST_XI_CONF_SIMULATE"
- I prepare an XML for activation procedure like this:
<?xml version="1.0" encoding="utf-8"?>
<nr1:TelcoServiceConfirmation xmlns:nr1="http://sap.com/xi/CRM">
<TelcoService>
<InternalID>000500019</InternalID>
<Item>
<InternalID>0000000010</InternalID>
<ExternalID></ExternalID>
<ItemProcessType></ItemProcessType>
<ActivationStatusCode>01</ActivationStatusCode>
</Item>
</TelcoService>
</nr1:TelcoServiceConfirmation>
After I execute this, both contract and order shows as <Released>
I can set items' status to "In Distribution at TSStart (XI)" with code.. What I want is activate order/contract with code. Do you have any idea how can I do this? -
REFX - customize installment in lease-out contract
Dear gurus,
I would like to customize installments for certain contracts in REFX, lease-out, and I just can't.
I see in the flow type customizing thta we can assign reference flow types with relation - 310 installment payment. I added a line 'reference 310, from flow type 1000 to flow type 1008'.
In ssignment of account symbol to flow type I customized flow type 1008 with debit and credit on customer.
in define doc type I added a line REPP (periodic posting) / REIS (installment) / 1008 / D5 (doc type).
Now, how does SAP treat this information when I post with RERAPP? What is this supposed to generate? How are amounts installed (split by periods)?
Thank for you help.
Benoit FannaHi again,
In the end, does anybody know how to customize installments in REFX contracts?
Thanks -
Problem in Activating Contract
Hi all,
I am creating Contract in REFX while creating contract I am activating the contract. It is showing the error "Activation is not possible due to warnings (Partner Assignment)"
Message no. RECN027
Can anybody help me in this?
Thanks in advance.
ShailendraHi all
Just had an upgrade and I am experiencing the same problem: Message no. RECN027
Activation is not possible due to warnings (Partner Assignment) when trying to activate the Contract in RECN.
Where in the Business Partner do I change the validation of the partner please
Thanks in advance
Gavin -
Hi there, my daughter purchased a used iPhone 4S from a local newspaper who has had it in the lost and found for nearly a year, and no one ever claimed it. It is locked with Telus, my daughter is a Virgin Mobile customer. Telus told me they will only unlock it if she activates it with them, she cannot do that as she is in a contract with Virgin. Is there anything I can do to get around this problem?
Only the carrier to which the iPhone is locked can unlock it. In
this case, you must work with Telus. If they have a pay as you go
plan, activate the iPhone on Telus that way and then after
you meet whatever requirements Telus has, stop using Telus
and move the iPhone to Virgin. Or sell the iPhone to someone
who can use it on Telus.
Telus is the only one who can unlock that iPhone. -
I'm not under warranty, insurance or anything like that. The reps at the store when I bought my phone were not very clear about really anything with me and I'm just not sure if the contract is ONLY for iphones..? I was thinking of getting a Samsung or HTC and it would suck if I bought it and they wouldn't let me activate it on my contract. Sorry if this has already been answered, I've been searching and found nothing so far. Any help is greatly appreciated.
You can add insurance sometimes open entitlement is in march. How is it broken sometimes tech can do an exception. If its a warranty things there might be a slim chance.
-
I recently inherited a restored iPhone 5 from my uncle and its needs a sim to be activated, could i use my friends sim just to activate my iPhone and then give the sim back once its activated without affecting his contract and later on get a sim for myself and a contract for me and it all be normal??? Thanks
The phone MUST have a SIM present in order for activation to complete. The process will not finish otherwise.
For the OP:
If the iPhone 5 is locked to a carrier, you must use a SIM from that same carrier. Otherwise I think you would be OK borrowing the SIM to activate the phone.
~Lyssa -
Do I need to activate the Iphone 4 if I buy it without contract?
Hey Guys, Do I really need to activate the Iphone 4 when I buy it without contract at the apple retail store? Thanks.
If you are in the US, you cannot purchase an iphone directly from Apple without an AT&T contract. If you want to purchase a no commitment/no contract iphone, you will have to purchase such directly from AT&T. However, the phone will have to be activated on AT&T's network before you can do anything with it. AT&T will require that you establish a post paid account at a minimum.
-
REFX: display contracts without payment performed
Hello RE Gurus,
I wonder is there any possibility in REFX to display Contracts, which don't have payment for current date yet.
For example, I have 3 Commercial lease-out contracts with the same conditions and terms.
For the Contract 1 Customer have performed payment for the due date YYY, for the contracts 2 and 3 payment haven't been performed yet for the same due date.
I want to run some kind of a report, enter a due date YYY and see contract 2 and 3.
May be you will be able suggest me something? ThanksHi,
We will get some information using FBL3N and FBL5N..
By giving contract number against assignment we can get the postings:
We generally use:REISCDCF, FBL3N, FBL1N, FAGLL03 and KSB1 to know the status of contract wise postings.
Thanks and Regards, -
REFX - LEASE IN - CONTRACT CASH FLOW ERROR :
Dear Experts,
I have an issue with REFX - lease in scenario.
For a ( RECN) RENTAL/ CAM contract we have filled all the required details correctly. ONE MONTH POSTINGS also done correctly FOR cam charges.
But now Cashflow is showing as “CAM CHARGES PAYABLE” ( reversal entry ) in simulation mode which is not expected.Due to this we are unable to make the postings.Attached screen shot FYI.
Can any one suggest to do needful. Kindly treat this as a priority issue.
Thanks,
N.S.RaoDear N.S.Rao
In your case, When your condition has been changed unit price or period, Cash-flow can be re-generated according "Assign Reference Flow Types" configuration as below ;
Relation Description FlowType Ref.FlowType
10 Follow-Up Posting due to Condition Increase ZXX1 ZXX2
20 Follow-Up Posting due to Condition Decrease ZXX3 ZXX4
so , If you want to control this re-generated or re-calculated condition item, you can configure this IMG.
Go to RECACUST >> Conditions and Flows > Flow Types > Assign Reference Flow Types.
and also, for your information, you can check 'Balance amount for your contract" according to use "Contract Screen >> Overview tab >> Account Sheet". then you can see entire financial document not only contract related posting but also customer/vendor and clearing document.
Many kinds of Financial Functions already applied to "Flexible Real Estate module" as a sub-functions.
Regards,
Jeong, Yeong Chul -
How to activate field contract in transaction F-43.
Hello.
In transaction F-43 is hidden field "Contract". How to activate this field (BSEG-VERTN) ?
I am waiting dor help.
BogdanHello.
I have solved this problem myself by changing configuration for "Field status group" for this kind of account.
Best regards
Bogdan -
Can i activate any verizon phone to my contract if mine broke?
My phone is broken and I am far from my upgrade date, can i buy any verizon cell phone via ebay or wallmart or anything and activate it onto my existing contract number?
Yes. As long as it is a Verizon branded device that is not suspended, blacklisted, banned, reported lost/stolen, etc and is eligible to be activated on your type of account.
-
SAP REFX - HOW TO RAISE PROFORMA INVOICE FOR CONTRACT
Dear Experts,
I am looking for a clarification WRT to REFX - lease in scenario.
Actually we are using REFX for paying RENTALS / CAM charges.....etc for the rental objects.
I would like to know if i want to Raise a Proforma invoice / Invoice based on the contract / postings, Is it possible in REFX / If yes Pls suggest to do needful.
Thanks,
N.S.RaoDear N.S.RAO
It's my pleasure for your help.
Please, try to check below items ;
1) RERAIV (Invoicing Screen)
- If you want to create the invoice for planned cash flow, you check the due date
when you want to create the period and this contract must be activated
on the system status.
2) Configuration for Rent Invoice
- Go to the IMG :
RECACUST >> Accounting > Rent Invoice > Number Range for Rent Invoice
- Go to the IMG :
RECACUST >> Accounting > Rent Invoice > Company-Code-Dependent Settings
3) Configuration for Correspondence
- Go to the IMG :
RECACUST >> Correspondence > PDF-Based Forms (Mass Print and Single Print)
> Forms > Define Forms
(==> Form name : RE_CN_120, Try to change the form by "Smart-forms")
- Go to the IMG :
RECACUST >> Correspondence > PDF-Based Forms (Mass Print and Single Print)
> Correspondence Activities and Applications > Correspondence Activities
(==> Correspondence Activity : T520 , Do not check the "Inactive")
For your information, I will try to my sample screen.
Regards,
Jeong, Yeong Chul -
if i bought an Iphone 6 from usa (contract free,T-mobile) can i use in srilanka (outside the usa) ?
and to activate it should i have t-mobile sim ?As Ethmoid says, it is still a CDMA phone as I told you earlier, and it will not work with t-mobile. Even if Sprint unlocked the phone, it would only unlock the GSM side for international use. They will not unlock the GSM side for domestic use in the US.
Maybe you are looking for
-
I have a simple web page with two form elements say, two text box and submit button. when submitting my form, i didn't get the form data in my action page. This occurs only in Firefox 3.6.13 several times. Not always. May be form get submitted twice?
-
Systems Preferences Quit Unexpectedly
Good day, For the past year, my Systems Preferences "Quits unexpectedly" everytime I open it. I would like to fix this. Any Recommendations for Mac OSX 10.7.5? Here is the report it generates: Process: System Preferences [88964] Path:
-
Error out from MB01 and MIGO when using BADI "INSPECTIONLOT_UPDATE"
Hi all: We are currently implementing Quality Level with Dynamic Modification Rule using SAP Quality Management module. We are trying to change stage level by modifying the field PRSTUFENAE of the table QDQL (Material Quality Level) using BADI: INSPE
-
Segmentation fault calling an oracle db status script
HI, I have a problem on a OEL 5 cluster with an Oracle 10.2.0.3 in active/passive environment (not RAC). When the Oracle Cluster service script checks the status of the service sometimes I have segmentation fault error. The script is: #!/bin/sh # Clu
-
Information on iPhone Water Damage?
I have had my iPhone 3G for about 8 months now, and today my 2 year old brother dropped the phone in a glass of water when I wasn't looking. I'm not sure how long it was sitting there, but about an inch or so of the lower part of the iPhone (where th