Does anyone know how I can activate numerous process chains in BI 7.0, do I have to go into a particular variant for each chain and manually mantain each of the variants to activate or can I do many at a time?  If so how?
Thanks
DV

Hi Guys,
I am activating the metachains which inturn activate the process chains.  When I have numerous process chains with metachains, is there an easy way to activate the chain without having to go into the process chain/meta chain > go to first event and maintain it to activate?  Once this first event is activated the whole process chain is working actively.  This problem only occurs as I have transported a lot of process chains from Dev and have to activate them in Prod.
Thanks
DV

Similar Messages

  • DSO activation in Process Chains - takes long time

    Dear All,
    We have included DSO activation in Process Chains. This process takes a long time to execute. We manually cancel the corresponding process in Process Overview and repeat it from chain. The chain runs daily and this issue also occurs on a daily basis.
    Does anyone one of you have an idea of how to deal with this performance issue?
    Regards.

    Figure out in which class does your process fall in:
    Class A- High Priority
    Class B- Medium Priority
    Class C- Least Priority
    Background processes
    Class A jobs
    The number of work processes reserved for job class A is a subset of the number of background processes.
    You should only reserve work processes for job class A if it makes sense within your system organization. Work processes reserved for class A jobs are no longer available for job classes B or C.
    Set parallel processing for a specific BW process in the (variant) maintenance of the process
    Call the function for setting the parallel processes.
    You can call the function in the process variant maintenance of a process chain or in the process maintenance. The function call varies for the different BW processes.
    For example, in the data transfer process you call the function with Goto-->  Background Manager Settings.
    The Settings for Parallel Processing dialog box appears
      Under Number of Processes, define the maximum number of work processes that should be used to process the BW process.
    If you enter 1, the BW process is processed serially.
    If you enter a number greater than 1, the BW process is processed in parallel
    In the Parallel Processing group frame, make the relevant settings for parallel processing in the background:
    Enter a job class for defining the job priority.
    The job priority defines how the jobs are distributed among the available background work processes
      In the group frame Parallel Processing, you can define whether parallel processing should take place in dialog work processes or in background work processes for the processes ODSACTIVAT, ODSSID and ODSREQUDEL for the DataStore object
    Transport:
    The entries in tables RSBATCHPARALLEL and RSBATCHSERVER are written on a transport request of the Change and Transport System.
    Edited by: ram.pch on Oct 7, 2011 9:55 PM

  • DSO cannot be activated when process chain is launched from BPC

    Hello,
    we are facing the following issue in our project: we have created a process chain that loads transactional data into a DSO and then a BW cube. From there we will be launching the data into BPC.
    The process chain that we have built is working and loading OK when this chain is launched from the RSPC trx. However, when launched via the datapakage "Execute Process Chain in BW" data are loading OK from the source system up to the DSO, but the activation does not take place.
    The error that we are getting on the BPC data package is:"An exception with the type CX_SY_DYN_CALL_PARAM_MISSING occurred, but was neither handled locally, nor declared in a RAISING clause
    Call of the method IF_RSPC_GET_PARALLELIZATION is SINCHRONOUS of the class CL_RSPC_CHAIN failed; the obligatory parameter I_VARIANT has not been filled."
    Has anyone faced this issue before? could you please help on this topic? I have tried several options and all of them are pointing to the parameter I_VARIANT.
    Thanks in advance.
    Kind regards,
    Begonia

    Hi Reddy,
    I've deleted deltas load from DOS, then I launched and activated a repair full load from ECC, it worked well.
    After that I went for delta load so the load was OK but the activation failed.
    The message 'Type of data update' was: Repeat of the last delta and the Nº of Transferred and Added was zero.
    ¿Do you think I could solve the problem if I do a repair full load from ECC then I delete the Delta init and create a new Delta init?
    Any another idea?
    In conclusion I'm not yet solved the problem so advices are welcome.
    Regards,
    Jorge

  • Error in ODS activation in process chain

    I am getting errors when activating request using process chains.
    Error message is Message No. RSM1102.
    Please suggest if any notes apply for this.
    Regards,
    Nitin

    Hi,
    This happens when data is not acceptable to ODS  definition. Data need to be corrected in PSA.
    Check  for Infoobject which has caused this problem in the monitor details tabstrip. Delete request from datatarget after changing QM status to red. Correct data in PSA and update data back to datatarget from PSA.
    Cheers
    Raj

  • Error while Activating a process chain

    Hi,
    I have just modified the existing process chain with the new info package for loading into ODS and then delta update into the Info Cube.
    when i am clicking on the option schedule and activate.
    Its giving error as :
    "InfoPackage ZPAK_49RJW545FSO2MB3NF1MIZ9NJ9 is
    generated; NOT able to be used as loading variant"
    This is a IP, which is used for delta update from ODS to cube.
    I have checked the IP, its fine like i can do the delta through this pacakge manually.
    Please help, points will be rewarded....

    Dear himanshu arora  ,
    Go and check whether the Info Package exist ,
    You can check in Rsa1 and give IP name and find it.
    If your IP is not there please create it,
    If tehre please check the all parameter associated with it.
    Also go through these
    Process Chain Errors
    /people/mona.kapur/blog/2008/01/14/process-chain-errors
    Process chain creation - step by step
    /people/juergen.noe/blog/2008/01/11/process-chain-creation--step-by-step
    Data Load errors and Process chains
    /people/siegfried.szameitat/blog/2005/07/28/data-load-errors--basic-checks
    /people/siegfried.szameitat/blog/2006/02/26/restarting-processchains
    /people/siegfried.szameitat/blog/2006/02/26/restarting-processchains
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/19683495-0501-0010-4381-b31db6ece1e9
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/3507aa90-0201-0010-6891-d7df8c4722f7
    http://help.sap.com/saphelp_nw2004s/helpdata/en/8f/c08b3baaa59649e10000000a11402f/frameset.htm
    ope the following links will give u a clear idea about process chains and clear ur doubts.
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/com.sap.km.cm.docs/library/events/sap-teched-03/using%20process%20chains%20in%20sap%20business%20information%20warehouse
    Business Intelligence Old Forum (Read Only Archive)
    http://help.sap.com/saphelp_nw2004s/helpdata/en/8f/c08b3baaa59649e10000000a11402f/frameset.htm
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/8da0cd90-0201-0010-2d9a-abab69f10045
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/19683495-0501-0010-4381-b31db6ece1e9
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/36693695-0501-0010-698a-a015c6aac9e1
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/9936e790-0201-0010-f185-89d0377639db
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/3507aa90-0201-0010-6891-d7df8c4722f7
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/263de690-0201-0010-bc9f-b65b3e7ba11c
    /people/siegfried.szameitat/blog/2006/02/26/restarting-processchains
    Siggi's weblogs for data load error and how to restart process chain
    /people/siegfried.szameitat/blog/2005/07/28/data-load-errors--basic-checks
    /people/siegfried.szameitat/blog/2006/02/26/restarting-processchains
    Hope it helps
    Regards
    Bala

  • Master data activation by process chain

    hello all,
    As I have seen that we have to right mouse click and activate master data after loading so that we can report on it. Thats a essentila step right?
    How can we achieve that in process chain, when we run infopackage to load master data do we add some other variant to activate that data ?
    Thanks in advance

    Hi Raj,
    yes we can acheive this using process chains, create a variant on this , in the process chains screen on the left side, u can see "ATTRIBUTE CHANGE RUN" in "OTHER BW PROCESS"
    Regards
    Vijay

  • Error while activating Process Chains

    Hi all,
    while activating the Process Chains, i am getting the following error "Job BI_PROCESS_PSAPROCESS could not be scheduled. Termination with returncode 8"
    when i double click on the error msg, i got the following help msg: "
    <i>Message no. RSPC065
    Diagnosis
    Program RSPROCESS is to be scheduled as job BI_PROCESS_PSAPROCESS under user ALEREMOTE.</i>
    Can any one please show some way to solve this problem? please do this favor, i have been suffering with error for a long time.
    Points will be given
    Thanks
    Ganesh

    Hi,
    Just analyze the error message that you get while activating the PC, don't give any server name.If you are trying to run process chain using Flat file, it won't work,
    and you should have source system R/3 or you have own datasources in BW system itself at that toime you can use PC to extract data. If your source system is Flat ile, it won't work. other wise you should place your flat file in application server, using AL11 tcode.
    <b>OSS : 511475</b>
    <b>Symptom</b>
    You cannot schedule or perform any batch jobs with the BW or source system background user.
    The error RSPC 065 occurs in the process chains:"Job could not be scheduled, termination with return code 8"
    <b>Other terms</b>
    RSPC065
    <b>Reason and Prerequisites</b>
    The user type is
    "CPIC" up to 4.6B
    "Communication" as of 4.6C
    This user type may not execute or start any batch jobs, irrespective of the user authorizations.
    <b>Solution</b>
    Set the type of background user to
    "Background" up to 4.6B
    "System" as of 4.6C
    This user type corresponds to the "Communication" type and may also perform background functions.
    Through the Customizing, the BW user is automatically created by mistake as a communication user.Depending on your BW system release, you can solve this problem as follows:
    BW 2.0B
               Import Support Package 24 for 2.0B (BW2.0B patch24 or SAPKW20B24) into your BW system. The Support Package is available once note 456551 with the short text "SAPBWNews BW 2.0B Support Package 24", which describes this Support Package in more detail, has been released for customers.
    BW 2.1C
               Import Support Package 16 for 2.1C (BW2.1C patch16 or SAPKW21C16) into your BW system. The Support Package is available once note 456566 with the short text "SAPBWNews BW 2.1C Support Package 16" has been released for customers.
    BW 3.0A
               Import Support Package 8 for 3.0A (BW3.0A patch08 or SAPKW30A08) into your BW system. The Support Package is available once note 452632 with the short text "SAPBWNews BW 3.0A Support Package 08" has been released for customers.
    <b></b>

  • Error in process chain activation

    HI
    I am learning on 3.0b,(on my pc) while using process chains, at the time of activating the process chain it is giving the following error "JOB BI_PROCESS_PSAPROCESS COULD NOT BE SCHEDULED, TERMINATION WITH RETURN CODE 8". Why am getting this error, is there anything wrong with my system or software or there any mistake in activating process chain" (what ever may be the process type i use, i am getting this error), plz help me.
    thanks

    Hi Ganesh,
    The possible reason for that error is the User type of the background user. Please check out OSS note 511475 which talks about this problem and possible solution. I have used this earlier.
    You can see this for info on how to make the change:
    /message/685940#685940 [original link is broken]
    Hope this helps...

  • BI Content 7.57 SP4 Activating Process Chain

    Hi,
    I am trying to activate a process chain from BI content . My source system is ERP 6.0. While collecting objects for activating this Process Chain BW gives an errors. It says some of DTP and Transformations are missing. I have put two of the errors are at below.
    When i search these missing objects on the BI content these objects are not exist. Also on the BW system they are not exist. I could not find any solution for this problem.
    Can you please show me a way for solving this. I am stuck on this.
    I am trying to activate following Process Chain.
    Technical Name: 0HCM_FULL_P0EMPLOYEE
    Name : Load Data for InfoObject 0EMPLOYEE
    Error 1:
    Shadow object DTP_DYF4USYQ4EYMWILRMUGLXW2KG cannot be expanded; chain is inconsistent
    Message No. RSPC142
    Diagnosis
    You want to determine the objects that are source system-dependent for shadow object DTP_DYF4USYQ4EYMWILRMUGLXW2KG so that they can be inserted in the modified version of the process chain or of a referencing process. This was not possible.
    Error 2:
    Object DTP_ETKRN0DQM7QVOBZSVBC9J61HB (Data Transfer Process,DTPA) could not be collected for object 0HCM_FULL_P0EMPLOYEE (Process Chain,RSPC)
    Message No. RSO296
    Diagnosis
    You have collected objects in the BW Metadata Repository. Associated objects for the object 0HCM_FULL_P0EMPLOYEE of type Process Chain,RSPC have also been collected. Object DTP_ETKRN0DQM7QVOBZSVBC9J61HB of type Data Transfer Process,DTPA was among these objects. This object
    DTP_ETKRN0DQM7QVOBZSVBC9J61HB of type Data Transfer Process,DTPA, is not, however, available in the Metadata Repository.
    System Response
    Object DTP_ETKRN0DQM7QVOBZSVBC9J61HB of type Data Transfer Process,DTPA is ignored in further collections. The links for object 0HCM_FULL_P0EMPLOYEE of type Process Chain,RSPC are incomplete. This may result in not being able to activate this object.

    Hello experts
    I am not able to find support package name.
    When i click on package level button from SAPM tcode
    BI_CONT     703     0000     -     Business Intelligence Content.
    Is my BI_CONT add-on installed successfully?
    And also i am not able to see BI_CONT in imported packages list.

  • Incorrect data after activating the request through Process chain.

    Dear SDN chaps.
    Today morning. I encountered a strange issue in DSO..
    I have DSO which is updating from the AL11(application server) flat file.
    While i am loading it to PSA there were no issues and after loading it to the DSO there is no issue and its passing through the routine and the data is populating properly in NEW data Table .But after successful activation of  the request through process i am getting the wrong records in active data table.
    Then i deleted the request and reran it manually i mean triggered the DTP and ran the manual activation surprisingly accurate records are coming through manual process..
    I am just wondering why it is not working through process chain and why it is showing incorrect records through process chain execution and how it is showing accurate records through manual uploading process..'
    Could some one please help to come out from this..By the way mine is SAP BI 7 SP20 &SP05 for BW 7.01
    Thanks
    K M R
      

    Hi Pra
    Thanks for your response..
    We are doing PSA deletion and then we are uploading the data to PSA as well as DSO.
    Now the issue is not in the part of loading we are facing the issue in Actiation of request if i am executing the activation through process chain it is sucess but the values are incorrect. If i am doing the manual activation it sucess with correct data.
    Even i tried with a new chain but still i am facing the issue.
    Surprise thing is in new data table the data is perfect in both the ways like manual upate and Process chain update only during activation i am getting incorrect record in the active data table..
    Appreciate your help on this....
    Thanks
    K M R
    Edited by: K M R on Jul 9, 2010 11:09 AM

  • Statistics technical content activation issue with MD process chain in BI7

    Hi,
    Let me give you history of the issue first.
    I had to activate the Statistics in BI7. I followed the SAP Note 965386 and activated the Technical Content.
    Faced activation issues in MD process chain, Content Master Data-0TCT_MD_C_FULL_P01. It dint get activated, Followed the SAP note 1065919, which asked me to remove the below process from RSPC and activate it.
    Load data- Process Variant Attribute and
    Load data- Process Variant Text.
    I did the same and it got activated after removing them.
    Issue is. Later knew that manually activating the Process chain from Content would have activated those Infopackages aswell.
    Now how should I get those processes into the chain and activate? Based on your suggestions, I can let you know what all I have been trying to fix it?
    Relying on you for solution.
    Thanks
    Pavan

    Thank You Neethika,
    I have this issue solved. I replicated the data sources, activated those infoPackages manually and then added those variants into the process chain manually. So my MD chain now has all the necessary process.
    Now i need to schedule them and see if it runs with out any errors. I will keep this thread open till i run it to take your help if i get any errors while running them.
    Thanks
    Pavan

  • Problem in Activating Hierarchy Attribute change run through process chain.

    Hi All,
    I have the problem in Hierarchy change run processw running through process chain..and also process chain completes successfully without any error..
    Even hierarchy change run  completes successfully the hierarchy objects are not activating,
    so daily when i have to activate hierarchy objects manually..
    and what i did was in one attributechange run process i have included 10 hierarchy object is it correct or else i have to separatly create 10 attribute change hierachy proceess in the process chain.. pls through some lights on this issue
    With regards,
    Hari

    Hi venkat,
    Yes.. i already include the save hierarchies process in process chain...
    my main problem is hierarchy infobject are not activating  using process chain and also even process chain is not giving error message.. and in which log table the hierarchy objects are maintained (such as run time, date , status etc..).
    IS there is any other settings to be made in process chain..
    with regards,
    hari

  • BI Admin Cockpit - Problem in activating Process Chains

    Hello,
    We're trying to activate the content for BI Admin Cockpit.
    While activating the process chains, we get a "red" message as
    mentioned below.
    "Object '0PAK_5JTN7F5HTP45CGZ04PQTMCNTI' (ISIP) of type 'InfoPackage'
    is not available in version 'D'
    Message no. RSO252"
    OSS message 966131 suggests that "The InfoPackages mentioned are shadow
    InfoPackages and the message is unnecessary because there should not
    have been a search for the package at all." and we should apply the
    correction (as part of SPS10) for this purpose.
    We are currently on SP11 but still having the same issue and hence not
    able to activate the process chains for BI Admin Cockpit.
    Thanks for your help with this.
    Ashish

    Hi Ashish,
                   We had the same issue. You must have one of following:-
    BI_CONT 702, Support pack 7
    or
    BI_CONT 703, Support Pack 4
    Once you get either of above, you will not have that problem. But you might have some problem in process chains because of roll up of aggregate in delta PC. Just ignore that and you will be OK...( This problem is because there is no agg. defined and PC is trying to do roll up..which make no sense and hence there is error)
    Also refer to OSS note 965386
    This is my first answer to SDN...so assign my first points..:)
    Thanks,
    Anil

  • Process Chains & Misc

    Dear experts - I am a novice to bw and if someone could share their ideas regarding the following, I'd be very thankful.
    I have activated a process chain and tried to execute it. This is a onetime execution and is not dependent on any event. When I tried to execute a process chain for the first time, I was prompted for a date and time for scheduling for which I chose "now" and had given the date and a future time (which was a few minutes after). But the error msg said this was a past date and time. This message kept on appearing for whatever time I had given.
    1. Is there some other date that I have to change elsewhere ?
    And the confusing part is after trying for a few times, the chain started executing suddenly (Sounds funny, but really I don't know how it started).
    and I am confused..
    Any stepwise procedures that you could help me with ?
    Is there some other scheduling that I need to do other than mentioning the date and time even for onetime run ?
    And if someone could share any information on the business content reports/data models/data targets available for campaign analysis based on external lists..
    that's really helpful.
    When I transfer the data from crm to bw, what datatargets could I make use of for surveys' information ?
    Thanks.

    Hi,
    You are setting the time in the correct dialog box but i believe you are placing the wrong time. Make sure you are inputting a time in the server's time zone. The server's time and timezone maybe different form yours. To check your time zone and the server's time zone, go to transaction su3 and proceed to the "Defaults" tab and look at Personal Time Zone of the user and the Server. When you know your time zone and the server's then you can input the correct time in the process chain scheduling.
    Please advise if this has solved your problem.
    Message was edited by: Emmanuel Nepomuceno

  • Error in transporting process chain

    Hi
    i added two DTP's in the process chain and transported. The transport ended with errors.
    The following is the error msg:
    Results of check for process AND EVEN_4CEJM320EVCIY0L5L62W61JVB in chain PC_BI_TD_POSDM_CAST:
    Process variant AND EVEN_4CEJM320EVCIY0L5L62W61JVB does not exist in version A
    Results of check for process AND EVEN_4CEJM320EVCIY0L5L62W61JVB in chain PC_BI_TD_POSDM_CAST:
    Process variant AND EVEN_4CEJM320EVCIY0L5L62W61JVB does not exist in version A
    I saved and activated the process chain but still transport to QA ending with errors.
    When i saved the process chain in DEV, i am getting the msg:
    Version 'M' of chain PC_BI_TD_POSDM_CAST was saved without checking
    What does that mean?
    REgards
    Annie

    Hi
    If I got your question properly, Your AND Event is not Collected at the time of Transport.
    Try to Re Export the Process chain with all necessary grouped objects.
    Version 'M' of chain PC_BI_TD_POSDM_CAST was saved without checking
    What does that mean?
    Try to Check-- Save and then Activate and Then Transport .
    Please follow the Sequence for the transport, You may recheck the flow again
    Transport Sequence
    Info Objects,
    DSO
    INFO CUBE
    TRANSFORMATIONS
    MP
    INFOSETS
    PROCESS CHAINS
    QUERIES
    Objects need to be transported with respect to their
    dependencies
    InfoProviders will bring in all relevant InfoObjects
    Importing of Global variables is dependant on their reference
    InfoObject being already active
    Queries, workbooks and roles are dependant on InfoProviders
    and InfoObjects being active
    Use the Transport Connection Tool to analyze your objects
    Transport all customer-defined packages (dev classes) before
    transporting objects
    Transport InfoProvider(s) using the "In Data Flow Before" or
    "Only Necessary Objects" grouping option
    Transport all Global Variables with primary package
    assignment
    i.e. ZBW
    Transport BEx objects with appropriate individual package
    assignment
    Transport roles and workbooks together.
    Hope it helps