Activity status , and partner changed by FM CRM_ORDER_MAINTAIN

Hi any one used FM CRM_ORDER_MAINTAIN to change the Activity status and the BP assign to the activity. If yes please help me.
Import parameters:
        it_partner 
        it_status
CHANGING
        ct_orderadm_i
        ct_input_fields

Hello Sachin,
Search for the thread "CRM_ORDER_MAINTAIN - Appointments" on SDN. This talks of your problem and should give u the exact solution.
https://forums.sdn.sap.com/post!reply.jspa?threadID=47889
Reward points if it helps !!
Rgds
Priyanka Bansal

Similar Messages

  • Archiving flag for BP based on activity status and delete archvied BP

    Hi All,
    Can we flag archiving check box for BP based on specific activity status and delete these archived BP's using BUPA_DEL.
    Thanks

    Use Function module
    BAPI_BUPA_CENTRAL_CHANGE and set the flag CENTRALARCHIVINGFLAG to true in the structure
    BAPIBUS1006_CENTRAL.
    Thanks,
    Thirumala.

  • Find Activity status and date

    hi,
    i wont to now in which table i can find Activity status ,
    i now that tr. cj20n but i don't now where i can find it in  tables (if open,close).
    i need to the  date of opening Activity .
    Regards

    Hello Ricardo,
    You mean to say that does a WBS element has a active status are not Right !!!.
    Then it is very simple. Read the table JEST with the OBJNR and INACT = SPACE. If the select statement returns any record then the WBS element has a active status.
    Hope this helps you.
    If yoiu have further queries please revert back to me.
    Cheers,
    Vasanth

  • One plant with ML active status and another plant without ML active status

    We have one ML active plant under the company code X. We need to create another new plant under the same Company code  but we don't want to activate Material Ledger for the same as all the material in this plant are of consumable nature and maintained at Price control "V". Can we do that? Please give your advice.
    Mukesh

    Hi Mukesh
    usually, this is not recommended by SAP... I read this in one of the notes, I dont have the note now...
    However, if you are not going to have any stock transfers from the ML Active Plant to the ML Not active plant - you can think of it
    But, as far as I know, this is not recommended by SAP, Though technically it is possible
    br, Ajay M

  • Active directory, SSGD and password change

    Hi everybody, we have some problems with SSGD, active directory and password change
    Scenario:
    We have 2 different perfectly working Active directory called "Gruppo" and "Eracle";
    We have 2 different tarantella installations called "Sgd" and "Tlv";
    Sgd servers are working servers and users authenticate against Eracle, used by our customer.
    We made 2 basic different test with Tlv:
    1. we configure Tlv to authenticate users against Gruppo (that is our real need)---> we can't change pasword using kpasswd or ttakpasswd
    2. we configure Tlv to authenticate users against Eracle ---> everything was ok
    There are NO DIFFERENCE beetween Sgd and Tlv, they have same configuration, same krb5.conf etc..
    There is ONE DIFFERENCE beetween Eracle and Gruppo:
    Eracle Active Directory's properties:
    Domain functional level: Windows 2000 mixed
    Forest functional level: Windows 2000
    Gruppo Active Directory's properties:
    Domain functional level: Windows 2000 native
    Forest functional level: Windows 2000
    SSGD documentation doesn't speak about different Active Directory properties. The SSGD documentation says that you can authenticate users against Active directory, so, IT HAS TO WORK even if the domain functional level of active directory is different.
    Can someone help us^Hi Simon
    I'll try again to explain you our problem, because it seems that I wasn't so clear.
    Scenario:
    We have 2 different perfectly working Active directory called "Gruppo" and "Eracle";
    We have 2 different tarantella installations called "Sgd" and "Tlv";
    Sgd servers are working servers and users authenticate against Eracle, used by our customer.
    We made 2 basic different test with Tlv:
    1. we configure Tlv to authenticate users against Gruppo (that is our real need)---> we can't change pasword using kpasswd or ttakpasswd
    2. we configure Tlv to authenticate users against Eracle ---> everything was ok
    There are NO DIFFERENCE beetween Sgd and Tlv, they have same configuration, same krb5.conf etc..
    There is ONE DIFFERENCE beetween Eracle and Gruppo:
    Eracle Active Directory's properties:
    Domain functional level: Windows 2000 mixed
    Forest functional level: Windows 2000
    Gruppo Active Directory's properties:
    Domain functional level: Windows 2000 native
    Forest functional level: Windows 2000
    SSGD documentation doesn't speak about different Active Directory properties. The SSGD documentation says that you can authenticate users against Active directory, so, IT HAS TO WORK even if the domain functional level of active directory is different.
    Can someone help us?
    Many thank
    Patrizia

    Added question.
    Do you guys know if changing the password will change the password on their Active directory access.
    Thanks,
    helmut

  • Change mass status and desscription documents.

    Hi all,
    I would like to know how is possible mass change status and description from all documents in SOLMAN?
    Thanks in advantage.
    Warlei Figueiredo

    Hello Warlei,
    Unfortunately i don't know such functionalitiy and i highly doubt that it even exists.
    I would advice you using transaction SI80 to change description and status because you ll get an overal view of all documents of your project in one and only screen
    For each entry (doc) you can click on button 'Set Status' to change status and button 'Change Attributes' to change other attributes such as Document type, Document Properties, Title, Technical Name, Content type...
    In order to have your list in SI80 Click on button '+ with search', then select 'Solution Manager', then in 'technical Name' fill your ptoject Name and validate.
    You ll see a new line that adds to your Favorites. By double clicking on your project you ll see the list of documents.
    If you need a mass update tool , you can ask a developer helping you achivere that. Table SA01PHIO contains description & status of all documents !!
    PHIOID is the hexadeciman id of documents; DESCRIPT is the description you want to change and STATE is status of doc
    A simple program mass updating this table (meaning description and status) won't be complicated for a developer to code
    Hope this helps
    Regards
    Khalil
    Edited by: Khalil SERRHINI on Jun 21, 2010 4:19 PM

  • Partner Change Event not working

    Hi,
    I have created a WF which has start event as Attribute change and Partner Change.
    1st when i save the details on UI the WF triggers but next time if i add any partner functin on UI only partner function and no change in attribute the WF does not trigger.
    how do i resolve this. I need to trigger the WF on the adding a partner function to UI.
    Thanks
    Tarmeem

    Hi
    The WF should also trigger if i add the Partner function in UI.If i change any Attribute the WF triggers but i dont want to change the attribute when i add the partner function.
    If i have only one event for WF that is Partner Change the WF will not trigger it for the 1st time when i save the UI. But next i come to the same saved doc and add a partner function then the Wf triggers.
    So this means that Partner change is active.
    the issue here is i need to trigger the WF on , the 1st time i save the UI, for which i wil be using Attribute Change and next time when i come back to saved doc the and add only the partner function and no changes are made to attributes the WF should again trigger.
    Thanks
    Tarmeem

  • Filtering My Open Task in SAP CRM based on Status, Transaction & Partner Function

    Hello
    Whenever i create a Task in SAP CRM, it displays that transaction in the My Open Task of all Business Partners involved in that Transaction.
    I want to restrict the My Open Tasks based on Transaction Type, Status and Partner Function.
    1) The system should work as it is for all other Tasks but for my Custom Transaction Type the logic should be based on status of the Transaction
    2) When My Open Task component is prepared the system should consider the Status and Partner Function as well i.e. if the status is Approval of Manager, the system should show the Open Task only to the Manager and not other parties.
    3) if the status of the Transaction is Open, the system should only display this Transaction / Task only to Employee Responsible and not to Manager and other people involved in their My Open Tasks.
    I have gone through the following post in SCN:
    https://scn.sap.com/thread/2056959
    I have implemented the method DO_PREPARE_OUTPUT as per the post but it does not do anything. When i redefine the method GET_QUERY_RESULT and remove everything,it does not prepare any list.
    If possible please specify which method needs to be redefined in the component/view CRMCMP_GS_WC/TodaysTasks & if possible please share the code that needs to be maintained in that method.
    Thanks

    Hi,
    Method DO_INIT_CONTEXT should be redefined
    This should be redifined to get the collections with your required filter criteria.
    * get the collection of entities for the tasks
       lr_col      = get_query_result( gc_status-open ).
    If this does not help, Delete the collections which are not required after above selection but before this code.
       me->typed_context->resultnew->collection_wrapper->set_collection( lr_col ).
    Thanks
    Ajay Singh

  • Hide "Last Active" status on profile

    I would like to see an option for hiding your last active status on your profile.  Even though you can sign in as invisible, your active status always shows when you have been on line.  This causes problems amongst friends sometimes, because you would like to jump on tagged to check messages only or pets, and you may not always have time to reply to them.  Then you get it in the neck from friends saying they were on line at the same time and you get accused of ignoring them.  I feel this is a privacy issue and we all should be able to have this feature. There is actually one profile I have come across that shows no "Last Active" status and was wondering if they have found a way around this or there is something wrong with their profile.

    +2 

  • Workflow Process stuck in Active status

    Hi,
    My workflow stuck in Active status and user is not able to proceed further. But it is not happening every time. Sometimes the process activty gets stuck. Could anyone please let me know the reason for this behaviour and how to fix this issue?
    Thanks

    You need to get more information as to what is going on, identify more facts around the issue:
    1. First off, run wfstat.sql to get a history of the activities of the process as well as its attribute values.
    2. Once the workflow gets 'stuck' what makes it progress? For instance, does running the background engine with parameter Stuck processes=Yes fix the problem?
    3. Are there activities deferred that do not get process by the background engine?
    4. Does the process get stuck after a notification is responded to but 'nothing' happens?
    It would also be useful to have the complete DB version.
    Regards,
    Alejandro

  • WF activity remains in ACTIVE status

    Hi,
    There are situations when a wf activity remains in active status for long time. The sql procedure, this activity runs, is successfully completed (updates took place) but the wf does not move to the next activity (until we SKIP it with handle_error()). This behavior randomly happens (ex. 2 blocks from 1000 runs) and we cannot identify the cause.
    Any suggestion about a possible cause for this behavior?
    Thank you.

    wfstat.sql output is the best data to troubleshoot such issues. Typically the work item will be in ACTIVE status and the last executed activity will be in NOTIFIED, DEFERRED, ERROR statuses.

  • Set Project status error Activity 000005012744 0010 No changes possible bec

    Hi All,
    I am getting this error on RPM "Activity 000005012742 0010: No changes possible because of status CLSD"  after setting project status to Complete Technically or Closed. I could not change the status to any other status when set to these two statuses.
    I tried looking for custom implementation in the BADIs but unfortunately breakpoint is not triggered on any of the BADIs. Is this a configuration issue?
    Thanks and I hope someone can help me.
    Renz
    Edited by: Jorenz.Llanes on Jul 5, 2011 8:43 AM

    I found out that the activity of a project should be released first before setting a status to the Project level after which is applied to the project hierarchy.

  • Activity search by Completed status and End Date

    Hi All,
    When i try searching for an activity based on the date on which the status was set to Completed, the system does not show any results. 'Criteria used are Activity Type, Status = Completed, End Date.'
    If i choose an End date = Date on which the status on the Activity was set to Completed, the system does not show correct results. The system only shows those activities where the Activity Status was Open and Completed on the same day. For activities where Open and Completed Status was set on different dates, there are no search results.
    However, with the same criteria set, if i change the End Date = Date when Activity Status was Open, i get the results.
    Is it not possible to search for activities based on Status and End date combination?
    Pls. suggest

    Hi Kansal,
    There is a possibility that the status profile you maintained for the activities has some issues.Please check the Business transaction (which maps system status) that you have mapped with your completed and open staus.It might be that the user staus is set to be open but in the status profile it is accidently mapped to the completed or finished.
    Hope this helps.
    Regards
    Priyanka

  • BAPI for changing activity status in CIC0

    Hi
    We are developing a custom application on Netweaver platform which interacts with CRM system.
    As one of the requirements we need to <b>change the activity status from open to closed</b> in the transaction <b>"CIC0"</b>. 
    I am looking for some BAPI which can do this task for me. Can anyone help me on this issue?
    Thanks
    Yashodhan

    Hi Amit,
    Thanks for the reply. I was trying to change the status flag from open to close using the said function module.I had gone through the documentation of this module and trying to use this with parameter "Status". The approach I am following is as follows:
    1. Assiging the sequence as
              a. BAPI_ACTIVITYCRM_CHANGEMULTI
              b. BAPI_ACTIVITYCRM_SAVE
              c. BAPI_TRANSACTION_COMMIT
    As an input to Parameter in case of BAPI_ACTIVITYCRM_CHANGEMULTI  I am sending following:
    REF_GUID-> GUID of the transaction Activity.
    STATUS-> Status Key like E0003 for closed status
    USER_STAT_PROC-> Status Profile for my Business Transaction type ( Which is defined in transaction "BS02")
    As an input to "Obejcts_To_Save" in BAPI_ACTIVITYCRM_SAVE I am again sending the GUID of transaction activity.
    Now when I am executing all the above in sequence I am gettin error by BAPI_ACTIVITYCRM_SAVE  saying "Doucment could not be saved"
    I am not able to figure out what is the problem?
    Please help!!
    Thanks
    Yashodhan

  • Status of Info packages and process changes become yellow after Unicode con

    Dear Friends,
    We have been facing very critical issue in Production system after Unicode conversion.
    Sequences of Details are provided for your reference.
    1.  We suspended all BW loads for 48(2 days) hours before Unicode starts and Handover the BW system to Basis.
    2.  Basis started doing Unicode conversion on BW and they found some standard jobs ( BI_* , Ex: BI_PROCESS_LOADING) which are released status and they assumed that these jobs would run any time so that they suspended all of them but they didnu2019t inform to BW team that they had done. We didnu2019t know that when they did that like pre-Unicode installation, during the Unicode conversion and post Unicode.
    3. Basis handover the system to BW team for Unicode testing (we called five finger testing) and we didnu2019t find any issues in the testing. Again we handover the system to Basis for post installations settings for Unicode and back up things. That time we didnu2019t release any jobs to load data to BW because Basis didnu2019t inform us that we can start loads. 
    4. After post installation is done and basis told us that you can start loads from Monday. Entire Unicode activity had been done on weekend.
    5. Before releasing all BW loads to run regularly, I found the all completed process chains status become yellow and I did further detailed analysis to find why; then found some more strange things those are as follows.
              1. Only info packages in process chains are become yellow and other process variants are fine like activation,
                   DTPu2019s, index and DB stats.
              2. Requests in PSA which were completed successfully are become yellow.
              3. Info packages in the process chains are successfully completed are not updating correct status instead of green it
                  showing yellow because of that other dependent objects are not triggering.
    We all thought that suspension of standard jobs must have been caused the problem.
    How can we change the status of IPs, PSA and process chains automatically?
    We reactivate all PCu2019s and released to run tomorrow.
    Could you please share your thoughts about the issue and help us resolve?
    Thanks in Advance,
    Nageswar.

    Nageswar,
    A couple of questions :
    1. If your previous  PC runs were in yellow status - it would not impact furute PC runs..
    2. If your IPAKs are in yellow - then you might have an issue with deltas happening since the last status would have been shown as incomplete.
    3. Suspension of the standard jobs will not affect the status since the jobs were suspended but not the actual loads i.e the loads were not stopped halfway but only the released jobs were stopped - you might have to schedule the process chains again to get back the old schedule.
    Usually in a Unicode conversion - the data is exported out of the DB and imported back - this might have caused some inconsistency in the database for the RS tables used for the monitors.
    Which version of BW are you in ..?
    were there any errors in the export / import procedure for unicode conversion ?
    As part of testing did you check if loads went through properly ..?
    Was stats run on the tables after unicode ?
    Also if possible regenerate all the indices on the files.
    Rerun stats and indices for all RS* tables

Maybe you are looking for