Activity Type Changes in Work Center

Hi Experts,
We now want to change the activity type in a work center, and hope all the routings that have the work center being changed automatically. Currently, the existing routings can not be changed automatically. Is there a way to have all the routings changed as well? 
Best Regards,
Helen

Hi,
In Costing tab next to the activity you should find a check box for Reference Indicator. If this is ticked, then the changes done in work center will be automatically read into routings.
If it is not, then you will have to manually change in routings. For individual, you can use CA02, for mass work with CEWB, working area as SAP_OPERATION
Regards,
Vivek

Similar Messages

  • Activity Types for a Work Center

    Dear Experts,
    I have done KL01 and KP26 transactions. That is I ahve defined the activity and assignes a cost conter to it.
    Still, when I am trying to enter the activity type in costing tab while creating the work center, the system throws an error as "No activity types are assigned to the cost center XXXXX, controlling area XXXXX....."
    The Msg No. is CR 091.
    Please guide me to find out where I am missing something?
    Thanks & Regards,
    Rohit.

    HI,
    Create a Cost center using T code - KS01.
    Create an activity type using T code - KL01.
    Assign the Rates for an activity type & cost center combination using T code KP26.
    In the input screen of T code KP26 ,enter version as 0, from period 1 and to period as 12 and the Fiscal
    Year as 2009,enter the cost center, activity type click on overview screen (F5) & enter the per hour Rate
    After performing this in work center assign activity type & cost center
    should be assigned. Then while creating routing/task list this work center can assigned for performing
    as per the operation time, whichu2019s used by the work center, the cost is getting calculated.
    Overhead cost is the indirect cost which's spent during production.
    So when the cost rollup is taken using T code CK40N (or else using CK11N estimating & CK24 for
    Hope You will get some idea
    Thanks and regards
    E.Rambabu

  • IW41: automatic update of activity type when changing the work center?

    Hello colleagues,
    when doing a time confirmation with IW41, we have following problem:
    In the PM order the operations are assigned to a neutral executing work center, as it not known which individual technician is completing the operation later on.
    Now when the individual technician is entering the time confirmation with IW41, system is proposing the work center indicated in the operation from the PM order, then technician is overwriting the work center proposal with his own individual work center ID (and pressing Enter), but the activity type is not getting updated automatically. So the technician must jump to field "activity type" and choose the correct activity type.
    Is there any solution (hopefully with user exits!) to have the field "activity type" automatically updated with the one indicated in the work center, which was entered manually?
    Thanks for your ideas!
    Regards,
    Patrick

    Hi Maheswaran,
    yes, as usual all PM work centers have only 1 activity type assigned in the costing tab.
    We also checked the settings of the activity type (KL03), but we just found one difference: the price indicator was set on 3 "Determined manually" - we've changed to 1 "Plan price, automatically based on activity" (..same setting as for the act. type of the work center with working update of act.type).
    We tested already all possible constellations and scenarios, but we have not found any good reason for the behaviour.
    Thanks for your efforts so far!
    Patrick

  • Automatic change of Work Center during Confirmation.

    Happy New Year to all!
    Just want to ask if anyone of you encountered the scenario during confirmation in which the backflushed work center was changed. The user claims that they did not do any changes during confirmation nor did they change manually the order itself. The confirmation happened last December and they only noticed it this month when they were checking the reports.
    I did not configure their system so that they can change the Work Center during confirmation. By default, the work center is grayed out during confirmation.
    Hope to hear from some of you soon!
    Thanks and regards,
    jLmendoza
    Edited by: John Luis Mendoza on Jan 4, 2011 3:15 AM

    Dear
    If your production order operations are re-scheuled and dispatched after Capacity Avalaiblity check in cm21/cm22/cm31 etc  , then during the dispatch of operation ,  you have option to change Work Cnetre , time , date based on the selection option in Startgy profile (CM31/CM21-Enter the WORK CENTRE /Order )  and check wether work centre is changed.
    One more option may be in Order Change in CO02-Operation Overview -Operation -Work centre -Here user may change the Work Centre .
    If you have Order Change management active then you can trace the same .
    Refer : Production order change history
    Otherwise , there is not such confirguration in SPRO where work centre can be changed automatrically during confirmaiton because it will grade out based on the ste of confirmaiton default screen in OP00.
    Hope it clarifies
    Regards
    JH

  • Changing operations work center during creation of  PM order

    Hi all,
    I am looking for BADI or EXIT in order to change operationS work center which created from maintenance calls.
    Does anyone know such possibility?
    Assaf

    Assaf,
    Have a look at BADI IWO1_TL_INTEGRATION2.
    Also see [OSS Note 925072|https://websmp130.sap-ag.de/sap(bD1lbiZjPTAwMQ==)/bc/bsp/spn/sapnotes/index2.htm?numm=925072]
    Which system are you running?
    PeteA

  • All default routing value has to be changed, while changed the work center in production order

    Dear friends,
    our client they want to change the work center in production order.according to production version work center also they are changed.so while change the WC,all the default value has be changed as per routing what we maintained in routing.At present we have to enter the manually change the W.C as well as set up time and operation time enter manually.Any other option to do the automatically capture value from routing while change in Work center in production order.pl help me on this.
    Thanks&Regards
    Sabhapathy R

    Hi Rahul,
    Thanks for reply. I am maintained in diff value  maintained routing , Ex :First routing i have  work center 'X' value maintained as a setup time in 15 Min's and operation time 10 Min's
    second work center 'Y' I have maintained as set up time 10 Min's and operation time 30 Min's,
    Now I want to change the work center in production order as a 'Y' so whatever value maintained in routing , it has to be changed automatically (10 min's and 30 Min's), but system will not change only old value only picked (15Min's AND 10 Min's).
    Now I think you get to know what the client requirement, kindly do the need full.
    Regards,
    Sabhapathy R

  • Message error in trx CA01 "No activity types assigned to cost center &contr

    Hi,
    I'm getting the message error CR091 "No activity types assigned to cost center &controlling area & on &" from trx CA01.
    How can I link the cost center to an activity ?
    Thanks
    Best Regards
    Moderator: Please, avoid asking basic questions

    Cost center to an activity is linked through KP26.

  • What are the control functions of Suitability and setup type key in work center?

    Hi all,
    Can any1 plz tell me what is suitability and setup type key in workcenter default values tab?
    what are the functions controlled by these keys?

    Hello,
    Control Key in Defaut value keys screen is mainly for defining how the work center will be used in routings.
    Almost in all the PP we define same Control key to the work center as well in the routing.
    For example in work center control Key PP01 is used to define Routings/Internal proc. activities. When we go to the routing screen even if we do not see our components, work centers or control key we have to manually enter these details ans here control Key will remain the same as it was in Work center.
    No. of individual capacity defines how many machines are there of the same type in the work center. E.g if I have 5 CNC machines then I will make One work center and in capacity screen I will put 5 as No. of individual Capacity.
    Regards,
    Piyush

  • Change in Work center

    Hi SAP Friends,
    I want to do some tick marks in capacity field of work center in one work center as well similar tick mark at other work center also.
    Please Tell how to do in one time?
    Plaese Reply.
    Chandra.

    Hi,
    First in T. Code : OP36, you need to define the Default Capacity.
    Enter your plant and Capacity catgort for e.g : "001".
    Define the default values carefully.
    Then Secondly, in T. Code : OP42, you need to define the Default Work center.
    With thses two settings every time you will get the work center with filled in fields and you can modify at any point in time.
    But, to change the Work center Capcity details, I guess there is no Mass Maintenance Transaction..
    Regards,
    Siva

  • Update Routing data after change in Work Center

    Hello All,
    I have just modified the Costing Data for 100 Work Centers CR02, setting a new "Activity Type" and "Activity Unit".  But the Routing Data CA02 does not get updated correspondingly.  I would like to ask is there any standard program which can help me to do the mass processing as to update the data to the corresponding routing?
    Thanks.

    1) You can change as per Mr Anupam sharma Said
    or
    2) YOU can also Update the data IN CA85N
    In selection criteria enter the respective work center and Plant
    and In new Value Give
    Same work center, Plant,  activity value , Unit  and activity type
    execute
    select the all the work center  and then click mass change
    Edited by: Sundaresan . E. V on Nov 12, 2010 10:25 AM

  • Mass change of work center in production order

    Dear All,
    Is it possible to mass change work center in production order, i.e. i have around 100 production order of which i have to change the work ceter assigned in particular operation .
    Thanks and regards
    Manish

    Hi Manish,
    If you have not posted any activity or goods to the production order, then in header click on Functions -> Read PP Master Data.
    The order will now read the routing with the new work centers, provided the same has been changed.
    If you have posted some activities or goods movement done, then its a manual process.
    Hope the above answers your query.
    Regards,
    Vivek
    Added
    If in case you have posted some goods or confirmed some activity, check if you can reverse the same, re-read the routing & then post back the goods.
    Edited by: Vivek on Feb 24, 2009 12:22 PM

  • How to Book Activity Type to the Cost Center

    Hi Guys
    How should I put Activity type and a value to it in the cost center.
    In the Assessment Cycle I am getting the error as the reciever : Cost Center has Activity type assigned to it but there is no value in the Activity type.
    Can some one help me out on how the activity is initially linked to the Cost Center.
    and how will we put activity value in the cost center.
    Thanks in advance
    kranthi

    Hi,
    Use T.code KP26.
    Here enter the version as '0' & then enter the activity type, cost center & then click the overview icon in the top.
    A new screen will appear, here you can enter the fixed/vairable price.
    This activity type is to be assigned in the work center (T.code cr02), costing tab.
    Hope this helps, pl. reward.
    Regards,
    SDS

  • Activity independent in a work center

    In a work center, When  you define an activity-dependent quantity, the cost estimate is based in quantity. i.e.: lot size is 1000 and activity price is 10 usd.
    if you change the lot size to 500, activity price will be 5 usd.
    So, in case of activity-independent (i.e.: time of setup machine) that is independent of the quantity, how you customize this in a work center?

    Hello Cetalina,
    Set up time is not an activity independent for the machine... If you really have set up time for a machine as an acitivity then you have to assign this activity via standard value key.
    Set up also base quantity dependent (Lot size dependent). In material master "work scheduling view" you can define the set up time for suppose base quantity 1000 is 10 minutes then every time during scheduling this time will be multiplied with base quantity...You have to manintained formula also. For costing create as activity as set up time to cost center and assign this to work center in costing tab with formula.
    If you want to define the lot size independent then you can define total in house production time as lot size independent in the same view. There is no key to define setup time as independent time.
    IF helpful please rewrads your points.OR let me know any more doubts.
    Regards
    TAJUDDIN

  • Changing default Work Center during CATS time entry

    Hi Folks,
    I am hoping someone here can throw some expert advice.
    Currently during time entry in CATS, we have Work Center coming in from the Work Order. Its getting defaulted without any option to change it. Business here has a need to change it. I have llooked into the CATS profile to see if there is a place that enable the WC to be defaulted.
    In Transaction CAC1, there is a section that shows what fields are being defaulted during CAT2 time entry. However I do not see the Work Center as one of the option there.
    Can any one help?
    In short, where do we disable the defaulting of the WC from the Word Order during time entry?
    Thanks in advance.

    Hi,
    Adding to what Kapil said; if the work centre is a grayed out in time shet screen then you can go to CAC2 transaction and make it editable. By this way users will be able to change the work centre on screen.
    Regards
    Sreekanth

  • User exit/Badi for changing operation work center based on service product

    Hi,
    I have an requirement to change the operation work center based on the service product in IW31/IW32 transaction. I am using the BAdi 'IM_SM_BADI_READT399A' for changing the main work center. It changes all the operation work centers except the first one. But I need to change it all the operations.
    Thanks in Advance.

    I am using the enhancement spot 'IWO1_TL_INTEGRATION2' for changing the first operation work center

Maybe you are looking for

  • InDesign CS6 PDF Issue: Unsearchable PDF document

    Hello all, I have an issue that I've exhausted with days of Google searches. I have a text catalog created with ID CS6. Sections were PDF documents given to me from our engineering department. The book was created, exported and all went well until I

  • Dock disappears when downloading

    Whenever I upload or download a file, my dock disappears until I'm finished. For example, if I go to upload a picture to facebook, finder pops up and asks me to select the file, right? Well as long as that finder window is open, my dock completely di

  • RAC and Oracle Sequences

    We have a RAC running for two instances , we have noticed that one trigger on update which is using a sequences to get ids is not allocating such sequences on sequence as expected , is every instance of RAC caching a set of sequences and the other in

  • Selected DPS content blocked in mainland China?

    This is in relation to our question yesterday re: Is DPS content being blocked in mainland China? (http://forums.adobe.com/message/4354992#4354992) Our app was made available in App Store recently. It was a multi-issue mag app created using DPS Pro.

  • Chart YValueMember

    Hello, I have a question regarding Chart bound to a data set.  I have my line chart bound to the dataset, consisting of three columns.  In the Series Collection Editor My columns appear under the XValueMembers, but under the YValueMember my only opti