Activity Type cost allocation

Hello,
I have an activity type for labor which i have setup in the routing of a BOM and have maitained the cost in KP26.   When I check the itemization costs in the production order, it displays the cost of the labor.  I issue and recieve the order, then go to KO88 to settle the order, but the labor cost does not get added to the cost of the finished goods.  Anyboy have an idea why the activity costs do not get added to the finished goods?
Thanks in advance.
Scott

Hello
Please check cost variant(planning and actually) if assignedto order type.
Thanks
Benny

Similar Messages

  • Activity types cost Elements not reflecting in Cost Centre Report.

    Hello SAP Gurus,,
    1. Here we are facing one issue in Zreport. total is not matching, compare with KSB1.
    Values are more in Zreport, in other words activity type cost elements are not reflecting in Zreport, but it reflecting in KSB1.
    example: flow from PM module.
    Actually we had used logic based on the Cost Centres, in that cost centre by taking Object number and it passes to COEP table, then we are getting values as same as KSB1.
    As per investigation i found that the object number is differ from COEP table and CSKS table.
    Exapmple : 1410000 object number in CSKS table, 1410000EL in COEP table, thats why in Zreport these values are not reflecting.Finally our requirment is , Zreport values should same as KSB1 vlaues.
    2. We need same functionality as same as KSB1 for match code or drop down menu functionality for Cost Centre Group and Cost Element Group,  but while user wants select from match code or drop menu (F4), as of now i didnt given any logic to abap for match code functionality or drop down menu (F4),so in this case which logic or table i have to use.
    So please give me inputs or logic how to over come the above points.
    Regards,
    Raj.

    The OBJNR field structure is as follows :-
    AABBBBCCCCCCCCCCDDDDDD
    AA = object type eg. KS (cost center)
    BBBB = controlling area
    CCCCCCCCCC = cost center
    DDDDDD = activity type
    Based on the structure, you will be able to filter the relevant cost center/activity types. You can also use other fields eg. cost element, partner object, source object, value type, etc. to get your desired figures as per KSB1.

  • Activity Types and Allocation Cost Element

    Hi
    What are the impact of having same Allocation Cost Element for different Activity Types. Is there any where we use this condition. SAP allows to have same allocation Cost Elements to different Activity Types, but i did not understand where we can utilizes this feature.
    Thanks
    Sivaram

    Hi Sivaram,
    in WIP customizing OKG5 you can assign specific cost center/activitity type combinations to different line-IDs, even though the same cost element is used. By this you can e.g. differentiate the value flow of one cost element in 2: one for capitalization, the other for non-capitalization.
    Personally I would not recommend to use this and stick to the rule "one activity type - one cost element" - makes it easier for IT and controlling departments.
    Regards
    Harald

  • Activity Type: cost element does not exist

    Dear All,
    I am working on ERP  configuration for PP module as an academic exercise. I am already through with FI, CO and MM modules.
    I am not able to get through the Activity assignment step in PP module. (Accounting u21D2 Controlling u21D2 Cost Center Accounting u21D2 Master Data u21D2 Activity Type u21D2 Individual Processing u21D2 Create). While creating activity type labor (labor hours), I am getting error "cost element does not exist for aggregated period"
    In CO module I have created primary cost element for "Labor"(Category: primary cost/ cost reducing revenues). Also created secondary cost element for labor (cost element category: Internal activity allocation).
    Can anybody guide me on how to go further?
    regards,
    Supriya

    Dear
    Please revivew the following steps when you are creating a New Acvity type :
    OP51 - Check Settings for formulas
    OP54 - Check formulas for Costing
    Ensure that usage of the parameters are indicated.  Some parameters are appropriate for capacity calculation but not for schedule calculation.  If you like to find out the parameter id, you could use the Search Fld. for Param. pull down button to do so.
    KLH2 - Maintain hierarchy of Activity type group.
    OP19 - Define standard value key
    The purpose of standard value keys is to group together a set of parameters for the purpose of ensuring that the standard values for the parameters are supplied in the operations of the routing.  This is so that the formula (for calculating cost, schedule, and capacity) could have the necessary figures to work with.  Once the parameters are associated with the standard value keys, work centers quoting this standard values will be able to dictate whether or not the parameter values are optional or mandatory entry in the operations of the routing.  The pre-requisite for using this transaction is that the parameters must have been pre-created.
    KA01 - Create Primary Cost Element for the new activities type. Maintain Correct From and To date inline with Activity Type KL01  - Create Activity Type tied to the primary cost element. (the Cost element field)
    KP26  - Change Activity Type/Activity Price Planning - maintain the Variable price
    If the user include the additional activities in their work center, the routing that used the work center will required more time to finished the jobs.
    The operations Start and Finish date will be extended due to the extra time spent on the work center.  The cost of production increases in line with the extra activity which will be reflected in the Factory Output when you do a cost analysis in the production order.   The new activity will have a price attached to it and the moving average price will increase.
    Regards
    JH

  • Is there a way to bypass activity type/ cost element for CJ20n Activity?

    Hi Experts,
    Is there a way to bypass the activity type set in the Internal tab of a particular activity in CJ20n?
    Here's a background of the scenario:.
    - In CJ20n, under WBS element 100->Network 10->Activity 1, under the internal tab, the activity type set up is ACT1
    - Under person assignment, I have 2 resources assigned Person 1 and Person 2, with the following values:
      Person 1          Work: 1.0h Dur. 10D
      Person 2          Work: 2.0h Dur. 15D
    - In infotype 135, person 1 has a cost element set as ACT2 and person 2 has a cost element ACT3.
    - The problem is that when you bring up the Plan/ Actual comparision report (ctrl+F11 in CJ20n), the costs are consolidated for ACT1 and negates the cost elements for Person 1 and Person 2
    Is there a way to bypass this and use the individual cost elements set up for person 1 and person 2?

    I dont think this is possible for the scenario that you explained. I mean, you have a single activity which has 2 resources assigned and each of these resources has a different activity type. Standard SAP allows only 1 activity type for an activity.
    Just a query, why dont you create 2 different activities for these resources since the activity types are diff for both?

  • Activity types&Cost Component Structure?

    Hello All,
    I would like to ask following**
    *Can production cost centers have three activity types Produced Quantity, Machine Hour, Labor hour? Will the confirmation of these tree act types on work center form Production Cost of Material. Question is regarding line whish will have name Production Cost in Cost Component structure /OKTZ/*
    Can only Primary Cost Component Split for Preliminary Costing be set and will it be visualized as itemization during precosting in CK11N? Which assignments regarding this have to be done?**
    Best Regards,
    Poly P**

    Hi
    I guess you need to educate your users a bit as to how the costing works as well as what is possible in SAP
    Having these many itemizations is neither possble, nor recommended
    The expenses like Discounts, Maintenance, Supporting costs etc are intended for analysis at Trial balance level.... These things are overheads from costing point of view.... So, you need to logically group them
    Material consumption cost is very much possible provided the material components are part of the BOM
    Direct Costs like Labor, electricity - you need to be create activity type for them.. ANd maintain a plan rate in KP26 for the same... You can not show original cost element in itemization for them
    Other costs mentioned by you are indirect costs - Which are absorbed as overheads... Either as a % of other costs (Material + labor + electrivity) or as a rate per hr of Labor, etc
    Regards
    Ajay M

  • Creat Cost center assig  activity type, cost center need to be tras to COPA

    Dear All
    I have created a Cost Center, and Assigned  Activity Type by KP26
    Now this Cost Center need to be transported to COPA
    Plz let me know the procedure what are the steps need to be followed.
    With Regards,
    kamal

    if you want to run an assessment of cost centers to CO-PA, you should create and run a cycle in KEU5.
    Dude
    I have gone to this particular transaction code, I have given period from
    1 to 12 and fil year 2007
    and given test run,
    and given Detal list
    its asking me the cycle , and date
    where i  there is no cycle being defined and date given as 22.02.2008
    Its throughing the error msg  cycle has not been created.
    With Regards,
    kamal

  • Activity Type set up for cost center

    Hi All ,
               While creating a task list i m getting a message
    Activity type is not set up for cost center in the year 2008
    Message no. CR062
    How could i set the activity type for cost center? Plz tell the procedure.
    regards
    sunil
    Edited by: sunil gupta on Sep 19, 2008 10:12 AM

    Dear Sunil,
    Check out this,
    1.Create a Cost center using T code - KS01.
    2.Create an activity type using T code - KL01.
    3.Assign the Rates for an activity type & cost center combination using T code KP26.
    4.In the input screen of T code KP26 ,enter version as 0, from period 1 and to period as 12 and the Fiscal
    Year as 2008,enter the cost center, activity type click on overview screen (F5)---> enter the per hour Rate
    under Fixed price and set value as 2 for distribution key and plan price indicator as 3.
    5.After performing this ,while creating the work center ,this combination of activity type & cost center
    should be assigned.Then while creating routing/task list this work center can assigned for performing
    operations.
    Check with this & revert back if you need any further help.
    Regards
    Mangalraj.S

  • Master record for cost center/activity type

    Hi all;
    How create a master record between an cost center and activity type?
    Thank you

    Hi
    You can create master data between cost center / activity type.
    You can link the two by planning for activity qty the combination of a cost center / activity type in KP26. Then you do a detailed planning for costs for the cost center / activity type / cost element in KP06.
    I hope it is clear..
    Regards,
    Suraj

  • How to Create New Activity Type  for Assiged to work centre Costing in Acti

    Dear Sir,
    We have four activity type to assigned in workcentre Costing Activity. Details are as under
    AIRJET     2010     AIRJET
    DONIER     2010     DORNIER
    SULTEX     2010     SULTEX
    SULZER     2010     SULZER
    in addition one more loom is comming in our unit and require new activity type.
    How can i create new.
    Please guide.
    Thanks in advance
    Regards
    Ajit

    Dear ,
    To create new Activity Type  , you need to follow the below steps :
    KA01 - Create Primary Cost Element for the new activities type.
    KL01 - Create Activity Type tied to the primary cost element. 
    KP26 - Change Activity Type/Activity Price Planning - maintain the Variable price
    Assign the activity type to cost center using T code KP26.
    In the input screen of T code KP26 ,enter version as 0, from period 1 and to period as 12 and the Fiscal Year as 20xx.
    Click on Overview tab on top and key in costing details in this screen.
    After performing this ,while creating the work center ,this combination of activity type & cost center should be assigned.
    At work centre level , you should have
    1.Create Standrad Value Key -OP19 and Formula Key in OP49.
    2.Create Formula Parameters in OP7B or u can use existing one to assing in the Standard Value Key
    3.In CR02-Assing the Standard value key in Basic Data  and select the Formula Key in Costing tab with cost centre assingement .Save
    Try and check
    Regards
    JH

  • How to Book Activity Type to the Cost Center

    Hi Guys
    How should I put Activity type and a value to it in the cost center.
    In the Assessment Cycle I am getting the error as the reciever : Cost Center has Activity type assigned to it but there is no value in the Activity type.
    Can some one help me out on how the activity is initially linked to the Cost Center.
    and how will we put activity value in the cost center.
    Thanks in advance
    kranthi

    Hi,
    Use T.code KP26.
    Here enter the version as '0' & then enter the activity type, cost center & then click the overview icon in the top.
    A new screen will appear, here you can enter the fixed/vairable price.
    This activity type is to be assigned in the work center (T.code cr02), costing tab.
    Hope this helps, pl. reward.
    Regards,
    SDS

  • Resource - cost center - activity type

    Hello,
    I can see the link Resource - Cost center  (in the resource master data)
    I can see the link Activity type - cost element
    I can see where the activity type's planned cost is done, for such or such cost center
    I cannot see the relationship Resource - Activity type
    isn't there any direct link or is it only an indirect link, through the cost center
    Thanks for your help
    KR - Loï

    I need to post 2 diferent type of costs to 2 different accounts (cost elements) my question is what impact is if I mantain in one resource with cost center 1000 2 activity types, one is also linked to CC 1000 but the 2nd is linked to CC 2000
    In the costing tab at the Resource there is a field for the cost center so my question is what are de implication with this cost center and the link between the activity types and the cost centers
    you can maintain 2 cost element for two activity.
    But you can't combine two cc in one resource
    then you need to create two resource, one with cc 1000 and other with cc 2000,
    the second question is, I have to maintain these 2 different cost at the time of confirmation, Is it correct that I mantain the cost of an HOUR in KP26 so when the confirmation happens I just have to say in COR6N that 15 hours were used so based on rate given in KP26 system will calculate and allocate that cost properly, Is this how it works?
    as per the formula in OP54, assigned in resource with respect to activity.
    at the time of actual booking, system will calculate the actual cost of the activity ( as per the formula maintained in resource)
    Also I want to ask if like the activity described before I can have 2 of these attached to the same work center and same phase? I know I can have up to six per Resource but how is the confirmation done, in one step at COR6N you give the 6 parameters to each of the activities or you have to go one by one and saving in this transaction??
    In resource for each activity ( parameter) you need to assign formula and activity type, while creating process, system will copy all the parameter and formula in process order, while booking  in cor6n system will copy all the parameter.

  • How we calculate product cost  without taken activity type

    Respected sir,
    pls tell me without taking activity type costing can we calculate product cost? is it possible through Overhead costing to  calculate product cost?
    or if we taken quantity base costing how we calculate each product cost?
    please help me.......
    Than'x
    Dhananjay

    Hi
    Without Activity type you cannot calculate Operation cost. It is not good practice. Why you want to do like this. Please explain.
    I think Over head cost can be calculated without operation cost.
    Regards
    J. Saravan

  • Update cost - activity type

    Hi forum
    I did confirmations in maintenance orders, but it was not the activity type to date. I have maintained the activity type in kp26 but the costs of the previous confirmations in the orders are not updated.
    Could you help me to make it possible.
    Best regards.

    Hi,
    If u have maintained cost for Activity type - Cost Center in KP26 then for earlier confirmation - try to cancel that confirmation using IW45 & again do confirmation via IW41 .. /i believe in this way it should udpate the costs ..
    regards
    pushpa

  • Cost allocation difference

    Hi,
    Wish to have advice from the forum.
    May I know what is the difference for the below?
    KB21N vs KB15N.
        KB21N from 1 cost object to another using activity type whereas KB15N settle from 1 cost object to another using cost element? I still not quite clear of this. need explanation.
    Thanks
    Rgds

    hi
    KB21N =  it allows you to perform allocation of ACTIVITY type cost among different cost centers
    KB15N = it allows you to allocate cost of cost elements among different cost centers
    hope dis helps
    regards
    sayeed

Maybe you are looking for

  • How should a TOC look?

    Folks, a newbie question: Ok, so, I've not had any training, and no books, just the robohelp-html o/l help system. And I have some issues. Problem: trying to load 300 pages of old documentation into robohelp-html (webhelp format), to get it around, a

  • Offline backup issue

    Dear all, My QAS offiline backup return error code .Following is a part of backup detail log,any answer will be appreciate, thank you in advance. BR0352I Decompressing /oracle/QAS/sapreorg/sr3.data10 BR0355I from /oracle/QAS/sapbackup/bedistwg/sr3.da

  • Are java byte[] stored on the heap?

    are java byte[] stored on the heap? If not, How can I clear a byte[]? For example in C, I could simply put the '\0' at the zeroth index. Please help. hm

  • Error in generating an Invoice via Copy To and Copy From method

    Hi All, Im having this problem when Copying To and Copying From Delivery to Invoice. The Error message is : 'Internal error (%ld) occurred, 'Internal error (-5002) occured' [Message 131 - 183]. Some Delivery can Copy to and Copy from to Invoice. Than

  • Is there a Camera Raw plug in to allow import of ORF files from my OM-D E-M1 Olympus camera?

    Can I import Olympus raw files, ORF, into bridge?