Activity Type Mandatory in Repetitive Confirmation
Dear guru ,
When I run confirmation (MFBF/MF42N) i can post actual activities for a specific operation.
I have one of this activity not relevant for controlling , itu2019s only used as statistical object for PP.
Why the system consider the activity type as mandatory for every standard value parameters ?
Can I have a chance to avoid that all the activities are relevant for controlling ?
Thanks.
Dear ,
For the same operation i have one standard value relevant for CO and one standard value not relevant for CO.
For the not relevant in view costing of work centre if I set no activity , in MFBF the standard value isnu2019t displayed and I cannot enter any value.
If I set an activity in view costing of work centre the system required an activity type in MFBF.
How can avoid in MFBF (posting actual activities view) to enter an activity type but to confirm a quantity for a value not relevant for CO ?
Thanks
Similar Messages
-
Making Activity Type Mandatory in Maintenance Plan
Hi PM Gurus,
Can someone please let me know how to make the field "Activity Type" and "Planner Group" mandatory (Required Entry) in Maintenance Plan at screen level.
Cheers
DeepalHi ,
If you do not want to go for user exit then you can also get it using transcation variants via tcode SHD0 ... for IP41 /IP02/IP42/IP43 Tcodes ..
Search this forum for steps as it was discussed many times ..
regrds
pushpa -
Activity types in time confirmation (IW41)
Hi,
I create an activity type and assign it to cost center with price using transaction KP26. This activity type is being included in the work center. When I create a time confirmation for the specific work center which has been used in a work order I have in the selection list of activity types in IW41 several options of activity types. How can I restrict to use only the ones I require?
What is the logic behind the selection of activity types in the time confirmation transaction?
Thanks
EdDear,
It is not possible to change the activity type this with Enhancement CONFPM04 PM/SM order conf.: Customer specific input
or CONFPM01 fields are AFRUD-LEARR (activity type) and AFRUD-LOARR (wage type)
Regards,
R.Brahmankar -
KP26 dump due to manual entry on Activity Type Category
Hello,
I keep receiving a dump RAISE_EXCEPTION program_error in the generated programs COCC2001... 03 etc.
When I run transaction KP26 for a Cost Center that has no entries yet (with a custom layout), and when I supply or modify the value in column T (Activity Type Category), and then confirm with Enter, I get this dump.
In line 1271 of subroutine ec504_update_others_for_uattr in program COCC2001:
itdat2_key = object.
<itdat2_key_werte> = 'PLST'.
READ TABLE itdat2 WITH KEY itdat2_key BINARY SEARCH.
IF sy-subrc > 0.
RAISE program_error.
ENDIF.
I checked entries of table itdat2 (I cannot find where it is populated though), and I can see 5 entries for the &KENNZAHL field:
PAEQ, PDIS, PTKE, PTOE, PTOF.
Could someone explain, what are those PAEQ..., and am I missing some config in the SPRO, or do I have to regenarate those COCC.. reports somehow?Hello,
Are you sure about the OSS note number?
I'm in system version 6.0.
I also found out that I have this issue with only one layout, and that maybe I'm missing some entries in table CEFORMF - still I don't know how to maintain that for the moment - maint. view, or SPRO action. Maybe I just need to refresh that layout somehow.
Regards,
Michal -
Activity type field in Maintenance Order
Hi all
My client requirement is that activity type (LARNT)should me mandatory in maintenance orders to capcture the cost with out fail.
Could any body suggest me that when we need to do that?
Regards
SrinivasHi
Since the work center is mandatory you can make the activity type mandatory for workcenter master data record in OPFA IMG
or check in OIOPL where you can make the activity type as mandatory ,but i think it will only work once you nagivate the operation tab
or check whether user exit order at save will be useful
regards
thyagarajan -
Difference in activity types values
Hi,
I have an issue that, the activity type values in the confirmation screen of process order is coming different as from the master recipe of the process order.
In recipe,
MACHIN - 48 H
LABOUR - 4 H
POWER - 82 KWH
Edited by: Jish... on Jan 28, 2010 9:17 AMI am really sorry ...Some mistakes....Please check the following thread.
I have an issue that , the activity type values in the confirmation screen of process order is coming different than from the master recipe of the process order.
In recipe,
MACHIN - 48 H
LABOUR - 4 H
POWER - 82 KWH
In confirmation screen,(tab-quantity/activity)
Planned for confirmation
MACHIN - 360 H
LABOUR - 360 H
POWER - 360 KWH
It seems that the value(360) is coming from the pooled capacity(CM03-standard overview,
from 28/01/2010 to 11/02/2010 , 15 days , 24*15 = 360 ).
How does this happen?
Any changes in the customization?
Regards,
Jish.
Edited by: Jish... on Jan 28, 2010 9:30 AM
Edited by: Jish... on Jan 28, 2010 9:30 AM
Edited by: Jish... on Jan 28, 2010 9:31 AM -
Confirmation of activity types in CO11N
Dear Experts,
I have a small issue, while confirmation of production order in CO11N the activity type for the actual quantity is confirming but our requirement is that if we are confirming the half quantity means partial quantity, activity should also be confirmed for the half quantity.
Thanks & Regards,
Alok TiwariDear Bhupendra Singh,
First of all thank you very much for your reply.
I am trying to do the way you said but it is not happening.
My requirement is if the production order quantity is 10 each and planned activity is 10 min for labor and if i want to confirm partially 5 each then the activity to confirm for labor should automatically propose me 5 min.
Regards,
Alok Tiwari -
Confirmation of activity type in Process order -Impact in FI.
Dear All,
On doing a confirmation of a activity type for a process/ Production order - values get posted to secondary cost element which has been assigned to a acitivity type. This means only a impact in controlling but not in FI
How woould the booking happens in FI ?is it not required to book in FI, if yes, why.
Please suggest.
Thanks.Hi Daya
1. You can calculate activity price for plan in KSPI and for actual KSII for respective CCtr and activity type...but some times people manually update price at KP26 directly which in my opinion is not right way because price is either more or less than the real calculation in KSPI and KSII...
2. However in your case price is directly updated in KP26 against activity type..when confirmation is done in order this rate * activity qty is your value posted in order level and at the same time respective CCtr is also credited by this amount which you can see in CCtr report
Example: CCtr XXXX01
Activity type 999999
Sec cost Element for activity type 999999 (43 cat)
Suppose you have booked FI entries for some expenses like Salary in F-02/FB50...against CCtr XXXX01 So your CCtr XXXX01 is debited by Salary amount and this amount will be absorbed in product through activity for which you need activity price and confirmation.
FI entry is booked your expense in GL a/c Salary and same time debited your CCtr through CE salary....Now when you charging this expense in product through prod order you are doing it through confirmation of activity qty which in turn calculating value by taking price from KP26 and qty from confirmation.
Kamal -
PM Order Confirmation using Personnel's Cost Center and Activity Type
Hi All,
Is it possible to have PM Order confirmation (IW41) using Cost Center and Activity type from Personnel instead of default from Work Center? If it is, can it be done with some configuration or user exit? Please advise. Thank you.
DaiHi friend,
Order confirmation will be done for order operations.While doing confirmation we post the actual work done by the repective work center and respective activity type assigned to the same workcenter.
But these activity types are assigned to cost center for cost calculation.confirming the respective operation in maintenance order through workcenters gives the report of planned work and actual work done by the respective workcenter.
We cannot confirm the operation using costcenter and activity type directly through transaction IW41.
If you want to develop new confirmation screen and making confirmation of the respective order operation with only costcenter and activity type fields, you can do it .
Regards,
Pardhreddyc
Edited by: Pardhreddyc on May 17, 2011 12:45 PM -
Confirmation of PM activity types in Plant Maintenance or Controlling
Hi,
Can anyone tell me if there is a possibility to Confirm activity types of PM workers on PM orders? Which transaction is used for this?
I would like to settle indirect costs of PM Cost center to PM orders. The tracing factor in this case would be the PM activity types confirmed by the PM workers.
However, I don't know the PM module and I don't know whether it's possible to confirm activity types using some PM T-code?
Should I use for this purpose KB21N (enter direct activity allocation) in Controlling, or is confirmation done somewhere in PM module?
Best wishes,
KarolHi,
You are right...
Confirmation of the activites are always done thorugh PM module transaction only... if i am not worng T.code IW41.. any how check the t.code otherwise consult to your PM consultant
Only very rarely KB21N is used to rectify or to add some xtra cost
In day to day lifr the confirmation is done by PM department not by costing department.
As suraj written for planning activity you use KP26.
Yah..for allocating the indirect cost to PM order where the basis of allocatio is on confirmed activity cost...this is a simple case of using costing sheet in PM order... where in Base put the activity allocation cost element which you have used in activity type master data and in over head key put % and in credit put cost center which incurrs the indirect expenditure and
the costing sheet assign in the valuation variant of the order type of the PM order..
Hope i am clear to you...
IF helpful assign the points..
Cheers
PK -
Activity type is mandatory: enter value between 01 and 07
Hi guys,
I would like to ask you for help..
Recently I updated the App CRM Sales to 2.0.3
Now, when I try to create an activity/task in IPhone(IOs6), it shows me this error "Activity type is mandatory: enter value between 01 and 07".
Do I need to apply any SAP note?
Does anybody have any idea?
Regards,
Eder.Hi Masayuki,
Thanks again for you help.
So, When I create an Activity/Task in CRM Backend I don´t have problem. I can see in my mobile device (Iphone).
The problem is when I try to create a new activity in App CRM Sales (Iphone).
I think that there is some obligatory field in CRM Backend, but that in App CRM there isn´t to filled in it.
Thanks, -
Confirmation CO11N - Activity Type
Hi Gurus
Is it possible to modify CO11N (Time Ticket) screen to include Activity Type while entering confirmation for the operation.
The reason Iam asking this is because I have a situation at my clients place that the same operation can be performed by Operator as well as Engineer. Since Operator and Engineer have different activity rates, is it possible that they can enter Activity Type while confirming the Operation.
Any solutions for this would be deeply Appreciated.
PS: I know this can be done if we have HR Module implemented where in we can link personnel number to capture cost, but right now client is not going for HR Module.
Regards,
AravindHi Pradeep,
Thanks for the advise.I thought of this too and suggested client about this.
They were apprehensive that what if they didn't select the right activity type while confirmation, meaning to say that if Operator selects Engineers activity, it could have lot of repercussions from costing point of view.
One more point to clarify is that the Operation will be done either by Operator or Engineer but not by both at the same time.
So i was working on this line whether they can select activity type directly at CO11N rather than entering time in respective activity.
SAP has this kind of option for network confirmation(CN25 , Project System Module) where in they can select the activity type in the confirmation screen. I was looking for the same kind of option in CO11N.
Not sure why SAP has not given this option in CO11N, i don't see any contradiction of logic here.
Regards,
Aravind -
PDC interface - PM/CS confirmation without Activity type
Hi,
We have a problem with PM/CS PDC confirmations in our ECC6 version of SAP. For PS & PP, the default activity type is populated automatically when doing the confirmation. But for PM/CS, the activity type is left blank. All three CONFXX idocs have no activity type specified.
The only thing I found regarding this problem/behavior is a OSS note, dated from 2001. OSS number is 0000381846. Is this note applicable for our system?
Is there someone who knows about this?
Thanks
EricHi,
what you are willing to implement is not a supported functionality in the current Yard management.
If this is not yet the case, I would encourage you to open a SAP Customer message so that your question gets checked and analysed at development support.
BR
Alain -
Mapping confirmed Activity type
Can anyone tell me how to map the confirmed activity type with material number to fetch material description from makt table ?
Hi Arvind,
i don't understand your Question. Can you explane it
a little more in detail?
Regards, dieter -
How to pick activity type from HR mini master during activity confirmation
Hi,
How to pick activity type from HR mini master during activity confirmation via BAPI "BAPI_NETWORK_CONF_ADD".
I have confirmed activity via bapi BAPI_NETWORK_CONF_ADD, and it is picking activity type from activity. but i wants from HR mini master. In BAPI i am passing Personal no.
Thanks in advance.Hi,
Did you mention Activity type information in HR Master-315 InfoType (TimeSheet Default value).
then you can get the value.
Vemula
Maybe you are looking for
-
Is there a way to "Save As" when downloading with Firefox?
I want to be able to "Save As" when downloading with Firefox. The only options I am given is to Save or Open. All the previous questions I have seen deal with being able to save to a certain location, and that I can easily set in Firefox. What I want
-
PO from PR only for a particular document type
Dear Gurus I want purchase orders should be raised with reference to purchase requisitions only. System should allow to make purchase orders with reference to purchase requisitions only for a particular document type only. I have configured in OMET a
-
My computer cannot install windows 7 using boot comp
hi my computer macbook pro cannot install windows 7 using bootcomp
-
Calling report from developer 10g in word program
My Dears: I Wrote this code to open report in word program web.show_document('http://127.0.0.1:8889/reports/rwservlet?report=c:\emp.rdf&destype=cache&desformat=RTF&userid=scott/tiger@test¶mform=no&MIMETYPE=application/msword'); I use this code in
-
Create an Apple ID without having to input a payment method
Scenario: This is for a school owned student used iPad. Problem: Can't download apps until I assign a payment method to my account Description: I've just created an Apple ID through the web browser (IE) on a Windows machine. Go to download an App on