Activity variable and fixed price

Planned
Cost center 3104
Cost element 4402 Activity (MACHIN) Category 1 Dependent Variable $.2000
Planned Hours 100 in KP 26 for MACHIN
Run distribution cycle Sender Common cost center to Receiver 3104 cost center
Cost element 4402 value come on 3104 $.1000
Run Assessment cycle Sender Common cost center to Receiver 3104 cost center
Assessment Cost element AS4402 value come on 3104 $.500
I run KSPI for calculation activity prices, result is
MACHIN 2000/100 = 20 Variable
MACHIN 1000/100 = 10 Fixed
Q. Why system ignoring assessment cost?
Q. I need system should calculate 3000+500/100 = 35 as Variable
Regards
Imdad Edited 26 Dec 08

Hi Suraj
Thanks for reply,
Actually I have 5 activity types and all maintained equvelance number 1 for cost center/activitiy types.
I am writing again my question.
I have Chart of account having Variable and Fixed GLs separately. Some cost will be posted directly on production cost center via Variable and Fixed cost elements. Cost on common cost center will be allocated through Distribution and Assessment on Production cost centers. Client requirement is
Prices for all 5 activities Variable & Fixed Separately. No proper solution was found and i planned cost activity dependent and result is OK in KSPI but allocated cost impact is zero. I have created a splitting structure and find that splitting is only possible for fixed price calculation.
How i can calculate Variable and Fixed prices for all activities.
Suraj hopefully you understand my problem. let me ur cell number i'll call u or e mail address i'll mail you screen shots.
waiting for reply
regards
imdad
i underscore bukhari at the rate of hotmail dot com

Similar Messages

  • Activity Allocation - Split of costs between variable and fixed costs

    Hi,
    The business is very keen on contribution analysis. Therefore all costs (cost elements) are broken up as fixed and variable.
    I have a utility cost center (boiler) which incurs both fixed and variable costs. The cost center produces STEAM (created as an activity type). The steam consumption at the process order level cannot be entered. Therefore the production cost centers contain only MHR (machine hour) as their activity. Morover because the business wants to look at costs by production process each production cost center provides a different MHR activity type.
    When I compute the activity rate at the boiler cost center for steam, the system correctly breaks up the rate as fixed  and variable. Now, when I try to do an activity allocation (KSCB) from boiler to the production cost centers, the entire costs are being treated as fixed.

    Hi,
    check SAPNET note 541858, this describes the system behaviour regarding fix/variable cost when KSCB is executed.
    Best regards, Christian

  • Switch between variable and fixed axis

    In my application I want a checkbox labeled: use fixed axis.
    When it's checked the chart's axis both get a maximum. But when you
    uncheck the checkbox the axis should get variabel again (which
    means, get rid of the maximum property).
    This is what I tried, but it doesn't work. You start with
    variable axis, and when you check the box the axis indeed will get
    fixed. But unchecking the checkbox will not get the axis variable
    again.
    quote:
    <mx:verticalAxis>
    <mx:LinearAxis id="vax" displayName="Healed / Mana"/>
    </mx:verticalAxis>
    <mx:horizontalAxis>
    <mx:LinearAxis id="hax" displayName="Healed / Time" />
    </mx:horizontalAxis>
    quote:
    public function fixAx():void
    if (fix.selected) {
    vax.maximum = 1000;
    hax.maximum = 1200;
    } else {
    vax = new LinearAxis;
    hax = new LinearAxis;

    Hi Delodic,
    To change back to a variable axis you need to set the maximum
    to NaN(not a number). this will tell the axis renderer to calculate
    the maximum itself. The update code is as follows:
    public function fixAx():void
    if (fix.selected) {
    vax.maximum = 1000;
    hax.maximum = 1200;
    } else {
    vax.maximum = NaN;
    hax.maximum = NaN;
    Hope this helps

  • Hello Apple. Iphone6 ios8.0.2. I have problem with activation imsg and fctm. My number doesnt display on both apps. I can only use them with my apple ID. How can i fix this problem. Country:Azerbaijan. Number:  *********

    Hello Apple. Iphone6 ios8.0.2. I have problem with activation imsg and fctm. My number doesnt display on both apps. I can only use them with my apple ID. How can i fix this problem. Country:Azerbaijan. Number:  *******
    <Edited by Host>

    Hello Khayalh,
    You should be able to link your phone number by following the steps in the article below. From your iPhone, sign out of FaceTime and iMessage and then sign back in and it should link. Check in the Start Conversation With and I Can Be Reached at section in iMessage and FaceTime respectively. 
    iOS and OS X: Link your phone number and Apple ID for use with FaceTime and iMessage
    http://support.apple.com/kb/HT5538
    Regards,
    -Norm G. 

  • [svn:fx-trunk] 8474: * Fixed the AST generation code path of Vector typed variables and

    Revision: 8474
    Author:   [email protected]
    Date:     2009-07-09 07:20:32 -0700 (Thu, 09 Jul 2009)
    Log Message:
    Fixed the AST generation code path of Vector typed variables and
      properties with Bindable.
    tests Passed: checkintests
    Needs QA: YES
    Needs DOC: NO
    Bug fixes: SDK-21587
    API Change: NO
    Reviewer: Peter D.
    Code-level description of changes:
       AbstractSyntaxTreeUtil.java
         Modified generateParameter(*) to use generateTypeExpression().
       binding/BindableSecondPassEvaluator.java
         Modified generateGetter() to use AbstractSyntaxTreeUtil.generateTypeExpression().
    Ticket Links:
        http://bugs.adobe.com/jira/browse/SDK-21587
    Modified Paths:
        flex/sdk/trunk/modules/compiler/src/java/flex2/compiler/as3/AbstractSyntaxTreeUtil.java
        flex/sdk/trunk/modules/compiler/src/java/flex2/compiler/as3/binding/BindableSecondPassEva luator.java

    I got again a total system freeze today when I wanted to launch firefox using only the openbox menu, without wbar running.
    So I decided to try now the 'nouveau.noaccel=1' kernel command line parameter, and to use again wbar for my frequently used applis.
    In the Xorg log, the differences are:
    without 'nouveau.noaccel=1'
    [ 30.761] (II) UnloadModule: "nv"
    [ 30.761] (II) Unloading nv
    [ 30.761] (--) Depth 24 pixmap format is 32 bpp
    [ 30.762] (II) NOUVEAU(0): Opened GPU channel 0
    [ 30.765] (II) NOUVEAU(0): [DRI2] Setup complete
    [ 30.765] (II) NOUVEAU(0): [DRI2] DRI driver: nouveau
    [ 30.765] (II) NOUVEAU(0): [DRI2] VDPAU driver: nouveau
    [ 30.776] (II) EXA(0): Driver allocated offscreen pixmaps
    [ 30.777] (II) EXA(0): Driver registered support for the following operations:
    [ 30.777] (II) Solid
    [ 30.777] (II) Copy
    [ 30.777] (II) Composite (RENDER acceleration)
    [ 30.777] (II) UploadToScreen
    [ 30.777] (II) DownloadFromScreen
    [ 30.777] (==) NOUVEAU(0): Backing store disabled
    [ 30.777] (==) NOUVEAU(0): Silken mouse enabled
    with 'nouveau.noaccel=1'
    [ 1191.621] (II) UnloadModule: "nv"
    [ 1191.621] (II) Unloading nv
    [ 1191.621] (--) Depth 24 pixmap format is 32 bpp
    [ 1191.621] (EE) NOUVEAU(0): Error creating GPU channel: -19
    [ 1191.621] (EE) NOUVEAU(0): Error initialising acceleration. Falling back to NoAccel
    [ 1191.621] (==) NOUVEAU(0): Backing store disabled
    [ 1191.621] (==) NOUVEAU(0): Silken mouse enabled
    [ 1191.621] (==) NOUVEAU(0): DPMS enabled
    So now 3D acceleration is disabled.
    I will see now if the system is stable enough for my daily usage and gives satisfactory performances.
    I am almost sure that the mesa nouveau dri driver is the cause of the freezes.
    Last edited by berbae (2013-03-27 10:07:42)

  • I formated my i phone 3 g and when it loaded back up and asked me to choose language local and wi fi connection everything went fine but when i hit next it said my i pod can not be activated  why  and how can i fix this i bought it for my daughter for x m

    i formated my i phone 3 g and when it loaded back up and asked me to choose language local and wi fi connection everything went fine but when i hit next it said my i pod can not be activated  why  and how can i fix this i bought it for my daughter for x mas and that is tomorrow

    AdaS_VZW,
    I'm not sure if the area has been surveyed; it's a large group of apartment buildings about a within a couple miles of Dulles International Airport in Northern Virginia, so I would imagine that it probably has, but I'm not sure. How would I find out?
    I understand that the Network Extender does not support LTE connections (I know there are two models, the 1x-only and 3g, both made by Samsung - I have the 3g model, SCS-2U01). I know that it can support a 3G data connection, but that should be irrelevant - I'm always connected to my wifi network in my apartment.
    What's particularly vexing, however, is that both a Galaxy S4 and Galaxy Nexus in my apartment (the other lines on my account) do not seem to have this issue. While I haven't done so with the S4, the Nexus exhibits this problem when my SIM is in it - and again, this is a fresh SIM from just a few weeks ago.
    I'm currently trying to disable Mobile Data when in the apartment to see if that will make it more stable. I'll post in a day or two with results from that.
    Shawn

  • Procure to Pay in 30 days - Fixed price Implementation

    Just so readers are aware, Oracle have just announced a fixed price
    fixed scope implementation methodology for iprocurement (p2P). More
    information is available at
    http://www.oracle.com/start/procure2pay/intro.html?src=726402&Act=29
    or www.e-vector.com
    This has been developed by Oracle Consulting Services (OCS). You can also get details from e-Vector Ltd as an Oracle Partner.
    www.e-vector.com

    Post Author: yangster
    CA Forum: Formula
    so we are dealing with a paydate which we can treat like any other dateso group by your employeecreate a running total base on the pay amounton the evaluate click the x2and put inif pay_date >= dateadd("d", -30, currentdate) then true else falseand set it to change on group on employeeput this in the group footer, you'll see the sum of all the pay amounts or you'll see a null valuesupress everything but the group footergo to the section expert and click x2 next to supress and put inif isnull({#running total}) then false elseif {#running total} = 0 then false else truethis will show you only employees who have a zero or blank amount over the past 30 days, schedule this on the last day of the month and you are setand obviously don't forget put in employee status = active in the select expertthis can all be done within sql to and cleaner too but this will do what you needhope it helps

  • Actual Activity allocation and Planned and actual activity comparison issue in Product Costing

    Friends,
    I have tried to explain the issue i am facing currently under Product Costing......
    1.Cost Component Structure
    10 – Material
    20 – Labour
    30 – Diesel
    40 – Electricity
    2.KP26 – Planned under Fixed Price
    Labour – 2.0 HR
    Diesel – 1.0 HR
    Electricity – 5.0 HR
    3. When I run CK11N system collecting correct rates for all activities (Costing Lot Size- 1)
    Like;
    1              E              LAB10    994310                  2.00        2.00        AED        1.0          HR Labour Cost New
    2              E              DIE20    994320                  5.00        5.00        AED        1.0          HR Diesel Cost New
    3              E              ELE30    994330                  1.00        1.00        AED        1.0          HR Electricity Cost
    4              M            1100000042                          5.00        0.00        AED        1              PC RAW MATERIAL BAKERY CONSUMED
    5              G            994201                                0.00        0.00        AED                        Depriciation Cost
    6              G            994202                                0.00        0.00        AED                        Sales & Distribution Cost
                                                                              13.00                    AED       
    4.When I do process order Cost analysis for the produced goods it shows me different figures as my
    BOM – RM is 1100000042 1 Quantity
    Routing – All activity time is 1 Hr
    40002                    RAW MATERIAL BAKERY CONSUMED          1005/1100000042            5.00
    40015                    COST OF GOODS MANUFACTURED              1005/4400000071            13.00-
    994310                  Labour Cost New                                              CBAKYPDDXB/LAB10      1.33
    994320                  Diesel Cost New                                              CBAKYPDDXB/DIE20      3.33
    994330                  Electricity Cost                                                CBAKYPDDXB/ELE30      0.67
                                                                                                                                              2.67- AED
    Note :- As per my understanding it should be
        Labour Cost New                                            2.00
                    Diesel Cost New                                              5.00
                    Electricity Cost                                                1.00
    5.Now after Process Order confirmation
    40002                    RAW MATERIAL BAKERY CONSUMED          1005/1100000042            5.00
    40015                    COST OF GOODS MANUFACTURED              1005/4400000071            00.00
    994310                  Labour Cost New                                              CBAKYPDDXB/LAB10      4.00
    994320                  Diesel Cost New                                              CBAKYPDDXB/DIE20      5.00
    994330                  Electricity Cost                                                CBAKYPDDXB/ELE30      2.00
                                                                                                                                              16.00
    6.For Month end actual Activity calculation and load the activaty actual rates on product
    I have configured the system in below manner
    1 Work center = Mapped to 1 Production Cost center
    Three Different Activities mapped to Secondary Cost Element with 43 Category
    For Electrictity Activity assesment from Primary to secondary 1 more cost element created with
          Category 42 Like; 994215-Electricity Cost All
    One Actual Assessment has been configured to allocate Electricity cost from Primary Cost element to
          Product/Order
    7.Assessment Cycle Details
    Controlling Area      1000 Controlling Area
    Cycle                ZELE01                  Status    Reviewed
    Start Date 01.01.2014  To  31.10.2014
    Text                  Elec. Cost Allocation to PROD
    IND- Interactive
    Assessment CEle       994215      Electricity Cost All
    Sender
    Cost Center    CBAKYDXBAD
    Cost Element 40204
    Receiver
    Cost Center    CBAKYPDDXB
    Tracing Factor
    Var.portion type – Actual Activity
    Selaction Criteria
    Activity Type - ELE30
    Receivers Tracing Factor
    Cost Ctr Factor per        100
    CBAKYPDDXB 100
    8.I have received the actuall electricity bill for 1100 AED and the same has accocated through KSU5
    After Cycle run when I follow below procedure
    KSS2 Actual cost splitting
    CBAKYPDDXB                    Production Dxb                LAB01                    183.33
    CBAKYPDDXB                    Production Dxb                DIE02                    183.33
    CBAKYPDDXB                    Production Dxb                ELE03                    183.33
    CBAKYPDDXB                    Production Dxb                DIE20                    183.33
    CBAKYPDDXB                    Production Dxb                ELE30                    183.33
    CBAKYPDDXB                    Production Dxb                LAB10                    183.35
                                                                                                                    1100.00
    Issue – System Split Electricity cost between all the activities assigned to Workcentres Cost Centre.
    But I want to post that cost only to ELE30 Activity and not for all
    When I RUN KSSI for actual Price determination system shows
    OTy        Object                                  Name                  AUn                Act Qty      Total price    Price (Fixed)              PUnit
    ATY        CBAKYPDDXB/DIE20        Production Dxb      HR                  5.0          366.66                  366.66                    10
    ATY        CBAKYPDDXB/ELE30        Production Dxb      HR                  2.0          916.65                  916.65                    10
    ATY        CBAKYPDDXB/LAB10        Production Dxb      HR                  2.0          916.75                916.75                    10
                                                                                                                                                          2200.06
    2200.06 is almost double than 1100.00 which is actual electricity cost and the same is actually determined for all the activities.
    After revaluation of the process order system posting below values
    40002                    RAW MATERIAL BAKERY CONSUMED          1005/1100000042                            5.00        5.00
    40015                    COST OF GOODS MANUFACTURED              1005/4400000071                            13.00-    13.00-
    994310                  Labour Cost New                                            CBAKYPDDXB/LAB10                      1.33        183.35
    994320                  Diesel Cost New                                              CBAKYPDDXB/DIE20                      3.33        183.33
    994330                  Electricity Cost                                                CBAKYPDDXB/ELE30                      0.67        183.33
                                                                                                                                                              2.67-      542.01
    Production Variance is posted as 542.01….
    I strongly believe there is some issue in configuration for activity allocation….
    Main issue is
    Point No. 4 – Different Figures in Process Order Cost Analysis
    Point No. 7 – Assessment cycle run
    Point No. 8 – KSS2 and KSII for Actual cost Allocation and Production variance…
    Friends… I have tried to explain maximum please help me to understand the concept or missing configuration/Process.
    Thanks
    Sagar Chinchkar

    Dear Rajneesh,
    I have made the changes as suggested....
    It seems now my Order Cost analysis and Product cost analysis are showing the same figures.
    I have also maintained cost center splitting structure for ELE30 Activity allocation.
    Structure Z1
    Splitting structure for AT
    Assignment 10
    Electricity Cost
    100
    Allocation for ELE
    Cost Element
    994215
    Activity Type
    ELE30
    Splitting Rule
    100
    Allocation for ELE
    12
    Activity quantity
    Version 0
    In my case actual activity confirmed is 3.1 for 2 orders in period 5
    Order 1 - QTY 2
    Order 2 - QTY 1.1
    Total actual Electricity exp is 1150 in period 5
    followed procedure to post actual activity on product is mentioned below
    KSS2 Actual cost splitting - Result as expected 1150 for ELE30
    KSII Actual price determination - Result as expected 3.1 actual confirmed QTY for ELE30 with actual price
           QTY 3.1         Tot Price 3,709.68        Planned(FIX) 3,709.68     Per Units 10
           (System is doing 1150/3.1*10=3709.68)
        3.CON2 Actual revaluation of orders
          Here while reevaluating the Process Orders system calculation is different
    Order 1 - QTY 2 -   558.00
    Order 2 - QTY 1.1 - 407.56
    Total -                    965.57
         4. After CON2 system is changing the value of other activities like
         LAB10 - Actual confirmed Value 10  to 0 
         DIE20 - Actual  confirmed Value 10  to 0
    Which should not be the case....
                                                                                                                  PL     Act     Var
    40002
    RAW MATERIAL BAKERY CONSUMED
    1005/1100000042
    10.00
    15.00
    50.00
    40015
    COST OF GOODS MANUFACTURED
    1005/4400000074
    26.00-
    26.00-
    994201
    Depriciation Cost
    WMBDDEP01
    1.00
    0.00
    100.00-
    994202
    Sales & Distribution Cost
    WMBDS&A01
    1.00
    0.00
    100.00-
    994310
    Labour Cost New
    CBAKYPDDXB/LAB10
    4.00
    0.00
    100.00-
    994320
    Diesel Cost New
    CBAKYPDDXB/DIE20
    10.00
    0.00
    100.00-
    994330
    Electricity Cost
    CBAKYPDDXB/ELE30
    2.00
    408.06
    20,303.00
    If we want to just post Electricity cost based on actual Electricity expenses and Labor and Diesel are based on planned activity rates.
    What setting is required in current system.....
    Million thanks in advance....
    Regards
    Sagar Chinchkar

  • Cost splitting and Actual price calculation

    Dear all,
    What is the difference between cost splitting and actual price calculation?
    Thanks & Regards,
    Ar

    Hi,
    KSS2 (splitting) is fixed cost splitting based on defined splitting rules. Fix cost splitting means, although the cost are activity unindependent (=FIX) they are splitted to each actual activity unit,... (based on the splitting rule you use)
    This is/can be a prerequisite for calculating actual activity rates, which is done by KSII (actual price calculation).
    best regards, Christian

  • What is the extractor to get Fixed Price (fixed portion of cur. plnd price)

    Hi,
    I am looking for extractor which has Fixed price information. i.e., Field LPLPX (fixed portion of current planned price) from MBEW Table (Material Valuation).
    I know that
    Total standard price = Fixed price + Variable price. Fixed remains same with respect to production but variable cost changes with prodn.
    In cost center planning, various data cells are linked together using periodic formulas, such as:
    Fixed costs + variable costs = overall costs.
    I have looked at extractor 0CO_PC_ACT_05. This has many fields but it didnot have LPLPX field. I know that I can  enhance the extractor to get this field.
    But I would like to know Is there any other extractors or alternatives? Please reply. Thanks,

    Hi,
    some threads regarding MBEW Table with field LPLPX:
    Re: How to extract Std Price from MBEW?
    Re: Trouble using Generic Extraction from table MBEW
    [For enhancement take a look at this thread...|Re: Enhancements in Extractions] It also includes the links to weblogs and a detailed description...
    Check this BI Content:
    [Cost Estimate: Detailed Report, Fixed and Variable Costs|http://help.sap.com/saphelp_nw04/helpdata/en/8b/e6b83912c4420de10000000a11402f/frameset.htm] If this BI Content query match your requirements you can use it to determine which objects you need or activate this part of the content...
    Query is based on:
    http://help.sap.com/saphelp_nw04/helpdata/en/14/d7b83912c4420de10000000a11402f/frameset.htm
    If standard extractor/bi content does not match your requirement you can enhance a suitable extractor with fild LPLPX or build a generic extractor by using view of table MBEW...
    Regards
    Andreas

  • How do I Help Apple Care Stop Warring with Each Other and Fix the Problem with My iPhone that They Acknowledge Creating?

    How Do I Help Apple US & Apple Europe Stop Warring With Each Other And Fix The Problem They Created?
    PROBLEM
    Apple will not replace, as promised, the iPhone 5 (A1429 GSM model) that they gave me in London, UK, with an iPhone 5 (A1429 CDMA model).
    BACKGROUND
    My iPhone 5 (A1429 CDMA model) was purchased this year in September on an existing Verizon Wireless (VZW) line using an upgrade. The purchase took place in California and the product was picked up using Apple Personal Pickup through the Cerritos Apple Retail Store. I will refer to this phone at my "original" phone.
    The original phone was taken into the Apple Store Regent Street in London, England, UK on November 15, 2012. The reason for this visit was that my original phone's camera would not focus.
    The Apple Store Regent Street verified there was a hardware problem but was unable to replace the part.
    The Apple Store Regent Street had me call the US AppleCare. At first they denied support, but then a supervisor, name can be provided upon request, approved the replacement of my original phone with an iPhone 5 (A1429 GSM model) as a temporary solution until I got back in the US. And approved that the GSM model would be replaced with a CDMA model when I came back to the US. I will refer to the GSM model as the "replacement". They gave me the case number --------.
    The Apple Store Regent Street gave me the replacement and took the original. The first replacement did not work for reasons I do not understand. They switched out the replacement several times until they got one that worked on the T-Mobile nano SIM card that I had purchased in England, UK. Please refer to the repair IDs below to track the progression of phones given to me at the Apple Store Regent Street:
    Repair ID ----------- (Nov 15)
    Repair ID ----------- (Nov 16)
    Repair ID ----------- (Nov 16)
    The following case number was either created in the UK or France between November 15 to November 24. Case number -----------
    On November 19, 2012, I went to France and purchased an Orange nano SIM card. The phone would not activate like the first two repair IDs above.
    On November 24, 2012, I went to the Apple Store Les Quatre Temps. The Genius told me that my CDMA phone should not have been replaced with a GSM model in the UK and that this was clearly Apple's fault. They had me call the AppleCare UK.
    My issue was escalated to a tier 2 UK AppleCare agent. His contact information can be provided upon request. He gave me the case number -----------.
    The UK tier 2 agent became upset when he heard that I was calling from France and that the France Apple Store or France AppleCare were not helping me. He told me that my CDMA phone should not have been replaced with a GSM model in the UK and that this was clearly Apple's fault.
    The UK tier 2 agent said he was working with engineers to resolve my problem and would call me back the next day on November 25, 2012.
    While at the Apple Store Les Quatre Temps, a Genius switched the phone given to from repair ID ----------- with a new one that worked with the French nano SIM card.
    Also, while at the Apple Store Les Quatre Temps, I initiated a call with AppleCare US to get assistance because it seems that AppleCare UK was more upset that France was not addressing the issue rather than helping me. I have email correspondance with the AppleCare US representative.
    A Genius at the Apple Store Les Quatre Temps switched the replacement with a new GSM model that worked on the French SIM card but would not work if restored, received a software update, or had the SIM card changed. This is the same temporary solution I received from the Apple Store Regent Street in the UK.
    By this point, I had spent between 12-14 hours in Apple Store or on the phone with an AppleCare representative.
    Upon arriving in the US, I went to my local Apple Store Brea Mall to have the replacement switched with a CDMA model. They could not support me. He told me that my CDMA phone should not have been replaced with a GSM model in the UK and that this was clearly Apple's fault. My instructions were to call AppleCare US again.
    My call with AppleCare US was escalated to a Senior Advisor, name can be provided upon request, and they gave me the case number -----------. After being on the phone with him for over an hour, his instructions were to call the Apple Store Regent Street and tell them to review my latest notes. They were to process a refund for a full retail priced iPhone 5 64BG black onto my credit card so that I could use that money to buy a new iPhone 5 64GB black at the Apple Store Brea Mall to reoslve the problem.
    The Apple Store Regent Street did not process my refund. He, name can be provided upon request, told me that the AppleCare US did not do a good job reviewing my case, that they were incapable of getting to the bottom of it like they were, and instructed me to call AppleCare US and tell them to review this case number and this repair id. I asked if he read the notes from the AppleCare US Senior Advisor and he would not confirm nor deny. When I offered to give him the case number he accepted but it seemed like would do no good. Our call was disconnected. When I tried calling back the stores automated system was turned on and I could not get back through.
    Now I have the full retail price of an iPhone 5 64GB black CDMA on my credit card and Apple will not process the refund as they said they would.
    I've, at this point, spent between 14-16 hours at Apple Stores or on the phone with AppleCare representatives, and still do not have the problem resolved.
    SOLUTION
    AppleCare US and AppleCare Europe need to resolve their internal family issues without further impacting their customers.
    Apple is to process a refund to my credit card for the cost of a full retail priced iPhone 5 64GB black.
    DESIRED OUTCOMES
    I have an iPhone 5 (A1429 CDMA model) that works in the US on VZW as it did before I received the replacement phone in the UK.
    Apple covers the cost of the solution because I did not create the problem.
    Apple resolves their internal issue without costing me more time, energy, or money.
    This becomes a case study for AppleCare so that future customers are not impacted like I have been by their support system.
    Does anyone have recommendations for me?
    Thank you!
    <Edited by Host>

    Thanks, but I've been on the phone with AppleCare US (where I am and live) and AppleCare UK. They continue bouncing me back and forth without helping resolve the problem.
    Perhaps someones knows how to further escalate the issue at Apple?

  • Problem with dsc shared shared variables and error 1950679023

    I'm having trouble using shared variables on my laptop PC (with Windows XP) using Labview 8.2 and DSC.   I've set up a simple project with one VI and one shared variable library.  In the VI, I have  a while loop that writes a number from a front panel control to the shared variable.  Another loop running in parallel reads the shared variable and displays to an indicator on the front panel.   The VI resides on my PC (no remote targets). This program executes just fine on my desk top PC; however I get the following error codes out of the shared variable nodes when I run the project and VI on my laptop for the write and read, respectively: ni_tagger_lv_Write 180121604 ni_tagger_lv_Read -1950679023 I've tried to manually deploy the shared variable library without success. The NI knowledge base  and other entries on this forum suggested that the Windows firewall should be disabled for a quick fix, however, the firewall was already disabled on my lap top. I didn't see any entries regarding the 180121604 error code.
    Any suggestions would be appreciated.

    The problem has mysteriously gone away.  For about the 10th time, I manually deployed the share variable library, and it started to work properly.

  • Error while creating a Fixed Price Order

    Hi
    I am creating a Fixed Price order for a customer which is created in the system.
    However, while doing so I am getting an error message, "No Customer Master Record exists for sold-to-party XXXXXXXXX.
    Please suggest.
    Thanks,

    hi
    Check  Table KNVV and KNVP, whether the customer is amintained or not.
    Go to SPRO --> IMG --> Sales and Distribution --> Basic Settings --> Partner Determination --> Set up Partner Determination
    Here u have to maintain procedure and its assignments, and then assign Procedure to the account group that you have created, and also maintain relevant partner functions to the account group created by you.
    Also check whether the customer is maintained as SP or not
    Check SP PATNER FUNCTION exist in your customer master or not.

  • Issue in Exporting the Sales Price List and Purchase Price List for the Materials from SAP Business ByDesign (SAP Cloud)

    Hello Everyone,
    I would like to have a discussion on the issues, which I am facing at the time of Exporting the Sales Price List and Purchase Price List for the Materials from
    SAP Business ByDesign (SAP Cloud).
    (1). Sales Price List :
    We have maintained Customer Group Specific Sales Price List for the Materials in the following Location.
    Location :         Product and Service Portfolio Work Center > Pricing > Price Lists > Customer Group Specific Price List (Type of Price List)
    Target :             We want to export the entire records in some reports or excel sheet.
    Records :          Number of Materials in the Customer Group Specific Price List is more than 2,00,000
    Issues : 
                                         (A). In the SAP Business ByDesign Screen we can filter by number of records but we can export till  50,000 records.
                                                 And if we are trying to export records more than that limit, then it throws "HTTP 500 Internal Server Error".
                                         (B). We could not find any SAP standard reports in Product and Service Portfolio and/or Business Analytics Work Center
                                                for getting the entire record set of the Sales Price List, so that we can have the entire set of records together.
    Searching For :
                                          (A). Is there any SAP reports or data source available for getting the entire Sales Price List records?
                                          (B). Can we have any other filter conditions for exporting the Sales Price List records in a single shot or module wise?
    (2). Purchase Price List :
    We have maintained the Purchase Price List for the Materials in the following Location.
    Location :           Product Portfolio Work Center > List Prices > Active List Prices (Type of Price List)
    Target :               We want to export the entire records in some reports or excel sheet.
    Records :            Number of Materials in the Purchase Price List is more than 4,00,000.
    Issues :  
                                           (A). In the SAP Business ByDesign Screen we can not see more than 10,000 records and the actual number of
                                                   records are more than 4,00,000. We could able to download the records till 10,000 but that is not sufficient.
                                                   We want to export the entire records in an excel sheet.
                                           (B). We could not find any SAP standard reports in Product Portfolio and/or Business Analytics Work Center for
                                                  getting the entire record set of the Purchase Price List, so that we can have the entire set of records together.
    Searching For :
                                           (A). Is there any SAP reports or data source available for getting the entire Purchase Price List records?
                                           (B). Can we have any other filter conditions for exporting the Purchase Price List records in a single shot or module wise?
    Please go through the attached screen shots for the references and more clarity on the issues.
    I am waiting for the valuable responses.
    Thanks and regards,
    Susanta Dey Sarkar
    Bangalore, India
    19th March, 2015

    Dear Michael,
    The number of records :
    2 Million (Approximately) is for the Sales Price List Material Price Data
    4 Million (Approximately) is for the Purchase Price List Material Price Data.
    Regards,
    Susanta Dey Sarkar

  • Photoshop CS4 always crash (how may I track and fix an APPCRASH) ???

    Hello
    My Photoshop CS4 always crash when happens these conditions:
    1. Open a file picture or create a file. (FILE 1)
    2. Import another file picture... (FILE 2)
    3. Copy FILE 2 in FILE 1
    4. Now FILE 2 appear inside a layer...
    5. Move with the mouse the layer corresponding to the FILE 2
    CRAAAAAAASHHHH
    BOOOOOOOOOOOOOOOOOOM
    Always happens the same, always, always.
    It is so annoying, that don't let me work and I am working right now with Photopaint (think I don't like).
    I would need your help to tell em how may I track and fix an APPCRASH.
    Do we have an application in windows that allow me to detect the causes of an APPCRASH?
    Or is this just because the application is failing?
    These are the data of the application crash:
    Signature of the problem:
    Nombre de evento de problema:    APPCRASH
    Nombre de la aplicación:    Photoshop.exe
    Versión de la aplicación:    11.0.1.0
    Marca de tiempo de la aplicación:    499bf9b5
    Nombre del módulo con errores:    StackHash_fd00
    Versión del módulo con errores:    0.0.0.0
    Marca de tiempo del módulo con errores:    00000000
    Código de excepción:    c0000005
    Desplazamiento de excepción:    65637275
    Versión del sistema operativo:    6.0.6002.2.2.0.256.1
    Id. de configuración regional:    3082
    Información adicional 1:    fd00
    Información adicional 2:    ea6f5fe8924aaa756324d57f87834160
    Información adicional 3:    fd00
    Información adicional 4:    ea6f5fe8924aaa756324d57f87834160
    Additional information about the problem:
    Id. de depósito:    1164041060
    The texts are in Spanish sorry, I'm from Spain.
    May someone help me to track and trace this bug and how to solve it?
    Thanks

    Prior to the subscription models—and of course that includes CS4—the Photoshop license was platform specific, either Windows or Mac, but not both.  Your CS4 Windows serial number ("key") will never work on the Mac version.
    CS4 is out of the loop as far as requesting a platform swap for a nominal fee.  It is no longer supported by Adobe in any way. A platform swap required the destruction of your PC version, so you could not use both the PC and the Mac versions.
    For a time, you could have used CS4 to upgrade to CS6 for about $200, but that time window has closed by now.  Now you would have to own a legitimate version of CS5 in order to be eligible to buy an upgrade to CS6.
    You can of course buy the full version of Photoshop CS6 Extended for $1,000 from the Adobe store:
    Creative Suite 6
    Alternatively, you can subscribe to Photoshop CC and Photoshop CC2014  on a monthly basis without ever owning the software.  If you stop paying monthly, the software ceases to work.
    The cheapest subscription is the Photography plan, which includes both Photoshop and Lightroom for $10 a month.
    These are user forums; you are not addressing Adobe here.  To contact Adobe support directly:
    Click on the link below, and after that click on "Still need Help? Contact us."
    Then on the next page, click Chat
    http://helpx.adobe.com/contact.html?step=PHXS_downloading-installing-setting-up_licensing- activation.
    There is also a phone option. 1 (800) 833-6687

Maybe you are looking for

  • Java object as input in XSL-FO processor?

    I want to generate XSL-FO document from XSLT document and from an object in Java (for example ArrayList). Can you tell me if there is a library with this functionality? I want to omit generating XML from ArrayList. thanks steensh

  • Convert cmyk to rgb in acrobat 7

    Good morning, I have a question about converting color spaces using Acrobat 7 Professional  and Pitstop Pro. I have some CMYK PDFs used for magazine printing that I need to convert to a 144 DPI RGB version for a digital edition. I know most folks are

  • How can I get videos I've taken with iPhone 5 to sync to iPad mini?

    I have several videos I've taken with my iPhone 5 and are currently on iTunes on my MBP. When I sync my iPad mini, it tells me the videos can't be sync'd because the format isn't supported on the mini. How in **** do I get this to work?

  • Classpath of Oracle Driver

    Hi, I downloaded Oracle Driver for ORacle 8i.and tried to put that in System environment variable CLASSPATh on windows NT 4.0.When I tried to restart,I had a problem of modified .dll s and later .exes. Could anybody guide me where to put th driver fi

  • Contribute Failing to Launch Groupwise

    I have a client that is using Contribute to maintain a site that I built for them. They use Groupwise for their email client. One user (on a Windows 2000 machine) is having trouble. Whenever they go to send a draft, Contribute fails to launch Groupwi