Actual Cost splitting

Hi,
Before I do the actual price calculation, I need to do actual cost splitting via KSS2. 
Suppose that I have 4 activity types for one prod cost center and the operating rates are as follows:
Direct Labor - 2.64%
Indirect Labor - 6.92%
Factory Overhead - 2.43%
Depreciation - 2.75%
Below are the plan fixed and variable costs for cost element Wages which I was able to follow based on manual calculations:
Direct Labor: Fixed - 22,000; Variable - 113,000
Indirect Labor: Fixed - 50,000; Variable - 0
CE Wages is not part of Factory Overhead and Depreciation activities
I did not use the plan cost splitting because when I uploaded the expenses, the fixed and variable portions have already been separated in the upload file.
Suppose that I made an FI posting for the cost element Wages for the same production cost center amounting to 120,000
The target costs as computed by the system and which I was able to follow also based on manual calcuations are:
Direct Labor: Fixed - 22,000; Variable - 2,985.24
Indirect Labor: Fixed - 50,000; Variable - 0
My problem is in the splitting portion.   Assuming there is no splitting structure, system is computing the ff: control costs for cost element Wages:
Direct Labor: Fixed - 35,206.79; Variable - 4,777.78
Indirect Labor: Fixed - 80,015.43; Variable - 0
For these computations, I am not able to follow the logic.  First I tried to compute based on the planned costs but it results to a very high variable cost.  Then I tried to compute based on the target costs, the resulting amounts are (following 2 splitting steps in SAP help):
Direct Labor: Fixed - 38,830.56; Variable - 378.84
Indirect Labor: Fixed = 66,830.56; Variable - 0
Thanks in advance for your advise.
Regards,
Thess

hai,
how you find the solution?
can you please explain me.
regards
VSN

Similar Messages

  • KSII, Can FI postings flow into Controlling actual cost splitting.

    Can FI postings flow into Controlling actual cost splitting and actual price calculation. I am trying post FI documents(FB50,FB60,FB01) with cost elements, activity type, quantity and cost center combination. I am able to post a document and then I do all the KSS2, in KSII is not able to show me that posting. I need to know, is it possible to move from FI to CO in tcode KSII , if yes let me know i am missing something. and i am getting an error message
    Message no. KP250
    Diagnosis
    The plan or actual activity for cost center , activity type  is 0. However, costs were planned or posted in period(s) 2.

    Hi,
    As you know, the system splits all activity-independent costs to the activities according to the following three step logic:
    -split based on target costs
    -if not possible split by splitting structure
    -in the last step if the above two were not possible split by equivalence numbers set in transaction KP26
    In your case, if there is no actual quantity for the cost center, then the system will split by equivalence number. Therefore please make sure, that the cost center has actual quantity.
    Further information is also provided in note 772794.
    regards
    Waman

  • Actual cost splitting - secondary cost element

    Hi All,
    My knowledge on actual cost splitting for cost centers are limited.
    Basically i am trying to use actual activity price calculation. In my splitting structure i have two different cost element group for two activities and i am using splitting rule 30 i.e., activity quantity. The system does the splitting perfectly based on the cost elements groups specified in splitting structure, but i am facing a strange problem. i have also allocated costs from different cost center to the prod cost center used for price calculation through assessment. But i havent used the secondary cost element in none of the cost element group for activities, but still the system is taking the cost of the allocated costs in secordary cost elements and allocates to both the activities in 50:50, which i am able to see in splitting showing as "division of activity-independed actual costs".
    Can anybody please let me know, is this the way it works or something has gone wrong.
    Thanks
    With Best Regards,
    GJ

    Portion of  http://help.sap.com/saphelp_47x200/helpdata/en/5b/d2200743c611d182b30000e829fbfe/frameset.htm
    ".....the actual costs are distributed on the activity types according to splitting rules. If you have not defined any splitting rules for a cost center, the R/3 System splits actual costs based on the <b>equivalence numbers</b> for the activity types. "
    Your case could construed to be a missing splitting rule, because the cost element group is missing the secondary cost element within the splitting structure. As a result, the system may use the equivalence number of the activity types and distribute.
    Check the <b>equivalence number</b> of your two activities, it  may be 1 and 1 for both activities; hence those costs getting divided equally.  I suspect nothing has gone wrong.

  • Actual cost splitting error (Equivalence numbers)

    Hi
    I am facing an error during actual cost splitting (KSS2) . The situation is working fine in the case of Plan cost splitting (KSS4)
    I want to split costs in a cost centre based on equivalence numbers. But, i dont see any option of maintaining equivalence numbers for actual cost splititng. The option is available ONLY in KP26..
    Hence, I have maintained equi no.s only in KP26. This gives me error in KSS2 Quoting some divergence error. The message reads that activity price calculation did not converge
    It shows me a picture on screen which displays a loop between activity types. I am unable to understand it
    Can any one guide me on this??
    Any help wud be promptly rewarded
    Regards
    Ajay

    Hi Mahe,
      Here Kss4 Before cost centers are assigned Splliting Structure to cost center r not Plz check.Then Only it Work.Actuval cost Splliting is Working  Based On the Production Order Conformation and U r Fi entry Poistings Related to cost Planning.
    Best Regards
    Nagaraju Sami

  • Bringing the actual cost (splitting among activity type) using 0co_om_cca data sources

    Hi expert,
    I'm using the data source 0co_om_cca_9 to bring the cost center data but the actual data is not being split per fixed and variable cost.
    I've checked with CO team and the process to split the cost happens in the end of the month and it record the data with value type '3' in the covp table but the standard data source 0co_om_cca_9 just get the data with value type '4'.
    Does someone know a standard datasource to bring the data with value type 3 from covp?
    Thank you.
    César Sevilha.

    Hi César,
    Please check if DataSource 0CO_OM_CCA_2 can deliver what you need.
    Best regards,
    Sander

  • Report painter/writer for actual cost component split

    Hello Gurus,
    Any of you guys ever explored possibility of creating a report using report painter or writer that can give both Standard and Actual cost component splits in one report? Is it even possible without custom ABAP involvement?
    Thanks
    RG

    Hi Raghu,
    After your reply, I am getting a doubt..
    Have you Activated Material Ledger? When you say Actual Cost Component Split, are you talking about it what you get in Actual Costing/Material Ledger?
    If yes, then you can map your cost compnents for Actual Costing in the path SPROControllingProfitability AnalysisMaster Data Valuation--Setup Valuation using Material Cost Estimate -- Define Access to Actual Costing / Material Ledger
    Further, there are no standard reports available in COPA. Try to build a report comprising two columns, 1st column with the value fields which are mapped for Standard Cost Components and 2nd column with the Value Fields which you have assined for Actual Costing under the above path.
    You will be able to get the comparison...
    Pls don't hesitate to call me for further assistance....
    Srikanth Munnaluri

  • Actual Cost component split - Per PO

    Dear ML Experts,
    We have activated Material Ledger and Actual costing/ Actual cost component split in our implementation. The standard cost is based on delivery costs and there is no manufacturing involved. In order to test ML, we created some POs and did a GR and IR for those POs. When I look at the Material Price analysis on the Price Determination Structure View, I can see the Price differences per transaction (Goods receipt, Invoice receipt).
    But when I go to the Cost component View (Actual), I cannot drill down into the individual transactions. I am able to see the actual cost component split only at the summarized level across multiple transactions. I can see the category Purchase Order under Receipts, but I am unable to drill down to see the actual cost component split for the individual transactions (goods receipts, invoice receipts).  Did I miss anything on the configuration? The client wants to see the price differences per cost component per transaction and actual cost component split per transaction.
    Is it possible to view this information using standard configuration? Would I have to change the controlling level in order to achieve this?
    Can you please provide your advice?
    Thanks,
    Balram

    Hi Balram.
    If you have access to an IDES system, you can see a Cost Component split like this:
    As fas as I know, this is only for educational porpouses. In the standard System, its not recomended have the detail of the split per movement, due to the huge amount of data genereted. There is a Flag that control this, in a Txxx table (i dont have access to the system right now).
    If you really want this functionality, write SAP in the marketplace, and I guess their response is exactly what im saying.
    Arturo.

  • Raw Material Costing with Actual Cost Component Split

    Hi All
    I have requirement to split inventory RM Value with material component and Freight cost, all config done and looks well if I check at CKM3N cost component view, material cost $100 and Freight $20, I GR the inventory with freight cost, since I'm using actual costing when journal freight cost go to Price Difference account. But after actual costing closing why the system can't split the variance update to freight cost component? is this the standard SAP behaviour?
    Please help for the solution
    Regards
    Luiz

    I see that you want to split your material cost and freight cost. you need to check the following:
    Is your current standard cost estimate support this structure i.e do you have seperate cost components for RM and Freight.
    If not first you need to change cost component structure and as mentioned by owen you to map the purchase condition type to the origin group and cost component structure.
    Then system will do the same for the actual costing

  • Material Ledger Active - K088 Settlement doesnt use Actual Cost Comp Split

    Production Order quantities are all scrap (in confirmation) thus order balance contains Consumed Materials and Activity Allocation
    When KO88 Settlement is run, the system uses Standard Cost Component Split to allocate the residual to Cost Components instead of the Actual Cost Component Split
    When we run the flow trace, the message says:
    "Splitting according to output material S-Price CCS"
    Expectation was that costs would flow according to Actual Cost Component split.
    There is note 756167 - This note activates the update of the actual cost component split information in the material ledger document when you perform the order settlements.
    However current release is 604, so its expected that this is already applied.
    Any help or insight on how to settle using Actual Cost Component split is appreciated.
    Edited by: Chris Gibson on May 5, 2010 8:57 PM
    Edited by: Chris Gibson on May 5, 2010 8:59 PM

    The second option you mentioned of using separate value field for transferring the standard cost component split from the actual cost component split is the way SAP designed this integration between CO-PA and the Material Ledger.  But 40 value field for cost component split is excessive.  CO-PA allows up to 120 value fields maximum, so I agree it does not seem prudent to use 80 of them for this purpose.
    I suggest you reexamine the level of detail you think may be needed in CO-PA and try to use CO-PC reports at the cost element level to report on more detail.  Keep the CO-PA view more aggregated and you can stick with the standard solution for comparing standard to actual costs in CO-PA.
    Best regards,
    Jeffrey Holdeman

  • Need to de-activate Actual cost component split

    Hi All,
    I need to de-activate Actual cost component split in the test client.
    It has been activated by my testing associate by mistake.
    Please let me know the do and donts if anyone has done this de-activation before.
    I could not find any relevent OSS messages or consulting notes on this topic
    We are using ML Actual Costing and Multi Currency  - without actual cost component split.
    Thanks in advance,
    Regards,
    Vik Sood

    Hi Balram.
    If you have access to an IDES system, you can see a Cost Component split like this:
    As fas as I know, this is only for educational porpouses. In the standard System, its not recomended have the detail of the split per movement, due to the huge amount of data genereted. There is a Flag that control this, in a Txxx table (i dont have access to the system right now).
    If you really want this functionality, write SAP in the marketplace, and I guess their response is exactly what im saying.
    Arturo.

  • Difference between Actual Cost and Allocable costs in splitting KSS2

    I have Cost splitting structure results with me(KSS2)
    What is the difference between Actual Costs, Control Costs, Allocable Actual, Actual cost balance and which amount will system consider for calculating the rate with dividing the activity rates.

    Hi,
    In Splitting Structure KSS2 There are two Costs One is Target Cost (Planned) and Control Cost (Actual Cost)
    In Variance Calculation U will See Target Cost (Planned), Actual Cost, Allocated Actual Costs.
    Target Cost = Planned Cost
    Control Cost = Actual Cost
    Actual Cost = Actual Cost
    Allocated Actual Cost = Actual Cost of the Output Qty. This is Actual Credits from Activity allocation. This is Actual Credits from delivery of Stock.
    Hope you are Clear.

  • Actual Cost Component Split for cross company code transfers.

    Hi,
    My issue is as follows.
    Production process spans across 2 company codes.
    Goods are produced in production company code, transferred (via stock transport order) to marketing company code and sold to customers from marketing company code.
    Stock transport order follows sales scenario i.e.. marketing company code creates purchase order for goods from production company code and production company code bills marketing for the goods.
    Actual costing / Material ledger is implemented in both company codes.
    We would like to roll-up (transfer) actual cost component split from production company code to marketing company (in a similar way as in product cost planning in cross-company scenario).
    However, due to the fact that the transfer between the companies is in fact a "sales" the goods in marketing company code are seen as externally purchased and the only cost component we can create is based on PO conditions. But we want to get the info about production cost component split.
    Once again this is for ACTUAL cost component split.
    I would be grateful for any ideas.
    Thanks,
    Szymon

    Hi Udo / Szymon.
    I have a question about this issue.
    In the sap help  about multiple valuations / group costing:
    http://help.sap.com/saphelp_46c/helpdata/en/7e/cb848443a311d189ee0000e81ddfac/content.htm
    Its not clear if this can roll up the Actual CCS? or what it do? My question is because i read the documentation of  bussiness function: LOG_MM_SIT,and also the book *Actual Costing with The SAP Material Ledger*
    states that we can handle the rollup of actual cost component split inter-company only with this BF active.
    Could you clarify about this?
    thanks!!
    Arturo.
    Group Valuation
    Goods movements between affiliated companies not involving intercompany profits are processed using the group view. This view determines the actual cost of goods manufactured for the group, and does not include any intercompany profits. You can, however, display internal profits as delta profits in the legal and/or profit center views.
    When you define cost components, you can specify that internal profits between company codes and/or profit centers are shown in detail in the cost component split. You activate these delta profits for the group valuation in the attributes of the cost components.
    For each cost component structure, there can only be one cost component under which the delta profit is shown. This means that neither the legal view nor the profit center view can have more than one cost component for the delta profit.
    To cost multiple values, you define a costing type for each valuation approach in Customizing for Product Cost Planning. You use the costing type to specify which valuation approach you require. You define each costing type in a new costing variant and carry out a cost estimate with this costing variant.
    Group Costing and Multiple Valuation Approaches
    In-Depth Detail of the Value-Added Chain: Partner Cost Component Split
    You can display in detail the costs of materials and services of every company department in the value-added chain for every stage of the production process. The partner can be traced for every material used. To do this, you define a partner version, which enables the value-added portions of each manufacturing level to be displayed in detail. For further information about this, see Partners and Direct Partners.
    The group cost component split can be displayed according to your partner definition. You can display the cost structures of the partners hierarchically according to your requirements, such as the company code segments on the highest level and the plant or profit center segments underneath.
    To display partner cost component splits, define a partner version in Customizing and enter it in the costing type.

  • Cost splitting and Actual price calculation

    Dear all,
    What is the difference between cost splitting and actual price calculation?
    Thanks & Regards,
    Ar

    Hi,
    KSS2 (splitting) is fixed cost splitting based on defined splitting rules. Fix cost splitting means, although the cost are activity unindependent (=FIX) they are splitted to each actual activity unit,... (based on the splitting rule you use)
    This is/can be a prerequisite for calculating actual activity rates, which is done by KSII (actual price calculation).
    best regards, Christian

  • Actual Costing - CKME update in group and local currency - split

    Hi Experts,
    We are using Actual Costing and running CKMLCP and CKME to update our standard price, in local currency and in group currency.
    The result it is one PR accounting document, with group currency and local currency booked in it.
    Now, we have this requeriment where they want to have 1 PR document with local currency booked and $0 group currency and another PR document with local currency as $0 and Group Currency booked.
    It is like doing MR21 and not doing automatic translation into foreign currency, that is what we want.
    So, the question is, Is there a way of archiving this in a simple way?
    Thanks for your comments!
    Enrique

    Hi Enrique,
    The final step in CKMLCP enters future prices for all materials based on the actual prices of the period.
    You could Use CKMPRPN the 'maintenance of future prices' with it's rule based approach to change the data before activating with CKME.
    You could
    1. delete the group currency future prices (CKMPRPN)
    2. release the new standard prices in company code currency (CKME)
    3. create future prices in group currency by adopting the (previous month's) V-price as future price (CKMPRPN)
    4. release the new standard prices in group code currency (CKME)
    I am not sure if you could  also distinguish the validity dates between both currencies with CKMPRPN. If yes, that might be better than deleting and rebuilding the price.You could change the date for one currency into the future, use CKME, change the date back and use CKME again.
    A disadvantage of the procedure would be that you will not release the cost component split from CKMLCP. In step 4 only the new price will be released and the split will be created from the former split. In step 2 the original split from CKMLCP will be activated.
    best regards,
                 Udo

  • Actual Overhead Cost Splitting

    Dear All,
    We have 5 direct activity types and  3 overhead activity types in the system.
    Plan Overhead  cost splitted perfectly  aginst the 5 direct activity types based on the activity quantity,
    but when it comes to actual splitting:
    1.the system splitting the cost eually in NEGATIVE  among the 5 direct activity types instaed of splitting to 3 overhead activity types
    2. system considering the all direct activity cost as part of one overhead activity types.
    I am unable to understand how the system is behaving while splitting actual overhead costs to direct activity types
    Can sombody throw any light on this issue.
    Regards
    SU

    Dear Mr Ajay,
    Can you please help me on this issue.
    Regards
    Su

Maybe you are looking for

  • Can no longer scan with the HP Envy 4500

    I can no longer scan documents with the HP Envy 4500.  When I try to scan it times out and I receive the following error message: "Scanner communiocation cannot be established. Ensure your product is powered on, check the connection, and ensure your

  • Forecasting Alerts in SCM 7.0

    Hello, I'm trying to set up forecasting alerts in an SCM 7.0 system. In previous releases it was just selecting the required alerts and go, however in this release I cannot get it to work. I'm trying to get simple alerts like MAD / MAPE upper limit e

  • Cannot change Desktop picture

    My new 15" MacBook Pro running 10.6.8 will not allow me to choose my own Photo as Desktop. Any ideas, anyone? Thanks!

  • UC320W Regional settings.

    There UC320w should be set for outgoing zaonkov. The problem is that there is no regional settings of my country (Azerbaijan).Can anyone tell whether there is a file with the universal locale settings (preferably with no restriction on the length inp

  • How to Increase TableSpace

    Hi All, This is angeline, I have question how to Increase Table Space using NW2004s/Oracle 10g/OS 2003 server I check DB02 in SAP, I think I have to increase SAPSR3 Tablespace... can you please tell me how to do that step by step using BR-SPACE Table