Hi BI guru's,
In ECC T Code : CKM3N , it will get fixed  and variable values based on Standard Price and Period Unit Price.
Periodic Unit Price is getting data(Fixed and Variable Vlaues) with Cost Componentwise from Data Source :0CO_PC_PCP_01.
Which Data Source / Which Table  will get  Stanadard Price values with Cost Componentwise.
Could you anyone help me out.
Thanks,
Bhima

Hi
Check with 0CO_PC_ACT_10 DataSource
http://www.platinum-db.com/pdf/ASUG2004_ActualCosting_1406.pdf
http://help.sap.com/saphelp_sm32/helpdata/EN/02/a2e338d96cd84fe10000000a11405a/content.htm
Thanks
Reddy

Similar Messages

  • Actual Costing/Material Ledger (CO-PC-ACT) - Actual costing

    Hello,
    I have same problem with actual costing in material Ledger.
    When I perform the actual costing a price differences that belongs to materials (orders) which at the end of the period are WIP, remain not split and don not book them on Accruals and defer.acct(material ledger) (OBYC - Transaction LKW).
    Moreover,  in the following month, system does not taking into account the value.
    Does anybody had similar problem or  knew how tu handle it?
    Thanks in advance,
    Rafal

    Hi Rafal,
    there is a functionality built into acual costing to cover this:
    [WIP Revaluation  |http://help.sap.com/saphelp_erp60_sp/helpdata/en/9e/9e7a74681f1d4f9ba6f5d64aba4a44/frameset.htm]
    best regards,
                   Udo

  • Actual Costing / Material Ledger - Component values transfer after movement

    I executed a production order with several cost components, as Labor, Machine HS, after the settlement of the production order this cost where allocated into de CKM3N components. In addition to this, I executed movement 412 Q (Plant Stock to WBS Stock) for the material and the component values didnt pass to the material / PEP. I executed CKMLCP to Multilevel price determination. Can anyone help me with this?
    The original material kept the cost split values, but the Material / Pep didnt. (the material code and plant didn't change)
    Regards

    Hi ,
    Welcome to SDN ..
    Its not a ML issue , but its a MM issue..
    Movement 412Q is a transfer from plant stock to project stock. The material quantity gets reduced from plant stock and increased on project stock. The material value stays on the inventory account (so you won't see any actual costs associated with this transaction). ..
    After you do a 412Q you can to a 221Q to issue the material from your project stock to the WBS. This will reduce the quantity in your project stock segment. The material value is credited to inventory and debited to material consumption expense(actual cost on the WBS).
    The above applies to valuated project stock only. An issue to non-valuated project stock is treated like an inventory transfer from the logistics point of view(quantity is moved from plant stock to project stock) but like a consumption from a financial point of view(reduce inventory, increase expense).
    Since, your Project Stock is not consumed.. CKM3N is not reflecting any consumption. Please use the movement type 221Q and i am sure your issue will be solved..
    Please revert back for any further clarifications
    Regards
    Sarada

  • GI Actual Cost-Material Component

    Hello Experts,
    I have maintained movement type 101 for GR, 281 for GI for valuated project stock and Item Category L for creating material component. Actually, my report reflects the planned figures on WBS, then breaks on activity then reflects further breakdown at the material breakdown level under the activity.
    When comes to actual cost i.e. first GR the value goes on WBS, which is correct. However, when I do GI it goes on the activity and my material actual cost breakdown figures don’t appear, neither does the commitment column. They remain zero instead and the Actuals GI figure reflects on activity.
    Can you please tell me where am i doing anything wrong.?
    Thanks,
    Kumar Srinivasan

    Hi,
    Just check your procurement parameters.
    If the parameters are set to reserve/ purchase the material for a network and not WBS then it will always look for the network number as the controlling object. From there only you handle your stock, Good Receipts, Good Issues and its valuation means how it is valuated.
    Eg:-
    If you have set up your project by contradicting that the project definition has group requirements for a project and then you don’t have Q on your special stock indicator on the procurement page, then you will have your costs going in different directions.
    I hope this will clear your doubts.
    Regards,
    Amit Rajoria

  • Actual costs for laboratory exams / Material Ledger

    Hi Experts
    I have a doubt for actual cost scenario for laboratory industry.
    My  background is for product cost for consumer goods, specially food companies, so this is a new segment for me.
    This laboratory has baseline version, no service/production order, it means all material consumption goes to cost center and they use activities to send costs from cost center to cost center.
    They have BOM for all exams (finished product). They only run CK40N for standard costs but they don't have actual cost (material ledger - CKMLCP) implemented.
    This is the issue: they want actual cost for every exam in the way we have for consumer goods industry.
    So they can analyse profitability for product (exam) x customers.
    I wounder if the same industry actual cost scenario can be applied to this business segment or if there is a special SAP solution for this segment.
    The main issue is the stock, there is no stock, it´s service. I believe we could change the account in BSX key (OBYC) for some P&L accounts but I´d like your opinion/experience.
    I hope you help me to  clarify these doubts
    Thanks in advance.

    Dear Rupesh,
    I don't think so there will be any std.report in PS module to show plan vs actual cost of material component.
    For looking plan vs actual cost in PS having many std reports but they don't show for material component.
    I think for this you need to develop a Z report which will show Plan vs Actual cost of material component.
    In CN52N report (Component overview report) you can add two fields one is for plan cost & other for actual cost.This can be one of possibilty you can try.Otherwise develop a new Z report for the same.
    For this you need to take yr abaper's help.
    Regard's
    Sandeep

  • Actual Costing concept in Material Ledger

    Hi
    Masters , can any body please explain the concept of Acutal costing in material ledger i think that involves the following steps:
    1 Activate actual costing.
    2.Define userdefined names for receipts and consumption
    3.Assign user defined names for receipts and consumption /
    for the above 2 and 3 points what is the purpose we have to define and assign user defined names in coantrolling level selecting the B+ Procurement and V+ Consumption.
    thanks in advance

    Hi,
    Actual costing is a huge concept. It is difficult to explain the concept in few words
    Please go through the following link for detailed informaton:
    http://help.sap.com/printdocu/core/print46c/en/data/pdf/COPCACT/COPCACT.pdf
    Configuration Points:
    Path: IMG>Controlling>Product Cost Controlling --> Actual costing/Material Ledger
    1. Activate Material Ledger for valuation areas
    2. Assign Currency types to Material Ledger Type
    3. Assign Material Ledger Type to Valuation Area
    4. Configure Dynamic Price Changes
    5. Define Material Update Structure
    6. Assign Material Update Structure to a Valuation Area
    7. Activate Actual Cost Component Split
    8. Activate Actual Costing
    Coming to your Questions 2 and 3. they are required to be created if you want your own Controlling level for transactions that you would like to differentiate in the material ledger, further than the standard system offers. Normally we don't use unless there are some specific business requirements
    Some key points would be:
    ML records all receipts, consumptions and variances for each material.
    ML gives overview for each material of the starting balance, receipts, consumption, variance and ending balance.
    ML calculates the actual cost for each material u2013 finished goods, packaging.
    If a material has BOM, variances of lower levels are rolled up to next higher level up to finished goods, to calculate actual cost for raw material, semi finished & Finished goods in ML as unit price.
    Calculated actual cost at end of month can be used as standard price for next period in the material master.
    SAP MM is on standard price based costing, ML can do monthly average costing.
    Direct settlement of all kind of price differences / exchange rate difference/ to materials at the end of the period.
    Once activated , it is not that easy to deactivate although possible with implications like not having historic data.
    Cannot be used in isolation : All the plants within the company code shall be material ledger active.
    Material Price change is not possible after first transaction in that period.
    Using material ledger, inventory in US plant in Canada will be available in USD and CAD
    Hope this would help you.
    Best Regards
    Surya

  • Material ledger- pipeline materials actual costing

    Dear all,
    I am having problem with pipeline materials not being included in multilevel actual BOM in Material ledger actual costing. My client need information about actual quantity of pipeline material (natural gas) being consumed in multilevel production. I am not sure if pipeline materials are subject to actual costing/material ledger. Actual cost component is showing the amount of costs of natural gas, but in multilevel BOM, pipeline materials are not included. Am I right about this?
    thanks in advance,
    Duu0161ko

    Hi Rafal,
    there is a functionality built into acual costing to cover this:
    [WIP Revaluation  |http://help.sap.com/saphelp_erp60_sp/helpdata/en/9e/9e7a74681f1d4f9ba6f5d64aba4a44/frameset.htm]
    best regards,
                   Udo

  • Material Ledger,Revaluation Production Cost Center ,Standard Cost

    Hi, I have a problem with  revaluation of production cost centers.
    Firstly,  production cost center expenses are settled via activity types onto the production order at the end of the period. However,  CKMLCP revaluate cost centers after the settlement because of using standard price. So cost centers at the end of the period have some amount.
    As a result we can not find  actual price for production orders.
    If I use standard cost in order to consume on cost centers, material ledger revaluates again this cost centers. I dont want this condition. Because this cost center is settled to other cost object before closing.  
    Thanks.
    Message was edited by:
            Ergul Taslacioglu

    Hi
    Go to the following path in SPRO:
    Controlling -> Product Cost Controlling -> Actual Costing/Material Ledger -> Actual Costing -> Activate Actual  Costing. Double-click on "Actiavte Actual Costing" and change the indicator from "2" to "1".

  • Volatile raw material price and actual costing

    Hello,
    We are investigating the use of material ledger / actual costing in SAP. We have multiple production plants and multiple distribution warehouses that would be modeled as a plant.
    We are worried that due to the extreme volatility of our raw material prices and the fact that some of our products have low volume or slow turnover in some warehouses, our cost of goods sold in SAP using material ledger / actual costing will be difficult to explain and not reflective of actual conditions.
    For example, if a product is placed in Warehouse A in month 1, receives very little new product in months 2-4, and then we sell a lot of that product from warehouse A in month 4, the cost of those goods will be very close to the month 1 cost. We are worried about how that will affect our cost of goods sold.
    We would like to hear from other companies that have similar conditions to see if this really causes any problems using actual costing / material ledger.
    Thanks,
    Jimmy

    Hello,
    Thank you for your response. We would like to understand why other companies do not have a problem with this behavior. Our company is concerned that this will reduce visibility of raw material price fluctuations in COGS (and reports that use COGS data), and make it more difficult to explain COGS behavior. Note that we have some reports on COGS data by material.
    In our current system, COGS consumes inventory at the average price accross all warehouses.
    Thanks,
    Jimmy

  • Report painter/writer for actual cost component split

    Hello Gurus,
    Any of you guys ever explored possibility of creating a report using report painter or writer that can give both Standard and Actual cost component splits in one report? Is it even possible without custom ABAP involvement?
    Thanks
    RG

    Hi Raghu,
    After your reply, I am getting a doubt..
    Have you Activated Material Ledger? When you say Actual Cost Component Split, are you talking about it what you get in Actual Costing/Material Ledger?
    If yes, then you can map your cost compnents for Actual Costing in the path SPROControllingProfitability AnalysisMaster Data Valuation--Setup Valuation using Material Cost Estimate -- Define Access to Actual Costing / Material Ledger
    Further, there are no standard reports available in COPA. Try to build a report comprising two columns, 1st column with the value fields which are mapped for Standard Cost Components and 2nd column with the Value Fields which you have assined for Actual Costing under the above path.
    You will be able to get the comparison...
    Pls don't hesitate to call me for further assistance....
    Srikanth Munnaluri

  • Actual Cost of Product with Price control "S"

    Dear Gurus,
    Is there any report available where we can know the Actual Costs of Materials with Price Control "S".
    In the material master field the actual cost in the "Moving Price Tab" of the material with Price Control "S" is available, but is there any report available for plant level?
    Thanks & Regards,
    Amit Dhanurdhari.

    Hi Amit,
    -- Under Standard Costing, you value your inventory at Standard Costs and any variances in Production Process will be settled to Price Difference Account. You will not be able to find out actual cost per unit. In Multi-level BOM scenario under Standard Costing (CO-PC), variances don't get rolled-up to the next level, only costs get rolled-up.
    -- Under Actual Costing - Material Ledger, You will be able to find out the Actual Cost per Unit. Variances get rolled-up to the next level.
    To explain difference between Standard Costing in CO-PC and Material Ledger briefly....
    You have given Price Indicator as "S" in the material master of "X" material (semi finisher or finished) and you are doing Standard Cost Estimate for arriving at Standard Cost per tonne. Let's say, the Standard Cost per tonne is Rs.1000/-
    Now, when you created production order for 10 tonnes and received output of 10 tonnes (GR). But the total cost incurred on that production order is Rs.1100/-. In this situation, actual cost per tonne is Rs.110.
    But, because you are following Standard Costing, When you post GR against this Production Order, inventory will be posted at Standard cost only, i.e., Rs.1000/-. and the balance of Rs.100 will be posted to Price Difference Account. (and parallally the variance of Rs.100/-) will flow to COPA.
    So, it is clear that, though, at Production Order level you can see the actual cost, at "material" level, you will not be able to see the actual cost per tonne.(as long as you are using only Product Costing and Standard Costing)
    Alternatively, if you maintain Price Indicator as "V", you will able to get the Actual Cost per tonne at material level, but there will be no scope for establishing standard cost and comparison with actual thereof.
    But, the same is possible if you are using Material Ledger (CO-ML). If Material Ledger is active, you will be maintaining "S" in the material master, still, the variances will be settled inventory and you will be able to get the actual cost per tonne. (bothe Standard cost estimate, actual cost per tonne will be possible).
    Pls revert back for further explanation
    Srikanth Munnaluri

  • Valuation area not yet productive with material ledger

    While doing goods receipt at MB1C,i got the below error:
    The description of the error is given below
    Valuation area XXX2 not yet productive with material ledger
    Message no. C+020
    Diagnosis
    The material ledger has been activated for the valuation area but material data has not yet been converted in this valuation area.
    Procedure for System Administration
    If you want to work with the material ledger, choose Accounting -> Controlling -> Actual Costing/Material Ledger -> Utilities -> Production Startup.
    There you can convert the data for the material ledger by following the instructions in the online documentation.
    Note
    Setting the material ledger to productive cannot be undone.
    See also:
    Actual Costing/Material Ledger in the SAP Library.
    The implementation guide for Actual Costing/Material Ledger.
    Can you kindly suggest me how to fix this error.
    Regards
    Sabera

    Hi Sabera,
    The Valuation Area is not activated for your material ledger. Go to SAP Access>>Accounting>>Controlling>>product cost controlling>>Actual Costing>>environment>>Production Start up>>Set Valuation area as productive.
    If you already activated Valution area in to Productive Statge.
    Then go to T.Code OMX1 and for your valuation area XXX2 tick the ML activation box.
    the error wont come
    regards
    srikanth

  • Material Ledger to be activated for a Plant in Live system

    The scenario is as under:
    The Company is already live with about 10 Plants under the Company Code. For one of the Plant we want to activate Actual Costing /Material Ledger. Are there any risks or likely issues?
    Thanks,
    Sanjay

    HI,
    This sort of implementation in the live system happens every where and there is no risks involved.
    There will be some challenges might be.
    1. We need decide, are we going to have raw materials with pricing control S or V.
    2. Are we going to have actual price of last month is going to be new planned price of new month or not?
    3. Is it only for reporting purpose or more than that? like inventory control sort.
    4. User training
    Vijay

  • Post closing entry in Material Ledger

    During running og Material ledger last night, in CKMLCP, we ran post closing entry before we release the cost through CKME. When I tried to release tcode CKME and CK40N, the system gave error message as below:
    Price changes for material 200001  is not possible
    Message no. C+811
    Diagnosis
    You want to change the price or release planned prices for material 200001 with valuation type  in valuation area 2100. You have, however, already entered actual data or performed a single-level price determination in the period concerned. The status of the material in the period is Quantities and Values Entered.
    Price determination indicator 3 assumes that the standard price remains constant throughout the period, so that all movements can be valuated preliminarily with the same standard price.  Therefore, you can only change the standard price at the beginning of a period (i.e. as long as no actual data was entered).
    System Response
    The system does not allow the price changes or the release of planned prices for this material in this period.
    Procedure for System Administration
    In the future, to automatically release your planned prices upon creation of new actual data you can allow dynamic price release in Customizing for Actual Costing/Material Ledger.
    How I can release my standard cost for period 01.05.2010 to 31.05.2010. Please help
    Edited by: Ahmed EL Zain on May 1, 2010 10:49 AM

    Hey,
    What you described is the standard system behaviour.
    The price change or release of a cost estimate should always be the
    first transaction in a new period, when Material Ledger is active.
    Once period status = 30, the standard price cannot be release or
    changed. For more details please see note 190707.
    The only possible workarounds are as below:
    - postponing the costing release to next month
    - reversing transactions and usage of note 574930
    - using the option LTPC from note 555176
    Best Regards
    Young

  • 3 valuations in Material ledger

    Hi,
    My client's requirement is as follows:
    1) Legal valuation has to be in Local currency but on Actual Costing
    2) Profit Center Valuation in Local currency but on standard costing - same as Group valuation
    3) Group Valuation in Group currency in standard costing - Group valuation
    Is this possible when, Actual costing Material ledger implemented?
    I imagin, Legal valuation field in Material Master will be updated by periodic unit price when we run CKMLCP.  Then Profit center valuation field in the Material Master will be updated when we run CK40N in standard costing PC valuation costing run.  Then again we will run ck40n in standard costing for Group valuation to update Group valuation in Material Master.
    If my client opts to run ck40n for legal valuation, then he should also be able to mark and release standard cost new price, in Legal valuation field of material master and actual costing will not release standard price for new period.
    The requirement is typically complicated, as my client wants to maintain his Global template, though one country comes under actual costing requirement.
    I would like to dig out answers from real time experience please.
    Cheers,
    Ashok

    I can give you some information but not everything.  I have gone through the deployment of material ledger using 3 valuations, but not the ones you are using.  We used Local, Group and Group at Group.  All 3 are at actual costing.  What this means is that the local currency is the currency in the country where the plant exists.  The group valuation is a straight conversion to US dollars from the local currency based on the currency conversion tables M and P rates.  Note that both of these first two currencies can include intercompany profit if reflected on the transferring sales order between companies.  The Group at Group is the US dollar conversion without the intercompany profit.  We find this works for our business.
    The other thing about material ledger is that you need to have a standard cost estimate so that material ledger can keep track of the cos component structure.  The way it works is as follows:
    Say the standard estimate shows labor=$100, materials=$200 and overhead=$300 for a total cost of $600.  All transactions in the month using this material use the $600 standard.  Now, when material ledger is run at month end, the PUP (periodc unit price) is calculated and let us assume the PUP values are labor=$150, materials=$250, overhead=$350 for a total PUP of $750.  Material ledger already has tables with the details of the standard components against every transaction.  Now it will apply the remaining adjustments totalling $150 to the proper cost components for COPA purposes.  This is pushed to COPA using transaction KE27.  Think of it like this...Actual cost is equal to standard ($600) plus/minus variances ($150). 
    Therefore, you always should have a standard cost estimate when using material ledger.  At least that is my usage and understanding.  I hope I provided useful information for you in some way.
    David

Maybe you are looking for

  • IMovie 09 crashes when capturing HD video from Sony HDR-FX1

    I have done this many times before on an white iMac 24" and an aluminum MB Pro. However, on my new MB Pro 13", when I attempt to capture video from my Sony HDR-FX1, the program crashes. I have removed and reinstalled iMove, including updates, but sti

  • Boot from DVD...doesn't recognize hard drive

    Hello all, Hopefully someone can help me out. I just replaced my 160GB 7200rpm hard drive with a Hitachi 200GB 7200rpm hard drive, put it all back together, booted up from the DVD, went to select a destination for a clean install, but the hard drive

  • Still learning my new

    hello coming from pc. I have my safari ICON both on my desktop and on my Dock. When I try to move either on off to trash, it takea the whole program? or it tells me I can't re-launch because program is in the trash what can do so I only have one Safa

  • HT204411 Is there a way that I can contact Itunes to request new music that isn't available in Australia?

    There is a band in the UK that i like but their songs aren't on iTunes Australia. Does anyone know if i can send a request to iTunes to ask if ey can make the songs available to downlaod???

  • JDO VS Oracle's business component.

    Hi all, I did work alwys with Oracle's business components for connecting to a db so I don't know nothing about other technologies to connect java's applications with db. Now I would change and I'm looking for something about more flexible. I read so