Actual Goods Movement Date is missing in 2LIS_11_V_SSL

Hi
Daily we are loading the Order Delivery data from the 2LIS_11_V_SSL datasource into the Global Level DSO(ZTEST) and it is snapshot of ECC Production System . That means, only the latest data is avialable in the ZTEST DSO .
Now for some of the Sales Order's , actual goods movement date is missing in the ZTEST DSO. So i need to investigate why the actual goods movement date to missing in the ZTEST DSO .
So i want to test this datasource(2LIS_11_V_SSL ) whether it is bring the actual goods movement date or not .
So how can i test this datasource 2LIS_11_V_SSL . Do i need to populate the setup with a particular sales order number.
What is the steps for that . Please let me know .
Regards
Mohammed

Hi,
Please check the PSA data first whether the field is empty . Because sometimes if you have not added the correct key fields in the DSO,you may not get the changes. So check the PSA first. If it is empty then check the data in the ECC system . If you use the standard field for the actual goods movement date please check with the functional consultant whether the below logic is followed (extracted from help.sap.com) for those sales order missing the date .
MCEX_I_WADAT
Actual goods movement date of a delivery
Definition
This field contains the actual goods movement date of a delivery of an item order.
Use
The field is only used in the extract structure MC11V_0SSL (DataSource 2LIS_11_V_SSL).
There, this date is determined for one delivery at a time, and is assigned to all data records for this delivery.
In these data records, you are dealing with confirmed quantities of order schedule lines, which are assigned a corresponding delivery item as delivery.
The date is only assigned if it was entered in the associated delivery.
If the logic is correct for the sales order ,then you need to reload the data .Fill the set-up table with those missing sales orders ,and run RSA3 with the selections after the set-up table filling. Check the data again here and if you find date values,then you can run the repair full request to load the data.
Still if you miss the date ,as i said earlier please check with the functional people whether any business logic is missing .
Thanks.

Similar Messages

  • LAST GOODS MOVEMENT DATE wise report

    Hi MM Experts
    Is there any report through which we can find LAST GOODS MOVEMENT DATE ( goods receipt , issue date ).
    i have tried MC.2 but in this report material , plant and sloc description is coming , i want code so that we can understand easily.
    regards
    anubhav

    Hi,
    To get the plant, material code with description in MC.2 transaction.
    Please following below steps:
    on output screen >>>
    settings >> Characteriastics display >>> select key and description or only Key.
    Regards,
    Shailesh Mackwan

  • What is the difference between delivery date and actual goods issue date?

    Hi ,
    Can you please tell me the difference between Delivery date and Actual goods issue date ?
    Delivery data can be be greater than goods issue date?
    Thanks,
    Ajay

    Hi Ajay,
                  Delivery date means its the original date on which the delivery should be done.Actual goods Issue date is the date on which goods to be delivered according to the purchase order.There can be delay in the delivery so we maintain 2 objects.
    Yes delivery date can be greater than Goods Issue date.
    Hope this clears
    Regards
    Karthik

  • Collective Invoice - Actual Goods Issue date

    Hi Friends,
    Collective invoice topic has been discussed many times but I didn't find exact solution to solve my issue.
    From sap help and few other threads it is learnt that Billing type, Billing date, Payer, Billing unit, Terms of payment, Incoterms, Letter of credit should be same to have collective invoice. During my tests it is understood that apart from those Actual Goods Issue date (Post Goods Issue) date should be same to have collective invoice for different sales orders/deliveries. In my tests SAP didn't consider Billing date but it did consider Actual GI date. In other words, even the billing date and other requirements are same invoice split happend due to different Actual GI date. However collective invoice created even though the billing date is different but Actual GI date is same.
    My user creates one sales order and one delivery for a customer once in a week (so 4 orders/deliveries in a month) and creates Invoice by end of the month with collective invoice. So based on the above tests I can ask the user to create sales orders, deliveries every week but perform Post Goods Issue month end and then create invoice so that collective invoice can be done. But the issue is they want to do the Post Goods Issue every week because the stock levels should reduce on weekly basis. So how can we create collective invoice even though the Post Goods Issue is done weekly (so Actual GI date will be different)
    Any idea? Please let me know if further information required.
    Thank you

    Hi,
    You may consider writing a routine under copying requirements so that invoice is not split even if the Actual GI date is different.
    Consider the following [thread|Collective billing; for more info.
    Regards,
    Amit

  • Special stock indicator in the OD (goods movement  data tab)

    Hello SAP Experts,
    I would like to ask on how the special stock type indicator field (LIPS-SOBKZ) in the outbound deliveries, under the goods movement data tab, can be populated? For example, with stock type indicator E.
    Are there any configs or master data settings that allow the population of the stock type in the ODs? I'm just wondering why we have some ODs (replenishment deliveries) that are having the special stock indicator E, but sometimes, this field is empty. I would like to know what are the factors that allow the special stock type indicator field to be populated.
    Thanks in advance!

    On the SD side, the special stock indicator on a delivery line item is copied from the sales order line item.
    And the special stock indicator on the sales order line item is determined from the item category.
    If you are referring to the MM side of things, (and based on your description of the use of the 'replenishment deliveries you might be), then there probably are corresponding configuration on the MM side of things.
    Matthew
    +1 (707) 276-6473

  • Fieldes planned delivery date and actual good recipt date for SAP QUERY

    Hi Gurus
    I am changing sap query. I need to find two fieldes  : planned delivery date and actual goods recipt date
    I dont know MM tables, do you know wrhere are?
    in table EKPO i don't find the fieldes.
    Thanks in advance

    Thank a lot!
    Regards

  • Actual goods issue date required to be equal to planned goods issue date

    Hi All,
    Can anybody tell me on what basis does the actual goods issue date get determined and what needs to be done if we want to restrict the actuall goods issue date to be equal to the planned goods issue date?
    Avinash

    Avinash,
    Can anybody tell me on what basis does the actual goods issue date get determined
    ???? It is the date that the goods are actually issued from stock, e.g. whatever the date was when the delivery was actually issued, that is the date that is normally written to this field in the delivery.
    what needs to be done if we want to restrict the actual goods issue date to be equal to the planned goods issue date
    That's a pretty restrictive criteria.  Basically, you are telling the warehouse that they are not able to issue the goods early or late.  In companies I have seen, that would constitute a lot of deliveries.  Hope your customers don't need the parts....
    Anyhow, the restriction would have to be against the goods issue transactions being used by the warehouse.  I don't believe there is any standard configuration that creates such a restriction, so it would require custom development.  If you pursue this restriction, make sure you leave yourself some kind of override.
    In many companies, this problem is handled through policy and procedure.  Warehouse manager simply creates a policy about early and late goods issues.  The system will track discrepancies in the case the policy is not followed.
    Best Regards,
    DB49

  • Restriction to delete goods movement data during confirmation thru CO11N

    hello all
    Please let me know how to prevent the user to delete the rows in goods movement screen during confirmation through transaction CO11N ,as users are able to confirm without goods issue by deleting that rows.
    Should we contact basis person for the same
    with regards

    Dear,
    Please refer my reply in this thread,
    https://forums.sdn.sap.com/click.jspa?searchID=16368869&messageID=6047820
    https://forums.sdn.sap.com/click.jspa?searchID=16368869&messageID=6151829
    Try using transaction variants. There is a utility called GUIXT in transaction. You can write code to add a pushbutton on the desired screen by using the GUIXT. The coding syntax is provided in the SAP application help. Use transaction SHD0 to create the variants.
    http://wiki.ittoolbox.com/index.php/Implement_a_screen_exit_to_a_standard_SAP_transaction
    Hope it will help come back if any problem.
    Regards,
    R.Brahmankar

  • Delta not generated in case of Actual Goods Issue date change in R3

    Hi Gurus
    In our implementation in BI Production server we are using 2LIS_12_VCHDR and  2LIS_12_VCITM
    extractors where in R3 Deliveries are created first and then the PGI is done. While in BI Extractions As the data comes first time without any issue but when the PGI is done the PGI date Tech Name (WADAT_IST) gets updated in the R3 system but in RSA 7 too this delta is not getting generated. can any one tell the probable reason.
    We are stuck there Early help needed.
    Thanks
    Shivani

    Hi Shivani,
    did you manage to solve your problem?
    We are facing a similar issue:
    - We also have both datasources active: 2LIS_12_VCITM and 2LIS_12_VCHDR
    - In R/3 the following steps happened: A delivery was created and the record has issued to BW --> In PSA a request with status of good issue movement = A (correct!).
    - Afterwards in R/3 the delivery has been picked and then, after 1 second, issued.
    - This time the requests on the two datasource look different: in 2LIS_12_VCITM it seems like the good issue delta comes before the picking delta, so the result is that the delivery is read as still open (status of good issue movement = A Not correct!). In 2LIS_12_VCHDR, instead, is all correct: the last record in PSA refers to the good issue delta.
    Change documents order in R/3 is correct, but it is not the same as the sequence in PSA of 2LIS_12_VCITM.
    Can anyone help me?
    Thanks in advance
    Roberta

  • CO11N  I need than operation date is equal to goods movements date

    I am notifying with the CO11N, and need that the date of the movements of goods is equal to the  finish operation date .
    For default it takes the release date of the order.
    Is it possible this?
    Thank you.

    Hi
    Defaults will be like that only.
    If you want you can change the date of posting as requited.
    Can you explain your sceanrio in detail.
    Regards
    YMREDDY

  • Actual Goods Issue date and Planned Goods Issue date

    Dear All
    we are loading the january,08 sales  invoice from the legacy system to SAP system through BDC program.
    for this at the time of PGI we are using Actual GI date as month of January, 08 and keeping planned GI date as the system date and at the time of creating sales order, delivery, we are not changing the material available date, loading date, delivery date, at the item level and system taking automatically based on the current date
    when doing PGI system accepting and creating PGI document and billing also creating based on this delivery.
    But dose it give problem in Inventory managements and FI in future, then what would be the right procedure to uploading the back dated invoices in the system.
    Please give me solution for this issue, or what we are doing is the right procedure.
    Thanks In advance

    For those who might come across this note, the design issue was solved by incorporating Rule Groups.
    Problem:
    Need to have 2 different Date references for 0calday, based on the key figures. For example for Sales key figure date it would reference to Actual GI Date. But, for Intake key figure I needed the date reference to be Planned GI date.
    Solution-- applied to the transfer rules of the desired cube:
    1. In the starndard rule group delete the transfer rule for the appropriate key figures. in this case (sales key figure)
    2. In the same rule group map all time characteristics from the cube to Planned GI date from DSO
    3. Create a new rule group in the transfer rule between the DSO and the Info Cube
    4. In the new rule group, create a new rule for the appropriate key figure i.e. sales
    5. In the new rule group, Map the date/week/month/fiscal period to Actual GI date
    6. save/activate
    This solution eliminates the need for changing the data model, which makes everything almost transparent to the report users.
    Hope this helps someone.
    Edited by: Babak Shafiei on Dec 12, 2008 5:23 PM
    Edited by: Babak Shafiei on Dec 12, 2008 5:24 PM

  • Settings in Actual Goods Issue Date for Delivery Document

    Hi Masters,
    We have a Requirement in Which the client wants that while Creating Delivery Document through VL01N the Actual PGI Date Entered should not be before the Panned GI Date it should be only After the Planned GI Date. If the user Tries to Enter the Actual GI Date which is before the Planned GI Date the System should not Accept it and should give and Error.Please tell how to Configure this.
    Thanks in Advance.

    Hi,
    Pls make use of Status profile for the user as well as maintain proper schedule lines
    regards
    DSR

  • Movie Data Files Missing!!!

    Hi,
    Like many times in the past I'm trying to load a DVD Studio project which has had some movie files moved or damaged for one of the assets.
    As usual, this now means that the whole project can not be used and won't load. Is there anyway around this?
    Is seems like very bad programming for a whole project to be corrupted when simply one asset is damaged or missing. Does anyone else agree?
    I've now got to recreate quite a detailed and complex dvd project. Not happy with Apple. Looking for other software.

    If you are rendering outside DVD SP, and reencode an asset with the same name, and then open the project again DVD SP will let you know the assets changes, provides you with the option to look at the log and then continues.
    If the file is being rendered and not complete then then you will usually get a red warning in the assets bin (and tracks or menus where asset is used) and/or parsing issue

  • Good Movement Data Mismatch - Urgent

    Dear Friends,
    I have exe. the Init of BX,BF and UM and completed the
    Init of BF and UM with probper marker update procedure.  But I am facing a strange problem.
    I did the init on 31.01.08 with the R/3 sys down time. I have delete the setup tables for inventory and filled the setup table
    for BX, BF and UM, and every thing went of smooth.  But next day when I got the delta from BF, I have got few documents repeated/duplicate entries which are already exists in my Init.
    I am not able to understand how can it happend..when the sys is under downtime and no user was working until we finished the entire process making sure that no document posting happend...!
    But it is really strange for me..how come the records are repeated on that particular date ( 31.01.08 ) alone for few docs.
    Any sort of inputs/suggestions/procedure to fix this problem would be highly appreciated/rewarded.
    Thanks in advance.

    Friends...
    Any inputs/suggestions/procedure to fix this problem would be highly appreciated/rewarded.
    Thanks in advance.....

  • How to display planned movement date and actual movement date together?

    Hi, Professionals,
    My purpose is to list delayed outbound deliveries.
    Anyone could tell me how to display planned movement date and actual movement date?
    Appreciate your help.

    Thanks Shiva.
    I tried another way to do it. It works only for a short period of time.
    By using VL06O, I list all outbound deliveries by limiting both planned goods movement dates and actual goods movements dates to the same week I would like to inspect. Say both from 7th/11 to 14th/11.
    then I list outbound delivery list with planned goods movement date to 7th/11 but left out actual goods movements dates this time.
    In excel, I compare those two lists and filter out those unique ones because those unique documents means delayed deliveries which cannot delivery according to planned date.
    However, the "delayed" list generated by this method has some noises. Not all of documents are really delayed although most of them do.
    I'm also looking for a way to list sales documents number of these delayed delivery documents so i can retrieve order details from it such as order value.
    Help still needed.

Maybe you are looking for

  • Adobe 6 professional Versus Adobe 8 professional

    I work in the insurance field and it seems to be an issue where an Adobe 6 .pdf file is opened with Adobe 8 professional the formatting seems to be different.  Is there away not to have that changed so it will not change automatically?

  • PID v5.0 compatability with LV 8.0

    Hello, Where can I read up on the pros-n-cons of upgrading the PID Control Toolset v5.0 to v7.0 working with Labview 8.0? Definitely worth it? Don't bother? Is the issue a non-issue? Thnx.

  • AirPort Disk - Issue with Windows Vista Ultimate

    I setup an AirPort Extreme network, with a shared USB Drive and so far I've only found one issue. When attempting to create new files and renaming them, or rename pre-existing files on the shared USB Drive using Windows Vista Ultimate I get the follo

  • Slow connection speed with ps3

    I got BT Infinity installed last week. I am getting 38mbs download and 7mbs upload consistently. I can only achieve about half these speeds through the ps3,18mbs and 3mbs. I have removed the Ethernet cable from the ps3 and connected it to the laptop

  • My iphone is stolen and I have not activated Find My Iphone app, what do I do? Help, please.

    My iphone was stolen at a party last night and I'm worried a fob might've taken it. Unfortunately, I did not have a lock on it nor have I activated my Find My iPhone app on my phone tho I have already downloaded it. I would love to track it down, or