Actual work less than planned work

Projects 2010
If actual work is less than planned work the column remaining work is filled with difference between planning and actual. The actual work do complete the job (=100%). If % is put to 100 after actual work is filled and remaining work is
set to 0 the planned work is changed to actual work. I like to maintain the originally scheduled work. How I achieve that.
example: planned work   5.0 hrs
               actual work     3.5 hrs
               complete        100 %
              remaining work 0.0 hrs
This will enable to improve the planning

Hi Rene,
This is not possible. The work (planned work) will be equal to the acutal work.
What you can do is to use bsaeline: just baseline your project plan in order to keep the original scheduled work.
You'll have something like:
Baseline work: 5hrs
Work: 3.5hrs
Actual work: 3.5hrs
Remaining work: 0 hrs
% complete: 100%
Hope this helps,
Guillaume Rouyre, MBA, MVP, MCP |

Similar Messages

  • Why is actual memory less than specifi

    Hello
    I own a Creative Muvo TX FM (256MB) and I was just wondering why the actual memory is less than 256MB. For instance I see this in other players and in my own I have only 243.5MB.
    Also, is changing the format from FAT to FAT32 going to change this "practical amount"?
    Thanks in advance for you help/advice!
    Jacob

    Also, remember that when you are looking at actual space on the player, in the "industry", a mega-byte (MB) is ,000 kilo-bytes (KB) and not ,024.
    And yes, the operating system is going to also chew some space.

  • Allowance calculation based on Planned & Actual working hours

    Hi,
    Please advise how to calculate an allowance based on employees Planned working hours & Actual working hours for a particular work schedule rules.
    Example A – Employee on Work Schedule for the Whole Month Employee has a 0007 infotype record that has them on Work Schedule SC112 for the whole of April 2008. System pays 100% of the allocated payment of $166.67 per month
    Example B – Employee on Work Schedule for part of the Month, Employee has a 0007 infotype record that has them on Work Schedule SC112 for the part of April 2008 as they only started on 14th April 2008. Planned Hours for April for SC112 are 180 hours and this person has worked 108 hours which is 60% (=108/180). System should pay 60% of the allocated payment of $166.67 per month which results in a payment of $100.00 for the employee.
    Your help would be really appreciated.
    Regards
    Ranjith Yama

    Hi Manoj,
    Suppose ABCD is the wagetype for xyz allowance. I hope you are getting this 1000 amount from T510.
    This is the logic of PCR for your requirement.
    ABCD
      NUM=TKAU**        --> Getting Unpaid Absences (Suppose 2)
      RTE=KCONS2        --> Maintain CONS2 constant in T511K Table with 200
      MULTI NRA            --> Multiplying No.of Absences with 200.. that is 400
      ADDWT &BUFF     --> Saving that in one Variable
      FILFF NRA            --> Restoring Actual values
      AMT- &BUFF        --> Subtracting from 1000 and you will get the 600
      AMT?0
         ADDWT *
       <              
         AMT=0             --> if amount is less than 0 then amount will bocome 0
    Hope this helps.
    Pradeep.

  • Actual work in MS project project is different than PWA Business Intelligence report

    Hi
    Actual work in MS project project is different than PWA Business Intelligence report 
    (Numbers are different) Di u know why?

    Hi Project help,
    As mentionned before, I suggest you to open the period, recall the timesheet, update actuals and submit
    it, approve it by the project manager, open the plan and publish it.
    The steps can be performed using a delegation session if you don't want to bother the team member and the
    project manager.
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, P-Seller |

  • So my phone a 4s is less than two years old, the speakers do not work, and it will not connect to wi-fi, so my question is on the 1st of august why should I re-up my contract and purchase a phone that taken care of did not last the distance of a contract?

    So my phone a 4s is less than two years old, the speakers do not work, and it will not connect to wi-fi, so my question is on the 1st of august why should I re-up my contract and purchase a phone that taken care of did not last the distance of a contract?

    This is a user to user technical support forum.  It is not our responsibility to convince you of anything.
    Do you actually have a technical support question?  If not, post your question on a blog or somewhere more appropriate.
    Best,
    GDG

  • Adding time phased actual work to fixed work task with finish no later than constraint

    I am using MS Project Pro 2010, no service packs are installed. I have a 40 hour fixed work task, auto scheduling is on, and I've set a finish no later than constraint 4 weeks into the future. I have assigned a single resource with assignment units of 1.0
    and Project correctly determines a 5 day duration and schedules the task from the start of the project with the task start date the same as project start date and 8 hrs per day.
    I switch to task usage view with the time phased time scale set to weeks (middle) and days (bottom) and add the actual work field. Calculate on edit is selected in project options. When I add 8 hours to day one (which matches the planned work), the planned
    work on the last day of the duration changes to 2 hours and the remaining 30 hours is spread at 10 hrs each to the three days in the middle and the duration changes to 4.2 days. Work stays the same as expected.
    The behavior I expected is that after I add the 8 hours of actual work nothing would change since remaining work is 32 hours and there are 4 days left in the schedule and the work is already scheduled for 8 hrs/day. When I continue to add actual work of
    8 hours to each day, the duration continues to go down until I’m adding 8 hours past the duration. What am I doing wrong? This behavior persists whether or not I select the "move unfinished parts…” options in the project options or not. The only way to
    achieve the expected result is to remove the constraint, add the actual work and then reapply the constraint. I assume I have missed an option that needs to be correctly set to achieve the expected (and desired) result. Thanks.

    Thanks, Julie.  I thought it was just me.  The reason for the FNLT constraint is that I'm not really scheduling projects but scheduling a single multi-unit resource in a shop environment where many projects are running through at the
    same time.  I've set up a single resource with units equal to the number of shop personnel and I'm intentionally forcing overallocations (should there be any) by levelling and by not allowing Project to move my tasks any further than externally mandated
    delivery dates.  From that, I can then see where I will need to alter shop release dates, allocate overtime, hire new workers or subcontract the work.  By entering actual work weekly, I can also see where I might have extra hours to use elsewhere
    or vice versa.  Unfortunately, a deadline will not prevent Project from moving the tasks beyond the customer provided date when leveling.  This method worked fairly well in Project 2007 even though it's not really what the software was intended for. 
    I obviously only use a fraction of Project's capabilities.  There's probably better-suited tools out there but this is the one I have and it actually does a great job at it.  I'm sure I can still make it work in 2010 but it looks like I'll have to
    modify my approach.  I'll leave the question open a while longer and see if I get any additional feedback.  If not, I'll mark it answered and move on.  Thanks, again.

  • Less than or Equal to Variable on Calquarter is not working in Webi

    Hi Guru,
    I have Variable on Calquarter which brings the query result for all the cal quarters which are LESS THAN or EQUAL to entered one.
    But, when we execute the Webi Report of this Bex Query, we get data for all the Calquarters in the infoprovider.
    Its a "Single Value, Optional" variable with operand as LE.
    Thanks in advance,
    Deepak Jain

    In BEx side, calquarter is mapped as key or text?
    Maybe it is mapped as text and the variable in BO doesn't work correctly.
    Regards.

  • Firefox freezes when I open it after less than a minute of searching. It freezes regardless of the website I'm on. I've tried reinstalling it several times and have even tried a clean reinstall but it didn't work.

    When I open it, Firefox freezes after less than a minute of use. After waiting a few minutes, it unfreezes but then freezes again a few seconds later. This happens regardless of the website I'm on. I've tried uninstalling and reinstalling it and the problem didn't go away. I've even tried a clean reinstallation but it didn't work. This only happens on Firefox. IE and Safari work fine.

    -Plug your MacBook into a power source.
    -Click on the Apple menu and select "System Preferences".
    -Click on the "Energy Saver" icon.
    -Click on the "Options" tab.
    -Uncheck the box labeled "Automatically reduce brightness of display before display sleep"
    -At the top, next to "Settings for:", select "Battery" from the drop down menu.
    -Uncheck the box labeled "Automatically reduce brightness of display before display sleep"

  • My Nano is less than a year old and is no longer working where do i take it for replacement or repair using the manufacture's warranty

    I have a nano less than a year old. It no longer works properly, some of the buttons are no longer functional and it does not respond when plugged up to my PC.
    Where do I take it to get it replaced or repaired using the manufacture's warranty. It was a gift and I do not have a receipt. please help

    Make an appointment at the nearest Genius Bar ( Apple Store).

  • Photoshop CC 2014 stops working after less than 30 second and shuts down

    I have installed and uninstalled Photoshop CC 2014 three or four times via Creative Cloud and each time it stops working after less than thirty seconds and shuts down the program. I then installed a an older version of Photoshop CS5.1 from a CD and it works perfect. I also have Illustrator CC 2014 and Lightroom 5 installed from Creative Cloud and both work flawlessly. What can I do to get Photoshop CC 2014 working?

    You have not provided any system information or crash logs, so we can't really know.
    http://myleniumerrors.com/working-with-your-operating-systems-tools/
    Mylenium

  • I fainted and fell while holding my iPad and the screen cracked; it still works fine. It's just cracked. I have had this iPad for less than a year so it is still covered under warranties. Does this apply? If not how much to fix the screen?

    I fainted and fell while holding my iPad and the screen cracked; it still works fine. It's just cracked. I feel horrible, it was a gift from my brother. have had this iPad for less than a year so it is still covered under warranties. Does this apply? If not how much to fix the screen? Please help

    If you want a short list of third party repair options, here you go.
    iPad Repair & Screen Replacement Services
    http://www.ifixyouri.com/16-ipad-repairs
    RepairZoom iPad Repair
    http://www.repairzoom.com/ipad-repair.html
    Mission Repair
    http://www.missionrepair.com/Apple_iPad_Repair_Services_s/431.htm
    iGadgetResQ
    http://www.igadgetresq.com/ipad-repair/

  • I have a manual that contains headings and index entries that contain less than and greater than characters, and . The Publish to Responsive HTML5 function escapes these correctly in the main body of the text but does not work correctly in either the C

    I have a manual that contains headings and index entries that contain less than and greater than characters, < and >. The Publish to Responsive HTML5 function escapes these correctly in the main body of the text but does not work correctly in either the Contents or the Index of the generated HTML. In the Contents the words are completely missing and in the index entries the '\' characters that are required in the markers remain in the entry but the leading less than symbol and the first character of the word is deleted; hence what should appear as <dataseries> appears as \ataseries\>. I believe this is a FMv12 bug. Has anyone else experienced this? Is the FM team aware and working on a fix. Any suggestions for a workaround?

    The Index issue is more complicated since in order to get the < and > into the index requires the entry itself to be escaped. So, in order to index '<x2settings>' you have to key '\<x2settings\>'. Looking at the generated index entry in the .js file we see '<key name=\"\\2settings\\&gt;\">. This is a bit of a mess and produces an index entry of '\2settings\>'. This ought to be '<key name=\"&amp;lt;x2settings&amp;gt;\" >'. I have tested this fix and it works - but the worst of it is that the first character of the index entry has been stripped out. Consequently I cannot fix this with a few global changes - and I have a lot of index entries of this type. I'm looking forward to a response to this since I cannot publish this document in its current state.  

  • Save completed work in less than a week. Can it be done ?

    I have a 185 meg avi file. The volume is too loud and distorted to  use as is.
    I ran it thru soundbooth, got the volume and noise out to a natural level.
    Went to save it as default DV.
    As it started the save process, it went from 23 hours estimated to 35+ hours. I quit at that point.
    Is there a way to save this fixed ile so it takes less than a week to save it ?
    I probably wouldn't mind so much if I could minimize it while it's working, but it just takes up the full screen and won't budge.

    Profile is a folder which store all your personal data in a safe place
    * https://support.mozilla.com/en-US/kb/Profiles
    * here explain how to backup profile https://support.mozilla.com/en-US/kb/Backing%20up%20your%20information
    * here explain how to restore it
    https://support.mozilla.com/en-US/kb/Recovering%20important%20data%20from%20an%20old%20profile

  • Project Versions: Plan Work and Actual Work

    Hi,
    Can you pls suggest me,
    where can i get Project actual work and planned work from R/3.
    which R/3 table will provide this information for different Project Versions.
    Thes values are required against each Project version.
    Your valuable inputs will be rewarded.
    Thanks,
    Lakshmi.

    Hi,
    We have the following scenario: The system does not default the Actual Duration when the Start Date, Time and Finish Date, Time are entered on the time confirmation, it should calculate the time and insert the value in the Actual Duration field.
    Is it possilbe.
    Regards
    JF
    Please open a thread for your specific query.
    -Paul
    Moderator
    Edited by: Paul Meehan on Sep 9, 2011 10:59 AM

  • HT4623 I bought iPhone 4S from Kurdistan Iraq while I worked there now I retired and came back to my country India. Few days ago the rear camera of my phone is not working, it's shutter is not opening. It's less than a year I bought it. What to do now?

    I bought iPhone 4S from Kurdistan Iraq while I worked there now I retired and came back to my country India. Few days ago the rear camera of my phone is not working, it's shutter is not opening. It's less than a year I bought it. What to do now?

    First try one of these methodes:
    Try to restart your iPhone
    Hold the power button and slide to turn off, then turn it on
    if you still have the same problem then try the second methode:
    Reset Settings of your device:
    Settings>> General>> Reset >> Reset All Settings
    Make sure you reset only your settings and NOT any other Contents
    if you still have the same problem, so it seems to be a hardware issue, take it to the nearest Apple Store.
    Kind regards

Maybe you are looking for