Adaptive Processing Server & Report Job Server Stopped

Hi!
I am using BOXI 3.1 on windows server 2003 datacenter and we have a clustered environment.  Our most of the reports are Deski reports (1195) out of which around 56 reports are scheduled.
Adaptive processing server, Multidimensional Analysis server & report job server got stuck randomly and the only way left is to stop/start them.
It was happening from last few days and now from today it is not getting started.
I have restarted SIA several times but of no use. Suddenly after 2 hours they are in running stage. I am very confused with the strange behavior of BOXI servers.
Do anyone have clue on this.
This happens always at the time schedule instance start running.
Thanks & regards,
Saurabh Gupta

Adaptive processing server, Multidimensional Analysis server & report job server  are not used in Deski report procesing at all.
To find out what happens, you need to review Event Viewer logs, enable tracing on this 3 servers.
Or simply stop and disable them to give more resources to your Deski processing

Similar Messages

  • Object failed to run due to an error while processing on the Job Server

    when i am scheduling a report ith email notification i am getting  below error
    error msg: Object failed to run due to an error while processing on the Job Server
    i have configured email notification in bo cmc and server also SMTP enabled. while scheduling report to ueser i am getting error and even mails are delivered to users as well.

    hi prithvi,
    i am able to schedule reports to other destinations and reports are delivered as per the requirement.
    i am able to telnet SMTP server from Adaptive job server machine on SMTP port.
    have to check errors on log file....
    @ COULD YOU  PLEASE LET ME KNOW USER CAN SEND A MAIL TO USER  IN SAME DOMAIN . WHILE SCHEDULING A REPORT AND AS OPTION AVAILABLE  IN 4.0 LAUNCH PAD CAN HE SEND A MAIL DIRECTLY  AFTER RUNNING REPORT.

  • Report Job Server goes Offline

    I've had a persistent problem with the Report Job Server in the CMC going offline (BO XI R2).  I try to stop/start but I get a message that the server is already in the requested state (started).
    I've tried disable/enable -- still it is offline and my reports won't run.
    I check the CCM and all the servers are running.  The Event Viewer in Windows shows that the Report Job Server has stopped..."Unable to contact server sccecho2.reportjobserver.jobserver to change its enabled status. Please restart it."
    The only way to get it started again is via a server reboot.  Then the reports will run.
    This problem seems to happen shortly before I have several reports scheduled to run and none of them get sent off due to the Report Job Server being offline.
    Is there something else I can check somewhere or other thoughts as to what is causing this persistent problem?
    Thank you for any help you can send my way.
    kd

    Hi Kim,
    Try creating a new Server and check the issue.
    Thanks,
    Anisa

  • Report Job Server - Maximum Jobs Allowed

    BOE XI.2
    We would like to increase our simultaneous report jobs per Report Job Server.  We currently have 4 CPUs and the Deployment and Configuration Guide says the 'Supported Load' is 5 reports per CPU so we should only run 20 reports simultaneously.  Our CPU usage is very low and we'd like to increase the Maximum Jobs Allowed on the Job Servers, but I don't know what the consequences would be to our servers.  Has anyone gone above the 'Supported Load' numbers for simultaneous report jobs per Report Job Server?  How high could I go without having problems?

    Hi Eileen
    There is no definite answer on this. The Maximum Jobs Allowed setting depends very much on your environment. If you have reports that run quickly you could increase it. Also, do you have a high concurrency of jobs? The fact that the CPU time is low means either that your Job Server (CR, DeskI) or Web Intelligence Report Server (WebI) is waiting for results from the database OR that there are simply no reports or not even 1 report per Job Server to process at this time. If you run 1 report and you see 25% CPU usage in the task manager on a quad core machine, means that the Job Server uses up the resources on one core fully.
    Regards
    Roland

  • Crystal Reports Job Server

    What is the maximum number of jobs allowed through a Crystal Reports Job Server?
    We have 4 Crystal Reports Job Servers out of which 1 is not being used. Maximum jobs allowed for the other 3 CR Job Servers are 5-7.
    What is the limit?? Can I increase the number without effecting the system performance?
    Please advice.
    Thanks!

    Which version of BO do you use?
    There is a parameter setting for this that can be set over the CMC. The parameter is called Maximum Concurrent Jobs. If yaou set this to 0 then the number of maximum jobs is calculated automatically. In XI 3.1 you can see the calculated number in the Metrics of the crytsal report job server.
    Increasing the number of maximum concurrent job will affect the performance depending on the number of the submitted jobs. The higher this number the more reports will be processed in parallel and thus the more load your system has to handle.
    Regards,
    Stratos

  • Problem with Crystal Report Job Server Destinations

    I am using Crystal Reports XI Server and I am having problems with scheduling.  I believe that the problem is that I have not enabled any destinations under the Crystal Reports Job Server.  The following is an observation list:
    -Enabled and set up all destinations for other servers, such as the Destination Server.
    -Have been able to use Infoview to directly email, inbox, and file save reports in different formats (I believe the Destination Server controls this, right?)
    -All servers are enabled in the Central Configuration Manager
    -Have been able to go into the Crystal Reports Job Server within the CMC, but I DO NOT FIND ANY destinations to enable (why is this?)
    -Have not been able to schedule an instance of any report (neither email, nor inbox, nor file, ...nothing)
    Could somebody please help me with this?  Is this a limitation to the Crystal Reports XI Server vs the Enterprise edition?  Is there something else I am missing?  I have never been able to successfully schedule a report.

    Thank you for the input, but I have not yet solved my problem.  Please allow me to provide some additional information which may give more hints:
    I have Crystal Reports XI Server R2 installed as 5 named user license (version that comes with developer)
    The following servers are enabled in CMC (which is all of them)
    -Input.DomainNameSQL
    -DomainNameSQL.cacheserver
    -DomainNameSQL.cms
    -DomainNameSQL.destinationjobserver (has all destinations enabled)
    -DomainNameSQL.eventserver
    -DomainNameSQL.ListofValuesJobServer (no destination tab)
    -DomainNameSQL.pageserver
    -DomainNameSQL.programjobserver (has all destinations enabled)
    -DomainNameSQL.RAS
    -DomainNameSQL.reportjobserver (has destinations tab, but there are no destination entries to enable! Object type is: CrystalEnterprise.Report and detail: IDL:omg.org/CORBA/UserException:1.0
    . Details: %2.'
    These are the ONLY two event IDs that appear after I schedule the report instance.  No other events occur.
    Are there any other logs that I can check?  How do I look up what event ID 45387 and 45385 are?
    Thanks!

  • Creation of Report Job Server

    I've just installed a new copy of XI R2 running parallel with Crystal Enterprise 10.  My Enterprise 10 has 4 report job servers and I need to have XI R2 configured with 4 too before I start migrating the reports from CE10 to XI - How is this accomplished?

    On the server, launch the CCM (central configuration manager) from the program files\business objects.
    one of the icons looks to be a plus sign, holding the mouse over it would indicate "add server" Do this to add additional job servers. Since there are multiple jop servers insure that you select the crystal reports job server.
    Regards,
    Tim
    Edited by: Tim Ziemba on Jul 15, 2008 10:56 AM

  • Crystal Reports Job Server - Default destinations not available

    Greetings,
    Currently I'm installing Crystal Reports XI onto a new server.
    When scheduling reports they are stuck in a 'pending' status which records the following error in the windows event log:
    Transport System exception for backend plugin DLL type newIJob():: Couldn't get IJob interface: CORBA exception! Object type is: CrystalEnterprise.Report and detail: IDL:omg.org/CORBA/UserException:1.0
    . Details: %2.
    After further investigation I discovered the Crystal reports job server has no defaul destinations, however the servers Destination Job Server and Program Job Server do have the default instances.
    Firstly I assume the error reported in the event log is due to there are no destinations, as the scheduler won't know where to send out to.
    Can anyone help in advising how to ensure the reports server had some default destinations?
    I have restarted the server and rebooted the Crystal reports server too.
    Thanks
    Rob

    Hi RobWhalley,
    Could you provide me which version of Crystal Reports Server XI  you use?
    you could find useful below articles.
    [1202926 - Scheduled reports in Crystal Reports Server XI Release 2 stays in 'Pending' state |http://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/com.sap.km.cm.docs/oss_notes_boj/sdn_oss_boj_bi/sap(bD1lbiZjPTAwMQ==)/bc/bsp/spn/scn_bosap/notes%7B6163636573733d36393736354636443646363436353344333933393338323636393736354637333631373036453646373436353733354636453735364436323635373233443330333033303331333233303332333933323336%7D.do]
    [1477380 - Crystal Reports in Pending status|http://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/com.sap.km.cm.docs/oss_notes_boj/sdn_oss_boj_bi/sap(bD1lbiZjPTAwMQ==)/bc/bsp/spn/scn_bosap/notes%7B6163636573733d36393736354636443646363436353344333933393338323636393736354637333631373036453646373436353733354636453735364436323635373233443330333033303331333433373337333333383330%7D.do]
    And please check job server is enabled and under the CMC > Server > Crystal Job Server > RightClick on the server > Destination to File System.
    And you can increase the maximun concurrent job value through CMC>Servers>CrystalReportJobServer>Properties.
    Regards
    Rameez Shaikh

  • "Internal Job Server error" in Event Viewer

    Hi
    We are running Crystal Reports Server XI R2 SP2 (11.5.8.826).  We have numerous jobs scheduled to run during the day.  Each time one of these jobs is scheduled, the Windows Event Viewer returns the error message:
    "Internal Job Server error."
    The error is now being produced over 100 times per day, and has caused the disk to run out of space - and stopped the system working all together.
    We currently have the "-trace" command set on the startup script of the Crystal Reports Job Server - this was recommended by BO to find the cause of an earlier error.
    Has anyone experienced this error before?  Should we have the "-trace" command set on the server, or is this producing unneccessary error messages?
    Thanks all
    James

    Hello,
    If you already have the "-trace" command enabled  on the CrystalReport Job server  then I would recommend that you go to the logging directory under the folder that you installed Business Objects.   
    In the logging folder you should see some JobserverChild log files.  Start reviewing those files for information as to any failed scheduled reports.  Try and isolate the time in which the problem occurs to the time associated to the log files.  I would recommend if your system is going down and you are having difficulties  reviewing the log files then you may want to create a case in Service Market Place and attach the log files to the case.  I hope that helps.   
    Jorge

  • Destination disabled. []: [CrystalEnterprise.Ftp]. Please note the name of the job server used for your request and contact your system administrator to make sure the specified destination is enabled. (FWB 00031)

    Hi
    In BO 4.0 SP 9 when a administrator tries to schedule a report via CMC there is no error
    But when a user schedules a report and the destination is FTP location -> Use default settings he gets following error
    Destination disabled. []: [CrystalEnterprise.Ftp]. Please note the name of the job server used for your request and contact your system administrator to make sure the specified destination is enabled. (FWB 00031)
    There is only one Job Server and the destinations are enabled in it
    There is no Job server for Crystal Reports Job Server
    Do i need to create it and how.

    Please check if you have proper rights to schedule to FTP. You can create a new job server, whenever you schedule it, there are multiple job servers, it will handle based on the load. But it is not mandatory, depends on the load.

  • How to configure the crystalreports job server

    hi everyone,
    we are having crystal reports itself in our cmc .
    i am having a scenario where the  reports are stored in cmc i am showing you the folder hierarchy how the reports r stored in cmc( daily/eod/ak or fl or az), i am having the  specific crystal reports for that particular state in that folder. i want to schedule these crystal reports fro every day. i select file-system as destination for these crystal reports. my scenario is these reports need to be stored on the  server(i mean the location of the file-system)  under different directories  like
    /abcd/xyz/crystalreports/daily/eod/ak or
    /abcd/xyz/crystalreports/daily/eod/az.
    but i am unable to do that, i can see just to point all the crystal reports to one location i.e /abcd/xyz/crystalreports
    i did changes to my crystal reports job server by adding file-system to the destination and specified the path were i want to store the  reports but i cannot see how to store these crystal reports for different states in different directories on the server(i mean abcd/xyz/crystalreports/daily/eod/az)
    we r having boe xi 3.1 sp3 on solaris
    we want to schedule crystal reports thats the reason i asked for crystalreports job server
    Edited by: richa123 on Jan 13, 2011 7:41 PM
    Edited by: richa123 on Jan 13, 2011 7:44 PM

    Hi,
    If you are talking unmanaged reports (network location) then yes you can do this but if you are talking managed reports (reports stay in CMC) then you can not specify the folder path for the successful instance. The destination will be default enterprise and it will be same folder where the parent report resides, to keep the relationship intact.
    I hope this helps.
    Thanks,
    Muhammad

  • DI Job Server and Designer Losing Connectivity

    I'm running the DI job server (11.7.3.0) and DI designer (11.7.3.0) on the same Windows 2003 server.  At times when I start a DI job from designer after a while the job server stops updating the designer with load statistic.  I've never run across this issue before.  Job runs ok from the management console. Any ideas?

    Dear Suneer,
    Firstly thanks for your replay.
    Suneer I have already Data Integrator Designer(client) Install in My PC.
    and I Have Created a Repository through Designer Another Machine(oracle Server)
    These Two Work I have Completed Successfully.
    My Problem Arrise When I want to create  job and Assess Server.
    I want to create job and Access Server in my (Oracle Server)
    JOB SERVER CREATION:
    To create Click
    Data Services Server Manager----
    Job Server name:MYJOBSERVER
    Job Server Port:3500
    communication port:4001
    Repository Information
    Database type:Oracle
    Database connection name:rptcbl
    username:biadm
    Passsword:bi0adm
    Every thing i fillup here my Question this job server created
    in my client pc?
    or Oracle Server pc?
    Where?
    ACCESS SERVER CREATION:
    To create Access Server Click
    Data Services Server Manager----
    Default
    Directory: C:\Program Files\Business Objects\BusinessObjects Data Services\bin\AccessServer_1
    Port:4000
    Directory Indecate Client Pc but i want to create access server in my Oracle Server
    How?
    Please Help me and give my Instraction.

  • SQL Server Reporting Service 2008 R2 - The request failed with HTTP status 401: Unauthorized.

    I got the error "The request failed with HTTP status 401: Unauthorized." when I call the Reporting Service Web Service.
    The code is very simple:
    // Initialise the reporting service Web Service
    this.RSWebService = new ReportingService2010();
    // Pass windos authentication credentials to Web Service
    this.RSWebService.Credentials = System.Net.CredentialCache.DefaultCredentials;
    // List children
    List<CatalogItem> reports = this.RSWebService.ListChildren(folder, false).ToList();
    The SQL Server is installed on a different machine (say server A) from the Web server (say server B). We are using Windows Server 2003.
    The code work fine for all the scenario below:
    i) Run locally (XP) to call the web service on the sql server
    ii) Provide the Network Credentials with the username, password, and domain when calling the web service
    iii) If the web server and sql server is using same server (i.e. not distributed)
    I'm using windows authentication and impersonation. Any idea?

    Hi Raymond,
    If I understand correctly, the issue only happens in the environment that the web server is different with the SQL Server Reporting Services server. This means the web server is a remote server of the Report Server. Windows Integrated authentication is used
    in this case. When running the web page, the 401 error occurs.
    If so, it is actually a double hop issue. The double-hop problem will usually only be an issue to those of you who write some sort of web-based code (a web application or web service) that uses impersonation.
    To fix the issue, we can configure kerberos authentication for the web application and the SQL Server Reporting Services.
    Below is a great article that has delivered many solutions to fix the issue you met:
    http://odetocode.com/articles/216.aspx
    Additionally, you can read the following article to know more about double-hop:
    http://blogs.technet.com/b/askds/archive/2008/06/13/understanding-kerberos-double-hop.aspx
    http://blogs.msdn.com/b/knowledgecast/archive/2007/01/31/the-double-hop-problem.aspx
    If you have any more questions, please feel free to ask.
    Thanks,
    Jin Chen
    Jin Chen - MSFT
    Thanks Jin. I believe this is the cause of the problem as well.
    I tried to register the SPN but unfortunately it still doesn't work. I'm not sure whether I'm using the correct SPN name.
    I have 3 reporting server instance on the SQL box. So the Web Service URL is like
    http://Server:80/VirtualDirectoryDev,
    http://Server:80/VirtualDirectoryTest  and
    http://Server:80/VirtualDirectoryStaging .
    What's the SPN I need to register?
    I tried
    Setspn -a http/Server:80/VirtualDirectoryDev domain\account
    and
    Setspn -a http/aerver:80 domain\account.
    But both of them are not working :(

  • Adaptive Processing Server vs WEBI reporting server

    I'm planning for production configuration, I want to know when I perform following actions, which server is used? webi or Adaptiive Processing...
    1. User refreshes a webi report    (webi?)
    2. Schedule a webi report (webi and Adaptive Processing? )
    I will clone existing webi reporting servers, should I clone Adaptive processing servers also? AP has so many services running in it, I really don't need all of them. I just want to know which services are critical to report refreshing and scheduling.  If a schedule a large report (5 million rows for instance); which server should I beef up? webi ? or AP? If I add one more AP server, will BO knows how to take advantage of it?

    Is the Adaptive Processing server used for Scheduling Webi reports?
    Senario:
    I have Webi Processing services on production which are identical.
    there are Adaptive Preocessing services which has different set of services.
    1) AdaptiveProcessingServer1
    Trace log service
    audit service
    visualization service
    Web Intelligence Tracking Service
    Web Intelligence Monitoring Service
    2) AdaptiveProcessingServer2
    Custom Data Access Service
    Document Recovery Service
    Excel Data Access Service
    monitoring service
    Rebean service
    Trace log service
    Web Intelligence monitoring service
    audit service
    3) AdaptiveProcessingServer3
    Trace log service
    audit service
    DSL Bridge service
    security token service
    Web Intelligence Tracking Service
    Web Intelligence Monitoring Service
    My reports are failing sometimes with error: Exception raised:
    com.businessobjects.sdk.core.CoreException
    When i check for the SAP Note 1679045, however there solution refers only to the Webi Processing servers and not APS.
    So not sure if it is applicable to APS as well.

  • What is the Diffrence between Adaptive and Webi Job Server

    Hello,
    What is the diffrence between Adaptive Job server and Webi Job server?
    In my BO server we didn't have Webi Job server but we are able to schedule the webi reports successfully.
    Any Idea on this.
    Thanks,
    Nimesh.

    I believe the Adaptive Job Server is on a generic shell server that behave as a Webi Job Server when it processes webi reports, as a program job server when it processes program object etc.

Maybe you are looking for

  • Windows 8 to 8.1 automatic update doesn't finish

    (Model # m6-k010dx) My new laptop after 13 months automatically updated from windows 8 to 8.1 after I had said 'no' as many times as it allowed. After the update my files are still on it and most things are there but it seems 'stuck' and the orange s

  • VRF Issue on a 6500

    I have a 6500 with one VRF. I want traffic to pass from the VRF to the global switch through an IPS so I set up a point to point link through the IPS using two GBIC ports each assigned with an IP out of the same /30. One port is in the VRF and the ot

  • 500.11 GB Toshiba MK5065GSXF can't be repaired, what do I need to do?

    Hello, I've bought my Mac in 2011 and it has been working quite normally up until this couple of months. Whenever I use it and try to open Safari, it starts to freeze and won't let me open any other applications. So I have to shut it down and turn it

  • How to get a clean simple listing of metatags

    I'm working on my sites SEO and it would be very helpful to get a list of all the <title> tags, all the Description tags, etc in a simple text format. For example, a human-readable site map gives a list of all the <title> tags, and I'd like that, but

  • Photoshop cc can't open and make new documents.

    I'm using adobe creative cloud and photoshop cc. When I run the Photoshop cc, it can't open and create new documents. Open and make new documents Photoshop don't work so i terminate a photoshop cc use windows task manager. I use windows7 ultimate k o