Adding a new Cost Center code to a 82ax Report painter

Hi experts,
I am asked about adding Cost center code to the left of a 82a Report painter(Where the Pepe element code and description is) without modifying the actual length of that colum....
Is this possible??
Thank you very much.
Artur.

Ok, no reply for this

Similar Messages

  • Combination of cost center and GL account in Report painter report

    Hi Guys,
    Im creating a report for  profit centers using library 0FL- which uses table FAGLFLEXT in the report painter GRR2.I need to enter cost center with gl accounts in the characteristics.as these cost centers
    are assigned with cost elements.Can I do that ? cuz when I enter combination of gl a/c and cost center,I wobn't get nay data but only gl accounts shows the correct data.How to use combination of cost center and gl a/c, or I am good only with gl a/cs.Please suggest.
    Regards
    Shaun

    Hi
    Just check the G/L account assigned in the PO against the cost center, The G/L account assigned may not be the correct one, Check out if any validation is there for the combination, contact your FI-CO guy as there are always restrictions unknown to a MM guy.
    Regards

  • How to use new cost center field, new profit center field, new account field?

    As I create a new change request of adding new GL account, or that of new cost center, or that of new profit center, I normally enter the new GL code GL01, or new cost center CC01 or profit center code PC01 in "General Data" section on the change requst screen,  these codes (GL01, CC01, PC01) are landed in ECC upon data replication.
    I do see there is another field called "New Account" of GL change request, or "New Cost Center" of CC change request, or "New Profit Center" of PC change requst all of which is under "Administrative Data" section. I have never used it. but I was wondering what the purpose it will serve and how should I use them.
    Please advise,
    Thanks,
    LUO.

    Hi Kiran,
    Thanks for the info. I don't quite understand though. could you tell me more about the usage of each? Why it is used when GL or CC or PC is blocked? Would the new cost center code entered replace old cost center master record?
    Thanks,
    LUO 

  • Report FGI0-Cost center Code

    Hi,
    I am using the TS FGI0 to see the report '0SAPBLNC-01' with the opction 'object list' (I use NewGL). I modified the report (TS FGI2) copying the standard and adding the characteristic 'cost center', but the report shows only the text of the cost center, not the field 'KOSTL'.  I also need to see the code of the cost center field 'KOSTL', like the division characteristic (text and code). Any idea?
    Thanks,
    Cecilia

    Hi
    The object list is designed as such for these reports...
    If you execute in Drilldown option, Once you execute the report, Click on SETTINGS > Char Display... Choose Key & Name
    However, see note  Note 991753 - No description for Cost Element in New GL Drilldown, if it helps
    Regards
    Ajay M
    Edited by: Ajay Maheshwari on Jan 6, 2011 7:19 PM

  • New Cost Center trigger

    I need sample code to implement a trigger so that when a new cost center (dept) value to the accounting flexfield is added, then it fires off and creates the corresponding row in the fnd_shorthand_flex_aliases table
    Does any one know how to create it?
    Thanks,
    Chiru

    Hi All,
    I create a trigger to insert data into the fnd_shorthand_flex_aliases table, if a new flex_value is created in the fnd_flex_values and fnd_flex_values_tl.
    However, I am getting the error:
    ORA-04091: table fnd_flex_values is mutating, trigger/function may not see it.
    More than likely it is due to the fact that I am trying to query the table fnd_flex_values to insert into the fnd_shorthand_flex_aliases table, while inserting into it at the same time.
    Does any one know how to get around this?
    Thanks,
    Chiru

  • How to configure new cost center..

    HI
    my problem is untill now i used old cost center, to day onwards i want use new cost center... how to modify in my cost element in cost center.
    i want to modify my old cost center and put new cost center.
    Thank you.
    Ashok kumar

    hi Anil,
    Check your settings in the Transaction code OKB9. In this transaction, default cost centers are maintained for each Company Code and Cost element.
    Else you have defined default cost centers in your Cost Element. In such Case, use t-code KA02 and change the cost Center
    If you satisfied with the reply then plese assign points.
    Regards
    Mahendra

  • Regarding new cost center

    HI
    my problem is untill now i used old cost center, to day onwards i want use new cost center... how to modify in my cost element in cost center.
    i want to modify my old cost center and put new cost center.
    Thank you.
    Ashok kumar

    hi Anil,
    Check your settings in the Transaction code OKB9. In this transaction, default cost centers are maintained for each Company Code and Cost element.
    Else you have defined default cost centers in your Cost Element. In such Case, use t-code KA02 and change the cost Center
    If you satisfied with the reply then plese assign points.
    Regards
    Mahendra

  • To find out recently new cost center

    Hi all,
    I have a problem that I had updated one request new data(it's like 200904 transaction data) to cube,
    while the inexistent cost center in master data is added(0Costcenter).
        The problem arise,how could i find out which new cost center is added to 0costcenter,because I
    need to listed those new cost center to user.
        Thanks.

    in the maintain master data screen for cost center give all the attributes a restriction to initial value.
    once you get cost centers search with them in the infocube and take out final list from there.
    or you write a abap report to check cost centers which have all fields initial and get it in a file.
    data: itab type standard table of /Bi0/pcostcenter with header line,
            itab2 type standard table of /Bi0/pcostcenter with header line
    select * from /Bi0/pcostcenter
    into table itab
    where objvers = 'A'.
    loop at itab.
    if itab-BUS_AREA is initial.
      if itab-0COMP_CODE is initial.
    .... keep checking for all the attributes.
         .... if all atributes are initial
          append itab to itab2
      endif.
    endif.
    endloop.
    CALL FUNCTION 'GUI_DOWNLOAD'
    EXPORTING
    filename = <give file name here>
    write_field_separator = space
    TABLES
    data_tab = iout
    EXCEPTIONS
    file_write_error = 1
    no_batch = 2
    gui_refuse_filetransfer = 3
    invalid_type = 4
    no_authority = 5
    unknown_error = 6
    header_not_allowed = 7
    separator_not_allowed = 8
    filesize_not_allowed = 9
    header_too_long = 10
    dp_error_create = 11
    dp_error_send = 12
    dp_error_write = 13
    unknown_dp_error = 14
    access_denied = 15
    dp_out_of_memory = 16
    disk_full = 17
    dp_timeout = 18
    file_not_found = 19
    dataprovider_exception = 20
    control_flush_error = 21
    OTHERS = 22.
    you will get all cost centers which doesn't has any attribute

  • I would like to insert new cost center for the existing layout in BCS

    Hi,
    I would like to add cost center to existing layout.
    Currently we are loading data into BCS using flat file .
    In BCS we have current layout existed with below format.
    Header
    Controlling area
    Fiscal year
    Posting period
    Data Rows
    Company 
    Item
    Profit Center 
    Functional area 
    Trading partner 
    Period Value LC 
    Period Value GC
    Even we are getting flat file from R/3 as above format.
    Now our Business required cost center in BCS as their requirment and need to be bring from R/3 to BCS.
    In R/3 our ABAP people are working to bring the cost center from R/3 and made a flat file for us.
    In BCS we need to load the file which has new cost center,which was comming as per the new requirment.
    Please advise me how to add cost center in  Data Rows of BCS.So that it can accomidate new cost center which is comming from R/3.
    Please some advise me on this and answer would be appreated.

    Prasad,
    I knew how to add char to cube in BW.But i am not sure about BCS .
    - What's the difference in assigning the infoobject (CostCenter) to the infocube, doesn't matter if it's the basic (ordinary) or the BCS totals cube?
    I will follow as you said.
    - Taking the BW310 or SEM240 is very useful.
    Once it is done then what are the next steps need to do it.
    - What's done? What's the question?
    I am assigning points to you
    - I do not need the points assigned for nobody knows what. Feel free to unassign them.

  • Cost Center code proposed by system

    Hi Friends,
    Is there any option that system propose sequential internal code at the time of cost center creation?
    Now you are aware if you create cost center through KS01 you can put anything for cost center code. Do you don't think some control should be there like GL master creation?
    Regards,
    DJ.

    Hi
    If you are usng BW - better develop the report from there... Else, ABAP is the only solution
    Note that there is no correlation between Plant & Cost center except work center... Hence, Plant as an Input parameter in a cost center report is not possible.... Thats why, people prefer to have a cost center nomenclature that reflects the Plant No as well i.e. say 1st 4 chars of a Cost center name can resemble plant
    br, Ajay M

  • How to hide parent cost center code in the costing LOV

    Dear Gurus,
    I have a very peculiar issue. I want to hide parent cost center code that appears in the costing LOV of employee in the others tab. Can any body help me out on this one?
    Regards,
    Muhammad Noman Shafique

    Hi,
    I do not have the exact steps for form personalization as I am not good in this :-(
    But regarding the costing segment (removal from all pages) you can follow below steps:-
    1. Navigate to Sysadmin --> Application --> Flexfield --> Segments
    2. Search for title "Cost Allocation Flexfield"
    3. Now click on teh code that is attahed with your business group and then click in segments.
    4. You will see all the segments defiened for the costing.
    NOTE: If you want to disable one of them uncheck the "Freeze Flexfield Definition" in the "Key Flexfield Segments" window. But do remember that it will affect all your costing and you wont be able to select the disabled costing segments in any other window (Element Entries, Assignemnt, Organization, Element link and Payroll)
    Thanks,
    Avinash

  • How to add new cost center to cycle segments

    Hello SAP Gurus,,
    How to add new cost center to cycle segments?
    needed badly and ASAP

    Hi
    Go to KSu2 and give the cycle name ad select the segment that you need to add cost center.
    If you are deal with cost cneter groups add new cost center to your cost center group KSH2.
    Kesh

  • New Cost center Time-interval getting deleted automatically in Asset master

    Hi Friends,
    While changing the cost center in the asset master data with a new time interval, the check-box 'Deletable' gets automatically ticked and the new interval gets deleted and the new cost center is updated in the old time interval. The check-box is greyed out and cannot be edited.
    The right-most check-box in the 'More Intervals' button in the second tab of the asset master is the 'Deletable' check-box (Field Name: RA02S-XDEL).
    Please help me to make the check-box editable or help me to remove the default tick in the check-box.
    Regards,
    Shilpi

    Hi Murlidhar,
    Thanks a lot for the response.
    If the check-box gets deselected when we press the 'Save' button, still the new interval is getting automatically deleted.
    Earlier this was not happening, the new and the old interval was getting displayed separately. There are instances in the system, where both old and new interval is displayed.
    Of late, we notice that the new interval is getting deleted as soon as we save it.
    Please help to retain both the intervals.
    Regards,
    Shilpi

  • New Cost Center

    Dear All,
    Scenario :
    New cost center or new location or new office has built by organization , how to handle this scenario without interference with existing database entries ?
    Is the following option is correct ?
    To create new database and punching entries in that database for new location or new branch.

    Hi
    Thats purely ur managment policy and decisson based.
    See as u said by defining numbering series, Diff G/L acc, Cost Centre,whse we can achive simply, finally management  will get consoldiated P&L as well Profit Centre wise also for all Profit centre wise...
    If they want to maintain different DB then that also ok, finally there is no option for consildaation the P&L,TB without Some addons....so this factor u have to look when u r going for different DB for same Business process.
    Some Companies will have lot of constraints like this branch sales details, customers and their details should not be shown to other branches but to achive this in default B1 it is tough to achive...so u have to think in multiple angle which is best.
    Cheers
    Giri

  • Cost center after settlement in FAGLL03 REPORT

    we have process of material issue thru maintennce order. after issuing material FI entry is on respective gl and maintence order
    in report fagll03 we can see this combination and then after settlement of cost of order on cost center we are not able to see cost center in report  fagll03.
    is it possible to get cost center after settlement in this report.
    if no then how can  we see cost center /  gl /  material report for maintence orders.

    You can't able to see the cost center report until settle the maintenance order to cost center with secondary cost element.
    after settlement also you can't see in FAGLL03, you can see only cost center report with secundry cost element

Maybe you are looking for