Adding Clip on top of Clip

How do I place a clip on top of a clip like adding a fireball on top of a existing clip I have in a video using Adobe Premiere Elements 11. I have no idea how to do this.
      Any help will be greatly appreciated.
                     Thank you,
                                      Marvin Engel

Welcome to the forum.
This would be a PiP (Picture in Picture).
If you have an Alpha Channel for the explosion, just place it on a higher Video Track, above the background Video, and then possibly Scale and Position that explosion Clip, as is needed. The Scale, and Position are both Fixed Effects, and can be adjusted, as needed, with the Effects Control Panel.
For PrE 11, you would Select the explosion Clip on the Timeline, then click on FX to get to the adjustments.
Good luck,
Hunt

Similar Messages

  • Adding Slo Mo to a clip that's between 2 other clips? Not working Correctly

    Hi,
    I have a timeline full of clips.
    I inseet a clip that is 4 seconds long between 2 clips that are already on the timeline.
    I want to make the inserted clip 8 seconds long,
    I highlight that clip in the timeline, go to my "Speed/Duration", the dialog box opens and I change the time to 8 seconds or 50%.
    On the timeline, the top of the clip turns red, like it needs to be rendered, the clip now says it's 8 seconds, but it is still only 4 seconds.
    Why?
    When I take that same clip and put it on the end of the timeline where there is no clip in front or behind it and I change the speed, it works correctly.
    Why?
    Can you insert a clip between two other clips on the timeline and perform a "slow motion?" The clip should get bigger and all rest of the clips should all move down to the right.
    Why does this not work in Premiere Pro CS 5.5?
    Thanks in advance.

    Thanks everyone,
    I come from Final Cut 7 and when I do a slo mo it just moves everything down to the right on the timeline. That is what I am used to.
    I just did it in Premiere and checked the Ripple Edit check box in the Speed Duration Dialog box and then add slo motion, , and it did move everything to the right, but I had to render all of the stuff that needs rendering all over again. Don't want to do that everyime I change speed on a clip.
    Thanks again.

  • On imovie 11 the green screen isn't working i drag my clip on top and nothing happens the clip just get pushed to the side i don't get a pop up with options

    i drag my clip on top and nothing happens the clip just get pushed to the side i don't get a pop up with options
    please help

    Hi
    YOU need to - in iMovie - Turn on Advanced Tools !
    top row menu - with an Apple top left ---> iMovie ---> down to preferences ---> Here select to turn on Advanced tools .
    Now it will work when You drop a clip onto another IN a MOVIE PROJECT ! (can not be done in Event's)
    Next problem I had - was to get right clip onto the other - what was the Background and What was the Green screen - BUT just test - You only got two ways to try out.
    Yours Bengt W

  • Adding more than one music clip/track to a project

    I add the first music clip/track just fine and place it where I want it and it positions itself below the frames. When I go to add the next clip/track, it won't place where I want it. It always goes to the beginning of the project and it "surrounds" the video clips in a large purple frame. I can move it downstream to where I want it, but it never "places" underneath the video frames like the first clip/track. What am I doing wrong?

    Drop it on the video clip, not between clips or above the clips.

  • Green flashing behind clip in FCE and clip in corner?!

    Hi, I recently started a new project in FCE and started to add clips. As I added them I realised the clip was in the top left hand corner and the background flashes green and black?! I've tried deleting the clips and re-importing them and I've also tried closing FCE and reopening it but nothing seems to work?
    Please help

    Where did these files come from?
    You need a third party application like Streamclip from Squared 5 (free).
    You then bring a clip into Streamclip and export as a Quicktime file using settings that match an FCE Easy Setup.
    The current files look very non-standard for FCE use.
    I'm not even sure if they are DV NTSC or HD that has been manipulated somewhere else.
    Any file/clips that are used in FCE should match one of the Easy Setup specs or FCE is forced to render or in a worst case not even play. Your files sit in the middle, sort of playing.
    Al

  • How do I delete a clip without every other clip in my timeline moving over?

    So i've been editing for hours, and somehow, the first 30 seconds of my movie were screwed up. So now i'm trying to re-edit the first 30 seconds. When i try to delete a clip, the rest of the clips following the deleted one, move over to this empty space. I do not want this to happen!!!!! I want the other clips to stay in the same place!!!! How do I delete a clip without having all the clips after it move over to the deleted space????
    Please help.
    Thank you.

    Hello, richardzulu!
    Welcome to the discussions.
    In answer to your question, the clips behind the one you delete must move over to close the gap between the clips, an empty space left by the clip that you deleted. Otherwise, you would have a black/blank part in your movie.
    You CAN purposely create a black clip if you wish, but probably you just want the movie to continue as you have created it, leaving out the deleted clip. If your movie is just video, it should work out to be the same once the deleted clip is gone.
    However, if you have added some other audio, and not locked it to its corresponding video clip, the timing of the audio to the video will be off. Use the "Advanced" tool to select 'Lock audio clip at playhead' to avoid this. Once the audio is locked to a specific video clip, edits to other clips can be done without separating the audio and video. Occasionally, they still do get misaligned, so you do have to keep checking.
    If you really want to keep all the other clips the same without doing anything else, switch to Timeline view, and move the trailing movie over from the clip you want to delete, making sure that the length you move is the same as the clip to be deleted. Then, delete the clip. iMovie will create a black clip in that space and the rest of your clips will remain untouched. However, as I said, the movie will be interupted by this black clip.

  • How can I squeeze a clip in between another clip?

    I'm not sure if there is a better way to explain my question than simply writing it out: Imagine Clips A, B and C
    A=====B======C=====
    I want to move C between A and B so it looks like this:
    A=====C=====B======
    Notice how C just gets nicely squeezed between A and B with no space or gaps between the clips. Everything just sort of snaps into place.
    I know something similar is possible when you insert a clip for the first time with the "insert edit" tool. But that seems to just be for clips that are in the 'All Clips' bank. What I want to do is move/insert clips that are already in the story line.
    If I try to "squeeze" a clip in between 2 other clips (with the Select tool), it pushes the other clips above or below the clip I am trying to squeeze in between. I don't want it above or below--I want it in between them!
    I'm hoping there is a simple and easy tool for this. I just don't know about it. Thanks for any and all help!

    vwg wrote:
    … all of my clips have that. is there a way to detach or remove those? thanks!
    … sorry to say - your discription/screen-shot confuses me a bit …
    it looks like, your work-flow doesn't match with the intended one in FCPX:
    • everything is based upon a 'storyline' - a 'main track'
    • 'docking' anything (clips, stills, audio) upon or below it, gives the question: Why not IN the storyline?
    • if you 'compose' such a cluster of clips, you'll notice those tiny 'legs' you called it - because, the storyline is The Master - if the storyline's clip, that other clips are connected to, is moved, everything's connected to it moves with it = magnetic timeline
    • if you do NOT want that additional material being connected to a 'Master' - then, why not putting it into the storyline
    • I use tons of cut-aways in my lil' sport-documentaries  - for a quick 'first sight/first snych' I put'em on top of the main storyline; but the moment, I decided "yes, fits!", I press cmd-alt-down arrow: instantly, the connected clip gets a normal clip in the storyline - where it belongs! … and behaves like any other clip
    the easiest way to understand that concept:
    • think of a Lower-third-Title you add to some clip (e.g. person's name) - you move the video clip = the title SHOULD move too!
    • but… if the Title is a clip of its own (e.g. "Here comes the bride") - it shouldn't be 'connected' to anything - it HAS to be part of the storyline! When you realize, the bride comes later, you can move it… that simple.
    stacking clips: only, when a 'Master', a Main Cam content or just audio, e.g. music or an interview exists, and this is additional material
    in all other cases, your material should be in the Storyline.
    Even if you show a dozen pictures and 300 soundeffects simultanously - there's allways just ONE 'pace maker' - the story(line).
    btw: this is one of the very major differences to other NLEs - and it needs a while to 'get it'

  • Problem Synchronizing Multiple Video Clips to One Audio Clip

    So i recently shot some video for a cool project I have coming up however I am having issues with Synchronizing the Audio and Videot together in Final Cut Pro X. I have used Final Cut Pro X since Day 1 that it came out and I thought I had a pretty good grasp on how Synchronizing Clips and MultiCam worked. I record my audio separately so in the past I would start recording on the TasCam Recorder (Wireless lav set up) I have, start recording on the DSLR and end up with both a video and audio clip. I would take these into Final Cut Pro and highlight both and use the "Synchronize Clips" command to pair them both into a single clip and then turn off the natural audio from the DSLR and begin my cuts. I thought I had done this with multiple clips before without issue but I seem to have a problem now.
    Yesterday I shot 50 interviews. I pressed record on the Audio Recorder in the beggining and let it run for the full 2 hours, giving me one long audio file. Instead of wasting video space on my CF Card, I started and stopped recording for each of the 50 interviewees. My goal and what I thought would work was to highlight all 50 video clips and the 1 audio clip and say Synchronize Clips. This did not work. Upon looking at the Synchronize Clips in depth, i noticed that it synched all of my video stacked in the beggining in the first couple minutes. It didn't sync all of my clips, it merely just put them in the same timeline all up front.
    I then tried to highlight all and do the same thing with MultiCam, however thought it matched a few more clips, it still had an issue of not synching the way I was hoping for.
    I was wondering if anyone has had this issue in the past and what they might have done to fix it. Does FCPX have a limit on the number of clips it can Synchronize? Does anyone have any ideas for workflow for synchronizing all of these clips? In the future upcoming shoots should i resort back to starting and stopping audio recording the same way I start and stop video recording and then pairing individual interviews later?

    So i just read this in the support for FCPX
    Final Cut Pro analyzes the clips for sync points such as markers you’ve added, timecode, file creation date, and audio content. If no sync points can be found, the clips are synced at their respective starting points.
    This is what I am aiming for , however not what I am getting. The piece about how the clips sync via timecode, markers, and creation date/time intrigue me though. There is no timecode cause my external audio is just a wav file, but maybe I can get it to sync better via markers? Has anyone else had this issue? Maybe my audio file being close to 2 hours is too long?

  • How do you combine two or more movie clips into one movie clip in iMovie '09

    how do you combine two or more movie clips into one movie clip in iMovie '09

    First create an iMovie project. Then drag the clips (or portions of clips) that you need into the project.
    When finished, use the SHARE menu to share the project.

  • Importing tape into Imovie 11. How do I import all the clips as one long clip?

    How do I import all the clips as one long clip? I have 45 min of footage and I want it as one long take I can edit in Final Cut ProX. When I import, all the clips are split up when the scene cuts. I just want the 45 min in one long video.

    iMovie will import the tape as if it is direct from the camera. It will sense the scene breaks and put all the clips in chronological order.
    If you want to import it as one long clip, I suggest you load the tape into the app that you edited the tape with. Then export it out as a QuickTime movie in the DV codec. You can import this MOV file into FCPX or iMovie.

  • How do you link two audio clips to one video clip?

    Hi guys,
    I want to think multiple audio clips to one video clip and aint know how to do it! I found this page on Adobe knowledge base:-
    http://livedocs.adobe.com/en_US/PremierePro/3.0/help.html?content=WS1c9bc5c2e465a58a91cf0b 1038518aef7-7f40.html
    It says you can do it but I don't think it explains how? Can anyone provide me with the simple steps required to link two audio clips to one video clip? Many thanks.

    Do you mean manual syncing? I've been reading this thread about workaround, which aren't working for me: http://forums.creativecow.net/thread/344/21236
    But the question they are asking is the same one I am asking. Isn't this a typical situation, having multiple mics for one camera? For example, if someone filmed a concert with one camera but used both the camera audio, and ambient mic, and a mix from the board, then that would be 3 audio tracks with 1 video track. I'm in a similar situation, and I'm finding it hard to believe that FCPX isn't equipped to edit this way. There must be some way to get one video clip (with reference audio) to sync with four audio tracks.

  • Is there a way to make a long clip into a short clip without compressing it any further?

    Is there a way to make a long clip into a short clip without compressing it any further?
    I went through all my old formats (VHS, hi8, miniDV, etc) and captured them. They end up as .mov files. Some of the longer 2hr ones are about 28GB.
    If I am making a new project and I want to edit in short clips from several of these longer files, is there a way to save a short clip from an existing file without compressing it any further?
    In other words, lets say I have 10 2hr files, but I know I only want 1 minute from each. Is there a way to select the good 1 minute from each .mov file that I want to use and a version of this 1 minute from each in the folder I am working on the project in, without compressing them??? I like to keep all of the content I am working with on a project in its own folder in case the project needs to be moved from one hard drive to the next while I am working on it. I would hate to have to make a folder that is 280GB or more when I only need a minute from each larger file.
    I hope I have asked this in a way that is understandable. Maybe there is a term for what I want to do, that I don't know yet that has its own help section too.   Thanks for any assistance

    Thanks Jon - That's kind of where I started, but the part of that I need help with on is the second to last step.
    "Export using a codec that matches the source material. "
    The codec they were captured in is .mov at DV quality, but then after picking .mov, there are so many other options to choose from as far as compression goes from sound quality and settings, to how many passes, etc. I just want the new clip to be of the same quality as the original clip. It looks so complicated and its not clear to me what options to pick to match the original.
    Is there a setting or preference that helps you to match the compression settings of the original clip? Or is there  a way to detect the settings of the original clip so I can repeat that in the shortened clip??

  • I have a huge file which is in GB and I want to split the video into clip and export each clip individually. Can you please help me how to split and export the videos to computer? It will be of great help!!

    I have a huge file which is in GB and I want to split the video into clip and export each clip individually. Can you please help me how to split and export the videos to computer? It will be of great help!!

    video
    What version of Premiere Elements do you have and on what computer operating system is it running?
    Please review the following workflow.
    ATR Premiere Elements Troubleshooting: PE11: Project Assets Organization for Scene and Highlight Grabs from Collection o…
    But please also determine if your project goal is supported by
    a. format of your source
    and
    b. computer resources
    More later based on details that you will post.
    ATR

  • How to display newly added bookmarks on top of the list in Unsorted Bookmarks? (not in Bookmark Manager window)

    I have hundreds of bookmarks.The Bookmarks Toolbar is filled.I made a shortcut of the "Unsorted Bookmarks" folder and placed it in on the Bookmarks Toolbar.Whenever I click the star to add a bookmark, it adds one to the real Unsorted Bookmarks, which add a copy of that bookmarks into the folder named Unsorted Bookmarks which is on the Bookmarks Toolbar.
    When I click on the Unsorted Bookmarks(both original and shortcut folder), it displays the oldest bookmarks on top, which honestly makes no sense to me because the user has to scroll a lot to get to the newest bookmarks, which are more likely to be used than the old ones that have been sitting there for a long time.Is there any way to sort the bookmarks by a reversed chronological order and display newly added ones on top of the list ?
    I am aware that you can do this in Bookmarks Manager window(called Library?) but it requires too many steps and it's time consuming and not easy to use in general.I'd rather click on the folder on Bookmarks Toolbar to open my bookmarks, but they show old ones on top.
    Thanks !
    hashtag - firstworldproblem

    Hmm, you might need to create a "smart folder" for this. You may have noticed some blue folders in your bookmarks such as "Most Visited" and "Recently Bookmarked". These show the results of a query run against your bookmarks or history (Places database) and you can create your own queries with a little elbow grease.
    So one possibility might be to create a custom "Recently Bookmarked" folder that extends beyond the current limit of 10. I gave the steps for creating a 20-item version of this folder in this post: https://support.mozilla.org/questions/934205#answer-358492
    That example searched ''all'' bookmarks and not specifically Unsorted Bookmarks. To create a new "smart folder" for Unsorted Bookmarks, you could try this:
    (1) Select and copy the following places search query:
    place:queryType=1&folder=UNFILED_BOOKMARKS&folder=UNFILED_BOOKMARKS&sort=12&excludeQueries=1
    ''(For definitions of those parameters and many more, see: [https://developer.mozilla.org/docs/Places_query_URIs])''
    (2) Expand the Bookmarks Menu (e.g., from the toolbar button or menu bar, or in the sidebar or Library dialog), right-click the first bookmark, and choose New Bookmark
    (3) In the Location field, paste the query (Ctrl+v or right-click > Paste)
    (4) In the Name, enter something like Unsorted Desc (for descending order) or the name of your choice. Then click Add.
    (5) Drag the new bookmark to the desired location on the Bookmarks Toolbar. If you are using the menu, click and drag and hover over Bookmarks Toolbar until it expands. Once it is on the toolbar, you can easily move it again to the desired location. During the first move, Firefox will recognize it as a query-type bookmark so that is why I have you create it on the menu and move it to the toolbar.

  • Movie clip inside a movie clip

    Hi everybody,
    I'm creating a slideshow with Flash, like the  ones done with Powerpoint. I would like to create a movie clip inside  another movie clip, that is, say I have a clip called button1, and when I  click it, frame number 2 in this clip is displayed, and then more  information appears. Inside this frame 2, there are other clips, for  example an X button to close and return to frame number 1 in the clip  button1, as the image shows:
    What I have done is convert the button1 text into a movie  clip, and assign an action to it:
    on (press){
        gotoAndStop(2);
    When frame 2 is displayed, I would like to  click to the X-button to get back to frame number1, so what I've done  is, again, convert it into a movie clip and assign the following action:
    on (press){
        _root.gotoAndStop(1);
    But this doesn't work. I've been trying as  well changing other things, but no way... At first I thought it had  something to do with the _root or _parent, but now it looks as when  using gotoAndStop in the "parent" button (button1), no actions work for  the "child" buttons.
    I've loaded the fla and the swf files here, just in case  someone would like to check.
    Thank you very much in advance for your help.  I've been checking other posts, but apparently I couldn't find the  appropriate info.

    "_root" is only used to reference the very first level of your flash file. Right now you are telling flash to go to the second frame in your root timeline but you want to go to the second frame in your button1 timeline.
    Change the code that is on the X-button to
    on(press){
         gotoAndStop(1);
    Remove the "_root" and it should work.
    If it still doesn't work, make sure the button has an instance name of "button1" and use this code.
    on(press){
         _root.button1.gotoAndStop(1);
    This is using "_root.button1" as the 'address' of your movieclip and it wont matter where the code is.

Maybe you are looking for