Adding fixed cost in production order and creating liability

Dear All,
We are manufacturing one of our grade of material in a plant which we do not own.We pay some fixed charges to the owner of that plant @ Rs150 PMT produced in that plant.This  fixed charges is to be included in the production order and at the same time liability for that  fixed charges is also to be created so that payment can be made to that vendor.
For charging this expenses to the production order we have created one activity type and one secondary cost element.But with this the liability can not be created.
Please advice how to proceed in this circumstances.
Regards,
Shivaji

hi
I am following this thread...but want to add some views on this..
As I understood from your requirement that you are sending this material to a third party for some conversion with a fixed charge...so you must have a conversion contract with that party. In my views the process should be...
1. Conversion contract with the party (MM)
2. Material will be received from third party with conversion cost at the time of GR (MM)
     Example... Original cost + fixed conv cost = GR value
3. Invoicing ... MIRO ..Party will be credited at fixed conversion cost
4, When the same material is issued to another prod order the GI will be at cost as per sl.2
   Please revert back if you have any question
   Kamal 

Similar Messages

  • Actual cost of Production Order settled to Fixed Assets

    Dear all,
    My client is doing in-house production of moulds (internal order suggestion is not accepted by the client) for which
    they have the following
    1. BOM
    2. Machine hour
    3. labour
    4. overhead etc
    5.plan value
    6. actual value
    Can i settle the actual cost of production order to Fixed Asset ?
    If yes
    what are process kindly give me if any process other then the below
    1.production order created
    2. settlement profile - FA is settlement optional
    3. allocation structure
    4. Asset created
    5 define asset in settlement rule
    Kindly give me your valuable input
    regards
    elango

    Hi,
    Although i am not CO expert , please check with your FICO consultant who are expert before make the final call.
    During settlement to a G/L account or a fixed asset, the system ignores additional account assignments that were manually specified in the distribution rule.
    Based on what i know .
    you can stipulate that settlement may be made to cost centers and orders, but not to fixed assets.
    The Settlement profile is something that you need to create a settlement rule to settle the actual costs of a sender object.
    About the Settlement rule is something that  contains the distribution rules for the sender. It will define how the way to settle the cost.
    Allocation Structure
    In the settlement structure you combine the primary and secondary cost elements into groups, in which debits are then posted to the sender objects. For each group, you specify whether (for settlement to a given receiver type) settlement is performed
    by cost element or using a settlement cost element.
    For example, you might use settlement cost elements:
      To document the purpose of an order (such as, repairs or maintenance)
      To reduce data volumes (you can combine a number of debit cost elements
    under one settlement cost element).
    TQ

  • IDOC for Creation of Production order and also adding components

    Hi ,
    I have a requirement like I get the data from a 3rd party system and using that i have to create production orders and also should be able to add more materials in COMPONENTS part of that Production order. I was looking for a BAPI which can handle this process.
    And also can any one help me by letting me know is there any Message type available for handling this process of Production order creation and Adding extyra components to it.
    I have a  message type LOIPRO (for Production Order) and associated function modle CLOI_MASTERIDOC_CREATE_LOIPRO for creation of master IDoc, but not sure can i handle the Components part in this.
    Please do send replies ASAP, its very urgent.
    Or else atleast suggest me the other ways of doing this .
    Also send me any BDC program if anyone has already developed for this.
    Thanks
    Kumar
    Edited by: Phani Kumar Peddagopu on Mar 19, 2008 6:56 PM

    Resolved .

  • Function module for calculating planned and actual cost of production order

    Hi ,
    Do we have any standard function module for calculating planned and actual cost for production order?
    i need to implement this in a Z-report.
    Thanks
    Srini

    Hi,
    try below function module
    CRMCO_GET_PLAN_ACTUAL_COSTS
    CO_IH_GET_PLANNED_COSTS_TOTAL
    Regards,
    Sankaran

  • Fixed Cost & Variable cost in Production Order

    Hi  ,
           I have maintained the fixed cost & Variable cost in  KP 26 for the activity type .
    for 1 hr
    Fixed cost : 1
    Variable cost :1
    Operation duration is 1 hr , when i check the Planned cost it shows total plan cost is 6.92 ,
    Fixed cost as 3.46 and variable cost as 3.46 ,
    How the system calculates 6.82 ,
    I have maintained the valuation Variant for the activity type is Plan price for the period .
    As per my understanding system has to calculate the Planned cost as 2 (1 for fixed + 1 for Variable )
    Can anybody explain me why the system calculated the price as 6.82 ...
    Thanks in Advance ...

    Dear,
    Please check the following :
    1.Goto CR02-Slect the Costing tab -Check the Formula Key assinged in the Work Centre costing tab .??
    2.Please note that variable cost is dependant on quantity, where as fixed cost is independent of quantity.
    For example, if you have updated Rs.300 in variable and Rs.200 in Fixed cost fields and you quanity of activity type consumed is 100 minutes.Your fixed cost will be Rs.200 and variable cost will Rs.300/minute * 100 = Rs.30000
    3.What s the currency in Controlling area ??
    Regards
    JH

  • How to track costing in Production order

    Hello Everyone
    I would like to get some details about how to set the product costs for Finished Goods and also how to track the expenses like packaging, labor, electricity, other charges etc, for individual production order.
    I have created the labor and packaging as a non inventory item and have used it in the BOM, now after the production order is closed, i find these two costs to be in the Actual Additional costs as shown below, till this is great.   
    But the requirement was, when they want to view the expenses or a month, then they require individual split up of costs against each production order. Is this even feasible?
    Please require help from you guys.
    Appreciate your help in this regard.
    Thank You

    Product Costing
    The cost of a FIFO or moving-average product is the sum of its component costs and additional costs (such as labor and overhead). To ensure accurate calculations of product cost, even if the components were issued manually, SAP Business One uses the cost of the items issued to production order and not the cost of the items currently in inventory. This avoids differences between the actual cost of components used in the order and the value of the product.
    Note
    The cost calculation method described here is relevant only for standard and special production orders, but not for disassembly for companies managing perpetual inventory.
    In the case of disassembly the components enter the inventory with the same cost as the items currently there. If the component is managed by FIFO, the cost of the oldest layer is used.
    The cost of returned components does not change; it is the cost of the last one that was issued.
    The product cost calculation is determined by the item management method.
    Standard – When the product is managed by standard cost, no calculation is made, and the cost is copied from the item master data upon report completion.
    Moving Average – When the product is managed by moving average, two figures are required for product receipt into inventory: receipt quantity and total value added to the inventory. The total value is the product cost, which is the sum of all component costs used for those products.
    FIFO – When the product is managed by FIFO, each report completion opens a new cost layer for the product in the inventory. The quantity in the layer is the quantity of the products just reported as completed. The cost of the products is the sum of all component costs used for the completed products divided by the quantity of the products.
    On every report completion, the system checks the following three quantities for each manually issued component:
    Issued Quantity – The quantity already issued to the production order.
    Used Quantity – The quantity already used for the completed products (completed products multiplied by the base quantity of the component).
    Needed Quantity – The quantity needed for the products that were just reported as completed (quantity of products reported as completed multiplied by the base quantity of the component).
    If the Used Quantity is greater than or equal to the Issued Quantity, this means that all items issued for the production order have already been used, and the Needed Quantity is yet to be reported as issued from the warehouse. Since the cost of the items that were actually used for the products is unknown, SAP Business One takes the current prices from the inventory.
    If the Issued Quantity is greater than the Used Quantity, SAP Business One finds the cost of the components that were issued and not used, and uses them in the calculation of the product cost. When finding those components, the issuing order of the components is taken into account, meaning that the first components to be issued are the first to be used. The components following those that were used are the first to be used for the cost calculation.
    If the sum of Needed Quantity and Used Quantity is greater than the Issued Quantity, meaning that not all needed quantity was issued, SAP Business One needs to make an assumption for those items’ costs, so it takes the current prices from the inventory.
    Upon the completion of a production order, on the Production Order Window: Summary Tab, you can check the product cost figures of the production order.
    Regards
    Kennedy

  • Sales order - show total plan costs (from production order) on sales order

    Hi all,
    I have the following question/scenario:
    We create prodction order to collect cost (hours) for a service. There exists also a material master for this service.
    The confirmed hours are posted on the production order and then setteld to the respective sales order (settlement rule SDI).
    What to I have to maintain/customize to show the total plan cost (for the service) on gthe sales order?
    If I check the sales order via VA03 --> environment --> cost report , I can see the planned sales revenue but no planned costs?
    (the actual value flows work so far, postings via settlement or billing document).
    I hope the topic is understandable. Any ideas?
    Thanks in advance.
    Edited by: Butch66 on Sep 27, 2010 7:07 PM
    Edited by: Butch66 on Sep 27, 2010 7:08 PM

    Hi
    Planned costs from prod order can not show on sale order.. Both are 2 separate entities in their own respects
    Unless you calculate sales order cost estimate on your sales order, you cant see planned costs on sale order...
    To calculate sale order cost estimate, make settings in your requirement class...
    1. Go to procurement tab of sale order
    2. See whats the requirement type
    3. Go to IMG > Controlling > Prod cost Contr > Cost Obj Contr > Prod Cost by Sales Order > Control of Requirements
    4. Here you can see mapping of req type to req class....
    5. If you want to have sales order costing and have sales order as CO object inorder to have sales order wise profitability, you should have following settings in Req class...
    >Acct Assignment Category should be E
    >Costing: Either Blank or X
    >Costing Id and Costing Method: As per your requirement
    Regards
    Ajay M

  • Cost in Sales Order and Billing not match

    Dear all,
    I am facing a problem that the cost in Sales Order and Billing (order-related billing) not match.
    The error seems related to sales order is getting moving price (MBEW-VERPR) as cost but billing is calculated by issued amount / qty.
    Here's the detail (refer to the screen captures).
    Sales qty = 1330 PC.
    Local currency = HKD, sales doc currency = RMB, exchange rate = 1.26215.
    Condition type ZCSR, condition category = G (Internal price).
    When creating sales order ,
      Cost is take from MBEW-VERPR => 1.86 HKD
      Cost converted to doc currency =>  1.473 RMB => 1.47 RMB
      Total amount = 1,330 x 1.47 = 1,955.10 RMB
    When creating billing from the delivery note,
    Cost seems taking from total value divided by total stock in the article doc.
    Cost = 2,477.82 / 1,330 = 1.863022556390 HKD => 1.476 RMB => 1.48 RMB.
    Total amount = 1330 x [(2,477.82 / 1,330) / 1.26215] = 1,963.17 RMB
    My goal is to align the same cost and amount in sales order and billing.
    Please help.
    Thank you very much.

    Dear joan,
    Thank you very much for your advise.
    I implemented example 1 as in note 24832, trying to disable price re-determination in billing.
    However it doesn't work.
    Added code in example 1:
    Copy control Delivery type LF to invoice F2, pricing type changed to X:
    Still ZCSR re-determined but not copying from sales order (1.47 RMB):

  • The relationship between production order and purchase requistion After running MPS

    Dear Experts:
         I met a issue . My users want to know the relationship between production order and purchase requistion . In my company we create production order and  purchase req. by  running MRP. our operations are:
    1. T-CODE: MD41  create planned order .
    2. T-CODE: CO41 convert planned order to production order .
    3. T-CODE: MD15 convert planned order to purchase Requisition.
      but I can't  find the  relation of them. would you like to give me some advices? thank you very much.

    Hello
    On the standard MTS process there is no link between the requirement (STO) and the replenishment element (production order).
    See the below extraction from note 12955:
    There is no index that the system could use to determine which issue element (sales order, planning, reservation, dependent requirement, ...) is covered by a certain receipt element (purchase order, production order, purchase requisition, planned order, stock level ...).
    A production order, for example, can be created to cover several different requirements, even when you are using lot sizing procedure EX.
    You can use transaction MD09 or MD04to determine the pegged requirements, but they are calculated dynamically and there is not fixed link between requirement and receipt.
    BR
    Caetano

  • Material cost in production order plan cost

    Dear all,
    -we are in sales order cost object with non-valuated stock...
    -we have created two production orders from MRP run. First one is for semi finished material and second one is for finished material.
    Issue-1
    Both production orders not showing material cost in production order plan cost...
    Issue-2
    When i consumed raw material against semi-finished material production order (261-E), system not gnerated any document and material cost not updated either in production order or sales order...
    where should i do changes in configuration to get updated material cost in the production order...
    Best regards
    Kishore

    Hi
    Issue 1 : Check Whether Standard cost is present for header material of prod order, and under control tab of order costing variant for plan is present.
    Issue 2 : Use 261 instead 261E.
    Rajneesh

  • Cost of Production Order

    Hi experts
    Can u please tell me at what value will the material gets produced (mvt type 101) from production order.
    i have a CIR and then i have done MRP run and then i have converted planned order to production order and then i have confirmed the activites and hence my material is created.
    can u please tell me the value of the material will be from the costing of the CIR or it will be just according to the price control and price value in material master??////
    Please not that the production order is CIR specific.

    Dear Atul,
    If that be the case, it should be MTO and variant configured. Each sales order shall get seperate cost estimate. This cost estimate shall not be updated into the Master Master and the GR happens on the basis of this Cost estimate.
    Trust this helps much!
    Cheers,
    Ashok SINGH

  • Problem in Fixed Assignment in Production Order

    Hi Gurus
    please help me , i am doing below mentioned scenario
    1) Set the customization such that, when we release the order,         
       Material Staging should happen automatically.                       
    2) Create a Production Order and save it after releasing it.           
    3) In CO02, delete the Fixed assignment for the AFS Raw                
       material and save it.     
    i cann't able to do step 3. while changing the Production order, system donot't allow me to change the Fixed Batch(Reservation) it saying that "Material assign for WM staging" can anybody knows why so?? does i have to change any spro's setting. or does it mean that after Assignment of Material staging , i cann't change the fixed assignment?????
    please give me some idea
    Thanks

    Hello Subham,
    Why not to post your question in the group Industries / Industry Solutions General..
    With addition of AFS in the subject line..
    Regards,
    Siva

  • Actual Costing in Production Order

    Dear All,
    We are in Production Client.I have created cost estimate and moved to material master.
    PP has created a production Order and confirmed the activities.
    When I view the costs from CO03,i can see the target costs perfectly,but actual costs are not apprearing in the order.
    We have 6 activity types and out of 6 ,we have costs for 5 activities and for the remaining 1 activity ,plan qty is maintained ,but there is no plan cost.Is because of this ,actaul costs are not coming in to order? Or any thing is missed out ?  
    Please share any idea on this issue as we are in production.
    Regards
    Su

    Dear Mr Ajay,
    Sorry for the information given in the previous one as I have given wrong Order No.while checking.
    I have checked once again with the correct order.When I checked COFC ,System has given the error messages for the Setup activity type for which price is not available in the system as no costs are planned for the activity type as we don't  have setup hours for this month,but qty is planned and PP has confirmed the set up qty.
    Is because of this issue ,actual costs did not appear in the order?
    To my knowledge ,as I said we have 6 activity types,out of which there is no cost for setup,hence system is throwing a error for no price for that activity.
    But the system can capture the actaul costs for the remaing 5 activities for which prices are available.
    Regards
    Su

  • Open production orders and outbound delivery after go-live

    Hello All,
    I tried to search answer for this question but could not find answer.
    Could anybody suggest, what to do with open production orders and outbound delivery after go-live when WM is activated. As, after go-live WM-PP interface will be activated and system should consume material from storage bin specified in control cycle and that will happen for newly created production order after go-live,but what about existing production orders how to update production supply area against work center in production order.
    Similarly with outbound delivery how to update WM status after go-live.
    Thanks in advance

    Thanks to both Jurgen and Sander
    Regarding production order yes, one way is to re-read PP master data in production orders, but is that the only way to handle this or do we have any other option?
    I was aware of re-read PP master data but it will real time consuming and also if it will problematic for already released or partially confirmed production orders.

  • How to bifurcate production order and purchase order

    hi all,
    is it possible to bifurcate all open production order and purchase order quantity of items.
    ex:i have one item like ffp001 it is showing 100 order quantity.but i want only open purchase quantity.i checked (item master data-->righ click--->Avail to promise) its showing open production and purchase quantity.so i need only open purchase quantity.
    Plz tell me the process of Bifurcation of open orders.
    thanks&Regards,
    P.Pratap

    Hi,
    By default there is no option , as a workaround you can use below method,
    Create 2 warehouse , for example Purchase , Production
    When ever you create purchase order use "Purchase" warehouse, Use production warehouse in production
    In the "Available to Promise" Report you have warehouse filter option.
    Using this filter you achieve can achieve your requirement.
    OR
    Right click "Filter Table"
    Document -> Start with-> PO
    Now you can see only PO
    Refer below image

Maybe you are looking for

  • Error message when starting Sun Studio express IDE

    When I start the Sun Studio express IDE version 3/09 I get the following error message: java.lang.IllegalArgumentException: Instance_urn = urn:st: already exists in the registration data.      at org.netbeans.modules.servicetag.RegistrationData.addSe

  • TS3988 error 2343 - can't uninstall or repair icloud

    My itunes would not recognize my iphone or my ipod after latest itunes update. I tried everything and itunes kept saying that it could see the devices but not recognize them, and if the prob persisted, to uninstall itunes. I did and I noticed there w

  • Is it necessary to use a rs232 interface?

    Hi, I have a AL104 mass scale and I'm trying to read the weight on labview, I hook it up to the computer using a rs232 cable, but I don't really understand how the device and the computer is communicating, I use VISA to write the program, but I can't

  • Best way to reverse a payment proposal (done with Payment Wizard)

    Hello What is the best way to reverse the financial postings done by a payment run ? Thanks Stéphane

  • Unable to Save a Service Order (Account Assignment Error)

    Hi, When i Save my service order, it gets saved but says Account could not be determined in the ECC System. What could be missing ? Seems like something is not configured properly in the ECC System (back-end). I have pasted the error text for referen