Additional/suplimentary unit of measure for Intrastat
Hi!
I am trying to generate the Intrastat declaration.
I have a problem; i am using an commodity code with suplimentary unit of measure p/st. But I cannot define the unit of measure p/st in SAP because the maximum lenght for unit of measure is three characters.
There should be a table BNADDM in SAP where suplimentary unit of measure exists. But this table in empty im my system.
How can I configure unit of measure p/st in SAP in order to add it to commodity code configuration?
Thanks,
Marcel
found in Romania_Intrastat_docuE.doc which is attached to OSS note 1016386 - Intrastat for Romania
Customizing for the Electronic format
Please note following customizing related to the conversion of the Supplementary Unit of Measure has been involved.
The issue: The information about unit measure in SAP is maintained with majuscule (capital letters) and in external system (INS) no (e.g. M3 in SAP and in INS it is m3.)
The customizing is to setup the correct INS supplementary units of measure. Once you need to convert any UoM supplied with SAP application, fill the external system (INS) Unit of measure via the maintenance view:
/CEECV/ROLO_UO_V via transaction sm30.
Similar Messages
-
Unit of measurement for materials received and withdrawn
Hi Experts,
Base unit of material is KG whereas sales unit is M2 and conversion is maintained between both. Now I am using sale unit (M2) while entering material componenets. Then I am raising PR, PO, GR in project and withdraw the material in sale unit M2. But system updates the report in KG (under purchasing data tab of component). When I get material report, system shows reqmt qty in M2 but received and withdrawn qty in KG. Its confusing and doesn' serve the reporting purpose. Can we do something so that received and withdrawn qty will appear in M2 (sale unit) rather than KG (base unit)?
Thanks and Regards
Dinesh ChauhanHi,
To resolve this issue, you need to maintain the conversion factors. In material master, additional tab, unit of measure tab you need to maintain the conversion factors. Say example I Kg = How much M2. If you maintain this the system will convert automatically all the Kg in to M2, or vice versa you can do. Otherwise you can maintain the conversion factors in the Info Record also for externally procured materials.
Regards,
V. Suresh
Edited by: V.SURESH on Jan 5, 2009 12:19 PM -
Unit of measure for a pallet layer in MATMAS03
Hi all,
maybe ths is not the correct forum where to post this question, if it's out of topic I apologize in advance.
Fast question:
What is LAY? it is alternative unit of measure for pallet layers?
When i receive the IDOC i recieve LR as UOM, what is the relation between LR and LAY?
Thanks & regards
AndreaThese units could have been defined only in your system (I don't see them in ours). If it is so, no one here will be able to answer.
The conversion factors could be in Material Master (MM03), on Basic Data screen click Additional Data button and go to the Units of Measure tab. Also see tables MARM and T006. -
Need Multiple Units of Measure for a given material due to multiple vendors
Hello,
We have a requirement where we must have multiple units of measue (each, box, case, pallet) for a given material.
Background:
We have multiple vendors for one SAP material number. We need to store 4 levels of units of measure for each vendor+material combination.
Unit of Meaure levels
1. Each
2. Innerpack (ex: 12 each = 1 innerpack)
3. Box (ex: 36 eaches = 1 box)
4. Pallet (ex: 100 eaches = 1 pallet)
Standard SAP allows in MM01 additional data --> Units of Measure only 1 Ea, Box, Plt, etc.
Our requirement is to allow multiple Units of Measure due to multiple vendors providing the same material.
So, our unique combination is by a Material+Vendor.
We are considering adding the vendor name and vendor number to the material master --> additional data --> Units of Measure tab.
Does this seem like a good solution? What impacts do you foresee with approach?
Any alternatve solutions?
We thought we could enhance the purchasing info records to allow multiple units of measure too but then we need to also add many fields to hold the weight, lenght, height, width, volume, country of origin, etc.
Please recommend a best practice or solution to handle this requirement.
Thanks in advance!!!Hi,
Maintain the alternative units in Material Master in Additional Data -> Units of Measure section with proper conversion factors.
Create individual info-records i.e. per mtl-vendor combination & in the info-record maintain the order unit, along with other details as required.
Now when you create a PO, the details will be read from the info-record. To test the same, create them in your sandbox & see if it meets your requirement.
Hope the above clarifies your query.
Regards,
Vivek -
Leave unit of measure for calculation type A empty
Hi Gurus,
We are in SRM Extended classic scenario with 5.0 version.
Here in SRM we have Procurement contact with process type Global Outline Agreement (GCTR).
Currently we are facing problem while amending the condition type in the contact line item. When we change the condition type for particular line item then getting error message "Leave Unit of Measure for calculation type A empty. (item 10).
On the line item the condition could look like this
Condition Price Start Date End Date
Price(Contract/Bid) 100 EUR 2010-02-22 2010-12-31
gross surcharge % 5,5 % 2010-02-22 2010-03-31
gross surcharge % 6,5% 2010-04-01 2010-06-30
gross surcharge % 8,5 % 2010-07-01 2010-12-31
when we try to add additional conditon like "gross surcharge %" then we got this error message
Leave unit of measure for calculation type A empty
if I delete all condition "Gross Surcharge%" then the error disapear and then I can try again, sometime we could create those condition without problems but offen we have this error.
Can any one help me to get rid of this error message.
Thanks In Advance,
Jakob Banginitially you could do multiple periods but when you change the condition it is not allowing you.
can you make inactivate that andd new line item and add same item with new condition
(SRM might have limitations)
I tried this works for me
MM 123 -
FIRST :-
price contract bid - 43.99 USD 2010.09.02 to 2010.09.02
Discount (Absolute) - 3 % 2010.09.02 to 2010.09.02
Discount (Absolute) - 5 % 2010.09.03 to 2010.09.03
same GOA edited change version created
price contract bid - 43.99 USD 2010.09.02 to 2010.09.02
Discount (Absolute) - 4 % 2010.09.02 to 2010.09.02
Discount (Absolute) - 5 % 2010.09.03 to 2010.09.03
no erorr for me and GOA released too and reached backend too.
Muthu -
"MATERIAL-ADDITIONAL DATA-UNIT OF MEASURE"
There is a Business Content for "MATERIAL-ADDITIONAL DATA-UNIT OF MEASURE" tab page?
Thanks
Serenacan you plz tell more detail.
Regards
Bhima -
Report for Units of measurement for Material
Hi
Is there any report to extract the alterante unit of measurements for materials in a plant.
ThanksHi,
Please use the below table,
Related to Materials:
MARA - Material Master: General data
MAKT - Material Master: Description
*MARM - Material Master: Unit of Measure*
MAPE - Material master: Export control file
MARC - Material master: Plant data
MARD - Material master: Storage location
MAST - Material link to BOM
MBEW - Material valuation
MLGN u2013 Material Master: WM Inventory
MLGT u2013 Material Master: WM Inventory type
MDIP - Material: MRP profiles (field contents)
MKOP - Consignment price segment (old versions of SAP)
EBEW - Valuation of sales order stock
QBEW - Valuation of project stock
MVER u2013 Material Master: Consumption <Plant>
DVER u2013 Material Master: Consumption <MRP Area>
MVKE u2013 Material Master: Sales <Sales Org, Distr Ch>
MLAN - Material Master: Tax indicator
MARC - Material Master: Plant data
MAPR u2013 Material Master: Forecast
MARD u2013 Material Master: Storage Location
MCH1 u2013 Material Master: X Plant Batches
MCHA u2013 Material Master: Batches
MCHB u2013 Material Master: Batch Stock
MDMA - MRP Area data
DBVM - MRP Planning File Entry: MRP Area
MOFF - Outstanding Material Master Records (Maintenance status)
MARCH - Material Master C Segment: History
MARDH - Material Master Storage Location Segment: History
MBEWH - Material Valuation: History
MCHBH - Batch Stocks: History
MKOLH - Special Stocks from Vendor: History
MSCAH - Sales Order Stock at Vendor: History
MSKAH - Sales Order Stock: History
MSKUH - Special Stocks at Customer: History
MSLBH - Special Stocks at Vendor: History
MSPRH - Project Stock: History
MSSAH - Total Sales Order Stocks: History
MSSQH - Total Project Stocks: History
Regards,
Mohd Ali. -
Unit of measure for calculation type C must be completed
Hi All
When releasing some contracts in SRM , we are getting the error message as above.
The error message doesn't specify any particular part and the contract has more than 3000 parts.
There are no conditions at header or item level.
There is no Target quantity also. Just a Target value for the contract and prices for individual items are maintained.
We are using extended classic scenario and the contract is manually created in SRM.
I have checked the OSS notes for this error, but they are mostly for contract creation in Bidding and not for a manually created SRM contract.
We checked the UOMs for all the contract parts with the UOMs ( Base and Purchasing) in ECC Material Master and they are OK.
In our scenario , MM changes in ECC are replicated to SRM in real time
Any pointers towards pin pointing the error will be rewarded!
Regards
KedarHi,
We encountered this error message and resolved the problem by applying the following 3 SAP Notes:
a) Note #1022928 - Unit of Measure for Calculation Type C Must Be Completed
(Previously Mentioned)
b) Note #1702484 - Unit of Measure for Calculation Type C Must Be Completed
c) Note #1517648 - Default Conditions Added for Product Category Item Type
Although the contract required is similar to a "Limit" item, but had to be placed for bid, then the RFX PS Item Type was set to "Service" to receive the bid responses. After accepting the bid response, then we created a contract from the bid response. Since it was to be a "Limit" type contract, then we immediately removed the data from the following fields:
Remove the Quantity
Remove the Unit of Measure
Remove the Price
Remove the Price Condition
After removing the values from these fields, then we switched the PS Item Type from "Service" to "Product Category". We added the Guaranteed Minimum and account assignment data to encumber the funds. We were able to "Release" the contract successfully.
Bob Zinsmeister -
Dear Friends,
I have cretaed RFQ for services such as Manpower Hiring where Item category is,"D".Unit of Measure is UT.
Now I have selected the line item and clicked on Services to enter the details of Manpower such as Welders,Fitters,Carpenter etc. and here Unit of measure is HR (Hours).
Now when I am taking print out of this RFQ.Unit of Meauser for Manpower is UT,it is correct.But unit of Measure for Welders,Fitters,Carpenter etc is STD.Infact it should be HR.
I have checked the table ESLL and value of Unit of Measure here for Welder,Fitters,Carpenter etc and it is STD.
Can anyone explain me why the values are flowing as STD but not as HR?
Thanks in advance.
Regards,
ShrikantHi ,
Check is there any translation happening for your unit mentioned..
http://help.sap.com/saphelp_nw70ehp1/helpdata/en/1c/1b5d427609c153e10000000a1550b0/content.htm
I remember i had this issue once ..
Thanks,
sudhi -
Unit of measure for stock , Goods issue , Purchase.
Dear All Experts,
How we can maintain different unit of measure for Stock, Goods Issue, Purchase?
Regards,
Sandeep.Hi,
The UOM qualifies the quantity you enter on the
purchase order line. This will default in if you entered an item number, if not enter
a UOM of your choice using the List of Values.
Please Refer the following links...hope it helps you....
http://help.sap.com/saphelp_45b/helpdata/en/c6/f83bb94afa11d182b90000e829fbfe/content.htm
http://www.admin.cam.ac.uk/offices/finance/training/manuals/inv_training_stores_user.pdf
Regards,
Udaya. -
How to update Unit Of Measure for a material in BAPI_SALESORDER_CHANGE
Hi All
How to update Unit Of Measure for a material in BAPI_SALESORDER_CHANGEhi,
in BAPISDITM structure, which is their in orderitemin
update updateflag of BAPISDITMX, which is their in orderiteminx for the same field with update flag = 'U'
kindly try with <b>T_UNIT_ISO</b>
or
<b>TARGET_QU</b>
comeback with u r comment
regards,
pavan
Message was edited by:
pavan kumar pisipati -
Do you have any idea of 'Mass Unit Of Measure for DESADV'?
XI mapping
'Mass unit of measure for DESADV'
What action is supposed to do to for above words?To my understanding DESADV is an Idoc type we use when we deal with deliveries. I presume that the filed Unit of measure is not mapped in this idoc type in your system.
Pls give us more details.
Regards,
Mani. -
IS-Retail:how to maintain different unit of measures for a article
hi experts,
can anyone tell me how we maintain different unit of measures for sales and purchasing for a article.base unit of measure,order unit,var unit.Hope for a good answer.
RegardsHi,
Go to MM42, select basic data view
In,Units of measure/ EANs /dimensions sub tab
there u can see four radio buttons
B.Un Unit of measure is base unit (used internally only)
O.Un Unit of measure is the order unit - Purchasing
D/L.Un Unit of measure is delivery unit/issue unit - Logistics
S.Un Unit of measure is the sales unit - Sales
for eg:
First line enter EA (each) or PC (piece) in Auom for a material and enter 1 in Number and select radio button for B.Un
Second line enter CT (carton) in Auom and enter 10 in Number and select radio button for O.UN (when you creating a PO it UOB automatically picks as CT)
Third line enter PALin Auom and enter 50 in Number and select radio button for D/l .UN (when u creating a delivery UOB picks as PAL ie pallets)
Fourth line enter EA or PC and enter 1 in Number and select radio button for S.UN (when u creating a Sales order UOB picks as EA or PC as u defined)
Mohan -
Alternative unit of Measure for variant material
Dear All,
Here is an interesting scenario,
There is a naterial Billet with two variant characteristics length and size. and base unit of measure is TON. Now alternative unit of measure is PCS. How can define the conversion factor on the basis of these two variant characteristics.
In normal material (without variant char.)
we can define conversion factor 1PCS= 2TON
For variant material,
For the material Billet with variant charc length and size how can i define conversion
so that system calculates diff. PCS with diff. length and size but material is same. So how can i Do that.
for example for same material Billet but variant char. Length is 6 M and size is 120*120 ,its wt will be 2 TON for 1 PCS.
for the same material Billet with variant char. length 12 M and size 120*120, its wt will be 12TON for 1 PCS.
How can i cater this for the same material.Hi Shoaib,
We have faced the similar scenario for steel industry. Based on my experience, it is not possible to define variable values for Alternative UOM conversion with the variant characteristic/configuration, specially if you want SAP to maintain inventory with variable conversion rate.
Use the Batch specific unit of measure for this situation.
1) Create batch specific UOM i.e. Ton_per_pc (TOP) --- User proportional unit conversion
2) Create batch characteristic ton_per_pc and assigned UOm.
3) In material master additonal data select proportion unit and enter the standard conversion rate between ton & pcs.
4) While doing GR - In batch creation you can enter whatever the conversion rate is and Inventory will be updated accordingly.
Regards,
Ravi. -
How to hide/suppress unit of measure for values of columns in structure
hi,
hi i am using following in rows and columns.
Rows:
1. material group
2. structure (key figures)
key figure 1
key figure 2
key figure 3
3. base unit of measure
Columns:
1. structure (time scale)
fiscal period 1
fiscal period 2
fiscal period 3
fiscal period 4
If I run the report I am getting unit of measure for each key figure in each fiscal period. I wan to show unit of measure only once in a base unit of measure (row).
I want to suppress / hide unit of measure in columns (time scale - fiscal period). If I wasn't using strcture, I could have used NODIM in formula. But I dont think that I can use NODIM in strctuere.
Is there any alternative.
pls suggest. Thanks.It seems that i have found the answer. I have checked the query properties --> check the option - Display scaling factors for key figures.
Pls let me know if you have any other alternatives. Thanks.
Maybe you are looking for
-
Where can i find a Power Adapter for the IdeaPad A2109?
How are you? Looking for another Power adapter for the A2109.... Havnt found the original in eBay... Is anyone knows where can i find the Power adapter? If not the original - is there any generic alternative that in good quality? Any details? please
-
Dataload problem in Ouline having duplicate members enabled
Hello All, I have changed the 'Duplicate member name allowed' option in an essbase Outline properties from 'false' to 'true' in ver 9.3.1. Now, when I am going to load data through SQL rule file, then it is showing following errors-- ODBC Layer Error
-
How to assign values to UDf of sales quotation at Doc level using UIAPI
HI, I have a custom form, viz. Sales feedback. When the user clicks button "Copy to sales quotation" of this form, I create an instance of Sales quotation form and open it in SAPB1. I have to populate all sales feedback data to this form(Sales quotat
-
Your wallpaper and brighness settings crash?
On the ipad with iOS7, if you do double click on the Wallpapers%Brightness the application is closed. Any fix?
-
IPad mini Cannot Connect to ANY network, best course of action?
iPad mini was working until around 6 PM, where it just stopped connecting to wifi and internet just stopped. Tried all methods that was discussed in the past post, which included resetting network setting in Settings section, hard reset, putting the