Additional tabs in the production order

Dear Friends,
I want to have some additional tabs in the production order (one tab in the header and one tab in the item details). Some customer specific details I am not able to maintain in the production order... Hence I am planning for this one.
Please let me know...if anybody has done this. If so please give me some idea and let me know...how can we do it. Thanks in advance.
Regards,
Surya.

Hi,
You can create new tabs from SPRO-- Productionshop floor controlScreen controldefine user specific tab pagesdefine operation details screen.
There u can use the existing fiels available or use user defined fields.
For maintaining user defined fields, follow the path SPRO-- production -- basic data --routing -- operation data -- Define User defined fields.
Regards,
Santanu
Edited by: Santanu Paul on Jan 22, 2008 12:10 PM

Similar Messages

  • Field "GR Non-valuated" in tab "Goods receipt" of the production order

    Hi,
    When creating a production order, the field "GR Non-valuated" in tab "Goods receipt" is checked by default, due to my assessment customizing.
    This field indicates to the system that it should not create any accounting document, whereas I would like to create one. Does anyone know how to withdraw this automatically check?
    FYI, I do not use COPA and the very basic of CO-PC and I would like to create automatically a default assessment rule (cost center).
    Thanks for your help.
    Ronan

    Hi,
    please note that this is not an MM, but a PP-SCF related issue. It does not belong to the forum ERP MM.
    The indicator AFPOD-WEUNB is set automatically as soon                  
    as you do not settle your production order to category 'MAT' (see                    
    settlement rule). If the order is not settled to a material, then the                
    Goods Receipt will not be valuated and the flag G/R Non-valuated (WEUNB)             
    is set. Only when you settle to a Material is the G/R Non-valuated not              
    set, and you will  receive FI postings in the case of such a movement.               
    This is standard system behaviour.                                                   
    Please review the following notes relating to settlement rules: 518496,              
    400400.                                                                               
    To make sure that the GR-Nonvaluated flag is not set in the                          
    production order, field KZBWS must already be filled with 'M' in the                 
    customer requirement. For that, please set the field KZBWS='M' for the               
    requirement class that is used (see 'General Customizing' in note                    
    459734). PLAF-KZBWS (indicator:valuation of special stock).  
    Regards,
    Edit

  • Sales Order Schedule line not populating in the Production order

    Queation: Is there a way to tell the system to look at the sales order, line item AND schedule line. It is displayed in MD04 but it doesn't carry over to the Production Order. We are a MTO and this information is relevant in a number of ways. 
    Please Help.

    Vickie,
    If you are using MTO scenario then when you run the MRP for the material, it will create a planned order for that sales order based on the dates calculated from the sales order schedule line (Shipping tab)...
    So now when you convert the planned order to production order, all the sales order details will get copied.
    try and revert back.
    Swapnil

  • In the Production Order, Sales Quotation is displayed not the Sales Order

    Hello to All,
    I need a kind help from you.
    My scenario is as follows
    There is a Configurable Material (Finished Product)
    Sales quotation (VA21/2/3) were made for this material.
    Sales Order (VA01/2/3) with reference from the Sales Quotation were made for this same material.
    Now when I run the MRP (MD02) for this material, Planned Orders were created.
    Planned orders were converted to the Production Order.
    In the Production Order (say in Display mode), under the 'General' tab, there is a segment called 'Sales order'. In this segment, the sales order is being displayed if the Production Order is created for a sales order (MTO scenario).
    But, in my case, the Sales Quotation number is being displayed instead of the Sales order.
    My Issue which need your answers:
    Is it a standard SAP scenario?? I mean, if the production order is created for a sales order and again if the sales order is created earlier with reference to a sales quotation, then in the production order, the Sales quotation is displayed. Is it a standard?? Or it is showing wrongly? I mean, is it like that, always the sales order should be displayed in the Production order and not the sales quotation??
    Please suggest so that I can overcome this problem, if at all it is a problem.
    Some More Inputs (For your analysis/research):
    1. After the MRP run of the material the Planned Order is created. I have checked the planned order, and found tha the assignment of sales document (in this case Quotation) is done in the Planned order itslef. It is visible wthin the "Assigmnet" tab of the Planned Order.
    2. For the analysis purpose, I created one stand-alone Sales Order for the same material. I mean, without reference from any Sales Quotation. Then, when I run the MRP (md02), the Planned Order and then production order were created normally, with reference to the Sales order. This just for your kind information.
    3. I have checked the pegged requirement of the Production order in the MD04. It is showing the Sales order itself. But, if I see the production order (CO02/O03), it shows sales quotation.
    User Requirement:
    Evenif, the sales order is created with reference to a Sales Quotation, after MRP run, in the Planned and thereby subsequent production order, the Sales Order should display and not the Sales quotation.
    Please suggest.
    Thanks and Regards,
    Supriyo

    Hi
    Since your scenario is configurable material,  the system takes the reference of sales quotation only. Because the in case of configurable materials the sales quotation is the base and based on the sales quotation the sales order is created and subsequent production order.
    This is std SAP and for configurable materials the sales quotation is deciding factor
    Krishna

  • Additional field in the sales order screen

    I need some additional field in the sales order screen. There is
      also no screen exit available for VA01. Can I use this
      additional data B tab in header details by creating additional
      field in it. Please tell me how to use this tab or how to get
      different field in the sales order (header or item level).

    Hi,
       Yes. You can use this screen. For this either can modify the table VBAP with additional fields and put them on this screen.
      You have to code your logic to save these values in the include MV45AFZZ. The subscreens you have to use for this are 4462 or 8459.
    refer Screen exits - Urgent.
    with regards,
    Vamsi

  • "Material  Invoice Cycle- field" in the Invoice tab of the Purchase Order?

    Hi,
    Does somebody has a clue on the field "Material  Invoice Cycle- field" in the Invoice tab of the Purchase Order?
    What are the functions, dependencies and the scenarion one can use this field.
    Regards

    Hi
    Here in Is-oil we have invoice cyles. Provisional invoice, Final invoice, interested invoice, settlement invoice etc..
    So in sales at first provisional invoice has been created than the final invoice based on the Provisional invoice.. and further invoices like  interest invoice & settlement invoice ..
    So here we are using 4 invoice cycle.. hence you have to define in the Spro-->industry solution -->oil & gas  > cross component application>maintain the invoice cycle numbers... 4
    And this data has to be used in Condition type
    Spro--> industry solution -->oil & gas  > cross component application> MM split invoice -->Enter the data in additional invoice .
    These is the function of Material invoice cycle field...
    Thanks and regards
    Raja

  • Add an extra :Tab" on the Purchase Order's ITEM DETAIL level.

    Hi:
    Can anyone please tell me how I go about to add an additional "TAB" on the Item Detail level of a Purchase Order...??
    Thanks.
    W.

    It is not possible to add extra tab by configuration .you have to use user exit/BADI to get this .
    user exit :MM06E005 
    BADI : ME_PROCESS_PO_CUST
    consult with your abaper for developemnt

  • How can read BOM component date before save the production order??

    Hi Experts,
    In our company, we need to develop a program to read the BOM component data of the production order
    before we save the production order.
    That for example ,when we create and release a production order , before we save the production
    order,we want a porgram to read the BOM component data. If some component data can meet our
    requriement (may be if there is material requirement quantity>100 EA),then the system will pop up a
    small dialog box to remind us.
    There is user exit PPCO0007 and PPCO0007.But it seems they only can read the head data of the
    production order before we save the production order. And the BOM component data of the production
    order are saved in the RESB(Reservation Table).So if we do not save the production order,all the BOM
    component data are not saved in the RESB table.
    So how can slove the problem??
    How can read component date before save the production order??
    Are there any other user exit we can use???

    Hi Just wanted to check am I right that you are trying to check if you have enough Materials Available before you release or Save the order right ? if this is your business objective then when you create order you have material availability tab which checks and gives error if shortage is there. Please let me know if is this wht you asking for ?

  • How to settle the production order variance to 3 GL account

    dear all
    i met a problem in the project ,the customer need see the production order variance category detail for (material,routine,overhead variance) in FI report ,so it need to settle the variance to at least 3 GL account
    i don't know how to configure it ,i try to use result analyse like wip ,but go failed
    do you have some suggestion
    thank you

    Hi ,
    Through Standard SAP .. the same it not possible . Standard SAP will post the differences to one GL account ..The variance amount is not segregated..
    The way out is to use report KKO0  .( Product Costing Drill Down Reports  )  in CO . There are many reports available .. and you can compute the difference in CO Reports and manually make an entry in FI by manually reversing the original variance account and posting it to cost component wise variance accounts ..
    To use the KKO0 report.. please perform the following tasks :-
    1. Assign cost component structure in transaction OKN0 ( Date Extraction/Product Drill Down) tab.
    2.  Product Group Type = Material group..
    3. Run KKRV after period end every month to collect the data for drill down reporting..
    Please revert back for any further clarifications
    Regards
    Sarada
    Sarada

  • Costing the production order for the configured material

    We are trying to cost the production order for a configurable item.  But the system is not calculating any cost in the production order.  Sales order related to this configurable material is costed.  What additional setting I need to cost the production order for the configured material ?

    Hi Niki
    If your SO is costed, thats enough from a System's perspective... Planned cost will be the sales order cost estimate because SO saves the Chars required for the Configurable material
    Planned cost in Prod order depends on the Costing variant you have assigned in the order type... Check the error log if there is any error in cost calculation in prod order
    br, Ajay M

  • GR for production order post to cost center and not to the production order

    Hi all,
    when we post the goods receipt for the finished product against the production order (mov. type 101), the order is not credited with the corresponding stock value. Instead of this, the value accounts to a cost center.
    We specified this cost center in OKB9 (Default account assignment), because if not, we get an error when posting the goods receipt cause of lacking accounting object.
    I can't see why the system does not credit the production order?
    Any ideas?
    Thanks for your time
    Daniel

    Hi Daniel,
    This is the first time i am coming across an issue like this.
    neverthless from a logical front,
    1. Remove Cost center as a valid receiver in Settlement Profile.
    2. Your OKB9 setting are pretty much good. No need to worry about it.  Becasue, OKB9 only will work if the system doesn't identify any other cost object. In this case Production Order is an automatic cost object which system should have taken.
    3. Check the Settlement rule when you have created Production Order. It should have been MAT.
    4. I hope you are creating Production Order with Material (using CO01 and not CO07)
    5. Make sure in OPL8, the default rule in controlling tab is PP1.
    Once all these are fine, i do not see any reason why you will get your probelm.
    Please check and revert back to me if the problem still persists.
    Best Regards
    Surya

  • Merging the Production order number and operation number into sequential no

    Hi,
      I am creating the production order using the Tcodes Co01 or co10 and my requirement is that after creating the production number and then when I open that one in the change mode using  co02 Tcode the sequential number which is present in the assignment tab should come as a concatenation of order number and operation number .
    Thanks for the help in advance.
    Regards,
    Venkat.

    dear,
    this depends on the user buffer set.
    for each user there will be a buffer set in when logeed in and create a production order.
    depending on the saving the production order saving time there may be a situation as you have now.
    discuss with your basis people and under stand the user  buffer of numer for production order.

  • Deletion of components in the production order

    Dear all,
    Our client would like to delete few components issued to production orders by mistake.(these are bulk materials, transferred from legacy system).
    These materials are issued to orders already.
    The production orders are already confirmed .
    Is there any way to delete these items from the production order?.
    regards,
    Kumar.

    You can directly delete the component bulk material in  Co02 itself in the componet tab.
    Do the where used list in CS15, ANd check whether that BOM material have production order in COOIS, and go to change mode of  the order and delete the component manually.
    It is very difficult to delete the component through LSMW, reason is the line item component, for one order it may in line item 10, for  other order it may be in  line item 40.

  • Target Cost not captured in the production order.

    Dear All,
    I have created cost estimate for the FG material and moved the standard cost to FG material and created the production order.
    In the production order ,I could see the Actaul cost & Plan cost,but the Target cost is ZERO.I have checked the entire and PP & CO settings ,it is OK.
    Please let me know that what could be the reason for not capturing the Target Cost.
    Regards
    Subbu

    Hi Subbu
    1. Have you released the cost estimate from CK24 before GR from prod order? Check if field Current price in Costing 2 view is not Zero
    2. If your contr area currency is different than comp code currency, then your costing variant should allow you to release the cost in contr area currency as well.. T code OKKN ("assignments" tab)
    3. Check if target cost version 0 is defined properly and assigned to your contr area
    4. check if variance key is there in your prod order.. you can assign default var key to plant in OKVW
    5. Execute Variance calculation KKS1/2/6
    Regards
    Ajay M

  • How the material PRT issue/receipt to the production order can be handled?

    Hi PP Gurus,
            For one of our clients, the handling of PRT is to be controlled with the issue/receipt for the production order.
    1. What is the procedure for issue/receipt of PRT material in the SAP?
    2. What is the procedure to block the PRT for the creation/release of production order when it was already assigned to the other production order during the same time?
    3. The PRT is to be available automatically once the assigned production order operation is confiremd.How it can be handled in the SAP?
    Appreciate your early response.
    Thanks,
    Reddy.

    Hi Ramanujam,
            Thanks for your response.
         1. The dies can be used for the production of Pressing, Casting and Forging etc. These dies will be managed in the stores. The stores representatives will issue the die to the shop floor for an operation of a production order.They will return back the die once the production is completed at that operation using the die. How to map this process in the SAP.
            Typically, these dies can be treated as PRT materials in the SAP system.
         2. OPJK configuration is not sufficient. The same PRT will be assigned to the many production orders during the same time.The system won't block with only this setting. There are some other steps involved to complete the process.
                     I would like to know the complete procedure with all the steps to block the PRT once it was assigned to the production order operation. The same PRT is to be available for other production orders automatically once the operation is confirmed after production.

Maybe you are looking for

  • Oracle 10g 64-bit database on Windows 2008 R2 (64-bit) error ?

    - I have installed Oracle 64-bit database on Windows 2008 R2 (64-bit) server - Now everything works fine locally on the database. - I had installed Oracle forms/reports 6i which has Oracle SQL Plus 8.0.6. on a windows 7 Professional (32-bit) PC. Now

  • B2B Add on -  Party configuration using B2B - AS2 Aadapter

    Can anyone help me  to configure Party using B2B AS2 Adapter . I tried configuring the channel using Party passing the Sender ID . Getting this error. Cannot get channel binding: com.sap.aii.af.service.cpa.CPAObjectNotFoundException: Couldn't retriev

  • Company email through exchange

    I have tried every way possible to get my storm 2 to activate with my company email and will not connect?  Why?  I talked with my IT department and they have supplied us with all the information.  It wants an exchange URL, and I have provided that UR

  • SMTP with TLS

    Hi Colleagues, we are on CRM 5.0 (AS 7.00 SPS 15) and we have requirement to send emails to the external system over TLS, so I was wondering if it's possible to configure SAP SMTP server to use TLS or we need external Secured E-Mail Proxy Server to d

  • Can't get itunes to play on my computer

    I have Window 8.1 and just did an update in itunes but when I went to play my songs they won't play.