Adopted Info record price should not be changed in PO

Dear All
I do have a requirement that, my company wants to maintain info records for each vendor price combination, and wants user should not change adopted prices/conditions etc in PO while creating the PO.
Can this be possible without doing any ABAP coding using BADI?
Thank you

HI,
Its possible by MM configuration in Condition type ( PBXX or PB00).
What u want to do is In the conition type T.Code :M/06
Under the Changes wich can be made tab, thaer is
Manual entries  , Plz give' D'     in the tab , that means manual entries not possible.
Hope it clear,
Regards,
Andra

Similar Messages

  • USER EXIT/ BADI (The price should not be changed in the billing document)

    Hi all,
    We have given manual entry provision for pricing in Sales order level. But as per the company requirement, the price should not be changed in the billing document. Also the point to be considered is, it is a delivery based billing. 
    Kindly help me for finding USER EXIT/ BADI to achieve my requirement.
    Thanks.

    Hi,
    Please refer to OSS notes:
    105621 - Authorization check for the condition screen - you can use following user-exit includes for changing the condition tab to display only:
        USEREXIT_FIELD_MODIFICATION
        USEREXIT_PRICING_CHECK
        USEREXIT_FIELD_MODIFIC_LEER
        USEREXIT_FIELD_MODIFIC_KZWI
        USEREXIT_FIELD_MODIFIC_KOPF
    1165078 - Authorization check for conditions or subtotals - from ECC6.0 EHP4 there is a dedicated BAdI for authorization check, however if the user is not aurhorized to change the conditions, the conditions are not visible for the user as well.
    Regards,
    Marcin

  • Info record price should be Mandatory in PO.

    Hi Experts,
    I wanna to do Info Record Price mandatory while creating PO.
    System should give Error Message if the price in PO & Info Record Differs?
    How it is possible?
    Thanks in advance.

    Hi ,
    As jurgen suggests , you could do with exits.
    If there is possibilty for you to change the pricing schema.
    Then have a schema which has only PB00  condition with access restricted to Info record only. This might create a situation where price amendments can be done only with info record and PO's created will always have the pricing in sync with info record.
    Correct me if my thinking is wrong.
    Harish

  • Costing issue-Why Info record price is not read ?

    Hi,
    We have an issue while costing a Material procured externally.
    Valuation Variant >>> Priority 1-Info record price. >>Priority 2-Material Master valuation price.
    However, system is picking the price matained in the Material master.
    I have verified the validity of the info record and the Blocks on the Vendor and seems ok.
    Are there any specific checks need to carry out to know if the info record is a valid one.
    Any idea why system is picking Price from Material Master?
    Your help is appreciated.
    Kind Regards
    Umapathi G

    HI Umapathi
    Does any scheduling agreement exists for this info record
    refer this link.. This issue is pretty common these days and has been discussed many times in the forum
    CK11N- Material cost estimate with & without agreement
    Regards
    Ajay M

  • INFORECORD PRICES SHOULD NOT BE CHANGED IN PO

    Sir,
    INFORECORD PRICES SHIOULD NOT BE ABLE TO CHANGE IN PO.
    REGARDS
    AMEY

    Hi,
    I think you need to check on all possibilities here.
    1. Is your requirement for all kind of PO's (direct spend, indirect spend, STO's....).  If it is for all, then when you have new material to be purchased how does it pull in the price (if in case no inforecord exists)...check this.
    2. If your requirement is only for few kind of purchases, then you need to limit it with the document type.
    Your requirement could be achieved through function authorization for buyers and maintaining the parameter id for the buyers to restrict them with the access.  Check if you have used parameter id for any other purpose.
    Please clarify your business requirement elaborately.
    Sk.

  • Update info record price, when changing contract price

    Hi
    In the SAP OSS 569885  it is precised clearly:
    If an info record already exists, upon creation or change of
    a contract, neither price nor conditions are updated in the info
    record.
    So, my question is:
      Is there any way to update info records  prices upon a contract change or creation .
    thank you in advance for your support

    the info record is a kind of general, means it has the general price. A contract is an agreement for a certain quantity and price and period that may have a price that you can only get from your vendor  with this kind of agreement. So it is not really logical to have the contract price in the info record, too.
    There is no way to get this update automatically.

  • Pricing should not be changed in billing document?

    HI,
    We have given manual entry provision for pricing in Sales order level . But as per the company requirement, the price should not be changed in the billing document. Also the point to be considered is, it is a delivery based billing. What is the configuration required to ensure that , System should not allow pricing to be changed in billing document when it is getting created.
      I have checked the forum and found no threads linked to it. Kindly help me in this regard.
    Thanks in advance
    Rgds,
    Sivarajesh. J

    Hi ,
    In SPRO -> S&D-> Billing Documents ->Maintain copying Control for Billing documents. Here select for copying control for ( based on your case) delivery type to Invoice type  (Eg: Invoice type F2: Delivery type : LF) and then go to Item and select Item Category.
    And then go to Item Category details (Eg: TAN) .  Here you find Pricing type and based on your requirement you can select. If not satisfying your need then you can modify the copying requirement.
    Thanks,
    Veerendra

  • Update info record price

    Hello,
    We have requirement to update 2 info record prices based on qty irrespective of validity .i.e.
    the first supply of 100 qty will at price u201CXu201D and there after the price will be u201CYu201D.
    How do we maintain info record ?

    Dear All,
    After supply of 100 nos, we will release order which may be less the 100 and the system should pick up Y price.
    Scales will not help our requirement.

  • Info Record Price

    Hi !!
    My PO is of date 01.01.2010 & now I changed Info record price from date 01.01.2010 & today is 10.04.2010,but how this will be changed in PO.

    Hi,
    Open Po in change mode go to conditions and then click on update select B Carry out new pricing.
    Thanks and regards,
    Amol S. Arote.

  • Info Record price wrt inco terms

    Hi
    The current scenario is that the info record price maintainance is mandatory.
    However in a scenario that is import there are prices based on the inco terms.
    Is this possible? For eg Price when CIF is 100 and when FOB is 90 for the same material vendor purch org combination
    Thanks
    Rahul

    Hi
    Yes this is possible, if you need to determine your price based on the Incoterms then you need to maintain the condition records accordingly.
    Maintain the condition records with the key combination containing the Incoterms.
    If you do not have any key combination then you createa  new condition table and assign it to the access sequence and then you can create the condition records.
    Configuration steps are in the Price determination process in Purchasing
    Thanks & Regards
    Kishore

  • Automatically update of the info record price conditions from last purchase

    Dear.
    I need to massive update the info record price conditions from the last purchase order price for a list of materials.
    Does exist a standard transaction where I can I do this ?
    Thanks.

    hi,
    Yeah, I just checked it..
    Its not possible in Std. SAP system...
    There is no field provided for the same...
    the other way, but doesn't applies to you...as you are doing massive job...
    still if req. then check..
    The other way is:
    Maintain Quotation and ref. it in inforecord...price gets updated easily from it...
    Regards
    Priyanka.P

  • Fetch Info Record price from ECC 6.0 and print on Consignment Contract form

    Hi, we need to fetch the info record price from ecc 6.0 and print it on the consignment contract form. the system for using consignment contracts is not designed yet. once it is designed the consignment contracts would be created in the srm system. we're using srm 5.0 and using extended classic scenario. currently the purchase contracts are being created directly in the srm system. someone plz help me with this.

    knock knock...anyone here? plz help me.

  • No valid info record price when creating PO

    When I created a PO with an info record, but no valid price for the date, the system used the most current PO to price the new PO.
    Is there a way to have the system give a warning message that there is no valid info record price?

    Rahim
    I made the change to the setting and it did return a warning for NO info record.  But the second time I used the material/vendor, there was no warning theat there was no valid info record price
    The PO just used the price from the previous PO with no message about the source.
    How would a buyer know that he needs to go "do something" about an info record price?
    thanks for you help
    Althea

  • Info record price log

    I want a log of the price change for an Info record?
    How can I get it?
    Regards
    VS

    Hi ,
    Execute the program RV16ACHD in SE38  . u will get the change documents for the info record price changes .
    Please reward points for useful answers
    Regards
    Mani

  • Change in Useful life of asset in mid year, but the previous posted depreciation should not be changed

    Dear Experts,
    I have a requirement in one of my client, We need to extend the useful life of asset in mid of an asset fiscal year and the depreciation which was posted in the previous should not be changed.
    Requirement:
    Useful life of asset  is to be extended after completing depreciation for 4 years and in-between the current asset fiscal year. Provided the present asset value has to be taken as the new book value of the asset and the depreciation posted henceforth to be posted based on the new asset value till the remaining useful life.
    Previously posted depreciation should be unchanged.
    Analysis:
    1.      The fiscal Year followed - October to September.
    2.      The useful life of asset will be changed, and the depreciated value posted till 31/mar 2014 will have the old depreciation value ( based on the original acquisition value)
    3.      The Depreciation key used in of type LINR (linear), depreciation value will be calculated based on the Book value till the asset value becomes ZERO at the end of useful life of the asset.
    4.      We can change the useful life of the asset at the end of a Asset fiscal year say FY- 2014, if this is done the existing configuration will take the Book value of the asset at the end of the Fiscal as the asset value and the new depreciation will be calculated based on the new useful life of the asset. The asset value will become ZERO at the end of the newly changed Useful Life.
    5.      But the requirement is that the useful life of the asset will be changed exactly half way in between existing Asset fiscal (i.e., 31/03/2014), if this is done system will change the depreciation value based on the new useful life ( since the Dep Key is LINR), but the depreciation value will change from the fiscal start say October 2013 to September 2014 ), which will not satisfy the requirement of the client. Since the depreciation which is already posted from October 2013 to March 2014 should not be changed.
    Note:
    1. We are not willing to retire the asset and create a new asset with the remaining book value as asset value and start depreciation.
    Kindly let me know if the requirement can be fulfilled without retiring the asset.

    Dear All,
    This requirement has been completed.
    1. I created New Multi level valuation method with base 26 ( Net book value w/o Revaluation ).
    2. New depreciation key was created and the above method was assigned to it. I never changed the Base method.
    3. new interval was created in the depreciation area, with this created dep key and extended the useful life of the asset. The depreciation was calculated according to the requirement.
    Originally the asset had useful life of  5 Years, I changed the asset useful life to 8 years now with new Depreciation key 2001.
    Depreciation was already posted to the asset till 04- 2013 for an amount of 148.27 SAR.
    Net Book value carried forward to 2013 = 1575.56 SAR
    Depreciation already posted till 4th period =   148.27 SAR
    Current Net book value after useful life extension           = 1427.29 SAR .
    Now the new depreciation key 2001 with Multilevel method 201, will take this Net-book value as Asset value and will depreciate along the useful life of the asset till it becomes zero.
    Planned depreciation of 2013 ( remaining 6 months) = 166.24 SAR
    Planned depreciation of 2014 = 225.96 SAR
    Planned depreciation of 2015 = 225.96 SAR
    Planned depreciation of 2016 = 225.96 SAR
    Planned depreciation of 2017 = 225.96 SAR
    Planned depreciation of 2018 = 225.96 SAR
    Planned depreciation of 2019 = 131.25 SAR
    Total      = 1427.29 SAR ( the Asset value becomes zero at the end of its remaining useful life.
    The previously posted depreciation from 01.01.2013 to 30.04.2013 was untouched.

Maybe you are looking for

  • Want to erase a line in pdf file?

    Is there a way to use Preview to erase a line from a pdf file? thanks, Larry

  • Ovi and syncing with Outlook stopped working after...

    I recently upgraded to Ovi 2.2.1.23 and syncing of calendar and contacts stopped working. The reason seem to be that when I try to connect to Outlook from the sync menu, Ovi freezes. Everything was working fine before and I just upgraded Ovi, nothing

  • Picture Gallery Display

    Ok, I've got my website up and running with a few galleries on for my photography work. Nine images to a page, in a grid, with the pretty slideshow if you click on the slideshow button. But by accident I just clicked on a photo, and I got a big photo

  • I connected my Ipad to sync and got a message "Apple Mobile Device service is not started.  What's up with this?

    I connected my Ipad to my computer and get a message that "This Ipad cannot be used because the Apple Mobile Device service is not started.  This is the first time I got this message.  What do I do now?

  • Flex Automation issue

    Hi All, I am facing one issue reagrding flex automation.with the trial version of flex builder,is it possible to have all the classes related automation? when I am trying to use mx.aumation package lots of classes are missing.Can anybody guide me as