AE: Calendar Days for Escalation times

When setting escalation times in AE, the tool doesn't recognize holidays or calendar days.  Therefore, if we shut down for an extended period of time during a holiday, the request will automatically go the secondary approval.  Does anyone have a workaround for this?  Is the plan to disable the escalation times during major holidays?  What happens in the event the holiday is nation specific?

Hi Neal,
to my knowledge, there's no workaround yet.
We have the same problem with having an escalation time of 3 days, but over weekends this will reduce to only one.
Did you open an OSS to SAP on this?
Regards,
Daniela

Similar Messages

  • Calendar day start/end time not changing...

    I don't know whether this is a bug in Calendar or I'm just missing something. I have my 'Day starts at' set to 8AM and 'Day ends at' set to 11PM in the preferences window, but the Calendar simply would not change and it's driving me crazy. I never had this problem with Mountain Lion, but since I updated to this new MacBook Pro with Mavericks it just wouldn't work.

    Hi boris,
    1. minor problem
    2. we have to REFRESH the time value
    3. using GET TIME.
       (Then it will work correctly)
    4.
    START-OF-SELECTION.
    <b>GET TIME.</b>
    GV_ST_TIME = SY-UZEIT.
    END-OF-SELECTION.
    <b>GET TIME.</b>
    GV_EN_TIME = SY-UZEIT.
    regards,
    amit m.

  • How can I enlarge the calendar section for full-time events?

    Hi folks,
    since the update to ios 5 the calendar section at the top of the daily view (with full-time events) is limited in size. If I enter more than two messages I have to scroll to see all events. This is annoying since I typically miss the birthdays I cannot see.
    How can I change the behaviour to the "old" style: show me all full-time events and hide the bar that separates the full-tim events?
    Cheers
    Claus

    I understand that there are a couple of icloud sync apps available for the Galaxy, check its app store or google.

  • How do you set a calendar alarm for a specific time on the day of the event without it being an all-day event

    Does anyone know how to set a calendar alert at a specific time on the day of the event.
    So that the alert date adjusts accordingly if you were to copy and past it to another date.
    The custom alert function kind of does this, but because it is an absolute alert (not relative) it will still refer to the date you initially set it to when you copy and paste it to another date. So this creates more work where you would have to go and manually change all the custom alerts. I have potential
    Anyone know how to set this kind of calendar alert?
    Thanks in advance

    Greetings: Set the alarm to message you (on your screen) and then snooze it every day for 15 days, or, set 15 separate alarm messages. There is probably an AppleScript somewhere on the web too, try searching that way as well.

  • If I enter the time of day as I am entering a new event, iCal automatically enters the time into the daily calendar and deletes the time of day from my entry

    Hi,
    This feature is new in Lion. I get what Apple is doing but I don't view the calendar in day mode. I use iCal exclusively in Month mode. Therefore, if I add an entry like "10:00am doctor's appt.," iCal will (correctly) assume the obvious, and enter the event as "doctor's appt." at the 10:00 am slot in the daily view. The trouble is, I don't look at the daily view, and I have missed a few appointments because I didn't realize what was going on.
    My best work-around right now is to use a semi-colon for the time. That way, iCal won't automatically assume I'm talking about a time of day. For example, I now write "10;00am doctor's appt." This way, iCal puts in on the monthly calendar exactly the way I wrote it, like it was doing in Snow Leopard.
    Is there a more elegant solution than using semi-colons for the time to counteract iCal's insistence on entering the time automatically into the daily view?

    Perhaps users in the iCal forum know of a solution?

  • How can I view my Calendar on iPhone 5 in a continuous List view i.e.: View many days at a time by scrolling? Lost that ability after 7.1 upgrade.

    March 20, 2014 I updated the software on my iPhone 5 to version 7.1. After doing that, I discovered that I could NO longer view my Calendar items in a continuous list view. I can only view items I've put on my calendar under the Month view for EACH day at a time. This is Awful !  Is there ANY way I can view items in a continuous list where I can Scroll? That was available prior to this update?
    Thanks in advance for any Help and/or Suggestions.

    That helped, but still did not solve the "continous scroll" question.
    I did however discover that if you go to Search and type in a "common" letter like "s", a Continuous List view will appear.
    Any further help on how to do this as a default view would be appreciated from any and all.
    Thanks for the help and for the link paulcb.

  • Transit Time in Calendar Days?

    Hello,
    For quite a long time, I thought in transportation and delivery scheduling the TRANSIT TIME is measured in Calendar Days, which means weekends and public holidays are also included. For example, if the delivery date is 2007-12-31, and transit time is 8 days, the system will calculate Loading Date as 2007-12-31 minus 8, which is 2007-12-23.
    But a few days ago, I found my understanding is not correct. It seems the TRANSIT TIME is also measured in work days, in the route factory calendar (not the shipping point factory calendar). In this case, the loading date in above example will be calculated as 2007-12-19, for a typical calendar.
    Can someone confirmed this?
    Regards, Ke

    Yes that's right Ke.
    The calendar you maintain, if has a weekly off or for that matter country specific holidays these days will be considered as non working days in SAP. however if you want to change this you can define your own calendar having 365 days working.
    Regards
    Ranjeet

  • Where to go to see Lead Time settings? Calendar days vs working days

    Hi everybody,
    II'm trying to find the screen where details regarding Lead Time settings are shown. I'm looking specifically for information on the type of days we're using to identify Processing LT's. I'm not certain whether we're using calendar days or working days.
    I'm sure there is a simple way of finding this information out, but just don't know where to look/change the setting.
    Thanks,
    BG

    This is NOT a setting that you can view.
    Oracle always behaves like this.
    Best way to verify this is to create an item with PreLt=5, Processing LT=7 and Post-processing lt=5.
    Then create a sales order with a due date of say 9/21. Make sure 9/1 to 9/21 is regular 5 days week.
    Assuming no holidays, it will mean that you need material on the dock on 9/15 (5 days of PPLT = 7 calendar days.)
    So when MRP/ASCP creates a Req/PO, the promised date will be 9/15.
    Also, the Days from today will point to 9/1 - which includes 7 days of processing + 7 days of preprocessing (5 working days)
    Hope this answers your quesiton.

  • For iPhone4 with iOS7, how can i see the time of day for a voice memo instead of the length of time for the recording?

    For iPhone 4S with iOS7 version 7.0.2, how can I see the time of day for a voice memo, as opposed to its length (of time)?

    For iPhone 4S with iOS7 version 7.0.2, how can I see the time of day for a voice memo, as opposed to its length (of time)?

  • Creation of Multiple Activities for same Employee,same day and same time

    Hi Experts,
    In CRM 2007 I am creating an Activity(e.g Customer Visit) for a particular day for a particular employee. I am selecting the Option "Whole Day".
    When again I am creating another Activity same day and for same employee the ideally system should not allow me to create further activities as I have already scheduled for the whole day but its is allowing me to create as many activities i want irrespective of Time frame.
    I want to block overlappped activities created for  same emloyee same time.
    Can you please suggest me with your ideas inorder to achieve same???
    Regards
    Arup

    Hello,
    If there is no standard solution you can implement the BADI : CRM_ORDERADM_H_BADI
    Here you can see when a new activity is created, and then maybe you can cancel the creation or even replace the new activity by the existing one.
    Regards,
    Benoî

  • Transferring 650 gb to a new external hard drive for my time machine.  It is going real slow. Says it is going to day days. After an hour or so it stops and I have to start again.  When I restart, it starts where it left off.  I'm not always here to resta

    I have a new external drive for my time machine.  My hard drive of 650 gb is full.  It is reallyslow backing up to my external drive.  I have to stay near by as it stops after an hour or so.  If I'm not here to restart it, I lose all that time it could have been backing up. It says it is going to take 581 days. Eventually it will say 12 days. Back up time is all over the place.  How can I keep the machine backing up when I sleep at night.
    Gerald

    I would go into your  in the upper left corner of the mac
    Click on system preferences
    Click on energy saver
    Change the computer sleep and display sleep to never.

  • TS4268 Hello, it's been 5 days now since my imessage has not working..and i have chatted to the costumer for two times. I took thier advice and instructions just to enable to send and receive on it but unfortunately until now its still NOT working. Pls.he

    Hello, it's been 5 days now since my imessage has not working..and i have chatted to the costumer for two times. I took thier advice and instructions just to enable to send and receive on it but unfortunately until now its still NOT working. Is there anybody who could help me please?

    Try this even if you have already.  Just make sure to follow the steps specifically.
    Go to settings > Facetime > send and recieve > tap on your apple id and sign out.  If your not signed in then that will work as well.
    Go to settings > Messages > sent and recieve > tap on your apple id and sign out.
    Restart the iPad by doing the slide to power off setup.  Just hold the power button on the top right till it turns off.
    After the iPad has been restarted:
    Go to settings > Facetime > and sign in
    Go to settings > Messages > and sign in
    Wait about 3 min then restart the iPad again.  Same instructions as above.
    When you restart you should be able to use messages again.  If not then call support again and talk to someone higher than the first level support they have.

  • Payment to vendor above Rs.20,000 (in a day) - Except for One-Time Vendors

    hi guys,
                this is pertaining to FBCJ.
    i need to ensure that any posting to Cash Journal per Vendor should not exceed Rs.20,000 for that day for that Cash Journal. An exception to this rule would be payment made to ONE TIME VENDORS for which cumulative amount for that day can exceed Rs,20,000.
    Can this be done through GGB0 ??
    Pls help.

    Hi
    Sorry, but the other possibility that I know is to enhance the BAPI that do the same that FBCJ, that it isn't your requirement. See Note 616804 - FBCJ: BAPI for saving cash journal documents by curiosity.
    Regards
    Eduardo
    Edited by: E_Hinojosa on Dec 15, 2011 3:34 PM

  • What does "Analyze audio for flex time editing" in Garage Band? It's taking so long(3 days)! and I can't shut down my pc.

    What does "Analyze audio for flex time editing" in Garage Band? It's taking so long(3 days)! and I can't shut down my pc.

    Did you ever figure out what was going on? i've got the same issue.
    I record 2 hour choir practices then edit the talking out to make more useful accompaniments for personal practice. During my editing process my MacBk Pro (0r GarageBand) decides it needs to "Analyzing audio for Flex Time Editing". It will finish doing it and immediately start over again. I can not cancel it so I just have to force quit Garageband and lose eveeryrthing I have editied since my last Save. I've shut my mac totally off and rebooted and to no avail. Any suggestions?

  • Calendar object for the next week day

    I have a calendar object,
    How can I get the calendar object the comes on the next Tuesday or for that matter any week day.
    For example I have the calendar object for today ie. Monday, 7th Aug 2006. How can I get the calendar object for the first saturday after today.

    What you do is calculate how many days ahead it is.
    This would be the target day, less today's day
    reduced to modulo 7. Add 7 to guarantee the %
    operator works correctly e.g.
    cal.add(Calendar.DAY_OF_YEAR,(7 + Calendar.SATURDAY -
    cal.get(DAY_OF_WEEK)) % 7);
    Requires that the numeric values associated with the days of the week are ordered and one apart. Even thought this is the case, the API does not say this is the case so it should not be assumed.

Maybe you are looking for

  • I don't have Operator Interfaces with TS3.0 Installation

    HI, After the Installation of TS 3.0 I don't have a NI directory under \TestStand\OperatorInterfaces. I do have a User directory with some of my own interfaces. How can I install them? I found on the installation disk: \componnents\operatorInterfaces

  • Screen shots for  creating class in se24(class builder)

    HI i am a beginner in abap objects... can anyone give me the screen shots for creating a class in se24. plz dont give links... only screenshots.... useful answer wil be rewarded. Regards, jyothsna

  • Activation of Batch Specific Unit of Measure in IS-Retail System

    Hi experts, In our scenario for Articles, Client work with kg, but also want to keep track of the number of pieces. I am trying to MAP this Process using Batch Specific Unit of Measure functionality in IS-Retail. Is it Possible to Use the Batch Speci

  • Got Error when migrate repository from obiee10g to obiee 11g

    Hi all, i'm testing to migrate repository from obiee10g to obiee 11g , when i done the migration repository and check gobal consistency . It show an error below of repository's 11g , but when i check repository's 10g .It doesn' throw any error .Any s

  • Upgrade RAM or Separate Video Card

    I'm looking to buy a 21.5" iMac.  I do some photo editing with photoshop elements and iphoto.  I also use iMovie but don't do intense graphics or video work. So I have two considerations: 1. Should I purchase the iMac with a separate NVIDIA graphics