AE Major color/work-flow problems in latest release

Hello fellow After effects users,
I'm not usually one to bring up problems like this online but, recent changes to the "color" window have crippled my workflow. Ill describe the problems here and maybe there are new options I don't know of that can alleviate the challenge.
The color window is now seemingly a port of windows found in photoshop with a swatches panel and multiple color choosing options. This change however has brought on 2 major problems. First; the new "magnifying glass" color picker tool almost never chooses the exact color it highlights. The brightness and contrast selected are always slightly off for no explainable reason. In some cases, as in acquiring a color from another shape in AE, I can make a swatch of the color I want and use that. BUT, when I have a rasterized file, like a JPEG, it is impossible to match a color. There also is no Hex code box for colors, so no one stop way to copy and paste a color from one location to the next (my usual work around for faulty color pickers). This leaves, using Apple's built in color identifier (DigitalColor meter), then, switching back to AE to dial in the 3 parameters of hue, saturation, and brightness (or RGB) - an ok way to do things but way more cumbersome than previous methods.
Don't get me wrong; the swatches are amazing and have many great applications. I would not want them removed. There are just some things they cant do, especially with a color picker that does not work well.

Zach, in Preferences > General, is Use System Color Picker enabled? If so, you should disable this, and then you will see the same color picker dialog that After Effects has been using for several versions.
There has been no change to the color picker, and the Use System Color Picker option defaults to off but it sounds like this option may have been enabled for you at some point.

Similar Messages

  • Losing Edits?!?... Am I having a Work Flow Problem???

    OK, so this is what I am working with...
    All Graphic Designers are on Mac OSX Snow Leopard running Adobe InDesign CS5
    All Editors/Writers are on PC (various versions of windows?) running Adobe InCopy CS6
    We are all working off a server to share these files...
    This is our current "work flow", I've created .icmt files for the Editors/Writers to start their content in.
    I have also created .indt files for the Graphic Designers to start the layout process.
    Once the Editors/Writers have opened a .icmt file and entered the content, they save the file out as .icml files, then notifies the Designers that the content is ready to be placed.
    The Designer then opens the .indt file and places the .icml files into the layout (this document usually runs about 16 letter size pages with approximately 30 assignments (.icml files)).
    The file is then saved as a .indd file.
    Now during the editing process while the designer is still laying out the document, the Editor/Writer opens the .indd file in InCopy and checks out an assignment to start their edits... and on several occasions after spending a good amount of time on edits, they check it back in, but they lose ALL of their edits that they just made???  What are we doing wrong here (sometimes it works, sometime it doesn't)?
    If anyone could help me, i'd very much appreciate it.
    Thanks!

    Hello. I am recently having problems with my
    PowerBook. Hope you guys could help out =)...
    Firstly, I am having that 'beach ball problem' where
    the color beach ball keeps spinning and spinning when
    I'm loading applications or even using Safari.
    Secondly, I went to Disk Utility and did a 'Verify
    Disk Permissions'. My results are as follows:
    Verifying volume “Macintosh HD”
    Volume Header needs minor repair
    The volume Macintosh HD needs to be repaired.
    Error: The underlying task reported failure on exit
    1 HFS volume checked
    Volume needs repair
    I'm so lost and worried now! My questions is, my hard
    disk going to crash or something? I have no backup at
    all! Help Help!
    PowerBook G4 15-inch   Mac OS X
    (10.4.3)  
    Don't know about the beach ball. But the message indicates that the disk is probably OK. However, you cannot repair a disk while the system has it mounted; esp. the startup disk. You have to startup up using another disk; e.g., the install CD/DVD. Then you can run the disk utility and repair your main disk.

  • Internal order work flow problem

    Both WF issues are related to internal orders  , Transaction KO03
    ==========
    Example for 1 st case  
    consider A , 1 , 2, 3 , 4 are approvers
    A --->>>>     1)  , 2) , 3) , 4)
    if A doesnt  approved in 3 days , then it go to 1 , 2, 3, 4
    after 3 days , any one of them 1, 2 ,3 , 4 can approve it
    3 days passes , but before any one of them approve , its already approved by A
    all of  1, 2 , 3, 4 have mail in their inbox for approval , but
    here work flow is completed , what work flow is supposed to do , it does
    , but in status error is coming .
    why this is error is coming , even when workflow completed and workflow does its job
    ==========
    Second problem
    one user X have approved , after its approval status should change to approved ,
    but it is not changing  and it is showing status in process .
    therefore work flow monitoring team , who is checking which  WF request are still in process
    again  initiating workflow .
    Now again same cycle repeats , it again comes to inbox of same user  , who earlier approves.
    Please suggest  why status is not changing , even after approval , why it is showing status in process
    and why same user  X , who earlier approves it , getting mail in its inbox for approving it.

    What is G/R?

  • Regarding work flow for credit block release in sales order

    Dear Experts,
    Kindly help me with work flow-
    my scenario is if customers credit limit of 5000$ exceeds in sales order it should be blocked and notification should go to authorize person through simple mail to release this block.
    for this i have done settings in out control i have used output type krml and determined partner as employee responsible to release block in customer master but mail is not triggered to authorized person for credit block and how i can create work flow for this so that authorized person should get notify for credit block as well he releases block also.
    Regards
    Supriya

    Dear supriyaparimal,
    Please find the below points to fix your issue.
    1. Configure the out put determination by using the condition type KRML.(Hope oyu have done it already).
    2.Maintain the condition records in VV11 for condition type "KRML"
    3.Then select the condition record and click the communication tab .
    4. If you want to give any information you can use "Note for recipient".
    5. If the information has to be sent to relevant person you recipient name in the recipient column.
    Save the documnet.
    If you raise the sales order and if it is blocked then system automatically send the information to respective person.
    You can get this in formation in ""SBWP" transaction code.
    Check the in box, the information what you have mentioned in the condition records will be appeared.
    Please let me know if you have any clarifications
    Thanks&Regards
    raghu.k

  • Work-flow problem, 4 timelines

    Hi!
    I would need good suggestions for what would be the best way to do this:
    I'm editing an art installation for a artist, who wants to use four video-screens for his installation. So it's four TVs playing different films synchronised into music. The problem is, that the screens sort of communicate with each other, so it would be importat in the editing phase to see the four clips play at same time.
    Is it possible to play four timelines at the same time? The video material is DV, so maybe my G5 could do it.. But how?
    So far I have been able to only see one clip at a time, so it's been really painfull to make all the cuts sync..
    I read from the PRO-stories about this Muhamed Ali exhibition, where they did something similar:
    "Cortina created a rough cut for all five screens within one Final Cut Pro window. “We were able to have five layers of video running simultaneously — all composed the way we wanted — in the Final Cut window,” he says. “And we were able to render a five-screen video, all laid down into one screen so we could see the whole video play out.”"
    I didn't quite understand what and how they did that. Could somebody please explain.
    Or how else would you do a project like this?
    Thanks!!

    Build four motion effects that place video in the four corners. Save as favorites and name descriptively – top left, top right, bottom left, bottom right.
    Build a fifth sequence with four video tracks.
    Drag each of your original timelines to the viewer and then insert each in turn to a separate track.
    Drop your motion effects on each track.
    Mark the section you need to view and render only that much so you can see whether it is working.
    This is far from ideal – in theory when you make changes to the original sequences your "Quad Split" sequence will update, but you will need to re-render. You could also use Option-P or the Quick View tool to get a sense depending on how long the renders take, or how critical you viewing is.
    Hopefully someone will have a clever alternative.
    This is all for fine tuning when it is almost done. Before then I would just keep the codes consistent in your four sequences and work by time code references to sync events.
    Tom

  • Work flow problem

    Hi,
    I am getting this error message when I try to run the workflow in test environment.
    Work item 000002041364: Task WS92000002 cannot be read
    Message no. WL 820
    Diagnosis
    The attributes of the task cannot be read in the organizational model.
    System Response
    Creation of the work item or the requested action was terminated.
    Procedure
    Check
    whether the specified task is defined in the organizational model.
    the validity date for the specified task in the organizational model.
    the plan version in which you are searching for the task in the organizational model.
    Can anybody let me know what might be the problem or how should I debug the problem?
    Thanks in advance.

    Hi,
    Have you tried to check:
    1. Release status of the workflow?
    2. The agent assignment of the workflow, change it to general task if necessary?
    3. Recompile and reactivate the workflow?
    Regards,
    Lim...
    Edited by: Ruslim Chang on Oct 7, 2008 9:04 AM

  • Work flow problem with portal

    Hi,
       I am facing a workflow problem user is approving  employee transfer via portal but the approval is not moving to next level. I am having the ECR no (Notifiction no), can anybody explain me how to get the Workflow item number using the notification number from portal.
    Regards,
    Karthik.k

    Use Tcode IQS22 & display the notification.
    then you click on the dropdown beside the Services for Object icon in the menu
    workflow--> workflow overview
    here you can determine the error ie where the Notification is stuck.
    ~Suresh

  • [svn] 4143: Fixed problem with metadata in SelectionFormatTextStyles. as so that named colors work for selectionColor, unfocusedSelectionColor, and inactiveSelectionColor attributes on Gumbo components.

    Revision: 4143
    Author: [email protected]
    Date: 2008-11-19 14:53:40 -0800 (Wed, 19 Nov 2008)
    Log Message:
    Fixed problem with metadata in SelectionFormatTextStyles.as so that named colors work for selectionColor, unfocusedSelectionColor, and inactiveSelectionColor attributes on Gumbo components.
    Thanks, Glenn!
    QE Notes: None
    Doc Notes: None
    Bugs: SDK-18070
    Reviewer: Glenn
    Ticket Links:
    http://bugs.adobe.com/jira/browse/SDK-18070
    Modified Paths:
    flex/sdk/trunk/frameworks/projects/flex4/src/mx/styles/metadata/SelectionFormatTextStyles .as
    flex/sdk/trunk/frameworks/projects/wireframe/bundles.properties

    Revision: 4143
    Author: [email protected]
    Date: 2008-11-19 14:53:40 -0800 (Wed, 19 Nov 2008)
    Log Message:
    Fixed problem with metadata in SelectionFormatTextStyles.as so that named colors work for selectionColor, unfocusedSelectionColor, and inactiveSelectionColor attributes on Gumbo components.
    Thanks, Glenn!
    QE Notes: None
    Doc Notes: None
    Bugs: SDK-18070
    Reviewer: Glenn
    Ticket Links:
    http://bugs.adobe.com/jira/browse/SDK-18070
    Modified Paths:
    flex/sdk/trunk/frameworks/projects/flex4/src/mx/styles/metadata/SelectionFormatTextStyles .as
    flex/sdk/trunk/frameworks/projects/wireframe/bundles.properties

  • Bus2014 Work flow display problem

    Hi Folks,
    In my work flow I am using BUS2014, when I am trying to interpet the process for decison step, the process should display the purchase contracts, In some users its diaplaying and in some users its not displaying even though the same authorisations are there for all the users.
    What could be the problem.?
    Secondly,
    I am using one more decision step down the branched work flow to stop for user decision to change the purchase contracts, the  problem is when I am trying to call method display and when user is changing the contracts into change mode, saving and returning back the whole session is comming back to Easy access rather than staying in deision step of the user in workflow inbox. is there any alternative that I can deal with.
    Thanks and Regards,
    Krishna Mukthineni

    Hi folks,
    The second problem lies with the application displaying.. It cannot go to some other transaction like change mode and come back as in Njoy tranctions... so I have adjusted the code to make the display of the method in change mode i.e. Me32k so it is working fine.
    But still I have the first problem .. some times the display through method dont reflect for the user.. please help in this regard...
    Edited by: krishna mukthineni on Oct 10, 2008 4:26 PM

  • Problem in work flow attachments

    Hi ,
    I have problem in workflow attachments.Problem is from work flow after approval process one document will come in attachment.That form i have to attach in the vendormaster transactionxk01.How to attach the form in vendor master.
    If any body knows about it please help me.
    Thanks

    Hi please check the link below.
    https://app.primecontract.com/ua/webhelp/webwfp/wf_attachments_bg.html
    http://www.uiowa.edu/hr/imfo/workflow/attachment.pdf
    Murthy.

  • Using LR and DxO in work flow.. file size problems

    Hi,
    Does anyone have experience with using both DxO and LR in their work flow that can help me with the following problem?
    DxO takes my NEF and creates a DNG optically corrected. Great. Now I should just import these DNG files into LR and be on my way.. except that it seems to use Linear DNG rather then mosaiced and the file sizes are through the roof. My 10mb NEF file is converted into a 30mb DNG. Trying to reconvert using LR has no effect. If I start working with images in this size I will immediately see all my storage space cut by a third from the point of view of the number of images stored.
    Has anyone found a way to work around this problem? I tried to use the adobe DNG converter to reconvert the images but it can go from mosaic to linear but not linear to mosaic. Turning on compression has no effect implying it is already a compressed DNG. Trying to zip the files also fails to have an effect.
    I am really bummed out.. and wish I had paid more attention to file sizes during my trial.
    Right now I am leaning toward only using DxO for a few special images and doing the rest entirely in LR.. but that really defeats the purpose of what I thought would be a great one two punch.
    Thanks,
    Chris

    David,
    The output preset you're using must have TIF enabled. Either edit it to remove the TIF option or create a new JPG-only one if you want to keep the option of exporting to both in the future.
    I can't be more precise as I'm currently away from home and the DxO installation on my laptop has decided to deactivate and revert to time-expired demo mode, meaning I can't actually open the app!
    [Edit]
    Okay, sorted now.... In the DxO Optics Pro "Process" module, under the "Options" section you'll see "Output Formats". There should be one called "Default Output" which outputs to JPG. Ensure that the checkbox next to it is checked and that any others are disabled (unchecked). Your images will now only be exported after processing as JPGs. If you click the "X" next to an output preset you can delete it if no longer required.
    Alan

  • PR work flow Hierarchy forwarding problem

    Hi folks,
    Thank you one and all for your help making me reach my client requirments.
    However, I still face a critical problem in PR work flow. If there is no prerequistie maintained in the release prerequiste and If i have 3 persons in the hireracy then SAP system is triggering 3 sepereate work items to there inboxes, which should not happen according to the requirment. please suggest me with the relevant changes that need to be considered other than making the prerequiste mandatory.
    <removed by moderator>
    Thanks and Regrads,
    Krishna Mutkhineni
    Edited by: Mike Pokraka on Jun 26, 2008 10:25 AM

    Hi ,
    lets say  A0
                  A1
                  A2
    are the respective persons release code of the PR in the given hierrachy. Lets say that no pre requistie is specified for the release prerequistie. Client wants to forward first work item for approval to A0 first after a deadine of 8 days he wants that to be forwarded to A1 ( inspite of not approved from A0 ) and if A1 also not approves then it should be forwarded to A2 and wait there for ever for the final approval.
    But presently what happens is that there are three seperate work items that are getting created and simultaneosly forwarding to A0,A1, A2 and seperately waitng for their approval. so do plese suggest me with any invovative steps to achieve the requirments if possible.
    Thanks and Regards,
    M Krishna Chaitanya

  • Install problems with Work Flow 9.0.4

    I've installed the 10g (9.2.0.4 rdbms and 9.0.4 AS and CMSDK) on a RedHat 3 ES machine and had no problems (thanks to Werner Puschitz for his great how to http://www.puschitz.com/InstallingOracle9i.shtml).
    Now I am trying to install the Work Flow product that accompanies the ias904cmsdk. But the Work Flow configuration fails when it tests the SYS login.
    My reading of the sqlnet.log and workflow.log files is that the install script (wfinstall.csh) is trying to start an instance of Oracle in the AS bin folder. (Fatal TNS error connecting to ...(PROGRAM=/opt/.../as9i/bin/oracle)...
    I installed the J2EE / Webcache installation of AS (as per the CMSDK recommendations) so there is no instance of oracle in the AS home/bin folder. The rdbms is in a different ORACLE_HOME than Work Flow. I've tried setting and unsetting the ORACLE_HOME and this makes no difference.
    Does anyone out there have any ideas?

    This is not Adobe technical support, this is a user to user forum with the space provided by Adobe
    To talk to adobe go to https://www.adobe.com/cfusion/mmform/index.cfm?name=wishform
    And, be prepared to provide a LOT more detail about your computer and project

  • Work Flow Attachments Problem

    Hi all,
    i have to create a work flow to send notifications along with attachments. I am successful in sending when there is one attachment. But i couldn't make out how to send more than 1 attachment. The attachment number may vary from 0-10. How to keep the wf in aloop? can any one help me?
    Regards
    --Raj                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           

    Hi please check the link below.
    https://app.primecontract.com/ua/webhelp/webwfp/wf_attachments_bg.html
    http://www.uiowa.edu/hr/imfo/workflow/attachment.pdf
    Murthy.

  • Problem in Work Flow

    Hi Gurus,
    i am learning Work Flow.
    now i am doing work flow which given <b>****************</b> the first one
    Building a simple Workflow application using the steps "User Decision" and "Mail".
    After entering Abbr as DEMOWF and
                         Name as Demo_WorkFlow  in Give your New a Name Task Pop-up box i am getting error
    <b>Prefix number: entry missing for system ICS client 800</b>.
    can anyone gives me any idea, if anyone clears this doubt full points will be given
    Thanks and Regards,
    Vijaya

    Hi,
    Check out for the agent assignment and the user authorization.
    Is your manager getting the message to his/her in-box for approval/reject. What is the error message he/she is getting.....
    Check out for any new roles moved to PRD system and are generated/active....
    Regards,
    Prabhu Rajesh
    Message was edited by:
            PrabhuRajesh Janardanan

Maybe you are looking for

  • Bluescreen

    I installed Windows XP on my Macbook but when ever I try to install the drivers, I get a blue screen. How do I fix this? Thanks.

  • Dreamweaver Flash not compatible with ASP

    I've build an ASP page with DW CS4 that has also a Flash element on it. When testing the page I've been surprised to see that IIS fires an error saying that is not alowed to have nested object tags in a page. And that's exactly what DW does when inse

  • A tough one for EJB experts - Stateless session bean spec question

    I am busy learning more about EJBs and came across something confusing regarding the legal operations in the various container callback methods for stateless session beans. Specifically, the EJB spec states that in the ejbCreate() method, the Session

  • URGENT question about an E7 on Orange.uk!

    Hello guys, I'm about to buy an E7 from ebay. The auction says it is locked to the Orange.Uk but I've searching and I believe that these phones are not locked! Could you confirm me if Orange.uk sim-locks their E7's? And do they "firmware-brand" them?

  • Install Elements 12 on my desktop (no disk)

    Have an upgraded copy of Elements 12 on my Desktop computer. Downloaded it from Adobe (no disk). How do I install it on my new Surface Pro 3?