After mrp run-planning file

dear gurus,
           after mrp run.planning file entry should be deleteted.if not deleted what will be the reasons for that?
             what is replanning of materials?
please through some light on this issues
                         -gide

Hi,
Planning mode controls how the system is to deal with proc proposalexisting
from last planning run which are not yet firmed in the next run.
When we are changing reqmts qty and dates for proc proposals the system
automatically take this into account.Where as if there is any change to
bom/material master whether these changes will have an effect on planning run
will be controlled by planning mode.
Planning mode is set automatically set in the planning file and also
we can override in md02.
Mode 1: Inthis mode system reactivates the existing planning data
ie the system adapts existing planning data.
ex changes to qty/dates
Mode 2 : In this mode the system reexplode tho bom for all existing proc
proposal which are not firmed if there is any changes to bom
ex changes to bom /sales order bom
changes to production version / bom explosion no
Mode 3 : Inthis mode the existing proc proposal are deleted and again recreated
ex changes to inhouse prodn time / planned delivery time/sch margin
key
Hope this will help
Regards,
nandha

Similar Messages

  • MRP Run - Planning file entry Issue

    Dear All,
    We are facing one problem in MRP Run. We run MRP in the background for a plant (MDBT) System is not creating planned order for few component. I have checked all relevant setting. I found that planning file entry is missing. I would like to know that how system can miss the material? How system creates & delete planning file entry ? I have some data related to this.
    Last MRP run date is 22-04-09
    PIR changed date on 30-04-09
    MDRE Run on the 30-.4-09 at night.
    MRP Run on 02-05-09 at night.
    Problem reported that no planned order for the material on 07-05-09.
    We have huge number of material so its difficult to check all material individually whether MRP run happend or not ?
    Please let me know the possible reason for this.
    Thanks & Regards
    Kundan Kumar

    Dear,
    If you carte materaial or uplod materail before activation plant for MRP this may be the cause for this.
    Planning File creates all the materials relevant for the planning run.
    The planning run and the scope of the planning run (which materials are planned in which planning run) are controlled by the planning file.
    For planning file entry use the following transactions,
    MD20 : Create planning file entry
    MD21 : Display planning file entry
    MDAB : Set up planning file entry in background
    MDRE : Check planning file entry Please run this in it will solve your problem
    All materials assigned with MRP are automatically entered in planning file entry.
    Depends on changes in material planning or in proposal , system will create planning file entry.
    When MRP run system will consider only which materials having entry in above contents of planning file entry. After MRP run system delete the planning file entry. And again material gone the changes like GI GR on any other demand  then system generate planning file enty again.
    Hope it will help you to understand basic concept.
    Regards,
    R.Brahmankar

  • Purchase requisition not generate for dependent requirement after MRP run

    Hello PP expert,
      In our MTO scenario after MRP run planned order generate for header material but no PR generate for BOM components, (BOM not explode) when we run MRP component level in MD02 PR generate, system showing message "40- No coverage not provided by master plan" in MD04 order tree. this problem coming after when we DIMP applied. I checked some OSS note also.
    Can any one provide right solution.
    thanks in advance.....its urgent as client requirement.
    regards,
    Amit Awasthi.

    Hi Amit
    You must select the green star for the correct answer, in order to close the thread.
    You may also select the yellow start for the helpful answers, in order to award points for those who helped you. See the blog below for more details:
    How to close a discussion and why
    I can see that most of your old threads are still open, therefore, I'd like to ask you to review and close them, by selecting the correct answer.
    BR
    Caetano

  • Planned order created after mrp run instead of purchase req

    Hi All,
    I am facing a strange problem about planned order being created after mrp run jobs runs in background instead of purchase req. This is happening randomly. In the material master MRP view 2 procurement type is F and in the varient for the MRP job the in Purchase requisition control parmater 1 is marked that is purchase requisition. Also planning file is having the entry once there is shortage and hence MRP run is there always if there is shortage of material.
    With Regards
    Tarun

    Hi Tarun,
    Please maintain the control parameters as
    Processing Key                                       NETCH
    Create Purchase Requisition                          1
    Sched. Agreement Schedule Line                   3
    Create MRP List                                            1
    Planning Mode                                               1
    Scheduling                                                     1
    Please let me know the results.
    Regards,
    satyajit

  • Schedule lines are not coming for HALB after MRP run

    Dear All,
    I am not getting schedule line after mrp run, inspite of all required setting only purchase requisitions are coming.
    Material type is HALB and involve a subcontracting process (30). For raw material I am getting the schedule line but in the case of HALB, it is not coming.
    Pls let me know if I am missing something and guide me further on this.
    Thanks & Regards
    Kundan Kumar

    Hi,
    In transaction OMDT you have to enable the indicator create schedule lines
    In MD02 MRP control Prameter here select the Delivery schedules -3- Schedule line. Processing Key as NETCH and Planning Mode - 3 delted and recreated.
    Maintain source list ME01, in that put MRP indicator as '2' i.e. schedule lines via MRP.Put your agreement no in that.
    If u run MRP properly u will get schedule lines automatically in ME38.
    Make the schedule agreement, make it source relevent in the source list make is FIX and MRP indicator as 3.

  • How system will generate schedule line for PO after  MRP run.

    Dear Experts,
                                 i have updated  MPS in MD61, the period indicator was  M (monthly),  after  MRP run, system  generating schedule  lines  on daily basis for Scheduling Agreement(ME38), i want  schedule lines   on mpnthly basis, how to achive this,
    thanks in advance.
    regards
    rajakarthik

    Hi
    1. Are you maintaining any Planning time fence period for MPS- No 
    2. What is the PIR qty you maintained in MD61:
                                                                                    i.) FG01 is having BOM  child part RM01.
                              To  produce 1 nos of  FG01 , I need 1 nos of  RM01                                                                               
    ii.) i maintained  FG01 in MD61  with PIR  Qty 5000. in MD61,Planning period is M  and planning hirizon1- jan10To 31-Jan10
           ii.)  i maintained lot size:Monthly lot size for RM01.
           iii.)  there is  no stock  available for  both RM01 and FG01.                                                                               
    3. After MRP how much qty is get planned on what date-     
         i)   planned order created for FG01 in co41 with qty-5000 nos.
         ii)  in ME38, schedule  line created for RM01,  on 01-01-2010, with 5000 nos,  currently Category of Delivery Date
    field is D and delivery date is   01-01-2010, but i want Category of Delivery Date should  be M and delivery date should be 01.2010.
    thanks
    raja

  • PR created after MRP run, instead of schedule line

    Dear all,
    I want to create schedule lines automatically from the planning run, for raw material. I have maintained info record, scheduling agreement, quota arrangements and also the source list.
    For the raw material, safety stock of 1000 nos. has been maintained. The current stock of the material is 0.
    After MRP run, based on the upper level PIRs, schedule lines are generated properly. But, against the safety stock of 1000, a PR is generated.
    I donot want a PR to be generated.
    Please suggest a solution.
    Thanks in advance,
    Shrenik
    Edited by: Shrenik on Mar 8, 2008 4:17 PM

    Dear all,
    I checked an found that the schedule agreement date does not have any effect. Even if the requirement date falls outside the date range, i am able to create schedule lines.
    I also found that if i maintained GR processing time, then always a PR is created. If GR processing time is 0, then only schedule line is created. Moreover, planned delivery time does not have any effect on the calculations, even if it is 10 days, 20 days or 900 days.
    Can someone please clarify all these? How are these times taken into account?
    Thanks in advance,
    Shrenik
    Edited by: Shrenik on Mar 9, 2008 3:04 PM

  • Automatic creation of PR after MRP run

    Hi,
    can anyone please tell me what all fields are picked up in a Purchase Requisition(PR) in the scenario of automatic creation of PR after MRP run.
    If we are using more than 1 PR type in the system how is it determined during the MRP run that the PR will be created for which type.I understand that source list will have to be created and maintained but how is the PR type determined
    Thanks in advance

    In PR the system checks for the material and vendor. See the steps below.
    Step1:Auto PO tick in material master Purchasing view (mandatory)
    Step2:Auto PO tick in vendor master Purchasing view
    Step3:Maintain Source list for vendor and material (If u r not using source list for auto PO creation, the assign the Source of supply to a PR in ME56)
    Step4:Maintain Pur. Inforecord
    Step5:ME59n : execute for PR and Vendor In ME59n, you can also select the PR document type. If you want to select different document types, go for multiple entries and enter the doc types.
    When u execute, the system will give the appropriate PRs. Select the required and convert to PO.
    But through MRP you cannot create PO directly only Planned orders can be created.
    Reward if helpful..
    Thanks,
    Srib

  • PR after MRP run

    Hi,
    After MRP run we want the valuation type system should pick up automatic in generated Purchase requisition. Can you please confirm how it is possible ?

    Hi Sun Riser,
    If purchase requisitions for materials subject to split valuation are generated within materials planning (Transactions MD01, MD02, MD03), the system does not supply a default value for the valuation type. The header record is generally used (without valuation type). This is standard behaviour please look at note  15297 Materials planning: No valuation type defaulted. Workaround is when you enter the valuation type during conversion PReq -> purchase order, an account determination is performed with the corresponding valuation type automatically
    Regards,
    R.Brahmankar

  • Defalut Document Type assignment for PR after MRP RUN

    Hi,
    I want to know we have 6 types  of different document types , i want to know after MRP RUN i want to assign a document type how to do setting for this  like for each plant i want to assign diffrent document  type after MRP RUN, also if we have not made  which will be the defalut doc. type after MRP RUN for PR
    regards,
      zafar

    Dear Zafar,
    Go to
    Spro-Materials Management-Consumption-Based Planning-Planning-Procurement proposals-Define External Procurement-MRP Group-Under Doc Type SPO you can maintain your default doc types in front of your plant.
    Now run MRP.
    It will work.
    Regards
    Utsav

  • Availability/GR Date after MRP Run

    Hi All,
    After MRP Run for perticular period, system plan the material at the start date of the period. Is there any ways where we can set it to last date of the period.
    Like if I will put the PIR for Month of March and April, system will create the PIR on 01/03/07 and 01/04/07. so is there any ways where it can be change to 31/03/07 and 30/04/07 for march and April.
    Regards
    Pavan

    Hi Pravan,
    you can configure lot size key in SPRO accordingly
    lot size procedure-p
    lo size ind-M
    Scheduling-2
    no of period 1
    assign it o material in MRP 1 view.
    Regards
    Hemant Gadhari

  • Production Order Cycle after MRP run?

    Dear PP gurus
    pl.
    Explain Production Order Cycle after run the MRP?
    thanks

    Hi,
    After MRP run you will get pl. orders for inhouse produced material.
    Double click this planned order & then convert intoi production order.
    Check the dates, material availablity,capacity availability & then click the Release (flag)icon.The order status will become REL.
    Then Save the order.
    Inmd04 you can see the new prod order.
    Now use T.code MB1A , 261movement to issue raw material (sub - components) wrt this order.
    Then use T.code CO15 to confirm the order.
    T.code CO11n can be use for confirmation by operation wise.
    Then use T.code MB31 to post the stock.
    Then delivery is made use T.code vl01n against a sale order.
    Billing is done using vf01.
    Overhead calculated using KGI2.
    Variance calculated using KKS2.
    Order settled using KO88.
    Here the cycle is completed.
    Regards,
    Senthilkumar

  • Got Unwanted PR after MRP run

    Hi,
    Can sombody give me some tips?
    The following is my perplexed thing:
    Material Strategy group is 10.
    Today is 2010-05-19, the stock is zero.
    The material's planned delivery time is 30 work days .There is a LSF requirment 500 pc on 2010-05-19.
    And also There is a 500 pc PO whose Delivery Date is 2010-07-20.
    When MRP run,we find we get a PR whose purposed quantity is also 500 pc and Delivery Date is  2010-06-18.
    However since there is a PO whose Delivery Date is 2010-07-20,we only need an Exception message number for the PO,not a PR after MRP run. In another client we can get what outcome we antcipate. But in this client we can not find where the problem is.Can somebody tell me where the problem is ?
    Regards
    chunhui

    Hi,
    Is there no exception message for the existing purchase order??
    As i u/s there would be exception message for the purchase order exception message might be 20(cancel process).
    If it is so then check the settings for reschdeuling (OMDW)  with the existing client & in the client where you are getting the result correctly.
    Check n revert.
    Regards
    Mithun

  • After MRP run, SA Deliv. Sched. Lines will be on monday, wednsday and frday

    Hi Experts,
    On the MM side creating scheduling agreements for week. When i run the MRP with parameter "Schedule lines in the opening period" i want to scheduling lines for monday, wednesday and friday in weekdays and weekly quantity of scheduling agrements will be seperated 3 equal quantity for monday, wednesday and friday.
    For example;
    Scheduling agreements 
    Date: 09.02.2012(Thursday)
    Quantity: 600 ST
    After MRP run;
    Scheduling agreements in MD04
    06.02.2012(Monday) - 200 ST
    08.02.2012(Wednesday) - 200 ST
    10.02.2012(Friday) - 200 ST
    In this scenario which badi, user exit can i use or is there any standard solving. Can you help me. This is really urgent subject.
    Thank you very much.
    Best Regards;
    baaksoz

    Hello Anup,
    Thanks for your reply.
    Actually i have already define Planning Calendar and i have assigned it in MM. The problem is i couldnt seperate the total quantity to 3 same quantity for 3 days. Here i think i can use a badi but i couldnt find any badi to use. Could you have any idea for that.
    I think i need badi for MRP run or badi for purchasing order. If you know any, could you help me about it. Thank you very much.
    Best Regards,
    baaksoz

  • How to restrict RESCHEDULING after MRP run ?

    Dear All,
    We r using prodn. strategy 30. We don't take MRP run for finished material. First we create production orders for finished material & then we take MRP run to create planned orders for semifinished material.
    After MRP run , production orders of semifinished material of previous month gets rescheduled . How to avoid this ?
    We created production orders of NOV2007.
    When we take MRP run today i.e. SEPT2007  to create planned/prodn orders of OCT2007 m/c shop plan. It shows wrong results. It is not giving right requirement for blanks .
    PL' answer.

    Hi,
    In OPPQ/OPPR increase the tolerance value to a high value.
    The system compares this value with the ( order finish date - reqmts date) and if it is greater the system do reschedules.
    Ex tolerance value -
    2
          diff bet ( order finish date - reqmts date )  -
    5
         the system reschedules.
        so increase the tolerance value to 5 and see the results. The system does not
        reschedules.
    OR in OPPQ disable the indicator for production order
    Regards,
    nandha

Maybe you are looking for

  • Mac not connecting to a wifi network when trying to reinstall OSX using Internet recovery

    Hi guys. I'm using a Macbook Air(late 2010 model) and seem to have some trouble reinstallling OSX 10.8.5 using Internet recovery. When I'm trying to reinstall the OS running the recovery mode, the wifi is not connecting. After some trials I noticed t

  • Elements 12: Watch Folder service:  Access Denied

    When trying to add a folder to the Watch Folder service, I receive the following error;            The Watch Folder service returned an error:  Access is denied. My suspicions are that this may somehow be related to Google Drive.   I'm working with f

  • LOV with 3 record groups

    I have two LOV s one in the mainform and one in the subform. If I select one category from the list in the mainform LOV. In the subform LOV has to change it's record group (3 record groups) depending on the category selected in the mainform LOV. Plea

  • Conditonal formatting with expiration date dependant on dropdown menu selection

    Hello all, I've got an interesting one for you. I'm creating a report tracking excel spreadsheet. I have to suspense the return of the report. That being said I want to find a way that I can have the row turn red if the suspense date is past but only

  • ERROR BRAIN (599): for characteristic 0FISCPER  Please enter a valid value

    Hi, We’ve an BI 7.0 System with Patch Level SP12 which is previously connected to an NW 7.0 Portal System + BI Java that has SP13 installed. We’re able to create Queries and Web Templates via Query Builder and WAD for BI 7.0 and publish to portal. Re