After production order settlement, where does the cost go?

Dear Experts,
I understand after we did the "order settlement" for production order, the cost will be settled to material manufactured from the said production order.  Say, the total cost is $10,000 to produce 1000 units of finished goods (FG), then the cost settled to each individual FG at $10 each, am I right?  Where can I see the settled cost in the material master?..
I checked in the cost center report, S_ALR_87013611, I can see the cost Credited from "production" cost center with a breakdown in settlement cost element such as machine hour, setup and personnel hour.  I understand the other side of Debit was to the production order, and only after order settlement, I'm not sure which cost center will be Debited.
That would be the CO side, how about the FI, would there be any cost posted to the GL side after production order settlement to the material?
Please advise..
regards,
Abraham

Hi Abraham,
It's not the button i mentioned. I was just trying to take u to the accounting document from the settlement screen. well just drill down the settlement screen and u'll get it. No big deal.
But more important is the concept. I'll share my understanding here. (cost by production order)
Any value that flow into controlling module should have a cost object. Here production order is the cost object.
First u create a production order (cost object) for say 1 unit of X with a std price of Rs. 10
Std price comes frm material master as a result of std cost estimate
U start production - Raw materials are consumed - 2 qty x Rs.3.
Entry RM Consumption Dr Rs. 6    Inventory Cr Rs.6 (Prod order is debited with Rs.6)
Activity (Let's say machine hours - 3 Hrs x Rs.2) According to the routing it was  2 hrs but actual production took 3 hrs.
Entry - None - But production order is debited with Rs. 6.
When production is complete for 1 qty of X, entry flows
Finished Goods Dr Rs.10    Change in Stock  Cr. Rs.10  (Production order is credited with Rs.100
Abraham, now visualise both sides of the production order. It will have debit of Rs.12 and credit of Rs.10.
Now accountant sees the production order and confirms the values are ok and puts the status of TECO to the order. which means the order is technically complete.
Now when u run the order settlement, this production order is picked up by the system (due to it's status). System sees difference between debit and credit of Rs 2.
So it cedits the production order with Rs. 2. Now both debit and credit of production order is equal (Rs.12)
Entry Price diff A/c Rs,2     Change is stock A/c Rs.2
Now this rs. 2 is settled to COPA. It does not flow to material.
Reason:  in a std costing system materials are valued at standard cost and
Hope this helps. Do revert in case of doubts.
Best Regards
Vimal

Similar Messages

  • After ripping a CD, where does the file go?

    After I insert a CD into the drive and click "import music" from the CD diretly into iTunes, where does the actual file go on my computer?
    I use windows XP.
    If I rip a cd in windows media player or something else, the actual file goes to My Music folder, where does the file go when I do it in iTunes?
    HELP!

    Thanks for the help, but that folder only contains music i purchased and downloaded from iTunes, it doesn't include music a import from CDs using iTunes.
    Can anyone help?

  • In sqlplus after a bad compile where does the show errors data exist?

    I am creating an automated deploy of code for project releases. In sqlplus I use the whenever command for sql errors but it doesn't catch bad compiles. When the process runs it runs as a dba user having the stored procs fully qualified causing the compile error not show in the user_errors but in all_errors. While experimenting I saw that another user could get a new record put into all_errors but my session when in sqlplus I still see the error from my compile from SHOW ERRORS. My question is where is the data from the show errors in my session stored and is it available for me to query so I can check for compile errors within sqlplus?
    Hope that was clear .
    Thanks,
    Ken

    In sqlplus ...You are in the wrong forum. This is for Oracle Forms.

  • After purchasing a song, where does the song go?!

    After purchasing songs on my iphone through itunes they used to go to my purchased songs in the ipod app. I updated my iphone and now after I purchase a song, I cannot find it and it is definitely not in my "purchased" songs. Anyone have any suggestions as to where they could be??

    Go to iTunes on your computer and click on "Check For Available Downloads..." under the Store drop down menu on the menu bar. If the song(s) won't download, check your purchase history on your iTunes Store Account to see if it was indeed purchased.
    As for the iPhone, try a reset (holding down the home and sleep/wake buttons until the iPhone restarts showing the apple logo screen). Ignore the red power slider.

  • Production order settlement accounting entry

    Hi,
       Can u gibve some link what is production order settlement ,  and how the accounting entry is generated,  our PP person have done the settlement in april 2010  but accounting entry are not updated in the corresponding g/l account how to check this.
    regards,
      zafar

    Production order settlement is just a process of closing the order after goods recipt (production) is being booked in system
    Production order settle the costs to CCNs from the orders. It doesnt have any entry unless under / over absorption. In that case following entry will be generated (i.e. of difference amount)
    Inventory Change Dr. To Inventory & vice a versa as the case may be of under/over absorption.
    If you go thru MB5B for the material, you will find the same without any Mvt. type.
    Hope it is clear.
    R/s

  • Production Order Settlement Process with respect to  a Project

    Hello All,
    I know about normal Production Order Settlement Process in discrete industries.
    Can anyone give me the steps for the Production Order Settlement Process if the Production Order is created with respect to a Project in SAP PP- PS Integration Scenario.
    Thanks in advance for your support.

    Hi Experts,
    Can anyone clarify my above queries.
    Thanks in advance for your support

  • Error while doing production order settlement

    Hi frds,
    When I am doing the production order settlement, I am getting the following error
    " There are no accrued amounts; settlement is not possible".
    The status of the order is TECO CNF DLV PRC BASC BCRQ GMPS MANC.
    Rajnish

    Rajnish,
    Please check if there is cost balance for the order, to me it looks like the order is already settled. In the order display mode (CO03) menu bar Goto->Costs->Balance.
    If balance exists then the problem may be related to the settlement period used in the Intial screen of transaction KO88. Please check the cost incured period and use the same period as settlement period.
    Regards,
    Prasobh

  • Costing affect with MRP at planned order level and after production order

    Dear all,
    How the costing affect with MRP at planned order level and after production order completion?
    Edited by: Maulik on Jun 24, 2009 1:59 PM

    Dear Maulik,
    check Mr. Vinod's inputs abt costing
    1. Maintain following master data:
    MM01 Material Master with Costing and accounting view. Make sure all the cost Std, Moving avg etc is maintained along with valuation class in Accounting view 1. In costing tab pls make sure "with qty structure" and "Material Origin" are ticked.
    CS01 BOM with components marked with costing relevance in Status/Long Text Tab. Also check all the qty are correct.
    CR01 Work Center in Basic data tab maintain standard value key sau SAP1 and in costing tab maintain the workcenter, activity type and formulas (Usually standard formulas like for Machine Hours SAP006, Labour SAP007, Setup Activity SAP005 is used).
    KL01 Cretae activity types, in basic data tab maintain ATyp Category AS "1" and cost element (as provided by your FI Guy).
    KP26 Activity pricing, here with the combination of Activity type and the cost center you assign price to the activity.
    2. SPRO Activity
    Maintain Costing sheet IMGControllingProd cost controllingProd Cost PlanningBasic settingoverheadsdefine costing sheet.
    OKKN Define costing variant, you define costing type (In the costing type, you define the purpose of a material cost estimate by specifying, for example, which field in the material master record the costing results can be transferred to like std price, moving avg etc), Valuation Variant (defines how the prices are prioratized), date control and transfer structure.
    3. Costing Process Flow:
    1. CK11N CREATE COSTING RUN
    2. CK24 CREATE PRICE UPDATE (You Mark and release the prce to be updated)
    4. COSTING VARIANT WRT PP
    1. OPL1 DEFINE COSTING VARIANT WRT PP
    2. OKK4 or OPN2 DEFINE VALUATION VARIANT
    3. OKK1 or OPM1 DEFINE COSTING TYPE
    4. OPL8 ORDERTYPE DEPENDENT PARAMETER (assign the above creted costing type for both planned and actual)
    Hope this will throw some light on product costing.
    Regards
    kumar

  • Production Order  Settlement After Process

    Hi,
    Explain the Production Order Settlement after the Process details.
    Plz, Advise me.
    Thanks,
    Jeevan.S

    Dear Jeyam Jevan,
    1. After Final Confirmation of Order ( Status : CNF) make GR for for order using Tcode : MIGO / MB31
    so Production Order Status will be DLV.
    2. Then complete the order technically by using Tcode : CO02--> Functions ( Menu)---> Restrict
    Processing -
    > Technically Complete. You can carry out TECO for multiple Orders in Tcode : COHV
    (Mass Processing).
    3. Over head calculation- KGI2 or CO43
    4. WIP calculation - KKAX or KKAO
    5. Variance - KKS2 or KKS1
    6. Settlement - KO88 or CO88.
    Also check this link,
    ORDER SETTLEMENT
    I hope this helps you.
    Regards
    Mangalraj.S

  • Standard table for production order settlement cost

    Hello,
    Is there any standard table available which carries the production order settlement cost?

    Dear,
    Once you do Production order settlement using T.Code KO88.
    You will find all relevant tables once RKACSHOW is executed for the corresponding object .
    Try the table is COEP
    Thanks,
    MS

  • Apple maps has received a poor performance rating just after introduction of the iPhone 5. I am running google maps app on the phone. Siri cannot seem to get me to a specific address. Where does the problem lie? Thanks.

    Apple maps has received a poor performance rating just after introduction of the iPhone 5. I am running Google Maps app on the phone. SIRI cannot seem to get me to a specific address. Where does the problem lie? Also can anyone tell me the hierarchy of use between the Apple Maps, SIRI, and Google maps when the app is on the phone? How do you choose one over the other as the default map usage? Or better still how do you suppress SIRI from using the Apple maps app when requesting a "go to"?
    I have placed an address location into the CONTACTS list and when I ask SIRI to "take me there" it found a TOTALLY different location in the metro area with the same street name. I have included the address, the quadrant, (NE) and the ZIP code into the CONTACTS list. As it turns out, no amount of canceling the trip or relocating the address in the CONTACTS list line would prevent SIRI from taking me to this bogus location. FINALLY I typed in Northeast for NE in the CONTACTS list (NE being the accepted method of defining the USPS location quadrant) , canceled the current map route and it finally found the correct address. This problem would normally not demand such a response from me to have it fixed but the address is one of a hospital in the center of town and this hospital HAS a branch location in a similar part of town (NOT the original address SIRI was trying to take me to). This screw up could be dangerous if not catastrophic to someone who was looking for a hospital location fast and did not know of these two similar locations. After all the whole POINT of directions is not just whimsical pasttime or convenience. In a pinch people need to rely on this function. OR, are my expectations set too high? 
    How does the iPhone select between one app or the other (Apple Maps or Gppgle Maps) as it relates to SIRI finding and showing a map route?  
    Why does SIRI return an address that is NOT the correct address nor is the returned location in the requested ZIP code?
    Is there a known bug in the CONTACTS list that demands the USPS quadrant ID be spelled out, as opposed to abreviated, to permit SIRI to do its routing?
    Thanks for any clarification on these matters.

    siri will only use apple maps, this cannot be changed. you could try google voice in the google app.

  • Where does the magnet go for the reed switch? (i found the magnet after . .

    My hinges had broken on the display so I replaced the display.
    After putting back the unit together I found a magnet ?
    The unit was going to sleep with the screen open.
    I assume this is for the reed switch, where does the magnet go?
    in the computer?
    I found reference to the 12" ibook G4 1.2ghz with the reed switch under "end" key and the magnet in the screen. However I found the sensor "reed switch" in my screen in the right upper side.

    I found it.
    Message was edited by: Patrick Bagdasarian

  • Production Order Settlement Question

    Hi all,
    When I create a production order and look up the material costs associated with this order I see
    Raw material 1          10.00
    Raw material 2          15.00
    Raw material 3            5.00
    Finished product 1     27.00 -
                                         3.00
    Proceeding further, I do GI to Order and finish the production and do GR to Order...  now looking at  the accounting documents, I can see the Accounting Doc for GI to Order showing 30.00 and Accounting Doc for GR to Order showing 27.00
    Now what happens to the 3.00?
    where does this amount get settled to?
    If I want the finished product to be 30.00 (10.0015.005.00) and not 27.00 (moving average price from material master) what should I do?
    Thanks,
    Kanagaraj C S

    Hi all,
    Thanks for all your replies... I started looking into replies and did some analysis... changing the Moving Average Price (V) to Standard Price (V) will change the dynamics of the material cost attributes and may have impact on the earlier determined business needs. Hence I didn't want to experiment with it. Hence I procceded to the my 2nd part of the question -
    If I want the finished product to be 30.00 (10.0015.005.00) and not 27.00 (moving average price from material master) what should I do?
    Playing around with the system helped me to calculate the finished product price to 30.00 (10.0015.005.00) and not 27.00 (moving average price from material master) for the same finished product. Here are the steps -
    Tcode - OKK4
    Select "007" - Production order - actual and goto details of this Valuation Production order - actual. Then select "Valuation with Additive Component Split" as Priority 1. Also make sure in you production order (CO01) under "Control data" in CstgVariantActl to be PPP2.
    These steps will help the finished product to take the calculated price from the underlaying components instead of the moving average price from the material master.
    Thanks for all the contribution,
    Kanagaraj C S

  • CO - Production order settlement(KO88)

    Dear SAPns
    1.Explain why the production order  actual settlement have to do.
    2. What is the financial impact (P&L and B/s) due to settlement of  production order
    3. Where/How  the actual cost is calculated?
    4.What is the benefit to do the settlement of production order.
    Anybody have document regarding above pls send me.
    My Id : [email protected]
    Regds
    Tamil

    Hi,
      Production order settlement is done to capture the variance and the WIP to the header material of production order. On execution of the settlement the entries for FI will be posted with respect to variance and WIP
    Regards
    Kaarthik.D
    Assign points if useful

  • Production order settlement in case of non valuated material

    Hello guys,
        Our client wants some of the materials have to be non valuated. These materials are raw materials and SFG also. We can assign UNBW material types to those materials.
       I have created one material for test purpose. It doesn't contain the accounting view so as no valuation class. BOM of it , doesn't contain any component as client doesn't want to show any consumption on production order.While creating the order for that material system asks for the settlement rule. I skip that step and create the order. I do GR for the same.
      My question is, is production order settlement essential for these orders? What if we don't settle the order. No activity type has been assign to the work center.
      Kindly give ur valuable inputs.

    Hi,
    No need to create material as UNBW type.
    Normal ROH, HALB, FERT material type we can achieve this.
    In the BOM of FG or SFG goto  item detail screen there is a tick mark in costing.
    Remove the tick by OS23 - BOM status.
    Now you can do your production as regular. But cost will not get update.You can do regular settlement also.
    Regards,
    Dharma

Maybe you are looking for

  • I am new to ipads. How do I set up my ipad to reject/block spam

    I am not computer literate and I just got a ipad for my birthday. I can block out advertising and other spam type of emails on my computer but am at a loss on how to do that on the ipad (mini). Can somebody advise if, and how to, as the manual does n

  • After the last update my iTunes won't connect to the store

    I'm not sure what happened but after my iTunes updated to version 10.5 I can't connect to the store.  I called in once and the person had me uninstall itunes and a few other things and then reinstall and it worked for a day and then iTunes updated ag

  • JS InDesign CS4: save document into specific location on a network

    Hi, I been able to save my document with new name, but I am not sure how to specify new network location for it. Here what I have: app.activeDocument.save (myFileName+".indd"); Thank you very much for your help. Yulia

  • Sinc to new ipod, but no videos

    i received a newe ipod, connected it to computer, itunes synced all music, but only 3 music videos. The rest seemed to have vanished.What do I do? at least 10-15 music videos gone

  • Calendar edit button is missing

    I can't delete some deadlines, becaus the edit button is missing Please help me. Sync. with macbook pro...