Aggregating requirements at a level above plant
Hi experts,
I have different plants set up in a company code. Each plant has its own material requirements. I want to group some of these plants into a "Hub" and then analyze the material requirements.
Can anyone suggest how do I map this in SAP?
Jack
Jack,
If this is purely for reporting purposes, then the simplest way would be to create <i>variants</i> for each group of plants in MCE7 or other reports.
I don't think that defining purchasing orgs. purely for analyzing material requirements for a group of plants is a good idea. Purchasing Orgs. are meant to reflect your purchasing structure and nothing more.
Hope this helps.
H Narayan
Similar Messages
-
Separate CIN (excise) GL accounts required at product level and plant level
Hi
Our client have one plant. It have two division - A and B. But excise registeration is one.
In SAP we have created two separate plants and two separate profit centers for two divisions A and B.
There are three products in A and two products in B. I believe that all CIN related settings and excise group can be assigned to a plant and not at a product level.
Now my client want product-wise stock and duty paid amount with PLA, RG23A and RG23C. Further they want to separately show clearance made without duty separately. Right now they are able to post product-wise JV in excise GL accounts so they have separate GL accounts at product level.
In SAP i believe that i cannot create separate CIN GL accounts separately for each products.
Please help. How to satisfy client's requirement.Hi,
You can develop a new report with the help of ABAPer and provide it to the client.
Regards,
Hansa Chechani -
Source list requirement at document level
Hello!
Can anybody suggest is there user exit or badi to set source list requirement on purchase order document.
I have faced following situation: materials are procured from different external vendors in different plants, to generate PR documents from MRP with fixed vendors for particular plants and set prices in PO from info records that are valid on particular date, I need to use source list. When I set source list requirement on plant level, I have to enter source list for STO items to move materials between plants also, this is very time consuming. I would like to remove source list requirement from plant level and activate source list requirement for particular document type for external procurement.
Is there Badi or exit to set source list requirement on document level?
Thanx!
Bruckewhy dont you set the source list requirment in the material master instead of plant in general.
then you just do not need to set the source list mandatory indicator for your STO materials. -
QuickTime Player requires Windows 2000 or above - Error
Running Vista 64 and get the following message: "QuickTime Player requires Windows 2000 or above." iTunes works fine, but when I try to run QT it fails. Any ideas of what the problem could be? Not in compatibility mode in either app. Running default configuration. Vista is at current level.
Thanks.I found the solution to my problem. It's actually pretty obvious, but I did have the "Run as an Administrator" option checked in the compatibility tab of the QuickTime.exe. I didn't think that could be a problem I guess, but when I unchecked it... QuickTime starting working again.
This might not be the solution for everyone with these symptoms but make sure NOTHING is checked in the compatibility tab. -
Pass on Material requirements to MRP areas within Plant
- We are on ECC 6.0 & have a scenario wherein material requirements from depots are passed on to respective plants according to the settings defined in the Special Procurement key in the Material Master (MRP View)
- The requirement from depots are passed on to the manufacturing plant & further down to the Plant in which MRP areas are defined, in the form of Planned Orders, if the stock is not sufficient at depot.
- For Subcontracting, we have various MRP areas within a single separate plant. The requirement is that PR that is generated for STO should be able to pass the requirement to an MRP area (after stock checking at MRP area level), (system to decide the MRP area to be selected for passing on the requirements).
- Currently the system is passing the requirements & checking the stock at plant level only.
- Stock determination rules donu2019t seem to work here.
- The opening up of the u2018Issue storage locationu2019 in STOu2019s by config: (u201CPurchase order-> - Set up Stock Transport order - > Set up Stock Transfer between storage locationsu201D) is yet to be tested.
- But in that case, only a single MRP area is defined for the material & therefore the requirements may flow directly to that particular MRP area. In case of Multiple MRP areas being defined for a single material, how can we ensure that the system determines a stock checking at one particular MRP area & pass on the requirements to it.
Seeking guidance as to how this issue can be resolved.
Precisely,
REQ.FRM>FLOW TO>AS (MRP element)
Depot>Plant 1>Planned order (PlOrd)
Plant 1>Plant 2>Material reservation (MtlRes)
Plant 2>MRP area of Plant 2>Transfer reservation (TrnRes)dear colleague,
Please check the following info that can be useful:
1) Note 358936 is relevant for MRP areas of type storage location and
not for Subcontractor MRP areas (which you would be knowing).
2) Secondly this note was created as an advance development and not
for any particular customer problem. It was also feasible to
develop this functionality with a small change.
3) The feature of procurement with Schedule lines for components
in subcontractor MRP areas is not available in the standard SAP
suite and there are no plans to develop this in the near future.
This feature would be an advance development.
best regards -
PM - Restric IQ02 to level of plant
HI, I need restrict teh access to transaction IQ02 (with role) to level of "Plant" (SerData), but this transaction only restrict maintenance plant and planning plant.
1) A new authorization object has been created, for this field name (B_WERK)
2) The IQ02 transaction has been changed for check this new object
3) The rol has been changed and contains this authorization object.
but the transaction doesn't consider this check...I can change the serial number of all plants.
Somebody know how restrict this?
Regards
ClaDiCaHi
I think you have posted this by mistake, check BASIS & security forum for authorisations and restrictions
Suresh -
Changing Batch Level from Material Level to Plant Level.
I want to create the batch class with the class code 22 instead of 23. As the batch class is maintained at the Material Level, not at the Plant Level. So is it possible to change the batch class from Material to Plant Level and create batch class with code 22.
Kindly suggest.Hi, Thanks for ur reply.
I have applied SAP notes and changed the batch status from material level to plant level...But still i am getting the class type as 23.
What are the next steps to be done. Currently in OMCT, Batch Level Conversion tab is active and rest all the tabs are in inactive state. so please guide. -
Process for batch level at plant level
Folks,
In case we have set batch level at plant level, how does the system reacts in case of an STO? I.e. I ship batch 1 for material 1 from plant A to plant B. In plant B, this batch might already exists as the level of batches is on plant level. HOw will the GR react? Will it create a new batch number in plant B?
Regards,
MdZHi,
Thanks for the reply. Just to be sure; in case of a scenarion in which we have an STO, an outbound delivery with message type SPED which creates the inbound delivery and copies over the batch numbers in the inbound delivery and we do a GR on the inbound delivery, the system will try to do GR for these specific batches. Will the system then also either receive the batches on the inbound delivery in case these do not exist and create new ones in case they do exist?
Regards,
MdZ -
Referancing objects in the level above the movie clip
i want to referance objects in the level above the movie clip that i have the AS in. what i mean is that i have a movie clip on the stage, and that movie clip has some actionscript in it, and that AS needs to refer to an object on the main stage, how would i do that? i have tried parent and stage 1, but neither seem to work
ok, so let's say that i have a MC on the stage, then inside that MC, there's a frame, with some code attached to it. i want to referance another MC on the main stage, can u give me some example code on how to do that please, thanks
-
Aggregate at 1 level above most granular level
OBIEE 11g
I have a table containing the following fields.
Category
Product
Sales
The Sales are aggregated at the product level. In OBIEE I would like to Aggregate the Sales at the Category level. How would I achieve this rollup to Category level.Create a dimension hierarchy with Category and Product levels.
Set the logical level of the sales fact to category. -
Restrict IQ02 to level of Plant
HI, I need restrict teh access to transaction IQ02 (with role) to level of "Plant" (SerData), but this transaction only restrict maintenance plant and planning plant.
1) A new authorization object has been created, for this field name (B_WERK)
2) The IQ02 transaction has been changed for check this new object
3) The rol has been changed and contains this authorization object.
but the transaction doesn't consider this check...I can change the serial number of all plants.
Somebody know how restrict this?
Regards
ClaDiCaHi,
when you have created custom auth object,did you link the custom object to transaction
and in transaction did you change the custom auth object to "check maintain" i.e in Su24.
And in the program, ask developer to maintain authority check statement for this custom auth object
And in the role did you add the tcode in menu tab then click on auth tab ->export mode->read old status & merge with new data.
custome object gets pulled into the role.
generate the role do the user comparsion.
Thanks,
Sri -
Change batch level from plant to material
Hi,
is there any possibility to change the batch level from Plant to Material level. system has now changed the table in material master from MARA to MARC.
Regards,
AliHi,
please check the below link.
http://help.sap.com/saphelp_45b/helpdata/en/25/2838714f7811d18a150000e816ae6e/content.htm -
Client level data & Plant level data
Dear ,
what exactly client level data & Plant level data.
In Material master Whats the reason that Purchasing is displaying in Client level data & also in Plant level data
*Client level Datas:--
Classification
Purchasing
Basic data
Storage
Plant level Datas:-
Accounting
MRP
Purchasing
Costing
Storage
Forecasting
Quality management
Sales
Regards,
Suresh.Phi
the client level data is the field data which will be common for all plants
plant level data is the field data which is plant specific
also in purchasing view many fields are plant specific
to check it just do one goto mm03
give material and only select the pur view
at now give only plant and check fields
now repeate same without plant ,at this time u will see the client specific field
the UOM is the client level filed ,it is also in mRp view but as the mrp is used for plant it is in plznt specific data
hope it clears
regards
kunal -
Icon-Start Chart one level above Nakisa OrgChart 4.1 Live
Hello
In relation to the problem specified by Sakthi Seithur: "Icon-Start Chart one level above Nakisa OrgChart 3.0SP3 Live" we have a similar problem but this time it's on version 4.1.
We have upgraded from version 3.0 SP3 to 4.1. Previously we made use of the "AllowUpLevelForRootTypeUser" trick in version 3.0 sp3 to get the icon to appear. However, now in version 4.1 the problem is back and the "AllowUpLevelForRootTypeUser" trick doesn't seem to have any effect.
Does anyone have insight into this problem on version 4.1?Richard,
I had this same issue on 4.0. It worked then didn't after a build update (to #437 on 4.0). My client raised an OSS and (finally!) today it got an update ... they issued a new build ("0901052300" i.e. #532 on 4.0 version) to resolve the issue.
I wonder/suspect that the issue might be also in the 4.1 release. I would raise an OSS to ask whether this is a known issue in 4.1 and also specify your full build number (long one on the AdminConsole screen once you've logged in and loaded a build). Hopefully they have a newer build with it fixed or can test on your build version to replicate the issue.
Regards,
Stephen -
HP Pav dv7t-6100 CTO w/Beats Audio sound system reverberates at levels above 50%.
HP Pavilion dv7t-6100 CTO Entertainment Notebook PC with Beats Audio sound system havingf volume distortion issues. At levels above 50% everything has ab reverb effect that gets worse the louder the volume. Using Win 7 Hm Prem.
This question was solved.
View Solution.Issue resolved itself.
Maybe you are looking for
-
Hi All, Database Version: 11.2.0.3.0 We have requirement below: From the java application one of our database procedure will be called, and one of the input parameter for the procedure is part_number and it can contain multiple values, so the java se
-
[Forum FAQ] How to format and combine PowerShell outputs
Format the output with "Format-Table" and "Format-list" Sometimes when we query Powershell cmdlet, we would get ellipses in the result, which is not desirable. In this scenario, we can use the cmdlet "Format-Table" and "Format-list" to view the entir
-
Photoshop CS6 - problem displaying CMYK files in the project RGB
Hello! I have a problem in 64 bit Photoshop CS6 - a new file (RGB, 72 dpi, no color profiles, mode 8-bit) images I put smart objects (images, CMYK, 300 dpi, 8-bit mode) wanting to build a small presentation for the web. These images in CMYK in some p
-
Spry Validation Text Box - Playing Nicely w/ Javascript
Greetings- I'm using the Spry Validation Text Fields in a registration form I'm designing. I really like the validation they provide. However, I'm trying to get them to play nicely with a password validation Javascript code that gets called when the
-
Hello, my name is Abhik Dhar. I am a B.Com student. I am looking for a career in accountancy+ computer application stream. I want to be an SAP FI/CO consultant. What should I do after B.Com to get this job? CA or CS ? Thank you for answering my quest