Is there any ALE transfer program available to send Work Centers?
Urgent!!!
Regards,
Sunil.

HI sunil,
Using IDoc WMTRID01, you can send data on transfer requirements from the ... However, you define the work center where the material is to be staged.
see these links
http://help.sap.com/saphelp_sm32/helpdata/en/52/16ad34543311d1891c0000e8322f96/content.htm
http://help.sap.com/printdocu/core/Print46c/en/data/pdf/CABFAIS/CABFAIS.pdf
http://searchsap.techtarget.com/tip/0,289483,sid21_gci1202078,00.html
https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/68dbab90-0201-0010-2790-a020dc38bfe1
thanks
karthik
reward me if usefull

Similar Messages

  • ALE/iDoc for Work Center data transfer

    Hello, community.
    I am working on several interfaces for the PP and PM modules using iDocs/ALE.
    One of the requirements is that only created and modified data must be distributed from R/3.
    For Work Centers, we are using basic type LOIWCS02 and message type LOIWCS. We are generating iDocs through transaction POIM, which has two transfer modes: Complete (data for all Work Centers etc.) and Change (only new and updated data).
    The Change Transfer Mode assumes you have set both Change Pointers and Change Documents for the objects to be transfered. Otherwise, it'll work just like the Complete Transfer Mode.
    Our PP consultant told me there is no configuration to generate Change Documents for Work Center data modifications.
    Can anybody give me other opinions? I'll resort to Z-table solutions only if I have no other options.

    Hi Danilo,
    Do you know what the process codes are for
    LOIWCS and LOIROU ?
    Appreciate your help.
    Thanks,
    Gopi.

  • Shift patterns for work centers

    Hi,
    I have question regarding shift patterns for work centers. We are actually utilizing the work centres in a aftermarket setup (service jobs). What we would like to do is to add shift patters to the work centers which look similar to this:
    Mo-Su 07:00-19:00, Mo-Su 19:00-07:00     4days on/4 days off/4 days on/4days off. As you see we would like it to be a rolling schedule so the first 4 working days the day shift, then 4 days off, then the next working days the night shift and so on.
    Is there a way of simplyfying this setup? The length of the cycle can only be set to a maximum of 7 days meaning I can not create a rolling schedule in a simple way. I do know that I can manually add intervals with say a seven day cycle and defining the working hours and additional create shift for holding predefined working hours and breaks.
    I have looked at shift sequences but that doesn't seem to be helpful in this scenario? The sequence seems only to be used as a sequence on a daily basis. 
    If anyone has solution for this or if you have any thought on how to process I would be very thankful if you shared these.
    Thanks in advance
    Edited by: Karimi on Aug 12, 2008 1:13 PM

    In T.code : SHR0 (zero) Shift Report overview.
    Enter Report Type and Usage as workcentre, please do the this customazation then you find workcentres in F4.
    http://help.sap.com/erp2005_ehp_03/helpdata/en/45/c9ba093c512e96e10000000a155369/frameset.htm
    Please read the information from above link this should help.
    Jim

  • Table name for work centers with production or planned orders

    dear gurus,
    can you please help me on what table names have the work centers with planned or production order

    For production Order
    1.AUFNR ---> AFKO ---> AFKO-PLAF
    2.AFKO-PLAF --> AFVC -
    >  for respective VORNR get AFVC-ARBID
    3.AFVC-ARBID --> pass as  OBJID into ---> CRHD --->ARBPL (Work Center)
    For planned orders
    1.PLNUM ---> PLAF ---> PLAF-BEDID
    2.PLAF-BEDID -
    > KBKO ---> PLAF-PLNNR, PLAF-PLNAL
    3.PLAF-PLNNR, PLAF-PLNAL -
    > PLPO -
    > for corresponding VORNR (Operation number) get ARBID pass as OBJID ---> CRHD --> ARBPL (Work Center).
    Regards
    soundar
    Edited by: Soundar on May 29, 2008 9:18 AM

  • I have FF7, but to run a program for work I need FF3. Is there a way to normally run FF7, but have access to FF3?

    I have a project required for work that is incompatible with FF7. My computer is upgraded to FF7. The program is compatible with FF3. Is there some way to have access to FF3 while keeping my FF7 for regular use?

    "SheepShaver is an Open Source PowerPC MacOS run-time environment. That is, it enables you to run PowerPC Classic MacOS software on your computer, even if you are using a different operating system. However, you still need a copy of MacOS and a PowerMacintosh ROM image to use this program. SheepShaver is distributed under the terms of the GNU General Public License (GPL). "
    http://gwenole.beauchesne.info/en/projects/sheepshaver
    Installing Mac OS Classic on SheepShaver is a struggle. There is some instability once you have completed the installation.
    Message was edited by: rccharles

  • Cost Centers for Work Centers

    Dear All,
    In our senario we have defined 30 Work Centers required.   here the Activity are only for 2 (labour, Mechaine Hr).  In KP26 we have to maintain the Standard Price.   How can we build a logic in this.  Can we create 30 Cost Centers.  Y becoz each end eavery work center have the different price for Labour.  for EX;
    WC1 - 150 Labour Cost
    WC2 - 180 Labour Cost
    WC3 - 190 Labour Cost
    Like this we have to calculate.  I hope it is required to create 30 Cost Center to assaign wot Wrok Centers.  Here we are going to KP06.  We have a standrd pirce to calculate.
    Regards

    Dear Raj,
    IF the business is interested in capturing using different cost centers means then you can create individual cost center and
    assign it to the work center and define the rates in KP26.So only one activity type will be there but different cost center.
    The otherway is creating multiple activity types say LABH1,LABH2....and creating different rates for the activity type ans same
    cost center combination in KP26.But here the challenge is you have to assign the activity types properly under costing tab
    against the formulas.
    Check and revert back with your queries.
    Regards
    Mangalraj.S

  • Collective export of available capacity for work centers

    Experts,
    I am looking for a way to collective export the available capacity for multiple work centers for a plant.
    Data should be based on periodes and intervals&shifts determind in CR12.
    What might be a good way to do that ?
    Thanks in advance
    Jörg

    hi,
    this is no Standard report kind avaliable in SAP, but u needto develop the requirement. Its the best way which I feel is achievable.
    thanks
    svrsap

  • Split Individual Capacity for Work Centers

    In Capacity Leveling for Individual Capacity (CM27 & CM28), what is the process in setting up individual "persons"?
    What I would like to do is take an individual work center and divide it up into several different areas.  I would like to treat the individual 'persons' as listed in Individual Capacity as those different areas I would divide my work center up into.
    However, I have no current setup for personel available and when I go to assign a 'Person' to a specific quantity for my work center, there is "no persons found for the work center".
    Where do I go to setup individual "persons" for my work center, and is this a realistic way to divide my work center up?
    If not realistic, what method would you recommend to split up the work centers?
    Edited by: Cameron on Sep 21, 2009 3:06 PM

    Hi,
    The best way to learn all these settings is studying the documentation in the IMG itself.
    Still id you need the link or documents to read
    "http://help.sap.com/saphelp_47x200/helpdata/en/b1/c03e4a439a11d189410000e829fbbd/frameset.htm"
    Read the documentation step by step....
    I hope this will help you.
    Thanks
    Raja

  • Linearity for work centers.

    Hi Fox,
    I want to customize a report that can show Linearity of all work centers.
    A future measure/metric that we would like to use is measuring Linearity on a daily basis for each work center.It's basically checking our ability to build what we're supposed to build on a daily basis. 
    For example, if we have 4 assemblies due that day and we only make 3 of them, then our Linearity is 75%.  Conversely, if we have 4 assemblies due and we make 5 (built one a day early), then our Linearity is still 75% because get 'penalized' for overproducing. 
    Will you guys help me to proceed for this.
    Thanks
    AKG

    confirmation tables:
    AFFW Goods Movements with Errors from Confirmat
    AFFWPRO Log of deleted AFFW entries
    AFRC Incorrect cost calculations from confirmat
    AFRD Default values for collective confirmation
    AFRH Header information for confirmation pool
    AFRH_DEL Backup Copy of Header Information for Conf
    AFRP0 Table of planned changes for confirmation
    AFRP1 Table of planned changes to conf.: Automat
    AFRP2 Table of planned changes for confirmation:
    AFRP3 Table of planned changes for confirmation:
    AFRP4 Table of planned changes to confirmatn: Da
    AFRU Order Confirmations
    AFRV Confirmation pool
    AFRV_DEL Backup Copy for Confirmation Pool
    AFWI Subsequently posted goods movements for co
    CORUUSR User Settings for Confirmation
    TAFWD CORU: Messages that are not interpreted as
    TCORD Table for field-dependent check routines
    TCORU Parameters for Order Confirmation
    TCORUPBTXT Customizing Single Screen Entry Confirmat.
    TCORUSSDEF Customizing for Single Screen Entry of a C
    TCORV Table with Routines for structureing varia
    TCORW Confirmation: Window Control
    TPARU Control parallelized confirmation processe
    TPRRU Control table for process chain for confir
    TPRRUT Text table for process control of confirma
    Or simply go to SE11.. click F4.. and click SAp applications. In that expand PP.. oyu will get all the tables for routing and confirmation..
    hope this helps..
    karthick

  • HR assignment for work centers using IR02

    Hello everybody,
           Need some technical help from all regarding issue mentioned below:
    I need to do HR assignments to work centers.
    Is there any function module available which does HR assignments to work centers.
    There's one which I found : COI2_WORKCENTER_HR_ASSIGNMENT, but I'm not able to understand the parameters we need to pass on to this FM.
    Please help me if anybody has used this FM.
    Also alternatively if any other FM is available plz. let me know.
    Help will be highly appreciated.
    Regards,
    Kavita

    Hi kavita,
    plz check the FM   "COI2_PERSON_RANKING".it uses the FM "COI2_WORKCENTER_HR_ASSIGNMENT" inside it..check the same.
    Regards,
    Nagaraj

  • Costing Formula SAP_09 for Work centers

    Hi Gurus,
    In OP51, we have a PARAMETR (for work centre formula) SAP_09 . It picks values from a Filed  "MGVRG" . I am not able to trace where this filed comes from in a Rtae routing or Work centre.
    Can somebody please advice me where MGVRG comes from  .
    Your fast reponse would be apprciated
    THNX in ADvance

    Assigned to PP thread

  • ALE Link for cost centers

    Hi,
    I need to send the cost centers from one system to another. I want to use BD16 (IDOC) for the same but both these systems have different controlling area. BD16 works only when both the sender and receiver have same controlling area.
    Can you please suggest me how can I still transfer the cost center to another system which has different controlling area?
    Thanks
    Chhavi

    Hi,
    Based on your post, I think you should have the INBOUND IDOC configuration in the legacy system done.
    My suggestion is:
    1. Find the process code for the INBOUND IDOC, there should be a FM binded with this process code
    2. Usually, SAP INBOUND IDOC FM will have enhancement in side, in other word, user exits
    3. Once you found the exits, you may implement the code to switch the controlling area to the right one
    On the other hand, considering the cost centers are master data, you may try the change pointers.
    As I remember, there are some convertion rules you could set up.
    Cheers,

  • Inbound ALE Setup for Work Orders in SRM

    Hi Gurus,
    I need help on Inbound ALE Setup in SRM.If i have Inbound Idoc available at SRM side, what needs to be done for ALE configuration so i can post this data to corresponding application documents.
    Which message type, Process code i need to use??Please suggest me.
    Thanks in Advance.
    Regards,
    Manoj Tiwari

    Hi Manoj,
    If you really want to use IDOCs, you'd better post this on an ABAP/ALE forum to get ALE/IDOCs gurus :p.
    But the integration of WO in SRM can be done using the standard process for "External requirement": then have a look on this thread: Work Order needs to move from CRM to SRM/EBP Shopping Cart
    Regards.
    Vadim

  • C# programming for work with some OS files

    hi . i want to write a program with C# language. i want to know that when we start laptop , when we shot down it and along this time witch app we use and how many second we spend on it.
    i don`t know to how to start . please help me

    You need to write a program that gets called automatically gets run as a service on the PC when the computer is turned on.  See webpage below
    http://stackoverflow.com/questions/7764088/net-console-application-as-windows-service
    jdweng

  • I have a program that I have to use for work and it will only run in firefox 4.0. I can not find it anywhere please help.

    I have uninstalled my 19.0 firefox to download the 4.0 for work and every 4.0 that I have found to download ends up downloading 19.0. I hate that I have to downgrade so much how ever I have to have the program for work. Please help. Thank You Catina with Nexgen Software Services

    You can install a portable Firefox (ESR) version to access websites that do not work with the current Firefox release.
    *http://portableapps.com/apps/internet/firefox_portable
    *http://sourceforge.net/projects/portableapps/files/Mozilla%20Firefox,%20Portable%20Ed./
    *http://sourceforge.net/projects/portableapps/files/Mozilla%20Firefox%2C%20P.E.%20Legacy/

Maybe you are looking for

  • Help!!!! i cant update and also my phone wont show up in itunes now

    i downloaded the software update and it started preparing the phone to get the the update and then it said that there was an error so now it wont show up in itunes help me thanks

  • Yosemite crashes Powerpoint

    Since loading Yosemite on my 27-inch late-2012 iMac, every time I try to open a Powerpoint document, the program crashes.  Any ideas?

  • In string comparisons

    Hello, I'm new to java and was wondering how I could do an in-string comparison. I.E. check if the string "the" is in "here is the". In ASP you can write inStr(string 1, string2) and I was wondering what the JSP equivalent was. any help is appreciate

  • JOIN is repeating values

    Hell All, I have following problem table 1 as F1 F2 a x b y c z table 2 as F1 F2 F3 a x 1 i am looking for result something like this F1 F2 F3 a x 1 b y c z actualy my table one is a parameter table and table 2 is parameter values table i need to cre

  • Preventing

    "IllegalStateException: response already committed.:"       But not always--it's worked on occasion.           I open a connection to a database to do an INSERT, QUERY, and INSERT early on.      I go to a couple of static pages.      I then begin a s