Alerts or task integration in to UWL from PI

Hi,
           Could any one tell me what are the different ways to send alerts or tasks in to UWL from PI.Also please let me know different ways of configuring PI to integrate with UWL in EP.
Thanks in advance.

Hi,
You can Reffer these Blogs for Help
/people/bhavesh.kantilal/blog/2006/07/25/triggering-xi-alerts-from-a-user-defined-function
/people/michal.krawczyk2/blog/2007/04/26/xipi-throwing-generic-exceptions-from-any-type-of-mapping
/people/michal.krawczyk2/blog/2005/09/09/xi-alerts--step-by-step - Alert Configuration
/people/michal.krawczyk2/blog/2005/09/09/xi-alerts--troubleshooting-guide - Trouble shoot alert config
/people/aravindh.prasanna/blog/2005/12/23/configuring-scenario-specific-e-mail-alerts-in-xi-ccms-part--1 -- ccms alerts – 1
/people/aravindh.prasanna/blog/2005/12/24/configuring-scenario-specific-e-mail-alerts-in-xi-ccms-part-2 -- ccms alerts – 2
/people/aravindh.prasanna/blog/2006/02/20/configuring-scenario-specific-e-mail-alerts-in-xi-ccms-part-3 -- ccms alerts --- 3
Alerts with variables from the messages payload (XI) - UPDATED -
/people/michal.krawczyk2/blog/2005/03/13/alerts-with-variables-from-the-messages-payload-xi--updated
http://help.sap.com/saphelp_nw04/helpdata/en/49/cbfb40f17af66fe10000000a1550b0/frameset.htm
From HelpFile
Regards
Seshagiri

Similar Messages

  • Alerts, Notify and e-mail using UWL from BPM tasks

    Hello experts,
    Can we activate UWL alerts and notifications for bpm human tasks ?
    For example, when a task needs to be completed and the user doesn't not make any thing, can we send an UWL Alert or message that appears to a supervisor role?
    Regards!
    Julio Cesar

    Julio
    I dnt think this is possible out of the box in UWL..However in BPM you can do the following..
    For the BPM Human Tasks you are concerned about, assign it a deadline/timeline..Create the timeline boundary event on the human task..Then assign an BPM email notification activity to the Boundary event..So during runtime, if the user does not complete the task within the timeline, it will trigger the boundary event and then an email will be triggered from the BPM (you can select the recipients as required).
    This should work for your requirement.
    Sandip

  • Service cannot able to open in UWL from the ESS tasks

    Hi Team,
    I'm facing a  issue like
    path: MSS --> work overview --> tasks --> click on any link.
    we got the following error.
    Service cannot be reached
    What has happened?
    URL http://<hostname>:8001/webdynpro/dispatcher/sap.com/ess~lea/LeaveRequestApprover call was terminated because the corresponding service is not available.
    Note
    The termination occurred in system GCP with error code 404 and for the reason Not found.
    The selected virtual host was 0 .
    What can I do?
    Please select a valid URL.
    If you do not yet have a user ID, contact your system administrator.
    ErrorCode:ICF-NF-http-c:000-u:SAPSYS-l:E-i:gccia-erpn01_GCP_01-v:0-s:404-r:Notfound
    HTTP 404 - Not found
    Your SAP Internet Communication Framework Team
    I have check forum thread
    Service cannot be reached in UWL from the ESS tasks
    but I'm not able to find out the solution.
    Any help will be appriciated.
    Regards,
    Mahee.

    i said to you that it shouldnt point to ABAP system!
    read my solution again
    Please ensure system configuration-
    >system landscape->system(my system)->Web Application server settings
    please check is it pointing to ABAP Server, If yes then change to Java
    server then your Application will work.
    The two types want different WAS properties. Now if you set
    up the WAS so that the BSP works well. There is a possibility that you
    can modify the WAS settings when you use WebDynpro launcher. You have
    three possibilities to change this:
    1. In the UWL connector settings modify the "Web Dynpro Launch System"
    property to SAP_LocalSystem. This case the webdynpro uses the URL and
    the port of the portal.>> I think this can suit you.
    2. In the System Landscape create a new system with the same properties
    as the R3_TEST1 but the WAS properties are different. After that you use
    the name of the new system as "Web Dynpro Launch System" in the UWL
    connector settings. This solution should be used if the SAP_LocalSystem
    is different than the necessary WAS settings.
    3. You can modify this setting in the configuration also under the
    ItemType. You should add the system property and the UWL uses it instead
    of the default one.
    Here is the help documentation:
    http://help.sap.com/saphelp_nw70/helpdata/en/92
    /a88931f2dd4631b9e8d530697d89c9/content.htm
    in regards to this parameter.

  • Completed Task cannot be launched again from the UWL.

    Here is the situation.
    The identified agent clicked the task in the UWL.
    Task was launched in a new window and opened an ABAP webdynpro application correctly.
    Agent then approved the task using the approve button in the application. Task was thus completed.
    Now the agent pulled the "Completed Tasks" from the Show dropdown on the Tasks tab in the UWL.
    The task which the agent approved earlier showed up.
    But when the agent clicked this link in the UWL. The application would not be launched again.
    The task preview does appear but the agent wants to the same application form displayed again to confirm what they have approved.
    Any ideas how this can be done. I remember we could do that in the PCR application on ISR framework.
    Edited by: Linkin Pereira on Dec 5, 2008 7:12 PM

    I did some investgation and figured out that there is no standard way to invoke an already completed Task.Therefore for our requirement I have proposed a new solution.
    I am storing the Workitem Id, when the task gets created, in a custom table along with all the data which is necessary for the I-View display.
    To enable users to open the I-View of the task they already completed and take a print out of the I-View etc, I have designed another application. and in this application I am using the Workitem Id to read which completed task they want to view.
    See if this works for you.

  • Using UWL from a non sap system

    We are intgerating OTM (Oracle transportation management system) with SAP.
    We need to have a single point where the users track all their norifications.
    Is it possible to add notifications (task or error) into sap UWL from a non sap system.
    If yes what are the main steps to do it?
    Which set up must be done in SAP UWL to manage this?
    Thanks in advance
    Regards

    Do some searches about "UWL custom connector" or "UWL custom connector API". You should find pretty good documentation about this subject.
    Regards,
    Karri

  • Posting entry in UWL from XI

    We are trying to post an approval request entry in a UWL from XI.  I'm using a BPM that makes an asynchronous call to an abap proxy in my abap client.  The BPM executes successfully.  The problem is the proxy call doesn't execute the code in the proxy (EXECUTE_ASYCHRONOUS).  I've done traces that show that the BPM is getting to the abap client, but I can't see what it is doing once it gets there and it doesn't post anything to the UWL.  I've tested the proxy to manually post something, so I know the proxy code works.  I just don't know why the proxy isn't being executed.  Can anyone provide assistance on what to look at next?
    Thanks,
    Keith

    Thank you all for your prompt responses.
    Yes, There are entries in SXMB_MONI in the XI client that show that the asynchronous call has been completed successfully (checkered flag).  There is an entry in SXMB_MONI in the business system that shows the proper BPM as the sender service.  This entry has a green flag instead of a checkered flag.  So I can tell that the message is successfully being received in the business system, but it appears to stop at that point.
    I see no entries in the queues in transaction SMQ2 in either the integration server or the business system.
    I'm looking though the blog "How do you activate ABAP Proxies?" to see if there is anything missed.
    Any other suggestions?

  • Alert when Tasks Overdue

    Hi All,
    I have a problem when create the new tasks in the SAP Portal for deadline yesterday, I need configure for each hour , and day after for this task send the mail, but these configure don't send the mail.
    How to configure for before and after send the mail for the assigned in the Tasks??
    We need configure these steps for recursive time??
    Roberto

    Patricio,
    I see documentation the UWL and it's possible configuration the alert when tasks overdue , without the using Guided Procedures.
    I search these documentation, because, I will need configuration for example send mail each hour when the task is overdue
    Best Regards
    Roberto

  • How to migrate UWL from EP6 to EP7

    Hello,
    We want to migrate UWL from EP6 to EP7. Is enough task to transport the customize XML file that is located in UWL?
    Is it necessary to upload to EP7 the rest of attached documents? How?
    Thanks,
    Marta.

    Just install the same way you did originally.  Download/install the desktop application, sign in, install the subscription application(s).  You are allowed to have two working installations so you can keep the original intact if you like.  If you prefer not to then you should sign out of the old installation as a minimum.
    Creative Cloud for desktop
    https://helpx.adobe.com/creative-cloud/help/creative-cloud-desktop.html
    Sign out, Sign in | Creative Cloud desktop app
    http://helpx.adobe.com/creative-cloud/kb/sign-in-out-creative-cloud-desktop-app.html
    Activation & deactivation help
    https://helpx.adobe.com/x-productkb/policy-pricing/activation-deactivation-products.html#a ctivate-how-to
    Install, update, or uninstall apps
    http://helpx.adobe.com/creative-cloud/help/install-apps.html
    Installing Creative Cloud Apps
    http://tv.adobe.com/watch/cs6-creative-cloud-feature-tour-for-video/installing-desktop-app s-from-creative-cloud/

  • Substitute tasks not shown in UWL but available in SBWP

    Hi, I am trying to test substitute functionality in our custom iview. I have added code(available in attached file) in UWL XML which shows Manage Substitution button and substitute tasks are shown in SBWP but not in UWL.  What else I need so tasks show up in UWL? Thanks in advance

    Nilesh Telkikar wrote:
    Is there any authorizations required in portal to add substitution?
    page 14, http://www.sap-press.de/download/dateien/1461/146_leseprobe.pdf
    Nilesh Telkikar wrote:
    I see entries in SAP table HRUS_D2 but portal table KMC_WF_SUBSTITUTE is empty when I add substitution.
    sorry, Im not familiar with the table. But regarding your expectation of new entries, did you saw that already?:
    UWL FAQ - Business Process Expert - SCN Wiki
    Substitution - Getting Started - Using SAP Software - SAP Library
    regards

  • Integrating ADF Business Components from heterogenous data sources

    Hi all,
    has anybody experience in integrating ADF Business Components from heterogenous data sources like ViewObjects from a DB2 database as LOV in a ViewObject from a Oracle 11g?
    What is the best practice approach to integrate such different ADF Business Components in declarative and programmatic ways?
    Thank you!

    thank you for the answer! We already updated out BC according to http://www.oracle.com/technetwork/developer-tools/jdev/multidatabaseapp-085183.html
    The DB2 ViewObjects are exported as ADF Libraries and imported in the BC of the project with Oracle DB ViewObjects. In the root AM I created instances from the imported DB2-ViewObjects as well as from the Oracle-ViewObjects, but when I start AM test environment it takes the preconfigured Data Source of the root AM. So I probably will pesneed to create two AMs for the different ViewObject types and for the two connection types. My question is what will be best practices to use data from the DB2-VO of AM_DB2 in the OracleDB-VOs as part of AM_Oracle? Should it be done only programmatically or can it be done also declaratively and any suggestions how to proceed?
    Thank you!
    Edited by: nbo on Jun 3, 2012 2:53 AM

  • Each time I try to start iTunes after it was closed, it wouldn't start. I have to go to the Task Manager delete Apple Push from processes and only after that iTunes statrs again. What is wrong?

    Each time I try to start iTunes after it was closed, it wouldn’t start. I have to go to the Task Manager delete Apple Push from processes and only after that iTunes statrs again. What is wrong

    Did you manage to get it working mine disappeared after I while I managed to download it but now my laptop/iTunes won't recognise my iPhone!

  • How can we call a task in process definition A from Process definition B

    Hi,
    Is that possible to call a task in process definition A from Process definition B?
    Thanks.

    Sure, as long as you can come up with the correct query to lookup the task key for the task you want to run.
    provIntf.addProcessTaskInstance(taskKey, processInstanceKey);
    -Kevin

  • Workflow task details are being retrieved from the server

    Hi,
    Using an approval workflow. when the task has been assigned to the person he is getting an email but when clicking on the edit this task button ,the pop window with the
    "workflow task details are being retrieved from the server" 
    error is getting. SharePoint site 2007 and Microsoft Outlook is 2010.

    I have a similar issue with my version of SharePoint. 
    SharePoint 2010 Enterprise.
    Outlook 2013 with MS Exchange
    Document approval workflow.
    When you open the document approval email that comes from SharePoint and click on "Open this task"  the popup window flashes across "workflow tasks details are being retrieved from the server ".
    I've tried the regedit fix and the hive fix and resetting IE that some of the other people have said that works and it doesn't. 
    When I go the site, and connect the task list to Outlook, I can complete the task that way.
    I also created a new approval workflow in SharePoint designer and it behaves the same way.
    Anything else I should try?
    == Steve Morley MedIT, Dalhousie University

  • What is the best way to manage tasks?  I have moved from outlook and only have mail and ical

    What is the best way to manage tasks.  I have moved from a pc with outlook and have lost 'tasks' in that programme.  Do I have to rely on ical or can I download an app to manage business tasks?

    iCal does have reminders but its implementation of tasks is pretty wimpy. There are a number of programs that are better geared to the job. I was a level 4 procrastinator until I discovered Getting Things Done and for me Things is perfect. It lets me handle projects which are dependent upon multiple tasks in a no-nonsense easy fashion. Much less expensive and really not much more than a list maker is Wunderlist. Thankfully there's a ton of shareware offerings - check out MacUpdate.com and see what works for you.

  • Copy items(like task list, pages..) from one workspace to anothe

    How do I copy items(like task list, pages..) from one workspace to another?
    I am the admin for both the workspaces, but I am not the oracle workspace administrator.
    Thank you

    Anonymous,
    No this is not a bug. Working with multi-select lists or any item which stores colon delimited values can be tricky to work with in APEX. There are a few work arounds for this. One is to replace the colons with something else like you described and then replace the colons on the landing page. Another solution is to send the primary key for that record and have an automatic row fetch or a computation pull the colon delimited value.
    Cheers,
    Tyson Jouglet

Maybe you are looking for

  • Expanding design elements with text?

    I'm developing the following page of a client's site: http://www.dancingeyes.com/prackart/profile.html and I'm wondering if it's possible to have a specific section of the page layout expand vertically as needed (for text overflow due to browser font

  • Oracle patch set 10.1.0.4  or patch #3895738

    I need to apply either Oracle patch set 10.1.0.4 or patch #3895738 (on top of 10.1.0.3) for Sun Solaris as suggested by Metalink Note: 283107.1 I cannot find either one by using Metalink Patches search. Where can I find them?

  • While Updating Item master 1250000088 - Date ranges overlap; change the active or inactive date range

    hi. i am updating item master. just i am trying to update to inactive from active i allready given the date ranges but above error is comming..         Dim vItem As SAPbobsCOM.Items                     Dim RetVal As Long                     Dim ErrCo

  • One so-two po

    Hi, I have one sales order for 100 qty. While MRP run I want system should create two planned ordesr for 50 qty each for two different plants. How can I configur for this scenario? Ex I have two silmilar plants and same material is maintained in both

  • Converting files to MP3s

    Does anyone know how to convert different files to MP3s? (Does anyone have a good program?) I need to do this in order to play a lot of my music on my phone Thanks