All the creation dates for my files are wrong?

I've had this problem for a long time but I finally want to fix it once and for all. All the documents, pictures, and other files on my computer have the same creation date - 1/5/09. When you right click a file it shows the correct creation date but if I just left click it then it shows the wrong date. is there a way i can fix it?

The creation date of your system will be the same for most of your system documents; there's easy no way to change this information. However, you might also see a more current date, indicating Modified information, and that will be more current.
There are computer commands that will blank out much of your system data, but that's to be done in cases of major problems. Don't worry about the creation date of your computer/data.
Post here if you have addtional questions, comments, praise!

Similar Messages

  • Used to convert all my videos into iPhone mp4 format using Any Video Converter - then add it to my iPhone 3GS. But last few days, I cant add video files to iTunes. and the iTunes doesnt even specify the reason except for that "files are not supported"

    Everyting was perfect earlier. Used to convert all my videos into iPhone mp4 format using Any Video Converter - then add it to my iPhone 3GS. But last few days, I cant add video files to iTunes. and the iTunes doesnt even specify the reason except for that "files are not supported"
    Everything is fine.
    -They are the right format
    -Quicktime is updated
    -I have tried simply dragging them into the 'movie' library
    -I have tried going to file<add file to library
    Nothing works, has anyone else had this problem and found a way around it?
    Any and all help appreciated.

    In addition to Mike's suggestions,  you only have 4GB of RAM and Mavericks does use more RAM than other versions. You may also want to look at the apps that startup on login and the possiblity of upgrading RAM.

  • When I look up the creation date for files on my Macbook I get the date and month in brackets, but not the year.  Why is this and how can I look up the year?

    When I look up the creation date for files on my Macbook (using "get info", or the information window in Iphoto) I get the date and month in brackets, but not the year.  Why is this and how can I look up the year? 

    Does the Date Modified column in a window set to List view show the date correctly, or does it also display it incorrectly?
    To add additional columns to a Finder (folder) window, with that window open and active open the View Options for it. You can do that by pressing Command-J or by selecting View Options from the View menu in the main menubar.

  • Ok... i am trying to sign into my apple account in the itunes store on my ipod and i have all the correct data for my credit card and it says " your payment information does not match your banks records. try again or nenter a new payment method. " help me

    ok... i am trying to sign into my apple account in the itunes store on my ipod and i have all the correct data for my credit card and it says " your payment information does not match your banks records. try again or nenter a new payment method. " what does this mean and how can i fix it??

    - See:
    ]iTunes Store: My credit card's security code or zip code does not match my bank's records
    - If still problem contact iTunes by:
    Contact iTunes

  • How to find the creation date for a released requests..

    Hi friends ,
    In se09 tcode , we a date which represents the last changed date .. Now , for a particular Released request i want to find out the Creation date for it . How can i find it . I checked the tables like E070create there also we have requests that not released yet , i have also checked se03 and other tcode and a fn mo dules like TR_READ_GLOBAL_INFO_OF_REQUEST .
    So how to find the creation date for a released requests. Iam waiting for ur inputs..
    Thanks in advance..

    hi,
    Did u found the way to get the request creation date?
    I also need the same information.
    This needed for audit purpose........so it is must.
    Please help me in this.
    Best regards,
    vinod

  • Is there a way to change the Digitised Date for Mov files in Lightroom?

    I am scanning some old photos.  Unfortunately Programs such as Dropbox and OneDrive display Mov files by their digitised Date.
    Consequently, My scanned photos are shown by the date that I scanned them. I can not seem to find anyway in LightRoom to change the Digitised Date so that they are shown on OneDrive/Dropbox in the correct order on my iPad.
    Any help would be appreciated.

    Your subject line says "Mov files" (which are video files), but your message talks about scanning old photos.  I'll address the old photos issue.
    Because there are so many dates/times associated with photos, and because every program feels free to use its own names, it's critical to be pedantically precise about terminology. The date/time a photo was originally taken (when the shutter was pressed) is called Date/Time Original or Capture Date. The date/time a photo was transferred to digital media is called Date/Time Digitized (when the analog file was scanned or when the digital-camera shutter was pressed). 
    A good rule of hygiene is to ensure every photo has a Date/Time Original (capture date).  Typically only digital archivists care about maintaining Date/Time Digitized.  If you ensure that every photo has a Date/Time Original, then pretty much any modern app and Web site will order your photos correctly.
    In LR, you set Date/Time Original using the Metadata > Edit Capture Time command.  By default, LR won't write the capture time back to the file's metadata, so depending on how you are transferring photos to other programs, the capture time won't necessarily get transferred.  So you either need to do Metadata > Save Metadata To File, or better, set the option Catalog Settings > Metadata > Automatically Write Changes Into XMP.
    Unfortunately, LR's Edit Capture Time isn't very flexible with dealing with scanned photos in which the precise date/time is not known.  So some people like to set an entire batch to, say, 1963/10/01 00:00:00, while others like to have each photo set in increasing increments of 1 second, so that programs will at least maintain the known relative ordering (which comes from the film or slide ordering).   To do that, you'll need a third-party plugin, e.g. ExifMeta or CaptureTime To EXIF.

  • AE not reading all the XMP data from DNG files

    I'm working on a very large time-lapse for a construction company - I have a sunset that is broken between two folders and rendering the folders seperately makes Quicktime unhappy during playback and I get an ugly jump in sunset exposure.
    So I combined the two folders in Lightroom (LR) from my RAW files (NEF) and exported the entire sequence as DNG files with simpler numbering. The sequence is about 1560 files and constitutes about 22 GB of data. I created a new LR library from the DNG sequence to make sure it all looked good and it does.
    I imported the same DNG sequence into AE, checked a few frames in the preview and sent it out to render. Two thirds of the way through the QT movie, exported in H.264 at 30 fps, I start seeing problems. Huge sections look like the XMP data has not been read, then there's a good section and then bad again. I matched the movie time to preview in AE and indeed saw the same problems in the AE preview. So the problem begain in AE's reading the files from the folder, not in rendering.
    I went back to LR for file comparison. There was no problem in LR. All the DNGs look great.
    I'm on a MacBookPro Retina with 2.8 GHz Intel processor, 16GB 1600 MHz DDR3 Ram and NVIDIA GeForce GT 650M 1024 MB graphics
    I have the standard 69GB cache on an external drive and have 11GB RAM available for AE.
    Installed CPUs =8
    CPUs reserved for other apps = 2
    RAM allocation per background CPU = 1GB
    Actual CPUs that will be used = 6
    I have the latest AE from the Adobe Cloud, although I haven't done the most recent update yet.
    My thought was to break the folder up into smaller segments for rendering, but that's not the problem. I see the XMP hasn't been consistantly read in preview. To me it doesn't make sense that the folder is too large for preview because it's not even rendering it there, just reading the files...?
    Any insight, solutions?
    Thanks,
    Dennis

    Moominman wrote:
    I am basically trying to export xmp files from a set of low resolution dng files so that I can access my Lightroom edits in the RAW files. I have separated the RAW and dng files in different folders
    Hi Andy,
    I dunno how best to get extracted xmp files into the raw folders, but if you are comfortable with exiftool, you can use it to extract xmp sidecars from DNG files.
    If you want a turn-key solution which does not required you to futz with exiftool, then consider a free plugin I wrote:
    robcole.com - xEmP
    It will allow you to create xmp sidecars with all your DNG adjustments and metadata (which can then be applied to the non-dng raw files).
    However, if you won't need the DNGs in your catalog afterward, then the easiest way is to convert them back to proprietary raw format using this plugin (also free, and I wrote it):
    robcole.com - UnDNG
    Conceptually, you can think of it as converting the DNGs to proprietary raw format, but note: it doesn't convert anything, it just allows existing raw files that are NOT in the catalog, to replace the DNGs that are in the catalog. All adjustments and metadata and everything else will be preserved (just like when you convert a proprietary raw to DNG format).
    Rob

  • How to change the created date for a file?

    I searched and found someone had asked this question last month, and an answer given was to try the site:
    http://danilo.ariadoss.com/howto-change-date-modified-date-created-mac/
    which I had previously found. However, when I follow the instructions I get a message stating "-bash: -t: command not found"
    I have gone through this numerous times, always with the same result. Is it possible that the direction given are not valid for Snow Leopard?
    Thanks for any help.

    First, thanks to both of you for helping - I hadn't realized that the 'touch' was part of the command itself. However, when I type in:
    touch -t 0904131115/Users/RobertFately/Desktop/suttonallen/suttonallen.jpg
    to test the procedure (there is a jpeg file I made today named suttonallen inside a directory of the same name) I get this error message:
    touch: out of range or illegal time specification: [[CC]YY]MMDDhhmm[.SS]
    This happens if I use the full year (2009) or just the last two digits (09) as seen above. My thinking is that I am attempting to redate the "create date" to April 13th of this year with an arbitrary time of 11:15AM.

  • The release dates for some ablums are incorrect.

    Some of the albums in iTunes have the wrong release dates posted. See tag, this album just came out in 2011.

    Bri,
    Suggest you just download 1.6 and take a quick run through the tutorials http://java.sun.com/docs/books/tutorial/ to pickup the basics again... you'll probably need a bit of a refresher course anyway if you're going back into coding for a living.
    But what you've really missed is the standard hugemungious leaps in the open source libraries over the past few years.
    I don't think the release notes are really worth reading, unless you're being paid to do it of course.

  • IPhoto has changed the creation dates to all of my photos

    I recently bought a new MacBook Pro, my first computer since my iMac circa 2005. I've successfully transfered all of my photos to the new computer, but iPhoto has changed the creation dates of every file, so they're no longer in chronological order. I've used DVDs and Dropbox, I've exported the files, copied the data files from the hard drive, everything, but the result is still the same. I contemplated changing each file manually, but I have over 3,000 photos. Has anyone had this problem? Is there a way I can restore the correct dates?

    Hi Keith,
    Yes, it's date that the photo was taken that has been changed. When I look at the "photo info" of each individual photo, the "original date" is correct, but the transferred photos on my new computer always change to a 2007 date, despite the fact that the photos were taken as early as 2002.
    Does this make more sense?
    K

  • AP PAYABLES- Not getting all the DUE DATE's in with split schedule payments

    Hello All,
    We have some issues with AP Data loading's into our DW from EBS 11.5.10 AP - PAYABLES.
    One of our customer is using split schedule and share payment into few payment. Our
    sql is not reading all the due dates for PAYABLES.
    We are using PAYMENT_NUM=1 from ap_payment_schedules_all table as condition to load the Data to avoid duplicate rows coming for Payables.
    Some hints: removing the "PAYMENT_NUM=1" from the where clause gives all the due_dates but then we have duplicate rows for Payables.
    Please help to modify our query so that it will work for split schedule payment.
    select
    inv.invoice_num,
    inv.doc_sequence_value,
    sob.currency_code,
    inv.invoice_date,
    'EH'||inv.vendor_id vendor_id,
    'EH'||inv.vendor_site_id vendor_site_id,
    ael.ae_line_number distribution_line_number,
    inv.invoice_currency_code,
    aeh.accounting_date,
    'EH'||ael.code_combination_id code_combination_id,
    nvl(ael.entered_dr,0)-nvl(ael.entered_cr,0) accounted,
    nvl(ael.accounted_dr,0)-nvl(ael.accounted_cr,0) amount,
    fuser.user_name,
    fuser2.user_name user_name2,
    inv.payment_status_flag,
    'PAYABLES' rowtype,
    inv.discount_amount_taken,
    inv.invoice_type_lookup_code invoice_type,
    inv.exchange_rate,
    inv.exchange_date,
    tax.name,
    inv.source,
    inv.attribute6 eflow_doc_id,
    sysdate transfer_date,
    sch.hold_flag,
    inv.cancelled_date,
    sch.due_date
    from
    ap.ap_invoices_all inv,
    apps.ap_ae_headers_all aeh,
    apps.ap_ae_lines_all ael,
    ap.ap_tax_codes_all tax,
    ap.ap_payment_schedules_all sch,
    gl.gl_sets_of_books sob,
    applsys.fnd_user fuser,
    applsys.fnd_user fuser2
    where
    aeh.ae_header_id=ael.ae_header_id and
    inv.set_of_books_id=sob.set_of_books_id and
    inv.invoice_id=sch.invoice_id and
    sch.payment_num*1=1 and ---------------------------------------------- *
    fuser.user_id=inv.last_updated_by and
    fuser2.user_id=inv.created_by and
    ael.tax_code_id=tax.tax_id(+) and
    ael.ae_line_type_code='LIABILITY' and
    inv.invoice_id=ael.source_id and
    ael.source_table='AP_INVOICES' and
    aeh.gl_transfer_flag='Y'
    Thanks,
    Aman

    Hello All,
    We have some issues with AP Data loading's into our DW from EBS 11.5.10 AP - PAYABLES.
    One of our customer is using split schedule and share payment into few payment. Our
    sql is not reading all the due dates for PAYABLES.
    We are using PAYMENT_NUM=1 from ap_payment_schedules_all table as condition to load the Data to avoid duplicate rows coming for Payables.
    Some hints: removing the "PAYMENT_NUM=1" from the where clause gives all the due_dates but then we have duplicate rows for Payables.
    Please help to modify our query so that it will work for split schedule payment.
    select
    inv.invoice_num,
    inv.doc_sequence_value,
    sob.currency_code,
    inv.invoice_date,
    'EH'||inv.vendor_id vendor_id,
    'EH'||inv.vendor_site_id vendor_site_id,
    ael.ae_line_number distribution_line_number,
    inv.invoice_currency_code,
    aeh.accounting_date,
    'EH'||ael.code_combination_id code_combination_id,
    nvl(ael.entered_dr,0)-nvl(ael.entered_cr,0) accounted,
    nvl(ael.accounted_dr,0)-nvl(ael.accounted_cr,0) amount,
    fuser.user_name,
    fuser2.user_name user_name2,
    inv.payment_status_flag,
    'PAYABLES' rowtype,
    inv.discount_amount_taken,
    inv.invoice_type_lookup_code invoice_type,
    inv.exchange_rate,
    inv.exchange_date,
    tax.name,
    inv.source,
    inv.attribute6 eflow_doc_id,
    sysdate transfer_date,
    sch.hold_flag,
    inv.cancelled_date,
    sch.due_date
    from
    ap.ap_invoices_all inv,
    apps.ap_ae_headers_all aeh,
    apps.ap_ae_lines_all ael,
    ap.ap_tax_codes_all tax,
    ap.ap_payment_schedules_all sch,
    gl.gl_sets_of_books sob,
    applsys.fnd_user fuser,
    applsys.fnd_user fuser2
    where
    aeh.ae_header_id=ael.ae_header_id and
    inv.set_of_books_id=sob.set_of_books_id and
    inv.invoice_id=sch.invoice_id and
    sch.payment_num*1=1 and ---------------------------------------------- *
    fuser.user_id=inv.last_updated_by and
    fuser2.user_id=inv.created_by and
    ael.tax_code_id=tax.tax_id(+) and
    ael.ae_line_type_code='LIABILITY' and
    inv.invoice_id=ael.source_id and
    ael.source_table='AP_INVOICES' and
    aeh.gl_transfer_flag='Y'
    Thanks,
    Aman

  • Creation date for schedule line

    Hi All,
    I have a scheduling agreement. MRP is generating the schedule lines properly. I want to know any table or any other way by which I can check the creation date for those MRP generated schedule lines.
    Regards,
    MHP.

    Dear Manish,
    As per my understanding from your question, you can use 'MD04-Stock/Requirement List' transaction for checking all the dates for planned order generated from MRP run.
    Regards,
    Hiren Ramani

  • How do I use AppleScript to Change the Creation Date to the Current Date?

    I sorted my downloads folder by creation date and found that the items were sorted seemingly randomly. On closer inspection, I saw that the creation dates were not the same as the dates that I downloaded the items, so I figures that Snow Leopard was using the date given to it by the server.
    In order to get the items sorted by download date, I figured I'd use Hazel, but it doesn't have a “change creation date” item. It does, however, have an “run AppleScript” item.
    So my question is this: how do I use AppleScript to change the creation date of an item to the current date?

    TC (Techno Cat) wrote:
    Okay, I tried changing the creation date with SetFile, but it kept giving me an error:
    What am I doing wrong?
    Looks like the date and time was not quoted
    Try this Applescript. It will change the creation date of every file in the Downloads folder to the current date and time:
    <pre style="
    font-family: Monaco, 'Courier New', Courier, monospace;
    font-size: 10px;
    font-weight: normal;
    margin: 0px;
    padding: 5px;
    border: 1px solid #000000;
    width: 720px;
    color: #000000;
    background-color: #E6E6EE;
    overflow: auto;"
    title="this text can be pasted into the AppleScript Editor">
    set current_date_and_time to do shell script "date \"+%m/%d/%Y %H:%M\""
    tell application "Finder"
    set filelist to every file of the alias (the path to downloads folder as text)
    repeat with currentFile in filelist
    do shell script "/usr/bin/SetFile -d " & quoted form of current_date_and_time & space & quoted form of POSIX path of (currentFile as string)
    end repeat
    end tell</pre>

  • Creation date for released transport request

    Hello everybody!
    Does anyone know how to find the CREATION date for a released transport request? I've already checked table E070CREATE and it only has entries for modifiable requests.
    Best regards,
    Luís Andrade.

    I think transport is released date field in E070 is overwritten with the releasing date.

  • Is it wise to keep the Nikon camera files "DSC's"  after downloading them and converting to DNG files via Adobe converter for lightroom use. In other words do the DNG files have all the raw data I would ever need in processing or should I save the camera'

    Is it wise to keep the Nikon camera files "DSC's"  after downloading them and converting to DNG files via Adobe converter for lightroom use. In other words do the DNG files have all the raw data I would ever need in processing or should I save the camera's DSC files?

    DNG files do not contain some metadata supplied by the camera, which can be used by the manufacturer's software. Thus, if you don't keep the original Raw photo, you will lose this information.
    If your 1000% sure you're never going to use the manufacturer's software, then this isn't a problem. But who can be sure what software you will be using 10 years from now?

Maybe you are looking for

  • How can I update my iphone from ios 6 beta to the regular ios 6?

    I currently have IOS 6 beta 4 and iTunes nor my phone will allow me to update. I want the additional features that were added. HELP!!!

  • Issue in Standard Function DateTrans

    Hi, I have a requirement to convert the date format from dd-MMM-yyyy to MMddyyyy. I am using standard Function "DateTrans" for this conversion.I am getting the error  Unparseable date: "01-DEC-2011" I am working on PI7.1EHP1. Source Dateformat: 01-DE

  • BB Hub is not updating anything except emails after installing update 10.1.0.273

    Haye Everyone, My BB Hub stops updating Facebook, SMS/MMS, BBM, PIN, Whatsapp, YIM.. I had tired all the given suggestions on different pages, threads except a security wipe. After a reboot, notifications come up for a couple of minutes and works fin

  • CS3 Dreamweaver no longer works

    I have installed lion (10.7) since the day it comes out, and have no problem on my MacBook Pro 17" Dual and had upgraded to 10.7.1 with no issue at all.  I just got a PowerMac 17" with i7 Quad, and when I migrate it to the new computer, everything wo

  • Disk is locked when trying to re-install osx

    I have a time machine backup of my old disk.  I get to the OSX Utilities Screen and try to re-install OSX on the newly installed hard drive (My old one was failing) and i get the message (HD is locked)...how can i unlock this disk?? Thanks in advance