Allocation on the basis of Quantity Produce

Dear All,
I want to do distribution through assessement of Over/Underabsorption of cost center on the basis of Quantity produce in that plant to COPA Value Field.. is that possible
Example
Cost Center A-1001 is having the Over/Underabsorption of 100000Rs
Now client ask that i want to distribute this cost to my product produce in that plant on the basis of Quantity produce in that plant.
I can get the sale quantity and weigh of the sale quantity in value field in COPA  but how can i get the quantity produce in that plant.
Kindly suggest
Regards
Shayam

Thanks for the reply...
I am also feeling the same
Issue closed.
Shayam

Similar Messages

  • Admin Costs to be allocated on the basis of  Qty of Goods Produced

    Dear Experts,
    Adminstration Costs to be allocated on the basis of Qty of Goods produced.
    Is there a solution where these (Admin) costs can be added to the Cost of Goods sold,  but should not include in the Cost of Goods Manufactured.
    Advance thanks
    Sanjai

    Hi
    Refer this thread where I explained an alternative...
    Re: Actual Overhead rates on Production Orders
    In OKTZ, create a separate cost component for Admin Cost and mark it as Not Relevant for Inventory Valuation.... Classify it as Admin Overhead i.e. part of COGS in in OKTZ
    br, Ajay M

  • Cost allocation on basis on quantity produced

    Hello Experts,
    I want to allocate overhead cost from different cost centers to production cost centers. This allocation must be done on the basis of quantity manufactured.
    Please let me know, if this is possible by any means (say for example: assessment and distribution cycle).
    Meena

    Thnx Rajneesh and Ajay,
    Me and my colleague executed it and we got it.
    But I have following issue. Please help.
    In our case, there are 20 FGs (it means 20 production cost center i.e. 20 receivers). Now out of these 20, we want to trf cost only to 15 FGs. Hence there will be only 15 cost centers as receivers. (Reason being: 5 FGs are pertaining to other plant for which CO is not being implemented).
    Senders will be 45 cost centers. Total value of all 45 cost centers is Rs. 90 Crores. But this 90 crores is pertaining to entire 20 FG. Hence system should proportionately transfer for 15 cost centers only.
    Remaining amount for balance 5 cost centers should not get transferred. Is it possible to achieve?

  • Credit check on the basis of quantity

    Hi Gurus
    The requirement is such that the credit check is to be configured on the basis of quantity. A customer is fixed with a total order quantity of 1 lakh and if the quantity goes beyond 1 lakh the system error should come.
    Thanx and Regards

    May be you can check whether if you can do this via a user exit for credit limit. You can follow the below steps
    1) Create a Separate risk category for this customer.
    2) and assign a User Exit check for this category customer in OVA8
    3) Modify the User exit  to your requirement.
    The User exit which can be used for this purposes are...
    LVKMPFZ1: USER_CREDIT_CHECK1
    LVKMPFZ2: USER_CREDIT_CHECK2
    LVKMPFZ3: USER_CREDIT_CHECK3
    There are three buttons of User exit in the OVA8 Screen. each button is numbered as 1,2,3 internally, if you mark User exit 1, then modify the first program  .... like tht..
    also you can explore the option of having a Quantity contract.. Create a QC for 1lakh Qty and try to refer this QC when ever u are creating the order.  Of course this will not stop you from creating an order with more qty, unless you explicitly throw an error..
    Rgds
    Srini

  • Output calculation (on the basis of running hour and quantity)

    Dear Guru,
    scenario:
    we have 6 work center and activity type cost will be calculated on basis of output quantity.
    ex : work center 1:activity cost: Rs 100
                                    output :100 nos(quantity)
                                      total  cost : 100*100= 10,000
    like this we are calculating the cost of every workecnter
    required sceario :we  want to calculate 4 workcenter cost on basis of output quantity and two on the basis of running hour
    please help me where we do the changes .
    thanks in advance for your suggestion

    Not sure if I understood your query, but based on what little I understand you would need to use a formula which has only duration as parameter & not operation quantity.
    Eg: Refer to standard value key - SAP4, which has SAPC00 as a parameter.
    Using this you can multiply the cost with the hours irrespective of the operation output.
    Do a test in your sandbox & if it meets your need adopt in PRD.

  • Cost on the basis of order quantity

    Can the cost be decided on the basis of order quantity ? For example when 100 pieces are taken the cost is 10 each but when 1 peice is purchased the cost is 50 each,
    Similarly this should reflect when we sell the item in customer service.

    hi,
    the scales would do that job for you. You do not need to explicitly mention a formulae at VK11 when maintaining condition records. And remember cost at sales order level has a different meaning. We use the term Cost to talk about VPRS condition. Normally the costs and prices at sales order level can be transferred to COPA for profitability analysis. We map these pricing conditions to COPA value fields for management reporting purpose.
    regards
    sadhu kishore

  • Production Report for Quantity produced.

    Hi PP Gurus,
    We want to capture a report wherein we need to capture quantity produced against work center/production order. Finished product got base unit of measure and alternate unit of measure like Base UoM= EA
    Alternate UoM= Case and Bottles
    Now the requirement is report should comprise of Actual unit produced in Base UoM and all alternate UoM.
    What can be done to resolve this issue.
    Thanks & Regards,
    Abu Arbab

    Hi,
    You can create a Z development using the Order tables : AFKO /AFPO/AFUM/AFRU.
    You can provide the Order type in the table and fetch the order number and qty in BUOM. You can insert a new column for Alt UOM and calculate the production qty interms of Bottles and Cases.
    Hope this will help you.
    regards
    radhak mk

  • Automatic clearing on the basis of contract no.

    Hi Friends
    I am facing a issue related to clearing on the basis of contract no..
    Details are as below,
    1. I am having 3 open items for 1 BP (customer). These are against a single contract amounting to 1775 EUR.
    2. In my EBS I am having a receipt of Rs1.1775 EUR from this customer. Contract no. is also getting identified & is mentioned in Payment advice notes.
    3. The flow types of open items are already customised in "Value Allocation for Incoming Payments Allocation ".
    Still the open items are not getting cleared  against this receipt.
    Please inform whether I am missing anything?.
    Full points will be granted.
    Kindly help.
    Thanks & Regards
    Bhairavi

    Hi Bhairavi,
    could you please check if you have done all settings mentioned in customizing for Electronic Account Statement for RE-FX:
    Path: customizing RE-FX - Accounting - Integration FI-GL, FI-AR, FI-AP - Incoming Payments Control - Prepare Account Statement Entry
    -> Electronic Account Statement Entry
    Regards, Franz

  • Alternative item sel on the basis of stock -2 items at a time by automatic

    we r dealing presently with alternative item selection at the time of confirmation screen MFBF.we are thinking  to make alt group in the bom by automatic sel with strategy 2 for all items so that on the basis of stock availability component will get selected.but my question is suppose we have below alt items for 1 perticular bom and at the time of confirmation we required 20 or more quantity ?how i can do automatic confirmation?
    because by maintaining strategy 2 for auto alt sel only one component will get selected at a time.
    220229-10 kg
    220222-10 kg
    220870-10 kg
    220901-10 kg

    Dear,
    With stg 2, system will selcet as per the priority and usage probability. If you use 100% usage probility, then system will check only first item to satisfy all 100% requirement, and other line items will not be considered, this is what i told in the first communication. Hence you need to change the probability in order change material overview screen after running availability check, system will show as below in CO02 component details screen
    Item -1 usage probability -100
    Requrement qty --10
    Committed qty----7
    Issue qty----
    0
    Original qty----
    10em 1
    Item -2 usage probability -0
    Requrement qty --10
    Committed qty----2
    Issue qty----
    0
    Original qty----
    10
    Item -3 usage probability -0
    Requrement qty --10
    Committed qty----3
    Issue qty----
    0
    Original qty----
    10em 1
    Item -4 usage probability -0
    Requrement qty --10
    Committed qty----4
    Issue qty----
    0
    Original qty----
    10
    Since you know the commitment qty now, You change it to
    Item -1 usage probability -100
    Requrement qty --10
    Committed qty----7
    Issue qty----
    0
    Original qty----
    7
    Item -2 usage probability -100
    Requrement qty --2
    Committed qty----2
    Issue qty----
    0
    Original qty----
    2
    Item -3 usage probability -100
    Requrement qty --1
    Committed qty----3
    Issue qty----
    0
    Original qty----
    1
    Item -4 usage probability -0
    Requrement qty --10
    Committed qty----4
    Issue qty----
    0
    Original qty----
    10
    Now if you do the confirmation...system will show the requirement qty as below
    item 1 req qty = 7
    item 2 req qty = 2
    item 3 req qty = 1
    item 4 req qty = 0
    Now it need not be corrected during confirmation.
    I hope you got the point. If not please give example as i have given so that we can understand...any other automation I think not possible

  • How to get this Airport Extreme base station to produce a wireless network?

    I had this Airport Extreme base station working fine at the house that I moved from a couple of days ago.
    After my house move, however, it seems that the AE base station isn't producing a wireless network. My wireless laptop isn't detecting a wireless network. Also, the left hand side light on the AE base station is not lit.
    The AE base station was softly cushioned during house the move.
    Regarding configuration:
    My non-wireless iMac (running 10.3.9) connects to the AE base station via an ethernet cable.
    Before my house-move, I regularly connected wirelessly via the AE base station from a couple of wireless-equipped laptop computers.
    I was using AE software version 5.6. (In desperation, I have just updated to version 5.7 - but that hasn't improved or changed situation.)
    At the new house, I found that I had to reset the AE base station back to factory settings before I could successfully connect to the internet through the AE base station from the (non-wireless) iMac.
    Since resetting the AE base station at the new house, I can also print via a USB printer that's plugged into the AE base station.
    I just cannot pick up any sign of a wireless network from the AE base station.
    G4 Powerbook   Mac OS X (10.3.9)   Problem started while I had Airport Extreme software v5.6. No improvement/change after v5.7 update.

    Sorry for my delay in closing this issue.
    I got the wireless network running again - though I'm not sure which of a "litany" of separate actions (which I gleaned from dialogs in several similar postings for similar issues to mine) was the solution. I suspect it was one of the following two actions, which have stuck in memory:
    1) I relocated a nearby cordless phone cradle/charger/base-station from alongside the Airport Extreme base station to about seven feet (two meters) away. However, the cordless phone is about eight years old, and I believe its radio frequency is far out of the range that I have read (in similar postings) can interfere with the Airport Extreme base station.
    2) I re-set the Airport Extreme base station, (a) by depressing the tiny reset button at the rear of the base station for more than 5 seconds (until the led started blinking), (b) from Utilities/AirPort Admin Utility/Configure/Restart. However, I had reset the Airport Extreme base station those ways previously without that restoring the wireless network. Also, I didn't record the sequence of the multiple resets and the configurations at the times of the resets.

  • Idoc to jdbc :On the basis of field WERKS, the child segments should get re

    We are working on IDOC to JDBC scenario.
    In my IDOC INFREC.INFRECMASS01 has one  segment E1E1NAM( parent segment), inside this parent segment we have one  child segment E1E1NEM containing two lines. On the basis of one field WERKS, the child segments should get repeated in the target  but in the target side we are getting only one of the values of WERKS .
    We have used SPLIT BY VALUE(each value) on WERKS but still only one of the values are coming on the target side .
    pl help
    rgds
    arun

    ahi arvind ,
    i sent the source /target every thing in ur rediffmail id  , we tried to change the context of WERKS TO E1EINAM ,removed split by value , but got an error
    Cannot produce target element /ns0:MT_IB_VENDORISL/STATEMENTNAME[2]/si_sku_vendor_link/ACCESS. Check xml instance is valid for source xsd and target-field mapping fulfills requirements of target xsd
    pl suggest ...
    rgds
    arun

  • How can i find the base UOM?

    Hi ,
    I have created an rfc function module in our BW system.  I have to call this RFC from SAP R/3 . To call this RFC I have to pass MATERIAL NUMBER , Quantity Required and  UOM. Every thing is working good.
    As per the Spec , "if UOM is not there on requested call , Assume base UOM"
    I Didn’t understand this point .How can find the base UOM of the quantity required?
    Could you please give me the idea?
    Thanks,
    Suresh

    Hi ,
    Thanks for your responce.
    Do you mean: When I call the RFC function module , if  i wont give any UOM,
    It will take the base UOM automatically  or i should include any logic to pass the base uom.
    Please clarify this.
    Thanks.
    Suresh.

  • How production peoples will know the sales order quantity?

    Hi,
    In our business we are getting orders from our customer in advance (ie before stock production). Is there any notification to send the Ordered item, Quantity and Dispatch date to the production department to produce the stock? Is there any setup for the same?
    Thanks in Advance,
    Regards,
    Prabhu.S.J

    Your MRP / APS will create wip jobs based on the sales order demand. The shop floor may / maynot care about which sales order they are building it for.
    If you want to create one-to-one relationship between the jobs and the sales orders, you can either make your items as ATO items and autocreate the wip jobs or check the LOT FOR LOT option in your ascp plan.

  • Error: One of the base documents has already been closed (-10)

    I have a web service to get and set pick lists and add delivery notes via DI Server. but I have one scenario that causes the error 'Error: One of the base documents has already been closed (-10)':
    i have a pick list with item A1 with a quantity of 10. I pick and delivery 3. now the pick list is closed and in the picklist creation dialog I can choose the remaining 7 of A1 for another picklist. but if I do so and then try to pick and delivery the remaining 7, I'm getting that error. The sales order, that is the base document of the pick list and the delivery, is still 'open'. so, what base document is meant here?

    I found the error. I tried to add the DocumentsAdditionalExpenses to the second delivery, too, and this is not possible.

  • How to increase Decimal Points for the BOM Component Quantity

    Hi All,
    While creating BOM:
    Can anyone help me to know how i can increase the Decimal points for the BOM components quantity.
    I can able to give only upto 3 decimal points, but the requirement is more than that.
    I have increased the Decimal point value to 5 in transaction Code CUNI. but still it is allowing me to enter only upto three decimal places.
    Thanks and Regards
    Khadeer

    Khadeer,
    You would be better off changing the base quantity of the parent part.  Instead of "1 EA  parent contains .00003MG of  component" you could say "100 EA parents contain .003MG of component".
    Alternately, you could use different units of measure for your parent or component parts, which would be more suitable for the 3 place decimal limitation.
    I agree with Anil in that if you elect to change the decimals from standard, you could end up with huge changes that will propagate through every module in the ERP.  In my view, there is no need of this kind of headache.
    Best Regards,
    DB49

Maybe you are looking for

  • Inspire P5800 5.1

    wonder if anyone can help me , had the usual controller problems , that were thankfully sorted out by returning the set to the shop n getting a replacement set of speakers .... why dont more people just do this? prob is .... can anyone tell me the Oh

  • Connect a ps3 to imac 27 i5 mid 2011

    How to connect PS3 to Imac I5 27 Mid 2011

  • HP Support Assistant

    Pavillion p6720f / Windows 7 / 64 I installed sp58919.exe from this site: It won't complete the check list. It won't connect to the HP server. No problem with my internet connection. It just keeps 'checking' with the HP servers ad infinitum. Also, th

  • Windows Server 2008 x64 Trial Install

    Problem: Error code: 0x80070070.  Situation: I have three drives. C:, D:, and E:. Drive C is my current OS, Win7 Pro x64. Drive D is my main storage drive for videos, music, etc... Drive E is a terabyte drive that is partitioned in half. I am trying

  • "The project was saved in a newer version of premiere pro and cannot be opened in this version." - Except it wasn't!

    Last night I saved a project I've been working on for a couple of days. It's been fine all along. Today, when I went to open it, it's no longer listed in the recently opened files on startup and i get this message: "The project was saved in a newer v