Allocation Structure
Hi,
When we execute the T.code KO88(Order Settlement for AUC), showing the below Error Message.
Complete allocation structure A1
Message no. KD503
Diagnosis
During settlement, the system puts the sender debits into groups (assignments), which are settled using the same settlement cost element. The settlement assignment is made in the allocation structure, which is stored in the settlement rule for the sender (under settlement parameters).
Cost element 410006 cannot be assigned to a settlement cost assignment in allocation structure A1, and therefore it cannot be assigned to a settlement cost element.
Procedure
Possible solutions are as follows:
If the posting under cost element 410006 was made to the sender because of an incorrect entry, and you can reverse the posting, and do not need to update the allocation structure. You only need to reverse the incorrectly assigned posting before repeating the settlement. Exception: For an investment measure with a line item settlement, you need to extend the allocation structure, even after the reversal.
If the posting was made correctly, you can do the following:
a) You can assign a different allocation structure to the sender: In the master data maintenance for the sender, choose "Settlement rule -> Goto -> Settlement parameters" and then enter a different allocation structure.
If necessary, also check whether the correct allocation structure is entered in the settlement profile. The allocation structure is defaulted in the settlement profile when you create sender master data or when you maintain the settlement rule.
You can update allocation structure A1
We have assigned Cost element for Receiver Cat. FXA.
What is the Problem?
Thanks in advance
In the allocation structure you need to include the source CE 410006.
Allocation Structure>Assignments (double click)>Source (double click)
Here in source you should have the CE mention in From else you should have created a CE group including this CE.
And now for this source ensure you've maintained the Settlement cost element (for FXA) either 'By Cost Element' or Settlement cost element.
Regards
Sreenivas
Similar Messages
-
How to remove overlap of cost element in allocation structure?
hi experts,
on KSES the source has double entry of cost element. those cost elements were defined under cost element group. when i checked on the Source screen the entries under the cost element group there is no double entry but when checked on Extras > Overview List i can see two entries of the cost element. how can i remove on the double entry of cost element on the source of the allocation structure?
thanks!Hi,
Go to KAH2 . enter cost element group.
Select the cost element to be deleted , then select arrow (upwars left , 3rd button from top left) , right click and then remove.
Regards,
Mrinal -
Message no. KD503 - Complete allocation structure K1 for Internal Order
Hi,
During Internal order settlement through KO88 I am getting this error as :
Message no. KD503 - Complete allocation structure K1
Diagnosis :
During settlement, the system puts the sender debits into groups (assignments), which are settled using the same settlement cost element. The settlement assignment is made in the allocation structure, which is stored in the settlement rule for the sender (under settlement parameters). Cost element 430500 cannot be assigned to a settlement cost assignment in allocation structure K1, and therefore it cannot be assigned to a settlement cost element.
Procedure :
Possible solutions are as follows:
o If the posting under cost element 430500 was made to the sender because of an incorrect entry, and you can reverse the posting, and do not need to update the allocation structure. You only need to reverse the incorrectly assigned posting before repeating the settlement. Exception: For an investment measure with a line item settlement, you need to extend the allocation structure, even after the reversal.
o If the posting was made correctly, you can do the following:
a) You can assign a different allocation structure to the sender: In the master data maintenance for the sender, choose
"Settlement rule -> Goto -> Settlement parameters" and then enter a different allocation structure. If necessary, also check whether the correct allocation structure is entered in the settlement profile. The allocation structure is defaulted in the settlement profile when you create sender master data or when you maintain the settlement rule.
- You can update allocation structure K1
The same configuration in Development Server there is no error but problem occurs in Quality server. Here the process is Internal Order creation - Creation of Reservation through MB21- Goods Issue against reservation through MB1A and finally settlement through KO88. During settlement this error occur. In configuration setting of allocation structure under Internal Order I have mentioned only revenue settlement (as per business) against assignments. Under source mentioned cost element group and under settlement cost elment Receiver Cat is "CTR" and tick "By Cost Element".
During MB1A i.e, goods issue accounting entry is generated as
81(Dr). 430500 Constimptuion Saprae and Stores
99(Cr). 310411 Inventory Machinery and Spare.
During settlement this debit figure should credit. But not allowiing to credit. Even in configuration under settlement cost element if I remove the tick of "By cost element" and mention secondary gl account whose cost element category is 21, still showing the same error in QA server. What may be the probabale solution ? Even if i remove allocation structure K1 from settlement profile 20 still same error exist. How this link gets during settlment inspite of removing allocation structure from settlement profile...
NB.. COPA is not implemented in our company. So PA structure should not arrise here....
Thanks & regards,
Samrat
Edited by: Samrat Roy on Aug 30, 2010 7:28 PMHi Samrat,
The issue is very simple.. Cost element 430500 is posted in your IO...
While settling you have 2 options... Either you can credit the original GL account 430500.. This happens when you tick "By Cost element".. This you have done already...
2nd option is not to tick "By Cost element" and assign a secondary cost ele category 21...
But for any of these options to work, you have to include GL 430500 in the "source"... The above 2 options apply only to those GL accounts which are mentioned in the "Source".... for rest of the GL accounts, system gives this error
Include 430500 in your "source" cost ele group.. Error will be resolved
Regards
Ajay M -
Error : complete allocation structure while doing Ko88 settlement.
Message no. KD503
Diagnosis
During settlement, the system puts the sender debits into groups (assignments), which are settled using the same settlement cost element. The settlement assignment is made in the allocation structure, which is stored in the settlement rule for the sender (under settlement parameters).
Cost element S10100 cannot be assigned to a settlement cost assignment in allocation structure A2, and therefore it cannot be assigned to a settlement cost element.
Procedure
Possible solutions are as follows:
If the posting under cost element S10100 was made to the sender because of an incorrect entry, and you can reverse the posting, and do not need to update the allocation structure. You only need to reverse the incorrectly assigned posting before repeating the settlement. Exception: For an investment measure with a line item settlement, you need to extend the allocation structure, even after the reversal.
If the posting was made correctly, you can do the following:
a) You can assign a different allocation structure to the sender: In the master data maintenance for the sender, choose "Settlement rule -> Goto -> Settlement parameters" and then enter a different allocation structure.
If necessary, also check whether the correct allocation structure is entered in the settlement profile. The allocation structure is defaulted in the settlement profile when you create sender master data or when you maintain the settlement rule.
You can update allocation structure A2Dear,
Please refer my reply in this thread,
Error in Rework order settlement
Regards,
R.Brahmankar -
While Doing Production Order Settlement "Complete Allocation structure" :
Dear Experts
I am Getting This Problem ,
please give me A suitable Solution.
I am created Another Allocation Structure And Assigned to Settllement Profile . But it is not trigering. Not Capturing That allocation
Complete allocation structure Z1
Message no. KD503
Diagnosis
During settlement, the system puts the sender debits into groups (assignments), which are settled using the same settlement cost element. The settlement assignment is made in the allocation structure, which is stored in the settlement rule for the sender (under settlement parameters).
Cost element 40512006 cannot be assigned to a settlement cost assignment in allocation structure Z1, and therefore it cannot be assigned to a settlement cost element.
Procedure
Possible solutions are as follows:
u2022 If the posting under cost element 40512006 was made to the sender because of an incorrect entry, and you can reverse the posting, and do not need to update the allocation structure. You only need to reverse the incorrectly assigned posting before repeating the settlement. Exception: For an investment measure with a line item settlement, you need to extend the allocation structure, even after the reversal.
Edited by: rajamallu on Jul 2, 2010 10:41 AMHi,
within allocation structure customizing you create assignments for allocation structure Z1.
Each assignment has a source (cost element, cost element range, cost element group).
The cost element 40512006 is not included in the source definition of allocation structure Z1 but there are values to be settled available on your sender.
Thus they cannot be settled and thats why the message occurs. So maintain alloc. structure Z1 completely.
Best regards, Christian -
What command would you use to check for allocation, structural, or logical integrity problems?
Wondering if you are looking for DBCC CHECKDB command? For more information, on that command, try to look at this:
http://technet.microsoft.com/en-us/library/ms176064.aspx -
Enter an existing allocation structure - Message No: KD013
Hi Experts,
While creating the Internal Order I am getting below error. We are using SAP from last 7 years with same Internal Order Types
Enter an existing allocation structure
Message no. KD013
Diagnosis
You have entered a settlement structure which does not exist.
Procedure
Enter an existing settlement structure or define a new one in the implementation guide.thanks for your quick reply.
I find out the solution.
T.CODE: OKO6
SPRO - Controlling - Internal Orders - Actual Postings - Settlement - Maintain Allocation Structures
We have maintained Allocation Structure which we have assigned in Order Types.
T.CODE: KOAL
Thanks & Regards,
Vijay -
Allocation Structure, Settlement issue
Dear All,
I have created a Allocation Structure with following details:
Allocation Structure: XX
Assignment: 01, 02, 03...
Co AREA: YYYY
In Source: I assigned relevant Cosat element groups
In Settelment Cost Elements: I assigned Secondary Cost elements
I have maintained the Settlement rule to settle WBS to CTR in CJ20N.
I have also checked that Allocation Structure XX is comming in Settlement paramters in the WBS (CJ20N)
After few postings on WBS element i get an error "Maintain sources for allocation structure A1 (this is pointing to a different allocation structure) in controlling area YYYY"
Ques 1: Is there any other config to be maintained required to Settle the Project to CTR.
Ques 2: In the settlement Profile what Document type i need to maintain?? Is this mandatory?
Ques 3: Is it must to create a source structure?
Warm Regards,
JatinderDear Gokul,
Yes this is newly configured allocation structure.
I have created a new settlement profile (where i have also assigned the new allocation structure) and assigned the Project profile.
Regards,
Jatinder -
WBS settlement issue:Complete allocation structure A1.Message no. KD503
hi all
I created an WBS 600041 and through FB60 posted the JV by assigning the WBS 600041.
Then I saw in CJI3 the posting is done and it is showing there and I created a settlement rule and gave the 100 % cost settlement on AUC and saved it. Now when I go to CJ88 and do the actual settlement and gave all the parameters for full settlement and execute it is giving the following error
Complete allocation structure A1.Message no. KD503
Is this problem due to cost elements? How do I go about it.please suggest.
kind regards
AmanHI,
Check your allocation structure OKO6 transaction. see whether your allocation structure is having the expense cost element you posted listed in it
OKO6- select your allocation structure-Assignments-source
Here the GL account should be listed
Regards,
Radha -
Pa allocation structure for pm orders
hi fico experts,
can any one tell us how to configure the pa allocation structure for pm orders for revenues billing thru dip profile use for service orders.
pl help
thanx in advance
regards
sriharihi
I need to post to COPA at the time of settlement of PM order thru KO88 with multiple order line items in PM order.
to clarify further,
Currently I am able to do settlement to cost center as per settlement rule in pm order with one order line item, when i have 2nd line item in same order, we are not able to do settlement thru ko88 because this has been linked to dip profile.
pl revert if u need more info
thanks in advance
regards
srihari -
Allocation Structure - Maintenance in production system
Hi all,
is there any way of maintaining the allocation structures (KSES) in production without opening the system (modifying the client status)?
Thanks in advance for your replyes!!!Hello Sadishivan,
The idea is not to create the allocation structure in production directly, but to be able to maintain the assessment cost element or even insert a new assigment, without the need of a Transport Order.
As example, the maintanance of Cycles is not modificable by default, but there is an option to maintain them in a not modificable mandt by implementing note OSS 326080.
I didnt find any OSS Note which would allow to do that with the allocation structures... but maybe there is another way of maintaining them in a not modificable mandant?
Thanks again for the reply -
Complete Allocation Structure A1
Hi everyone,
I have a problem concerning settlement of orders. Running transaction va88 gives me an error message stating that I should complete allocation structure a1. However, this is not the allocation structure I want to use. The message says that I can assign a different allocaton structure to the sender by chosing Settlement Rule --> Goto --> Settlement Parameters in the master data of the sender.
Now my question is where to find the master data of the sender!? Thanks for your help!
Regards,
MartinHi,
I have solved this issue now. Changed the allocation structure. Now I still have one problem concerning an account which is not maintained in the strucutre. However, to assign this cost element to the right part of the structure is something my controlling people have to figure out.
Thanks anyway for all you help.
Regards,
martin -
Complete Allocation Structure A1 in K088
Every month end, we settle IO unused supplies to inventory accounts (using KO88) but last July 2011 until today, system prompts this error: "Complete Allocation Structure A1"? Can anyone please help me resolve the error? Upon checking the settlement allocation structure, the master data and parameters seems all accurate. Please help resolve this issue. Thank you all in advance.
hi Gracey
your error msg. must be showing some cost element missing in the allocation structure.
Kindly maintain the same in A1...
Check the link below
Message no. KD503 - Complete allocation structure K1 for Internal Order
Regards,
Divraj -
Error In allocation Structure when doing settlement to GL from WBS
Hi All,
I got this error message. What should i do? I try to check my allocation structure...but it seem correct.
Complete allocation structure Z3
Message no. KD503
Diagnosis
During settlement, the system puts the sender debits into groups (assignments), which are settled using the same settlement cost element. The settlement assignment is made in the allocation structure, which is stored in the settlement rule for the sender (under settlement parameters).
Cost element 901000 cannot be assigned to a settlement cost assignment in allocation structure Z3, and therefore it cannot be assigned to a settlement cost element.
Procedure
Possible solutions are as follows:
If the posting under cost element 901000 was made to the sender because of an incorrect entry, and you can reverse the posting, and do not need to update the allocation structure. You only need to reverse the incorrectly assigned posting before repeating the settlement. Exception: For an investment measure with a line item settlement, you need to extend the allocation structure, even after the reversal.
If the posting was made correctly, you can do the following:
a) You can assign a different allocation structure to the sender: In the master data maintenance for the sender, choose "Settlement rule -> Goto -> Settlement parameters" and then enter a different allocation structure.
If necessary, also check whether the correct allocation structure is entered in the settlement profile. The allocation structure is defaulted in the settlement profile when you create sender master data or when you maintain the settlement rule.
You can update allocation structure Z3Hi Sreenivas ,
The accounting document looks weird :
Hi,
Settlement profile : ZPS001
GL, CC, Order, WBSE and FXA optional
Document type : SA (GL Account doc)
Distribution rule : 10
Residence time : 24
Allocation strucutre Z3
Default object type : FXA
tick on % settlement and equivalence no
to be settled in full
Allocation structure : Z3
Assignment : 1.Labour ,2.MAterial, 3. Subcontract
Source : 1. PSlabour , 2.PSmaterial 3. PSsubcon 4.Cost
Settlement cost center : FXA (ticl by CE), CTR (settlement cost element 90200) ; ORD (Settlement cost element 902001); GL put 747100f
I already successfully settle from WBS to GL 747100(settlement receiver) However, when i check FB03 it shows that
GL account 747100
Posting key 40
Amount 25000
GL Account 747100
Posting key 50
Amount -25000
What the problem ?
Cheers,
Nies -
Allocation structure changes at settlement (KO88)
Guys,
Here's a question from the PM contingent...
Is it possible to determine the <i>allocation structure</i> at the point of performing <i>settlement</i> for a PM order (e.g. KO88).
I've had a quick look for user-exits, but couldn't find anything.
Thanks in advanceAllocation Structure is define under settlement profile and this settlement profile is assigned to PM order Type.
Pl check and define your allocation structure and assinged to you allocation rule .
Thanks
Rajiv Pandey
Maybe you are looking for
-
My movie is a photo slideshow using Ken Burns effect throughout, using iMovie 09. It looks beautiful when I play the project directly from within iMovie, even when enlarged to fullscreen playback. Is there really no way to set the quality settings hi
-
How do I set a calendar reminder for the first Tuesday of every month?
I have recurring meetings that happen on different dates. i.e. 1st Tuesday, 2nd Monday etc. Is there a way to set this up in the calendar? Thanks, -Mark- IPhone 4 IOS5 Sync to Outlook and Gmail
-
I need to install a keyboard driver without a keyboard
I need to install a USB keyboard driver on my Mac Mini without a keyboard (my USB mouse works fine, and my original keyboard is 1000 miles away). I have only one USB keyboard in this house but the driver to make it work with OS X is on the Logitech w
-
Whats the best Audio Interface to use with Logic and MacBook Pro?
I currently own a Line 6 Pod X3 Pro and although its much better than the Eleven Rack (what an overrated piece of junk in a pretty candy coating, more fizz than club soda and still no balls. Some say it just needs a cheap overdrive box to do the tric
-
When is it coming out NOKIA ?