Alternate bom items

Hi, created a bom with 2 roh materials as bom items. For the first line item, alt item group 01 maintained as 1 (priority),2 (strategy-100% check), 100 (usage probability) and for the second line item maintained the same settings. Now wants system to pick the roh material, which is having more stock (more qty). when I create production order, system is selecting only the first line item. Pls advise how to rectify the same.

Hi,
The setting of the priority of an item within an alternative item group determines the sequence in which material components are reserved in the production order.
Strategy is to determine how the items within an alternative item group are selected for the withdrawal posting. Use the same strategy for all alternative items in an alternative item group.
Your requirement of withdrawal posting for ROH which has highest stock is not possible in standard system.
But
Strategies for withdrawal postings are supported with:
1) Withdrawal according to usage probability (manual changes possible) or
2) Withdrawal if availability is 100%
So in your case if 1st item is available 100% then the system considers only 1st
If it is not available then only it searches for 2nd item 100% availability
Hope you have understood the system logic
Pavan
For further clarification ref:
Alternate BOM
Edited by: ch pavan on Mar 22, 2010 3:22 PM

Similar Messages

  • SUB CONTRACTING PO FOR MATERIAL HAVING ALTERNATE BOM

    Hi,
    we are having following scenario for subcontracting process.
    FIN1 material can be produced either from RAW1 or RAW2.
    In PO for FIN1, in BOM assignment , BOM for FIN1 with RAW2 as sub component  is  assigned. But when thay want to make FIN1 from RAW1, system allows to issue RAW1 to subcontractor as it is maintained as subcomponent in alternate BOM of FIN1(not in PO) but while doing GR it gives message of " DEFICIT OF STOCK W. VENDOR UNR. 10 EA : RAW2 1000 O"
    I thot that this msg is arrising as component RAW2 is not provided to vendor ( as it is maintained in PO a subcomponent for FIN1). So what I did , I added another item as FIN1 in same PO with sub component as RAW1, and then carried out the process, so it worked. But this makes confussion to user as there are severel items in PO, and to judge against which item he will hav to make GR.
    So my question is, is there any setting or scenario in SAP to solve this issue?
    Regards

    1. You will definitely create two subcontracting info records for two raw materials say RAW1 and RAW2.
    2. There will be two seperate production versions for these two materials.
    3. Update respective production versions in respective subcontracting info-records.
    4. This will help to upload the alternate BOM even you changed the material from PO
    Amol

  • Scheduling Agreement Alternate BOM usage

    Hi all,
    For a FG material , i have 2 BOMs available for that.
    I make a scheduling agreement for  Subcontracting process while maintaining schedules ME38 , automatically system is picking the first BOM present for that material , but i want to use the alternate BOM to be picked for that particular vendor or for that Scheduling agreement. So should I maintain any thing else for that agreement .
    With Rgds,
    Vamsi

    Hi,
    Maintain two production versions, one for each BOM you have, Assign the default production version to the subcontracting info record
    When you create subcon PO, the default production version is used. If you want to change it, go in the item level "Material Data" Tab,
    click "Re-explode" and choose the production version you want
    Thanks
    Diwakar

  • How to define alternate BOM in SBO

    Hi all,
             Can you help me to define alternate BOM for an item?
    Thanks in Advance
    Suresh R

    Hi Suresh,
    One work around can be to define all permitition & combination in one BOM only and after selecting the BOM in Production order, user can decide which child items are to be kept and which child items are to be removed.
    Hope it helps
    BR
    Samir Gandhi

  • BOM Item Details fetching  issue

    Hello Friends,
    Actually I am fetching BOM item details data, with the use of STAS  & STPO tables but to my surprise I am not getting all counter values in STPO tables i.e. first I am passing BOM NO, Alternate & Item ID To STAS table to get counter details and then passing these counter values in STPO table to get item data like qty , variable size item data etc.  But I am unable to find all counters which are available in STAS are present in STPO table e.g. in STAS table there are 113 counters but in case of STPO table only 37 counter values are found.
    Kindly provide your valuable inputs for above mentioned issue.
    Thanks in advance.
    Regards,
    Tejas

    Hi Vivek,
    Thanks for your reply.
    Request if you can elaborate your answer.
    Right now I am taking counter values from STAS and then passing them to STPO but many of counter values are not available even I checked deletion indicator it is not marked with X still those are not available in STPO.
    Regards,
    Tejas

  • BOM item number - not repeat the item number

    Hi Friend,
    I wonder if you can block the registration of the same item with item number in the BOM,we have some problens with other software that comunication with SAP.
    Thanks
    Exemplo:
    Item            Material
    0001           ABCDEFG
    0001           HIJLMNOP   (this is problem, because there are two itens with item bom = 0001)
    Edited by: Marcelo Marcelo Alexandre Oliveira on Oct 18, 2010 8:00 PM

    Hi,
    You have to go for a user exit for this purpose.
    remmeber in case item is being changed with chnage number(with history req), it might show multiple line items with same bom item( but it will be for same bom compoennet)
    Also i guess for alternate and discontinuation bom componenets line item number remains the same.

  • How to Switching Alternate BOM to Primary BOM

    Dear All
    Need help...
    I have already try to switch from alternate BOM to primary BOM. but why it can not effect anything? any step that i mis?
    my step is :
    1. Navigate to the Substitute Components window. choosing the Substitutes button from the Bills of Material window.
    2. Enter a substitute item for the component.
    3. Enter the quantity of the substitute item needed to replace the full component quantity.
    its correct ??
    Best Regards,
    The pooh

    MRP plans according to primary bom. If you run ASCP constrained plan, you can set the plan options such that it will look at alternates as well.
    If you run MRP or unconstrained bom, you will have to change the primary bom itself (via ECO or BOM changes).
    You can also consider using the alt. bom when creating the work order manually.
    Sandeep Gandhi

  • MRP Plan - Alternate BOM vs Substitute Component

    We have certain situations where ITEM B (length 5 in) can be used in place of ITEM A (length 3 in) in which just the amount cut off differs.  To be recognized in MRP planning and work order creation, should an alternate BOM be used or a substitute component?
    Is there a general rule of thumb that indicates when to use which feature?

    Dear PP watson,
    1.While giving the PIR's in MD61,after entering the values click on the schdule line tab page and then in
    the top menu click on settings--->prod.version,now against the PIR enter the prod.version whould be
    considered.
    So this will be considered during MRP run.
    2.IF 2 prod.versions exists for the same lot size and validity dates then the system always picksup the
    first prod.version during MRP run.
    3.IF you want the system to consider the second prod.version,then lock the first prod.version before
    taking MRP run.
    4.If quota is maintained in MEQ1,then as per this you will get the output in MRP.
    Points 2,3,4 is generally used if PIR's are assigned without any prod.version.
    Come back with your queries.
    Regards
    Mangalraj.S

  • Alternate bom explosion

    Dear Gurus
    When giving a work order to a subcontracting item the BOM of the item is exploding but the system is choosing only first BOM is there any way so that the alternate bom can be exploded.
    Regards
    Sandip Sarkar

    Hi,
    As per SAP standard, always the first priority is for alternative 1. If you want to select the alternative 2 or 3, you can change the status of alternate 1 & 2 as Inactive. Then the system will pick alternate 3.
    Otherwise you can define the lot size, like lot size 1to 10 alternate 1, 11 to 25 alternate 2 like this, or you can define the valid from and valid to for each alternatives. Otherwise you can use the production versions.
    Regards,
    V. Suresh

  • Populating the custom filed - added in BOM item.

    Hello Friends,
    I have a requirement like, for the custom field added in BOM item data, it should come filled while executing the CS02/CS03/CS12/CS73....transactions.
    I have added a field which is one of the field from MARA table. what I have to do is to pass the MARA record into the custom field added based on IDNRK.
    This should happen as soon as enter button is pressed after entering material, plant, bom usage value.
    Please let me know if any exit is there wherein I can put the code OR if any other way!
    Thanks.

    i have solved this issue by doing some R&D.

  • How to get the latest and valid BOM item entry from STPO

    hi,
    may i know with what condition we can get the latest and valid BOM item entry from STPO table?
    i have STLNR and IDNRK as a input. But i realized that it would return multiple entry due to the combination of  valid-from and valid till date.
    can i use stlnr,idnrk and stpoz (with the latet counter) to get the latest and valid BOM entry?
    thank you.

    Hi
    You can get the latest BOM either by using the latest valid from date DATUV or latest internal counter STPOZ
    Regards
    Shiva

  • Error in Rush Order type with BOM item!!

    Hello,
    I am facing a very strange error while creating a rush Order with BOM item.
    System Error:
    1. No item category available (Table T184 SO ERLA TAQ).
    I except the error. I get next error as
    2. Structure explosion for item 000010 is not possible.
    After this BOM explodes with only first 2 Sub Items ( Item cat for main item is determind as TAQ and Sub Items as TAE) , where as the complete BOM has 7 Sub items.
    I have made the required configs in item cat determination in T184 table for order type SO, as follows.
    SO ERLA - TAQ for Main Item of the BOM
    SO NORM TAQ TAE for the Sub Item of the BOM
    The same item (BOM ) works very well in OR/BV kind of sales order types, by exploding the BOM to full level(i.e all the 7 sub items are determined).
    Has any one come across such an issue. Please let me know what could be the solution?
    Thanks in adv,
    Shripad

    Hi,
    Thanks,
    In vov7 for TAQ Item Cat. the structure scope is maintained as 'A'. And that's the reason for Standard order 'OR' , the BOM is exploding properly.
    It is only with Rush Order , the BOM is not exploding correctly.
    BR
    Shripad

  • Problem in Partial delivery BOM - items not copied in subsequent delivery

    Hi,
    We are using BOM in Sales order and we have activated delivery group for the BOM header item category.
    When we create first delivery we change the BOM header item quantity in delivey ( all the components quantity change accordingly) and save the delivery.
    Now when we try to create second delivery with reference to the same delivery for the left out qunatity in sales order, system is not copying the components of BOM items ( it is only copying BOM header) from sales order to delivery.
    Please let us know how can we create subsequent delivery with reference to the same sales order and delivery should get all the BOM items from SO to delivery.
    Please let me know if you need further information.
    Thanks
    Venkata Rama Reddy,K

    Hi,
    We already set the delivery group to A, and still having the same result.  We change the BOM header quantity only and automatically the component quantity is updated.
    This happens only if there are two header BOM in the Sales Order.  See example below:
    Bom Header 1 = 100
    Bom Component 1a - 80 (partial delivered)
    Bom Component 1b - 20 (partial delivered)
    Bom Header 2 = 200
    Bom Component 2a - 150
    Bom Component 2b - 50
    When creating outbound delivery, initially all the materials are copied to the outbound document.  If we want to delivery only Bom Header 2, then we will delete the Bom Header 1 line item.
    Upon deletion, the status of the component becomes fully delivered in the SO, but the Bom header is still partial delivered.
    Please confirm how to correct this.
    **If there is only one BOM Item in the order, then partial delivery is ok..
    Thank you,

  • Cost Estimate using Commercial Price 3 of BOM item

    Dear Experts,
    I am trying to create a cost estimate for certain materials using ABC costing variant. The objective is that the cost estimate should pick up Commercial price 3 from the material masters of the BOM item and then calculate cost estimate for the main product (The costing variant has been customized this way). However, for certain main products, the system is picking up the standard price of the BOM item and in some main products it it correctly picking up the Commercial price.
    The BOM items used in the different products are different.
    I am unable to understand this behaviour. If anyone has come across any such problem before, please help.
    Regards,
    Aditya

    hi,
    Check the Valuation variant and the strategy sequence whether you have selected the Commercial price 3 as the first priority and the Standard price as the next priority. If u don’t want the standard price to be picked u remove this in the strategy sequence.
    Further where the system is picking the standard price, possibly the commercial price 3 has not been defined in the material master. Possibly , the system is unable to find the commercial Price 3 and it is fetching the next Price as defined in the valuation variant which is the standard Price.
    assign points if useful.
    regards,

  • Avoid  automatic creation of purchase requisition for bom item N

    Dear.
    When I create a production order , for the components  with bom item N the system create a purchase requisition. I need to avoid this automatic creation , do you know a solution to obtain this ?
    Thanks.

    For the many people that have asked this question.
    N item category in the BOM is always going to propose direct procurement. Through configuration I have not found a way to make it go away from the planned order. You can make it go away from the production order.
    The IMG path: 
    Plant Maintenance and Customer Service 
    -> Maintenance and Service Processing 
    --> Maintenance and Service Orders 
    ---> Functions and Settings for Order Types 
    ----> Define Change Docs, Collective Purc. Req. Indicator, Operation No. Interval
    Under the Res/PurRq -> Specify Never
    In order make this setting effective, you must define the following
    system message to error or warning, as it is stated on note 569984
    Version Appl.A. No. Cat
    00000000 C2 280 W
    Please note that this setting is effective for reservations and
    requisitions.
    The best solution is to use BOM item category L with the bulk indicator set. You will not get any direct procurement proposals or planned orders and you can use long term planning to see the time phased MRP results.

Maybe you are looking for

  • Upgrade to 10.4.10 - won't sleep, slow to shutdown

    Hi All, Upgraded my MDD G4 desktop to 10.4.10 and the latest security update last night. Since then, I can't put it to sleep. It takes forever to shutdown as well. Any ideas? Thanks, Jeff

  • Set Cursor to the next field after scanning first field in RF programming

    Hi, I have requirement where i need to set the cursor to the second field i.e. Purchase order after scanning the first field i.e. Material in RF programming with out user interaction. I kept the material visible length to 6 chars instead of 18 on the

  • Embedding an image in email doc

    How do I embed an image in an email document?  I am using MacMail and an IMac.  I can attach a flyer as an attachment.  I need the flyer to show up when readers open the email.  I don't want them to have to take the extra step of opening the attachme

  • Deleting multiple items not working in Snow Leopard

    I can select multiple events from a repeated event, and when I hit Delete to delete them, iCal correctly pops up a message asking if I'd like to delete only these events, or all future events. I hit "only these events" and it only deletes one item. M

  • Permissions issue locks me out of my desktop folder

    Hi All. I have a worrying dilema that I am hoping someone can advise me on. The symptoms are: *1. A blank desktop after start-up (files, folders and volumes are not loading)* *2. It takes an extremely long time for the "Devices", "Shared", and "Place