Alternate Items in a BOM

I have a BOM for X which can make use of any component A or B or C in its BOM. The component A is always procured from China plant to the plant in India. I have set the usage probability of component A as 100 %.
But in my case I would require a situation where the system has check for component A in stock at china plant and if the stock for component A doesnu2019t exist then check for component B and then C so on from there it has generate an STO to the plant in China.
Please let me if itu2019s not clear.

Dear ,
Org Structure for India :  one Chart Of Account -India Company Code -India Plant -Storage Loactions
Org Structure for China : CoA of China -Chiana company code -Chaina Plant -Storage lacation .
I hope if you look both them from Client level set up , they are totally differenet lgal entity .So neither you could check material availiblty cross clinent nor the STO (manual or MRP generated ) can be done to full fill the A/B/C requirement  at India plant .
You may have to go to SAP APO -SNP /PPDS  to fullfill this requirement where availabilty check and Transpotation Requirement can be eastablished .
Hope it will give you an idea on this requirement
Regards
JH

Similar Messages

  • Different scrap quanitity for alternate item

    Hi Guys,
    I have alternate item in my BOM header. That is two alternate raw materials are used for manufacturing the SFG and have different scrap quantity , in this case how to create BOM?
    Thanks and regards
    Thamizh_g

    Hi,
    For the alternate items you can maintain the scrap % in material master as Assly scrap in MRP-1 view & component scrap in MRP-4 view. Also you can maintain the scrap qty in BOM also, in the BOM item level you can maintain the operation scrap. But BOM will be having the highest priority.
    Regards,
    V. Suresh

  • Mass Maintenance of BOMs with Alternate Item Groups

    We plan to create BOMs containing Alternate Item Groups (+ usage probability + priority) to cover alternative parts usage.
    What is the SAP solution for Mass maintenance of BOMs with Alternate item groups?
    Is it possible to use (or customize) CS20 (or another transaction) to do following tasks in Mass :
    - identify the BOMs containing a specific material number (where used)
    - add a new item line with a new material nbr in the BOM (with same quantity, subitems, Alternate Item Group, ...)
    - when required, change the usage probability of the members of the group to set the new material usage on 100% and all other alternates usage on 0%. When not required, add the new one with 0% and don't change the existing members of the group.

    Dear.
    Ask your ABAP Team to write BDC or LSMW program.
    This will help you.
    Regards
    Utsav

  • Alternate Items in BOM

    Hi All,
    I have the following scenario, i am creating a BOM in which for one material there are two alternate items. Here i mean if Material A is the main item, and if this not available then we need to use both Material B and Material C.
    We have alternate items but this is a case of two items been required to replace one. How do I set the BOM in tis case?
    Do i need to go with Alternate BOM...? That is BOM 1 with Material A and Alt BOM 2 with Material B & C.....Is this the only way..?
    Thanks for your review and feedback
    Regards,
    Srinath V

    Hi ,
    For This situation may be it is convenient apply Phanton?
    -The Father Product (X), have as component
    the Prod A and it is replaced by A1 , using option Discontinuation DATA
    The Prod B and it is replaced by B1 using option Discontinuation DATA.
    Phanthom X
                item A
                Item B
    Phantom X1
               Item A1
               Item B1
    Constraints
    Only we can use simultaneously A with B
    or A1 with B1, (We can't use A with B1 or B with A1)
    How we must config Built of Material ( Discontinuation Data or Alternative Item Group, using discont group,followup group) and MM02( discontinued parts)
    We need use item A/B until the stock was consumed, so we wil use Item A1/B1, and MRP must to calculate needs based on items A1,B1
    Thanks for you attention!
    Regards

  • PR generation of Alternate item of BOM

    Dear Gurus,
    I have a BOM with alternate item group maintenance among 2 item material. Those item group has maintained with proper priority and usage. Now I have a requirement of header item and the priority 2 material has some stock. Therefore, I would like to consume the priority 2 material first and then the PR will generate of priority 1 material, by demand - stock quantity of priority 2 material against of BOM.
    Looking for any help from all gurus.
    Thanks in advance,
    SAP PP

    Dear SAP PP,
       In this case, I think you should use production version to resolve it. You can create 2 production version in MRP4 view of material master data. You can assign Alternative BOM for each production version. When you create production, maybe you can choose production version what you want. Of course, one is what you need.
    I hope it can help you.
    Paul

  • Alternate Item Group functionality in BOM

    Hi PP Gurus,
    I was looking into the Alternate Item Group functionality in BOM and found it interesting for my business requirement.\
    But I am facing one problem as below:
    I have 3 components for Eg. A1, A2, A3 in my header material 'A'. All the three component materials are same but quailty of the 3 is different and also the standard price.
    My requirement is whenever I am creating Production material for header material 'TEST_Header_Material, the system should look into A3 first (Cheapest), if not available then A2 (Cheaper) and if not then A 1(expensove of all the three).
    For base quantity for A = 1EA, I have entered 1 EA for A1, A2, A3 in BOM. I have stock of A1=9, A2 = 6 and A3 = 2.
    When I am creating Production Order for A = 10 EA, ,yrequirement is that the system should consider A3 first, then A2 and then A1 based upon the prority and hence should withdraw A3=2, A2=6 and A1=2 for meeting the quantity for finish product A in Production Order. But actuall the system is considering A3 but confirming it as 0, then looking into A2 again confirming it as zero and then looking into A1 and  again confirming it as 0. And thus giving Missing Part list though I have sufficient quantity to cover the requirement.
    That means system is only considering total quanitty.
    Can you please advice?
    Thank You.
    Rahul.

    Dear Rahul,
    Priority:In this field, you define the priority of the item within an alternative item group. This determines the priority for planned
    withdrawal of items. Two items are assigned to an alternative item group (A1) with the following values for priority:
    Item 0060 Value for priority: 02
    Item 0065 Value for priority: 01
    The system reads item 0065 first.
    Also check these links,
    concept of alternative items
    Re: Alternative item in BOM
    Re: NOTE 149332 : Error for material components with usage probability 0
    Re: Discontinuation&Production Order
    Regards
    Mangalraj.S

  • How to define alternate items for Spare Parts

    Hi SAP Gurus,
    My Client wants to implement Alternate items for Spare Parts. It is not a Manufacturing unit.
    Actually Client wants their Service Partners to know that
    ex., Material A is an alternate item to Material B and can be used for servicing without ordering for Material A.
    Whether there is any Possibility to define alternate item in the Material Master.
    Off course I have gone through the thread and document of Alternate items in BOM.
    I would appreciate for providing Clarity on the subject.
    Best Regards,
    R.Velmurugan

    Hi Velmurugan,
    As per your requirement  i think you can achieve alternate item group functionality ( as your client is not manufacturing)
    You can maintain alternate material in MRP 4 view followup material field or basic data 1 old material Field than develop a ZReport extract the same as of client not manufacturing  any thing.
    Otherwise refer this document if you to go to Follow up material Functionality.
    Concept of Discontinuation Data - Material Master and BOM
    If you have any other query kindly revert back otherwise close the thread.
    Thanks & Regards
    Sandeep Kumar Praharaj

  • Can we define alternate material in a BOM

    Dear All,
    Can we define alternate material in a BOM,If yes,How???
    pl. guide....
    Tushar Aute

    Hi,
    In BOM , alternative items are assigned to alternative item group on the general data tab page.
    In the production order in the general data tab page.
    We can define the alternative item based on priority , strategy and usage probability.
    Priority:
    This defines the priority of the item within the alternative item group.
    This determines the priority of planned withdrawls of items.
    EX Two items are assigned to alternative item group
    item A Priority 1
    item B Priority 2
    The system reads the item A first.
    Strategy:
    use the strategy to determine how the planned withdrawl is controlled
    within the alternative item group.
    The strategy should be same for all alternative items within a alternative
    item group.
    If the value 2( 100% check) is defined for the strategy the first material in
    the defined priority sequence for which sufficient quantities are available
    are reserved.
    Usage Probability:
    MRP Plans these alternative material components according to probability
    of use.Material requirements for BOM Components are planned according
    to usage probability.
    The planned withdrawls for the production order are based on the reservation lists.These lists are based on the priority and strategy.
    Regards,
    nandha
    Edited by: S.Nandakumar on Feb 21, 2008 7:21 AM

  • How can I add alternate component in same BOM

    Hi Experts,
    One of my requirement like this , in same alternative BOM I want to add alternative components with existing components.So please advise how to do.
    With Regards
    Aravind

    Hi,
    This is discussed before in SCN. Please go through below links for your query,
    Alternative component in BOM
    alternative materials in PP
    Alternate Item in BOM
    Re: PR( purchase requ) for Alternative material in BOM
    Regards,
    Narresh

  • Alternate Item In case of Creating reservation(MB21)

    Dear Experts
    Can any one help me out from creating reservation with alternate item only Sngle item of Group. ,when we r defining the Alternate item in BOM according to group and afterwords i m creating reservation from (MB21 with reference to BOM)that particular BOM .then out put is taking all item of group. but we want only single Item of particular group and  create the reservation.
    Rgds
    Pankaj Agarwal

    Dear Experts
    Can any one help me out from creating reservation with alternate item only Sngle item of Group. ,when we r defining the Alternate item in BOM according to group and afterwords i m creating reservation from (MB21 with reference to BOM)that particular BOM .then out put is taking all item of group. but we want only single Item of particular group and create the reservation.
    If Any solution then Pl tell .
    Rgds
    Pankaj Agarwal
    Edited by: Pankaj Agarwal on Feb 11, 2008 10:33 AM

  • Ref Char fpr item descrption in BOM

    Hi All
    I want to change the item description in BOM through variant configuration (reference character ).
    The scenario is in sales order i will be entering the size (lenght and width) this two char should reflect or change the item descrption of the item in BOM.(which will b selected through sel.condition).
    Can anybody guide how to configure for the above req.
    Advance thanks
    Thanks and Regards
    Praveen S

    Praveen Sasi1,
    You are asking for Variant Configuration.
    1. Create Material
        a. Configurable Material - KMAT
        b. Gen. Item Category Group - 0002
        c. Item Category Group - 0002
        d. You won't have Accounting -1 and Accounting -2 View.
    2. Include Access Sequence - 57 Variants (Table 57)
    3. Include Condition Type VA00 - Variants in pricing procedure
    a. Maintain Charchteristics - CT04  (A property that describes and differentiates objects Ex. Length, Color, weight..etc)
    Say Ex Z_Engine_Dukati
    Basic data: Z_Engine_Dukati
    Description: Automotive
    Status : Released
    Data type: Charachter format
    Number of Chars: 9
    Values assignment: Single value(appply tick mark)
    Values TAB:
    char Values -
    > Description -
    > D ---> O -
    > S
    001 -
    > 500 cc -
    >yes -->NO -->NO
    002 -
    > 1000 cc -
    >NO -->NO -->NO
    003 -
    > 1500 cc -
    >No -->NO -->NO
    Click Save.
    silimlarly maintain other charchteristics.
    b. Classes: CL02
    Note Here Class type = 300 (Variants)
    Here you list all the charchteristics with Date and Value
    c. Configuration Profile: CU41
    d. Then Maintain condition records in VK11
    Moreover check the link
    [https://wiki.sdn.sap.com/wiki/display/ERPLO/SDVariantConfiguration]
    Regards
    Sathya

  • How to do backflush of alternate material in a bom?

    Hi,
       My user wants to do choose alternate material at the time of backflushing  according to material availability..
    currently we are maintaining as following priority - 1
                                                               strategy - 2
                                                                probability - for first material (100)
                                                                 rest of material as  blank.
    any body please guide me what should be the right procedure to achieve this.
    Already iu have searched found a thread Can we define alternate material in a BOM  try to apply our expert suggestion but it is not working.
    Kindly anybody help me to solve the issue.
    Thanks & Regards
    Sandeep Kumar Praharaj

    Hi Ramagiri,
      I have gone through your document but my user wants he should select the component according to his requirement.
    for that purpose i have opened the planned order in md12
    select the first component make the usage probability to 0.
    select the second component change the usage probability to 100
    after that requirement has been transfer from first alternate component to second alternate component.
    But after when i am trying to do the backflushing through MFBF second alternate component is not showing in overview screen it is still showing the first component.
    can u please help me why it is happening & explain how to achieve this point as you mentioned
    Thanks& Regards
    Sandeep Kumar Praharaj

  • PO line item link with BOM

    Hi guys ,
    Actually I am looking for some info on this scenario. while creating PO for specific document type(ZPOG)  and item category (L) , I need to modify the child material qty of the line item  .
    This is subcontract PO .
    For example if I am creating PO for X material (which has y as a child ) , I need to modifiy the qty of Y .
    actually there is one badi called ME_PROCESS_PO_CUST  to handle the PO creation ,
    But I am not able to find the link between that line item material and BOM material .
    points rewarded if the question was answered .
    Regards
    Siva

    Hi Ganesh ,
    Thanks for your information . But my concern is it ( Child material qty )  should be rounded off  while creating PO . not to be done manually .
    For that purpoes only I am using that Badi  , but I couldn't find the link between BOM material and PO line item material .

  • Change item category of BOM component

    Hi,
    Our user wanted to change the item category for BOM components through transaction IB12 using LSMW.Wanted to confirm whether it is possible to change item categoryof BOM component from "N" to "L" through LSMW.What exactly will be effected because of this change?And the steps to change the item category from "N" to "L" for the list of BOM component using LSMW.
    Request your valuable thoughts.
    Thank you in advance,
    Regards,
    Rubina Rahman

    Hi Rubina,
    N is non stock item
    L is stock item
    You have to make sure why the business warants to chnage the item category.
    To answer the question:
    It is possible to chnage the item category from "N" to "L" through LSMW (Provided depends on the number of components used in a BOM. If the number of items exceeds to multiple screen, then you have to think of developing BDC)
    The effect will be: with item category "N" if the material is used in the order, based on the configuration the system shall automatically trigger the purchase requisition. With item category "L" it is assumed as stock is available and taken care by MRP program.
    Suppose if it is material BOM:
              A. Use T.code: CS02 in LSMW recording
              B.  Provide information like Material number, Plant, BOM usage
              C. In the item level change the item category from N to L
              D. Save the recording
              E. I hope you know the remaining LSMW process steps
    Cheers,
    Raj

  • How to Populate long text(item text)  from BOM CS01 to CJ20N transaction

    I have requiremnt  in which i need to Populate long text/item text  of  BOM  from CS01 to CJ20N transaction(PS network)

    Hi Naveen,
    for anylong text related work use the functions READ_TEXT and SAVE_TEXT.
    read the long text of the BOM item using the proper header and then populate the same text lines to the PS network using the new header specific to the PS network.
    Prabhas.

Maybe you are looking for

  • Bugs in Apple iBooks 5.0.1: PDF support & remaining pages

    Bugs in Apple iBooks 5.0.1: 1) Adobe Acrobat PDF file format support: With iOS 5.0.1 I am still faced with severe Acrobat PDF file format incompatibility problems with the Apple iBooks app. Pictures in PDF documents partially disappear, characters ar

  • ALV-GRID Excel-template

    Hi, we offen use the ALV-GRID with EXCEL-Layout. In this layout you can Copy the sheet, print etc. But a lot of Function are grey and cannot be used. We want to send the excel-sheet via EXCEL-Button as an email. Question: is it possible to set this f

  • BPF Template and BPF Instance

    Hi All, In  BPF Template, in the DEFINE STEP REGION CRITERIA,we have given CORPORATE as the Dimension Members (Under Driver Diemension Member Selection) and under Selection formula we have given BAS. Driver Members          Selection Formula CORPORAT

  • Problem inworking of the  XSLT filter

    Hi All, I have created some XSLT filters to display the XML file as the HTML. It was working fine before. but suddenly there's an error. After applying the XSLT filter to the content. When i clicked on the content to see the output it is throwing " 5

  • MATLAB R2007a to Mathscript

    Hi I have written MATLAB code to produce a squarewave at a certain frequency for 0.01 seconds. The code then loops back to produce a similar squarewave but at a different frequency, and then concatenates it to the end of the first squarewave. There a