Alternate Routing in Process Manufacturing (OPM)?

Is there any option or workaround in Oracle Process Manufacturing to select another routing (Alternate Routing) when releasing Batch from planning?
Regards,
Arsalan

Batch Details > Action > Reroute

Similar Messages

  • BR100 Document for Oracle Process Manufacturing (OPM)

    Hi,
    Can anybody please send me sample BR-100 document for Oracle Process manufacturing for Steel / Coal slag processing industry??
    Thanks in advance.
    With Regards,
    Vishal Gujar
    Edited by: 956843 on Dec 14, 2012 12:42 PM

    11g is not release yet for SOA Suite. The latest version is 10.1.3.4.
    here is some docs to get you started
    http://www.oracle.com/technology/products/ias/bpel/htdocs/dev_support.html
    cheers
    James

  • Special variances in Process Manufacturing

    Dear OPM Forum member,
    You are in the Oracle Process Manufacturing Community and as a fellow member, I would appreciate your input on leading practices for this case.
    A large manufacturer in the Chemicals and Petroleum space has engaged us to collaborate on a footprint to rapidly deploy Oracle Process Manufacturing (OPM) globally.
    This Company uses four variance calculations not available in OPM. To illustrate, one of them is Manufacturing Yield Variance. The others are for usage, filling and batch. None of these are available in OPM.
    We have identified 2 probable solutions – (1) Calculate these variances in a business intelligence tool or report and then adjust the production formulae for accuracy or (2) extend Subledger Accounting by adding these 4 variances to the existing list.
    However, if you solutioned a similar requirement, we would like to know what you did to enhance OPM with these special customer calculations. A writeup, if already available would help us greatly.
    Thanks,
    Sanjib Manna

    Srini
    Sorry for my late reply. I was trying to get my arms around these variances and finally have time to update this thread.
    Here is the background.
    We have a liquid batch for paint intermediate (Master Rex). Intermediate product is yielded to the Filling batch wherein the liquid is filled in drums or containers to produce the final SKU product. There is a separate costing and production formula for the liquid batch and a separate costing and production formula for filling batch. Here are the details on the variances.
    1. What is MANUFACTURING YIELD VARIANCE?
    1st, M-rex Theoretical Gallons Available is calculated as - Actual Output / Formula weight per gallon.
    In the above, Formula weight per gallon is Total Costing Ingredient Quantity / Yield Product Costing Quantity.
    2nd, Manufacturing Yield Calculation is calculated as Planned Quantity - Theoretical Gallons Available.
    In the above formula, Planned Quantity = Production Formula Planned Quantity.
    Manufacturing Yield Variance = Manufacturing Yield Calculation * Product Standard Cost (M-rex).
    2. What is USAGE VARIANCE?
    = Sum ((Actual Ingredient 1 Quantity - Planned Ingredient 1 Quantity) * Ingredient 1 Standard Cost) + ........)
    3. What is FILLING YIELD CALCULATION?
    1st, Filling Theoretical Gallons Available is calculated as M-rex Theoretical Gallons Available. In the current domestic system, the filling batch is automatically spawned from M-rex batch once M-rex batch is completed. Additionally, there are automatic system checks to ensure the M-rex quantity in the spawned Filling batch is same as the parent M-rex batch.
    2nd, Filling Yield Calculation is calculated as Filling Theoretical Gallons Available - Actual Gallons.
    In the above formula, Actual Gallons = Actual Yield * Filling Formula M-rex Quantity.
    Filling Yield Variance = Filling Yield Calculation * Product Standard Cost (M-rex).
    4. What is METHODS VARIANCE?
    I made a 1000 gallon batch, here is the process assuming a standard cost of $1.00 for ingredients A, B and C and product X.
    Cost of making 1000 gallons of product X: 1000 Gallons * $1.00 = $1000
    Material cost incurred for using Ingredient A: 50 Kgs * $1.00 = $50
    Material cost incurred for using Ingredient B: 100 Kgs * $1.00 = $100
    Material cost incurred for using Ingredient C: 800 Kgs * $1.00 = $800
    Resource charges incurred for producing X: $30
    Methods Variance = $1000 – ($50 + $100 + $800 + $30) = $20.
    Thanks in advance,
    Sanjib

  • Integration with Process Manufacturing

    We are looking at upgrading Financials and Process Manufacturing to R11i early next year. Currently we use i2's Rhythm Factory Planner but are interested in the APS developments.
    Which APS modules are available for use with OPM? Also where can I get an indicication of the cost per module?

    I've got this info from Oracle. Hope this helps. OPM is integrated with APS now.
    1. It uses the advanced planning engine and global ATP.
    2. Demand Planning integration is in the works.
    3. Manufacturing Scheduling is purely a discrete option and not needed for
    OPM.
    The pricing of APS for OPM is the same as the standard APS and is priced by Cost of Goods Sold. You may get the price details from your local Oracle sales.

  • New forum for Oracle Process Manufacturing Users

    www.opmforums.com
    The OPM Forum is a new resource available to end users, consultants, developers and anyone else interested in learning more about making the most out of Oracle Process Manufacturing. OPM Forum brings together experts, proficient users and newbies to promote knowledge sharing, technical exchange and best practices around OPM implementations.
    The forum is fully searchable and contains postings around a variety of topics related to OPM. Current topics include data collection, inventory/receiving, order management/shipping, production and quality. The forum is open to the public and registration is free. Once registered, users can:
    Post new threads
    Reply to other peoples' threads
    Edit posts
    Receive email notification of replies to posts and threads they specify
    Send private messages to other members
    Enter events in the forum calendar
    Set up a 'buddy-list' to quickly see which friends are currently online
    The forum is non-commercial and individual email and/or other personal information is not disclosed.
    Check it out for yourself at www.opmforums.com

    You can still use this forum. It would better
    if we can concentrate all the Text questions on the Oracle Text forum.
    null

  • Scenario for Process Manufacturing..

    Dear All,
    Our client imports goods and then packages them at their site into different packages and boxes. After that those products are dispatched. The client wants to keep an eye on the status of packaging and for that they require a Manufacturing module.
    Can Process Manufacturing be implemented for this scenario or Discreet Manufacturing will be a better option?

    Hi
    Both the way you can choose.
    As an OPM Consultant, I prefer to go with Process Manuf. Module.
    In your case
    1. Your importing your Finished goods and just doing the packing to these Finished goods
    2. Now this Packed FG, your are now selling to the Customers
    When choose OPM, Here you need to create Formula/Recipe using this you need to perform a Production Batch.
    In Formula, keep your Imported Item as Ingredient and Packege Item as (may be box/Cartoon/Sheet....etc) Ingredient and Lables(if required) also as Ingredient and with these Ingredients now you want to make a desired Finished Goods as PRODUCT using Recipe in Production Supervisor Module to complete your Batch.
    Now your Packed FG is ready to Ship to Customer.
    Hope you understood and implement this.
    Regards
    Raj
    Sierra Atlantic.

  • Oracle Process Manufacturing Process Execution Cycle

    Hi I am new to OPM and looking for an overview of how OPM works.
    I have searched but could not find any specific document.
    If anyone is having or knows the process , Please share it.
    Thank you in advance..

    Hi;
    Please see:
    Information Center: Oracle Process Manufacturing [ID 1393312.2]
    http://docs.oracle.com/cd/E18727_01/doc.121/e13652/T321962T321965.htm
    http://docs.oracle.com/cd/A99488_01/acrobat/115gmepeapiug.pdf
    http://docs.oracle.com/cd/A85683_01/acrobat/gmetrm.pdf
    http://oracleappscommunity.com/oracle/blog/955/oracle-process-manufacturing-process-execution-tables/
    Also see:
    For r12.1.1:
    http://download.oracle.com/docs/cd/B53825_01/current/html/docset.html
    For r12:
    http://download.oracle.com/docs/cd/B40089_10/current/html/docset.html
    For r11:
    http://download.oracle.com/docs/cd/A60725_05/r11_doc.htm
    Regard
    Helios

  • Rework Process of Process Manufacture

    HI,
       Can you give me some help on setting up a rework process for process manufacture factory?I don't see some function in PI factory, like reference operation set (trigger point)in discret manufacture factory....I don't know how to make it...thanks..

    Monst Yang wrote:
    HI,pushpalas and all of you:
    >  thanks very much for your quick reply..
    >
    >  but I need a rework process for PI...I can't find a trigger point function in C201(reciept) to insert a reference operation set...can you tell me how to make it via process order(reciept,resource) instead of production order(router,work center)..
    >
    >
    > thanks..
    Hi,
    The below mentioned process hold good for Discrete as well as Process manufacturing
    Let it be normal routing or master recipe
    Open routing and select the operation line item
    To assign the Trigger Point function press GOTO MENU and then select Trigger Point Overview
    enter trigger point usage and description
    Now select trigger point usage line item and click DETAILS menu and select "TRIGGER POINT"
    Create Routing Trigger Point Details will appear
    Select the check Box="Insert reference operation set"; Sys Status=PCNF; Active=1
    now on the top Press the "PARAMETERS BUTTON" assign the group and group counter
    come back to the operation overview and save
    Regards,
    Raj

  • I have Windows 7, and I am being told that it does not support the newest Ai Illustrator, Are there any other alternate routes I can take to get adobe illustrator and photoshop on my computer? Perhaps an earlier version? Thanks! ~

    I have Windows 7, and I am being told that it does not support the newest Ai Illustrator, Are there any other alternate routes I can take to get adobe illustrator and photoshop on my computer? Perhaps an earlier version? Thanks! ~

    houseofrest,
    According to this page, you can use it for CC:
    Adobe Illustrator CC for Mac, Windows, PC - Tech specs
    Or you can buy CS6:
    http://helpx.adobe.com/x-productkb/policy-pricing/system-requirements-illustrator.html

  • Oracle Process Manufacturing Release 11i

    Hi there,
    Is there a free version of Oracle Process Manufacturing 11i for download? If so what is the site?
    Thanks.
    Regards,
    Leon

    Hi All,
    Here I talk a step to explain about Discrete, Flow, Process and project manufacturing process.
    Discrete:
    1. Assemblies are built in specific (discrete) quantities. These jobs or work orders use specific materials and resources.
    Say ship building, job shop companies etc are few examples of discrete.
    2. Assemblies that are made in groups or batches.
    Discrete Manufacturing is a Batch production situation related to most industries like Engineering
    It use routings to schedule job production activities and create operation specific material and resource requirements.
    Flow:
    Flow manufacturing developed to support 'Lean manufacturing'.
    Lean manufacturing concepts include:
    JIT, pull, value stream mapping, kanban, single piece flow etc.
    This module will enable flow manufacturing concerns.
    Ex: Car manufacturing
    http://forio.com/simulation/oracle/main.htm?page=background&FD_p=1
    http://www.psa-peugeot-citroen.com/en/psa_group/visite/index.html
    Process:
    It is purely for process manufacturing concern
    Ex: Chemical industry, pharmateicals etc jus think of chemical laboratory.
    Project:
    Projects are used to track costs by specifying revenue and billing methods. Each project can have a set of top level tasks, and a hierarchy of subtasks.
    As rightly said ETO is example for project manufacturing
    To answer your questions
    1- A Steel making Company is under Discrete Manufacturing or not?
    Depending the concern manufacturing practice only we can say it as discrete or not.
    From the above explanation you can able to understand it.
    All discrete industry will adopt few lean manufacturing principles to add value in their process.
    2- Can we have Discrete & Process in one organization? because some part of my Org like Discrete Manufacturing and other like Process Manufacturing ?
    Yes we can have, say for a final product two or more items may come from both discrete and process types.
    Hope it is clear and helpful.
    Tks
    M J

  • Alternate BOM & Alternate Routing

    Hi All,
           What is Alternate BOM ?
           What is Alternate Routing ?
           How do I create Alternate BOM ? [Please give me a step by step procedure]
           How do I create Alternate Routing ? [Please give me a step by step procedure]
           What are all the configuration set-up is required to automatically and manually select the Alternative BOM while creating a Planned and Production Order ?
       What are all the configuration set-up is required to automatically and manually select the Alternative Routing while creating a Planned and Production Order ?
    Please provide me an understanding on above questions will be grateful.
    Thanks in Advance

    Dear Madhan Shah,
    If  you are new to the FORUM kinly read the rules first, so that in future you wil avoid posting mulitple questions in same thread.
    What is Alternate BOM ?
    If you have more than one BOM for same material then each BOM is created as alternate BOM
    EX - The BOM for producing sample will not be same as BULK so based on lot size you will have this.
    What is Alternate Routing ?
    If you have more than one ROUTING for same material then each ROUTING is created as alternate ROUTING
    EX - The ROUTING for producing samplING will not be same as BULK so based on lot size you will have this.
    How do I create Alternate BOM ? Please give me a step by step procedure
    First create a BOM in the CS01 and save it.
    Again create a BOM for the same material, the system will give you a message telling Alternate bom created.
    You can see the alternate bom number.
    How do I create Alternate Routing ? Please give me a step by step procedure
    First Create a Group and Group counter 1
    Add the second routing as Group counter 2
    You can define the Alternate routing / group counters based on the lot size or validity
    What are all the configuration set-up is required to automatically and manually select the Alternative BOM while creating a Planned and Production Order ?
    What are all the configuration set-up is required to automatically and manually select the Alternative Routing while creating a Planned and Production Order ?
    For above 2 questions
    NO configuration is requried
    Creat PRoduction version in C223
    Here you define in each production version which is the BOM and routing it has to use.
    Each production version you can define it with a lot size or valdiity period.
    IN the MRP4 against the selection method you can define how the production version has to be selected.
    Kindly let me know your feedback , if answered kindly close the thread.
    reg
    Dsk

  • What is Process Manufacturing?

    Hello All,
    Can any tell me what is process manufacturing. As i am a starter, if you could throw some light in detail or brief level, how it works, where it works, for what it is? and What is the better way to start digging in to this module, i mean where is the head and tail?
    I am working on Supply chain process- Quote to Cash and procure to pay, is it related to that? or if you have some interesting doc's, if you could forward me and that will be a good start for me [email protected]
    Thanks in Advance!
    Vinoth

    Go through the following links, it should be helpful:
    [Process Manufacturing|http://www.oracle.com/applications/manufacturing/Process.html]
    [Applications Releases 11i and 12 - Process Manufacturing Manuals|http://http://www.oracle.com/technology/documentation/index.html]
    [Note: 417933.1 - Getting Started with R12 - Process Manufacturing FAQ|https://metalink2.oracle.com/metalink/plsql/ml2_documents.showDocument?p_database_id=NOT&p_id=417933.1]

  • No relation in PLPO for alternate routing.....

    Hi Experts,
    I am using PLPO table in my program but i am not getting alternate routing ( there are two alternate sequences ) link between the two table PLPO and MAPL. In mapl it is showing Matnr, PLNNR and PLNAL for alternate routing.
    In PLPO there is not link. Pl. help where i can get link with plpo table for alternate sequence ?
    Yusuf
    Message was edited by:
            YUSUF BHORI

    Hi Debopriyo,
    AFKO AND AFPO tables are order related. But in my case orders has not confirmed yet.
    Yusuf

  • Pls tell me the ICM router,logger process name

    pls tell me the ICM router,logger process name

    Hi Bhabani,
    Can you write clearly what you want.
    i,e, do you want to display the no. of workers in each dept.?
    Write clearly.
    Sastry.

  • Maintenance with Oracle Services or Process Manufacturing ?

    Could somebody tell me if Oracle Services is interesting for the maintenance of buildings, vehicles and workhops ? Does Process Manufacturing better suit to this ?

    Michael,
    service can be used for maintenance if you use some workarounds for the relation between your fixed assets and the installed base. Oracle will launch a new product emphasizing maintenance, it will be called Enterprise asset managementn (eAM).

Maybe you are looking for

  • How to delete some date in target table at a mapping?

    How to delete some date in target table at a mapping? I extract date from source tabel into target table, but before extract date I want to delete some date from target? how to do?

  • Burning IProject To DVD

    My IDVD / computer freezes up when trying to burn my I project to DVD. It freezes up at the same spot everytime (Rendering menu video asset).

  • HT201272 Is like to obtain all my ringtones from itunes

    I just got off the phone with a apple rep he had very little knowledge on helping me. When I contested he hung up it was rude and unprofessional. I waited two days for this call to not even be helped. I'd like someone to assist me or if you can send

  • Need Help!!! with Froms3.1 conversion please

    We are converting database in oracle 3.1 charecter-based forms into developer 4.5. When we converted to GUI, the forms look ugly. Does anyone know ho to fix this. I also need to put forms in multiple convasses (converted form) into one convass. I tri

  • Safari Hang

    EVERY time I open Safari it hangs and EVERY time I force quit it & then reopen it it opens properly! Date/Time:       2011-10-20 07:36:53 -0700 OS Version:      10.6.8 (Build 10K549) Architecture:    x86_64 Report Version:  7 Command:         Safari