Alternate Sequence operation confirmation ...

hi folks ,
i have 3 operation in STD seq like 10, 20, 30
and for the std sequence thr is alternate seq. which contain alternate operation for
20 th operation of STD.
FOR operation 20 now :
In STD seq only one activity Machine time required for 1 item to process is 10 min.
In ALT seq only one activity Machine time required for 1 item to process is 5 min.
when i am confirming the 20 operation in CO11 the time required for the opr 20in ALT seq opr. 20 is not appering on the QTY / YIELD .
regards

Hi,
You can cross-check in the production order, operation overview whether the operation 20 is that of the alternative sequence. If not when you create the production order the sytem will inform that alt. seq exist. Here you have to choose the alt.seq.
Also check the settings in the confirmation parameters (opk4).
Propose qty/standard value is to be selected.
Regards,
SDS

Similar Messages

  • Confirmation in alternate sequence

    Hi
    System proposes wrong qty to confirm after alternate sequence confirmation.
    op 10  -  10 ea
    op20   -   5 ea        op11  -  5 ea(parallel)
    op30   -  10ea
    In confirmation, after i confirm op10 for 10 ea, i confirm
    Case A: op20 - 4 ea (Final confirmation), op11 - 3ea (Partial)
    system proposal for op30 is 8ea
    Case B: op20 - 4 ea (Partial), op11 - 3ea(Partial)
    System proposal for op30 is 6ea
    why it is not proposing 7 ea for op30.

    Dear,
    In OPK4 check the following
    Operation sequence = Operation sequence not checked....then  do confirmation it will work as required by you.

  • Confirmation of parallel sequence operation.

    Hello friends,
    I want to do confirmation of parallel sequence operation. I use 3 or5 work centers  at a time for doing one operation. So i have defined parallel sequences for standard sequence. When I do confirmation of quantity and activity time in CO11N for one parallel sequence, other sequence quantity and activity time should be decreased. But system takes actual  quantity and time.
    How to make settings , so that  quantity and activity values should be decreased automatically for next parallel sequence.
    Waiting for Reply!

    Dear ,
    You are not able get the paralle sequence operation in CO11N because production order will copy the Routing based on the Order Type dependent paramter-OPL8-Routing  set up.
    Here , basically , you might have chkeced Alternative Sequence  and Sequence Exchange field (0)  , so while creation production order , routing with operation which are in alternative sequnce will be copied  and will be used in CO11N confirmation.
    2.You need to maintain "Operation Sequence is not checked " for operation sequence for the Ordertype/Plant combination in confirmation parameters using transaction OPK4.-Confirmation parameters of Order
    Try and revert back
    Regards]
    JH

  • Alternative sequence - operations number

    Hi all,
    I've got an issue on the alternative sequence.
    The standard sequence is made by operation 10, 20 and 30.
    I try to add a new alternative sequence to substitute the operation 20 with 2 different operations: 20 and 25.
    The system give me an error on the routing: CP331 - Operation: date 28.04.2010: operation number incorrect.
    I tried the option to change the standard sequence to 10, 20 and 40,  but the error is the same. The system checks the return operation (20) and is not possible to add operations into the alternative sequence with operations number greater than return operation.
    It seems that is not possible to substitute 1 operation with 2 operations.
    Anyone has solved?
    Thanks, regards.

    Hi ,
    Okay, you want to create an alternaive sequence only.
    Standard sequence is   10  20 30
    Alternate Sequence:
    1.Branch operation : 10
    Number of the operation from which an alternative sequence is to replace the reference sequence.
    2. Return operation: 30
    (number of the operation up to which an alternative sequence is to replace the reference sequence)
    Operations: 20, 25
    This should work.
    Please check and confirm.
    Regards
    Datta

  • Alternate Sequences in Routing?

    Dear Guru's,
    In our production process some of the operation we will perform externally by sending it to vendor. For this we are maintaining the alternate sequences in routing. So, when ever we want send the material to vendor to perform the external operation will exchange the sequence in routing.
    So, in some cases we have to do it in mass. I hope is there any t-code or any other way to do it.
    Need valuable inputs please.
    Thanks & Regards,
    Madhu.G
    Edited by: madhu333mac on Feb 13, 2012 9:14 PM

    Dear Madhu,
    Is it only a manual decision whether to process the operations in-house or else to be sent to the external party or is it based on
    the lot size say if the order quantity is for more than 100 it's to be given to the external party means then define a lot size for
    the alternative sequence for a lot size rangining from 101 to 9999999(For example).
    In this case during order creation the system copies the alternative sequences automatically.
    Check whether this works out for your requirement or not.
    Regards
    Mangalraj.S

  • Segregate the scrap as an operation wise during operation confirmation

    Hello PP Gurus,
               One  FERT item's BOM contains 4 HALB items in which 3 are mentioned as an negative qty, ( it may be reusable scrap using in production again), and having 5 operation sequence. The problem is while confirming first operation itself the whole scarp value is generated for those 3 HALB items which are mentioned as an negative value. I want to segregate the scarp value for each and every operation or at least any of operation by qty wise or percentage wise. Is it possible to maintain it in system? and also is it possible to control by order type wise?
    Is there any setting to do meet this requirement?
    No manual material issue , during confirmation material are issued/generated by using back flush.
    Thanks

    Hello Mr.Devendra,
                Thanks for your reply. I want to do an settings for component allocation by operation wise while during the production operation confirmation. Is there any option or SAP User exit and enhancements?
    For example, a FERT 'A' having as an sub assembly 'B','C','D' and having 5 operations(10,20,30,40,50)in Routing. In these 'B' mentioned as an positive qty and the remaining 'C','D' are mentioned as an negative qty. while doing confirmation components are allocated for first operation(10) itself. i want to allocate the component for operation wise. In my case, while confirming operation 20 only part of 'B','C','D' will be allocated and the same for segregate to operation 30,40. How can we handle this situation is there any option?
    Thanks

  • Inspection RR should be allowed for the operation confirmed qty only

    Hi  Friends
    I have one requirement , Inspection results recording should be allowed for the operation confirmed qty only
    i.e
        1. Release Production Order for 100 qty
        2. Inspection Lot created for 100 qty
        3. Production Confirmation done for 1st operation for 50 qty
        4. Next operation is testing or Quality inspection
        5. Used 03 insp type(WIP inspection)
        6. Result Recording should be allowed only for 50 Qty
        7. If i go for 51, system should give message(i.e confirmation not done for 51)
        8. Usage decision saved for 50 qty, Remaining 50 qty,we have to do separate RR & UD once confirmation done
    Please let me know the settings,
    Thanks & Regards
    Gajendranath

    Hello Gajendra
    Please find my inputs
    1) PLease activate in OPK4 for the production order type these 3 setting
    a) Operation sequence :  Error when operation sequence is not followed
    b) Overdelivery : Error when overdelivery tolerance is exceeded
    c) Results Rec. (QM) : Error message if no insp. result exists
    by doing this a) you make the sequence of operation mandatory. no body can confirm operation no 30 without confirming 10 & 20
    b) if you have confirmed 50 in the first operation, you cannot confirm more than 50 in second operation
    c) it will not allow you to confirm through C011n if the result recording is not done
    2) Kindly understand for 03 inspection the lot quantity will be of 100 (PO quantity as in your case). so it is impossible to give UD for 50 quantity and then do the UD for the rest of the quantity.
    UD is for the lot and not for the confirmed quantity. And please note for 03 inspection confirmation holds the importance rather than the UD
    So use 03 for intend of its use
    Regards
    Gajesh

  • Alternate Sequences

    hi,
      how i can maintain alternate sequences while doing long term planning.
    pavna

    Dear Madhu,
    Is it only a manual decision whether to process the operations in-house or else to be sent to the external party or is it based on
    the lot size say if the order quantity is for more than 100 it's to be given to the external party means then define a lot size for
    the alternative sequence for a lot size rangining from 101 to 9999999(For example).
    In this case during order creation the system copies the alternative sequences automatically.
    Check whether this works out for your requirement or not.
    Regards
    Mangalraj.S

  • Table name& field name for production order  & operation confirmation

    Hi All,
              I would like to know the table name and field name for the production order "confirmation" (CNF) and the operation confirmation (CNF).
    Thanks and Regards,
    PSS

    Hi there,
    CORU(R/3 Application development: PP Confirmations )
    AFFW       Goods movements with errors from confirmatio
    AFRC       Table of planned changes to conf.: Automatic
    AFRD       Default values for collective confirmation 
    AFRH       Header information for confirmation pool   
    AFRP1      Table of planned changes to conf.: Automatic
    AFRP2      Table of planned changes for confirmation: B
    AFRP3      Table of planned changes for confirmation: C
    AFRP4      Table of planned changes to confirmatn: Data
    AFRU       Order completion confirmations             
    AFWI       Subsequently posted goods movements for conf
    TAFWD      CORU: Messages that are not interpreted as e
    TCORD      Table for field-dependent check routines   
    TCORU      Parameters for order confirmations         
    TCORV      Table with Routines for structureing variabl
    TCORW      Confirmation: Window Control               
    TPARU      Control parallelized confirmation processes
    TPRRU      Control table for process chain for confirma
    TPRRUT     Text table for process control of confirmati
    TRUGS      User status caused by deviation            
    CO(R/3 Application development: PP Production orders )
    AFBP        CIM order: Batch print requests            
    AFFL        Work order sequence                        
    AFKO        Order header data PP orders                
    AFPO        Order item                                 
    AFVC        Operation within an order                  
    AFVU        DB structure of the user fields of the opera
    AFVV        DB structure of the quantities/dates/values
    FAPW        Index of production-/issuing plant for produ
    FTIND       Missing parts index                        
    ORDCOM      Communication control Operation download   
    T024F       Production scheduler                       
    T399X       Parameters dependent on order type         
    T441C       Profile - availability check               
    T441CT      Texts for Profile "Display Availability Chec
    T490        Transactions PP - orders - order category  
    T496B       CIM order: Assigning document types to refer
    T496D       CIM: Destination/lists/spool parameters per
    T496F       CIM order: Form description of the list    
    T496K       CIM order: Entity table of possible table id
    T496N       CIM order: List descriptions               
    T496P       Print PP documents: Determination of output
    T496R       Print PP shop papers: Report control       
    T496T       Print PP shop papers: Transaction control  
    T496V       PP Print: Default Value for Printing Online
    T496Z       CIM order: Table-controlled table access   
    TC32        Assigning subscreen to processing location 
    TC34        Allocating operation to object type for the 
    TC62        Sequence of detail screens when processing h
    TCO01       Sequence/operations control in logicstics or
    TCO03       CIM order: Texts for TCO01, Description of o
    TCO04       Table for controlling the screen sequence gr
    TCO05       CUA status depending on panel, trans. type, 
    TCO06       Exclusive functions for PP orders           
    TCO09       CIM order: Text IDs of objects in orders    
    TCO10       Valuation variant for order costing         
    TCO11       Control table for production orders - availa
    TCO12       Control table production orders - stock dete
    TCO36       PP orders: Control table for calling up pop-
    TCO41       CIM order: Default values for generating ope
    TCO43       PP-SFC order profile                        
    TCO43T      Description of production scheduler profile 
    TCO60       Sequence keys for input facility and verific
    TCO61       Sequence key for PP orders                  
    TCO62       Defining screen sequences for input facility
    TCO63       Sequence of detail screens when maintaining 
    TCODB       Database fields development class CO per ord
    TCOF        Profile for missing parts info system       
    TCOFF       Profile for Missing Parts Info System: Displ
    TCOFFT      Texts for Missing Parts Info System: Display
    TCOFG       Profile for missing parts info system: crite
    TCOFGT      Texts for Missing Parts Info System: Criteri
    TCOFK       Texts for functions in milestones/trigger po
    TCOFS       Profile for Missing Parts Info System: Sort
    TCOFST      Texts for Missing Parts Info System: Sort Cr
    TCOFT       Texts for Missing Parts Info System        
    TCOKO       Constants for PP orders                    
    TCOKT       Account assignment categories for order    
    TCOP        Field selection profile                    
    TCOPS       Field selection profile                    
    TCOPT       Description of Profile for Field Selection 
    TDUMMY      Dummy structure of a table for READ with VER
    TRUG        Reason for variances in completion confirmat
    TRUGT       Text describing the reason for a variance in
    TXPR1       XPRA control - missing parts info system   
    Regards
    Hemant G

  • Connecting the Sequence Operator to the Mapping Output Parameter?

    my OWB Client: 10.2.0.2.8
    my OWB Repository: 10.2.0.2.0
    I need to obtain a sequence number (from the Sequence Operator), then output it
    using the Mapping Output Parameter, if possible.
    I have tried two things:
    1. Connect Sequence Operator nextval variable to the Mapping Output Parameter.
    This generates error:
    "Table,View Or Sequence reference 'xx_SEQ.NEXTVAL' not allowed in this
    context"
    2. Join the Sequence Operator nextval variable with a source table, then
    connect a port from the dataflow to Mapping Output Parameter.
    This generates error:
    "Mapping Input Parameter and Mapping Output Parameter are intended to be
    executed before and after the data flow of the mapping and cannot accept
    inputs from any part of the data flow."
    From what I have seen so far, it appears it may not be possible to use the
    Sequence Operator along with the Mapping Output Parameter. If Im wrong, please
    let me know of an example of how the Sequence Operator and Mapping Output
    Parameter can be connected.
    Thanks

    User -
    Look at adding a Post-Mapping Process to your mapping, there you have a choice of built in functions or custom ones that could return a sequence value for you. You may have to create the sequence outside of OWB ...
    TXB

  • Problems with Sequence Operator in OWB

    Hi everybody,
    i want to use a sequence in my mapping. Now i have two problems.
    The first problem is the following. When i want to import my sequence (exists on my DB) i can select the sequence in the Selection Window, but when i click on Import i didn't see it in the Design Center, also there is no window which tells me that i have successfully imported the sequence.
    The second problem is, when i drag the Sequence Operator into my Mapping i shows the Selection Window where i have to select the poject and object to bind the operator. But i can't select any object.
    Can anyone help me with my problems and tell me how i can use a Sequence and the Sequence Operator in my Mapping
    Many thanks in advance.
    Greetings

    Hi everyone!
    I'm having a repeated problem with sequences in OWB: I'm filling a TIME table with 1096 rows. Now matter how and when I create the sequence it always starts with 2 instead of 1. Moreover, the last value of the sequence is 1101, when it was supposed to be 1097 or 1098....
    I did achieve the right ouput sometimes, but I must be doing something wrong. Here are the several ways I've tried in OWB:
    1) I've created all the sequences by sql code, in SQL DEVELOPER or PLUS*, and then imported to OWB. Because of being imported, I didn't have to deploy each sequence. Then, I've connected (by drag and drop to the canvas mapping) the sequence I wanted with NEXTVAL (as I always do) attached do TIME_ID of table TIME;
    2) I've dropped and created, several times(as before), the sequences and never had problems..until now. I've also experimented creating, by scratch, the sequences just in OWB and then deploy them in Control Center. After this, deployed the mapping and executed, just like in 1).
    So, the difference lies on how I create the sequences and what are the correct steps to create, deploy (if needed), deploy the map and execute the map.
    This is insain and I really need this to work. I've tried so many ways....
    Could someone PLEASE help me with this? Any thoughts?

  • Work center design and operation confirmation

    Hi All,
    In my scenario im grouping the similar m/c to a work center
    say for ex. 4 lathes m/c into a single work center as LatheALL and also the indiv cap as 4
    my customer wants the traceability in which m/c the job is done
    So i had designed in such a way that
    1 LatheALL -4 cap(this will be additional wc)
    2. lathe1 - 1cap
    3.lathe2 - 1cap
    4.lathe3-1cap
    5.lathe4-1cap
    in the routing only latheALL will be given., this will help customer in planning
    when going for operation confirmation i will give confirmation for that operation and will confirm as lathe1or lathe2  or etc.. this will help prodn dept for traceability in which m/c the work is done
    this is method i have informed to client .,
    pls advice is this approach is correct ?
    also suggest by giving confirmation for another work center will the capacity for the original work center will be reduced
    Regards
    Anand Srinivasan

    Hi Anand,
    this is method i have informed to client .,
    pls advice is this approach is correct ?
    yes, during confirmation time to enter the orginal actual work center, this suitable for your client requirement, do the settings for OPK0 - change the confirmations parameters (0410 or 0420)
    Regards,
    Sankaran

  • VLD-1800: Illegal use of sequence operator(s)

    I'm getting the following error.
    VLD-1800: Illegal use of sequence operator(s)
    ["ACCT_SEQ"] in a complex mapping.
    Does anyone know why this wuld be happening?
    Also, what constitutes a complex mapping?
    Any help is greatly appreciated.

    Hi John,
    Can you explain what your mapping is supposed to execute (merge statement with sequence, multi table insert with sequence, ...) ?
    Best Regards,
    Sébastien De Clercq,
    Brussels, Belgium

  • Illegal use of sequence operator

    Hi All,
    In my map I am using a sequence in the expression operator and then I am putting the output to a joiner and after that data is moved to target table but while validating this map I am getting error:sequence operator r used in complex mapping which requires generation using nested subquery.sequences r not allowed to be used in nested subqueries. Can anyone tell me how can this issue be resolved.
    Thanks n Regards,
    Amrit

    Hi,
    You can try moving the Sequence operator after join, ie as a final step close to target.
    Mahesh

  • Operation confirmation without inspection results - not working

    Hi All,
    We have 4 operations for one production order.
    1st operation has 5 MICs
    2nd operation - no MICs
    3rd operation - no MICs
    4th operation - 1 MIC.
    In tcode OPK4 I have configured error message if QM results are not recorded.
    Before result recording I tried to do 1st operation confirmation (tcode CO11n). I got error QM data for operation missing (as expected).
    Now for the first operation (having 5 MICs), I have recorded values for only 1 MIC (out of 5). Then it is not giving error for 1st operation confirmation.
    Our requirement is- all 5 MICs must be recorded for operation confirmation.
    How to handle this. Please Help.
    Thanks & regards

    The configuration setting you have made doesn't give error message during confirmation even when one of the MIC assigned to one Operation is recorded and remaining MIC's assigned are not recorded.
    Hence we can use User Exit during Confirmation screen and do the necessary coding to throw a error message if RR is not done.
    Best Regards,
    K. Raghavendra Nayak

Maybe you are looking for

  • Link to MobileMe calendar subscriptions in Pages '09

    I am working on a document with the end goal of sending out a PDF with links to subscribe to shared MobileMe calendars. I am using Pages '09, version 4.0.5 (852), Mac OS X 10.6.7, and the new CalDAV MobileMe calendar. The problem is that every time I

  • Changing the Workgroup Name on a Mac

    How do I change the work group name on a MAC?

  • Issue with Package ??

    hello experts i have to face a evalutaion . there i have to do a screen programming where there i will save data in a ztable but when i will save data then it will ask for a package and a requset number as like it ask when we create a report by se38

  • Auto mount failure with "not owner"

    I have setup auto_master with the following line: /-    auto_direct I also have tested a client smb share connection with the following successfully since this node is a member of the cih-ettm windows domain; I have also setup smbadm add-key with thi

  • Adding configurable material in MRP3 using MATMAS .

    Hi All, I am working on creation of material using idoc ., message type is MATMAS and basic type is /AFS/MATMAS05. In the view MRP3 we have a field called 'CONFIGURABLE MATERIAL ; and I am trying to pass the configurable material into this space usin