Alternative BOM in Production Order

Hi PP Experts,
I have a small issue which is like this:
I have two Alternative BOM for Material "A".
When I create production order it displays both Alt Bom for selection.
When I select the second Alt BOM, in production order it still reads the First Alt BOM.
Please advice.
Regards
Mohan

Hi Mohan,
I suggest if you have two alternate BOM for a material, you can use the production versions and assign the same for the material in Material Master MRP4 view.
Create Production Versions 01 and 02 and assign the alt BOM 1 for the PV 01 and 02 alt bom for PV 02.
Goto SPRO : Production -> Shop Floor Control -> Define Order type dependent paramters  ( Tcode : OPL8)  : Define the Production Version Slection either 1 for manual and 2 for automatic. (if you use automatic system will select the version based on the material master selection method )
regards
radhak mk

Similar Messages

  • How to compare sale order bom and production order bom.

    i would like to provide report with respect to comparation of sale order bom and production order bom, but i am not familiar with SD and PP, can anyone give me some clue? i only know sale order bom is created via 'CS61', afterwards run mrp to get production order, the process appears complicated, i needn't know the process detail, just want to know how to get sale order bom and relative production order bom. please guide me.

    Hi,
    Check Tcode:CS14 to SD/PP BOM's
    Chidambaram

  • BOM and Production Order: Multiple Inputs to Multiple Outputs

    Dear All, My client's industry required BOM and Production Order must be Multiple Inputs to Multiple Outputs. We propose to create customization program to work on it but client do not want any customizations. Any suggestions? SAP B1 8.81 PL13 Thank you very much in advance. Best Regards, Vivian

    Hi,
    Please advice your requirement with an example. There is possibility to input multiple components to produce single finished product.
    Not sure you have checked with SAP help file. If not refer SAP help file and below blog.
    http://scn.sap.com/community/business-one/blog/2014/03/01/how-to-implement-production-in-default-sap-business-one
    Thanks & Regards,
    Nagarajan

  • BOM and production order

    CAn somebody give me the steps for creating BOM alongwith routing  in SAP
    and also the steps involved in creating a Production order //
    Please give me all the t Codes //Iam basically a finance and costing consultant
    Iam trying to create a test scenario for testing a costing variant //
    Also trying to analyse the financial impact during creation of a Prodn order
    Thanx
    Nikhil

    Mr. Nick,
    Creation of BOM:
    1. CS01 -> BOM creation
    a. Enter Mtl No., Plant No., BOM Usage (use the value 3), If you wish to keep track of changes, then generate a change number & assign the same to the change number field & also select the date from which you want the BOM to be valid from.
    b. Once inside this transaction, add the components which you want along with the qty required.
    c. There are more settings which you can do, but for a simple BOM, these entries are sufficient.
    d. If you wish to link another BOM with this, enter the mtl nos which has the BOM, this way you can build multi-level BOM's.
    2. CA01 -> Routing creation
    a. You can create a routing specific to a material or you can have a single routing for multiple materials.
    b. If you want to have a routing per material, then enter the mtl nos, Plant, change nos if you want to keep track of changes & the valid from date.
    c. You can also have routing specific to a sales document or WBS element.
    d. If you wish to have a group routing i.e. a single routing for multiple mtl's which are going to be produced in a similar way, then just enter a name in Group field.
    e. Depending on what you select above, different screens open, i would suggest, you try creating one in the sandbox server & post back if you face any problems.
    3. CO01 -> Production order creation
    a. Once you have created the BOM & routing for the material, then enter the material for which you want to create the production order, enter the production plant & also the order type. If you are not aware of what order type, then please refer to your PP consultant.
    b. After making the initial entry & when you press enter, the system automatically reads the BOM & Routing associated with this material.
    c. Once again i suggest you create a production order in sandbox server & if you face any issues you can post back.
    Also note: You can use CS02, CA02, CO02 for modifications of BOM, Routings & Production orders respectively. CS03, CA03 & CO03 for display.
    Hope i was able to give some assistance to you.
    Regards,
    Vivek

  • Reg : BOM and production order

    Hi all,
    I have created two production orders for the same material but with diffrent BOM explosion date. now can any one please let me know how will i find which version of alternate BOM of the material is used in the production order.
    In the production order header table ( AFKO) i am getting only the alternate BOM number, i am ubable to find which version of alternate BOM is used for Production order.
    Thanks .
    VIJAY

    the relation is as below
    AFKO-STLNR = STAS-STLNR
    AFKO-STLTY = STAS-STLTY
    AFKO-STLAL= STAS-STLAL
    FROM HERE TAKE ALL
    STAS-STLKN AND STAS-STLTY
    PASS IT TO STPO
    STPO-STLNR = STAS-STLNR
    SPO-STLTY = STAS-STLTY
    STAS-STLKN-= STPO-STKLN
    THIS WILL GIVE YOU ALL THE BOM ITEMS USED IN THAT PROD ORDER.
    IS IT OKAY?

  • Change BOM and Production Order

    Hello Expert,
    I have recuuring problem, hope you can lean help to me. Can you explain to me why this happen?
    we have change a component BOM in CS02, first we create change number in CC01. with effective date for 30.09.2008.
    In BOM 6083, there exist a component 10020379. we want this component to be deleted on 30.09.2008 and be replace with a new component material 10060530 effective on the date 30.09.2008. that was the new set up of the BOM of material 6083 (at this date august).
    Today (27.08.2008) we create a production order for material 6083, relesed it and when we will look at the PO Component Overview of our created PO both BOM component material 10020379 and 10060530 was present both backflushed was tick. but 10060530 component has zero req. qty compared to 10020379 it has a value on req. qty.
    why that even we create the PO in August replacement material 10060530 was exploded and included in PO since this material will be effective on 30.09.2008?
    and when we confirmed the PO via CO11N, we have a COGI error for the replacement material 10060530 "Enter Storage Location"?
    How all this happen Guru?.
    Thanks and more Power

    Hi,
    in this scenario, you can control the BOM explosion better with Revision Levels.
    say you have created the Revision Level with CC11, using the same change master which is effective from 30.08.2008.
    Every time, when you create an Order, system will pick the latest/relevant Revision level.
    If you create an Order on 01.01.2009, suppose there is a chanege again to your BOM, still at the time of confirmation/backflush system will explode the BOM as on 30.08.2008.
    Hope this helps..
    Regards,
    Siva

  • Bom for production order and subcontracting

    Dear guru ,
    I have a finished material that can be use both produced in-house and procured externally with subcontracting.
    Now i use one only bom with usage 1 (production ) for the two process.
    I have a problem for one component.
    For subcontracting i must consider this component as a phantom (with explosion of its components) , instead for the in-house production I must consider this component as a normal stock item.
    Can I use only one bom or I must create an alternative bom for manage the two cases ?
    Thanks for your help.

    Dear CRIS,
    In my understanding this may create discrepancies during the material transfer from own stock to the vendor and also during
    month end checking process.
    What's the problem of maintaining that component as a stock item?why it should be treated as a phantom only for sub-
    contracting?
    Even if you are maintaining 2 different alternative BOM's for the final product one with the component as a normal assembly and
    the next one as a phantom,you will be facing issues during costing purpose and material inventory also.
    Come back with your further questions.
    Regards
    Mangalraj.S

  • Differ Bom For Production order and Subcontracting

    Dear all
    Is there any process to defined BOM for Subcontracting & production Order  separately and how can we make the Bom For Both case ,If it is possible then how can we choose in the production order for in house production and also for subcontracting for purchase order.
    Rgds
    Pankaj Agarwal

    Hi,
    After giving 'X' in the procurment type, maintain quota arrange usage as '4'.
    Then use T.code meq1, for creating quotas.
    Give the material no. & then give validdity date. Double click the validity date, this will take you to another screen.
    Here give the procurment type as internal production, the %quota & the prod version in the 'Version field'& then in the second row choose external procurement & choose sub-contracting in the special procurement field, then enter the %quota & prod version in the 'version' field.
    After this in T.code omi4 (for lot-size), check if the lot size you use has got a tick in the splitting quota. If not check this indicator & then run mrp. Based on the quota %, pl order & pur req will be created.
    Regards,
    Senthilkumar SD

  • Document Flow from BOM to Production Orders

    Dear SAP Gurus,
    I have attached a few documents at header level of the BOM. I have also attached document at item level in the BOM. When I create a production order these documents are not flowing to Production Order. Is there any way to do that. I also want to see them in CS11 and CS12 reports.
    In OPKP I have already checked Document Links-BOM "On Creation" and "On Release" for my production scheduling profile.
    Thanks and Regards
    Geravine

    I have three documents. One is attached at the BOM header level under the documents tab. The second with item category D is entered as a line item in the BOM Items. The third is in the Item Level under the item's documents tab in the item details. All have same document type.
    When I create the production order the second document is copied in the document overview of production order. First and Third are nowhere to be seen.
    Is there any config or user exit to achieve the same?

  • Bom for production order - Function module

    Hi
    I'm looking for a function module or bapi which can provide me with the BOM for a specific production order.
    The FM should also handle changes to the BOM and just show me the updated BOM on the production order.
    KR
    Jesper Dueholm

    Dear JDU,
    You can use this FM BAPI_PRODORD_GET_DETAIL if you want to get the BOM components related to the production order or
    use FM,CS_BOM_EXPL_MAT_V2 for getting BOM multi-level display.
    There is no functional Module through which you can do BOM changes in the production order or in the BOM and it has to
    reflect the changes in the order immediately.
    Check these functional modules for BOM change,
    S_BI_BOM_CHANGE_BATCH_INPUT   Change bill of material via batch input
    S_BI_CHG_CHANGE_BATCH_INPUT
    S_CL_P_ITM_MASS_CHANGE
    S_CL_S_ITM_CHANGE
    S_CL_S_ITM_CHANGE_COMPLETE
    S_CL_S_ITM_ODP_CHANGE
    S_CL_S_SUI_CHANGE
    S_CL_P_BOM_MASS_CHANGE
    S_CL_S_BGR_CHANGE
    Regards
    Mangalraj.S

  • Alternative resources in production order - primary resource selected

    Good evening,
    I have a following problem, for which I have not found a solution:
    we are using alternative modes in PPMs for reassigning orders to alternative resources and creating an order sequence for each resource in the Detailed Scheduling Planning Board (DSPB) in APO. However, when I convert a planned order to production order, this order is assigned to a primary resource again. Can I avoid this behaviour?
    Thanks and best regards,
    Jevgeni

    Thanks Thukral,
    I also thought about that. Unfortunately, the prod order gets assigned to primary resource anyway. I've heard, when planned order is converted to prod order and sent to R/3, it reads PP data in R/3 and there in a routing, it calls up a primary resource. In addition, prod order does not contain alternative sequences any more and cannot be rescheduled to another resource.
    I wonder, if this system behaviour can be changed or just accepted. But how is it than possible to to execute the sequences of orders created in the DSPB? It seems, manufacturing cannot use this sequence for execution, as all prod orders will be allocated to primary resource.

  • Printing UDF from BOM on Production Order

    I have added some UDF's on my BOM that I'd like to print on the Production Order. How do I get BOM UDF info onto the Production Order?
    Sal

    Sal,
    BOM and Prod Order are 2 different documents and therefore do not share the UDF.  You will need to create similar set of UDF on the Production Order Header / rows (as required) and create formatted seach to copy the data from the UDF.
    Please give me an example of the data in the UDF and I will walk you through
    Suda

  • BOM explosion from Production Order

    Hi All,
      I understand from SAP Help files that we can explode BOM from Production Order using Read PP Master Data. But it also says, that we cannot do this if items have already been issued out. So would like to know is there anyway out to ensure that the production order is reading the latest version of BOM.
      The reason i want to know is because, at present the BOM keeps getting updated & so the work order has to reflect the new items. The BOM contains about 300 or more items, so manual changes is very tedious & error prone at the moment. Furthermore some components are outsourced. So i want to receive them back & post new materials for them. Hope my problem is clear & await inputs
    Vivek

    Hi All,
    Thanks for the inputs. I think for the situation am facing, the Order change management method, should be of help, as the BOM changes does not take place on scheduled dates, for me to fix the BOM explosion dates & assign them. As of now the BOM gets changed, depending the customer requirements, which is unpredictable.
    Clarification required:
    1. The profile which is created using OPL7 & assigned in OPL9 is unique, i.e. for any change numbers of BOM will always follow the profile entered in 'Overall Profile' in Work Scheduling view & i do not need to create new profiles for each new change number of BOM
    2. Once i run the COCM with the new change number, in the production order - components view will i be able to see any error message for those items which no longer feature in the new version of BOM? & will the materials added in the new BOM automatically feature in that list or do i have to manually add these to the order & if so, how will i know which materials need to be added?
      Hope the clarifications sought are clear, await inputs
    Vivek

  • Object Links fields grey for Production Order,BOM header,BOm item

    Hello Friends,
    1) In DMS Object links tab ,for objects BOM header,BOM item,Production order fields are grey even though necessary settings are done. Is this standard or I am missing some config.
    I did the similar settings for other objects like material master,vendor master,claim etc and I am able to assign these objects in Object links tab.
    2) In Production order I can assign the existing document but can't create document from Production order.I maintain value 1 in img Maintain screen for object link --> Auth.
    Define doc type --> Define object links --> create document = 2 ( Use Transaction to Create Document)
    I can create a document from other objects like Material Master,Claim,PO,PR with similar settings.
    Kindly help me in this regard
    Regards
    Abhijit A. Pachgade

    As u right said this is a standard.
    generally a document can be attched from the function T-code or from the DMS T-code cvo1n, through the object link tab page. * BOTH WAYS POSSIBLE*
    but for BOM, production order it is only one way, u can attach at the function T-code level like co01....ect  ONLY ONE WAY
    especially for PP transation, its one way
    REGARDS
    SURYA

  • Production Orders Changes Log

    Hello,
    I would like to know if there is any Standard way in SAP to be able to see the modifications for a production order. I would like to see modifications in quantities or components.
    Does anybody knows if it is possible to retrieve that information in a standard way?
    Thanks

    Dear
    Changes in Production Order can be  traced through following ways :
    1.Order Change Management :
    Frist a Overall profile should be configured in SPRO > PRoduction>Shop Floor Control > Operations>Change Management for Production Orders-->Define Overall Change Profile.
    Create a Change Number CC01 with Release Key
    In Object Types select/tick "Actv", "object", "MgtRec",
    You get the Change Number by Saving .
    Use this Change Number to Change BOM or Routings
    Then Release the Change Number useing Release Key till then you don't find the Change of BOM in Production Order.
    Then go to Oder Change Process T Code :- COCM
    Tick Change Number and Select the Change Number & Execute
    Select the Production Order, click on Procurement element icon you get another screen select and execute again.
    You get an Pop-Up screen. "Determine changes, Check changes, Change Original Order.
    you see the changes in BOM for Production Order i.e. after COCM.
    Then Confirm the Changes in Production Order then New changes will be Active in production Order.
    Use COCM1 to find out the details or CO03--Extra --change
    Please check link  : http://help.sap.com/printdocu/core/Print46c/en/data/pdf/PPSFC/PPSFC.pdf
    2.To  get the changes in Production Order apply SAP Note 390635.
    3 .You can use T.code AUT10 to check the changes made to production orders in specified period.
    Regards
    JH
    Edited by: Jiaul Haque on Nov 28, 2010 2:11 PM

Maybe you are looking for

  • Connecting my MacBook Pro to a TV

    I own a MacBook Pro 7,1. 2.4 GHz. Intel Core Duo. 13 inch. 4GB memory What do I need to connect it to my TV please?

  • ITunes recognizes iPod but can't sync - driver missing?

    Here's the rundown. Several months ago, the complete content of the old XP machine where this iPod's library resided was migrated to a Windows 7 Home Premium system using LapLink PC Mover.  iTunes had never previously been installed on the Windows 7

  • What jar for com.sap.aii.mapping is

    Dear i am testing with blow blog. /people/pooja.pandey/blog/2005/06/27/xslt-mapping-with-java-enhancement-for-beginners in this blog, java program use the following; import com.sap.aii.mapping.api.AbstractTrace; import com.sap.aii.mapping.api.StreamT

  • I have uninstalled Garageband due to problems. Now it seems I have to pay for it.

    I've had some problems with Garageband when I tried to download extra content. I called Apple Support about a week ago and he said that one solution might be to uninstall Garageband and then reinstall in from Mac App Store. I've now unnstalled Garage

  • Why my sending mail goes to outbox?

    I have tried so many ways to send email from my ipad but I am not able , all the mail goes automatically to outbox and stay there . I turn on/off the ipad and also delete all the app in the back ground but still problem resist. Could any body help?