Alternative sequences cannot be released

Operations in alternative sequences cannot be released
Message no. CO224
im getting error msg while realease alternate sequence operation .
for my alternate sequence operation Branch operation 0020 and return operation 0030.
as of now my first operation confirmed .
im trying to release my aternate sequence operation (as a second operation)
Not all operations were released (see log)
Message no. C2038
once i see the log it showing the first above msg
wat will be the problem.???

Prakash,
You must be talking about parallel sequences. Alternative sequences are the part of routing only. While order creation, one of the alternate sequence gets copied.
By the way if not all the parallel seuences are released, you can release them separately also at sequence level or at operation level.
1. Go to sequence overview, select the desired sequence & click on the green flag.
2. Go to operation overview of the desired sequence, select all the operation & click on the green flag in the bottom. Your problem will be solved.
Hope this helps you
SmanS

Similar Messages

  • While releasing a PO an error showing PO cannot be released

    While checking the PO release an error showing PO cannot be released is showing.The release button is not appearing from the first code itself

    Hi,
    The following are the various reasons for the errormessgae.
    1. PO would have already released.
    2. PO would not have come under the perview of release u defined
    3.You would not have authorization for release M_EINK_FRG object.
    4.The charetarestcs defined will not come for this PO properties.
    ETc.
    Mostly , if all the config is setand done and working fine for other  POs tooo then this PO iswith the problem.
    Do you have this problem for other POs too with the same kind of PO?
    Regards,

  • Dunning letter cannot be released to multiple customers

    hi sap gurus,
    i did the all settings for dunning still  "Dunning letter cannot be released to multiple customers". can u pls help me.
    Thanks in advance,
    RAVI

    Hi mauri,
    Thanks for your reply
    I dont have authorization to view this can u send me the notes pls.
    Thanks in advance,
    RAVI

  • Purchase Requisition Cannot be released

    Dear SAP Gurus,
    While doing ME54N to release PR. System showing the Error 'Purchase requisition cannot be released'.
    PR created on 23.04.2009 then PO Created against it , again PR was dereleased now again when going for release of PR system is providing the error as mentioned above.
    Message no. MEPO822
    << Moderator message - Everyone's problem is important >>
    Thanks and Regards.
    Anil Thakur
    Edited by: Rob Burbank on Nov 10, 2010 3:52 PM

    Hello Anil
    During this period any release stratergies changed for pr ?  after de release the pr just modified small value and make it same again this is nothing but refresh.
    then check the pr release
    Laxman

  • ERROR - PR CANNOT BE RELEASED

    Hi,
    user creates a PR(a/c assgnmt K),saves it.then finds she has to change cost center,does ME53N..does required changes & saves again.
    Now while releasing the PR(both thru w/f or ME54N) it gives error - the PR cannot be released.
    Pl resolve/advice.
    thanks

    Hi,
    First check the release strategy triggered or not before the release.
    If not check all the charactersticks u have mentioned in the PR.
    Regards,
    Cherry

  • Sequence cannot be opened in Premiere Pro 5 after installing AE5.5 Trial

    I'm travelling with  my macbook pro and Master Collection CS5
    A couple weeks ago After Effects crapped out on me, saying Quicktime wasn't installed.  Days of delay while I searched forums and the intertubes. A quick workaround suggested by a friend seemed to be to uninstall AECS5 and install the AECS5.5 Trial, as I'm travelling 9000 miles from my installer discs and can't just grab them and reinstall the entire Master Collection LIKE I DID 3 WEEKS AGO BECAUSE ACROBAT FREAKED OUT and wouldn't open because it said it was installed as part of a suite and it couldn't find the suite.
    So the AECS5.5 trial got me going for my after effects work.   It reinstalled the QT32 server or whatever.
    However, now I go back to Premiere to open my project files from before I installed the AE5.5 Trial, and most of my presets are gone, and I get the "Sequence cannot be opened..." message detailed in other places on the forums.  Doing the XML hack doesn't work.  So the AE trial has trashed my formerly working registered Premiere?
    Any ideas?  I'm 9000 miles from my installer discs. I gather that the Premiere Pro trial won't have the presets I need to work.

    Hi,
    Workaround-
    You can download the trial version of Master collection CS 5.5 its free for 30days and it work like the serialized version that is there are no limitations..
    you dont need to uninstall the master collection CS5 for installing CS5.5...
    Are you able to launch Premiere CS5 ? and create new project ?
    How did you unistalled AE CS5 ?
    Did you used Dynamic link in your existing CS5 Project ?

  • Alternative sequence - operations number

    Hi all,
    I've got an issue on the alternative sequence.
    The standard sequence is made by operation 10, 20 and 30.
    I try to add a new alternative sequence to substitute the operation 20 with 2 different operations: 20 and 25.
    The system give me an error on the routing: CP331 - Operation: date 28.04.2010: operation number incorrect.
    I tried the option to change the standard sequence to 10, 20 and 40,  but the error is the same. The system checks the return operation (20) and is not possible to add operations into the alternative sequence with operations number greater than return operation.
    It seems that is not possible to substitute 1 operation with 2 operations.
    Anyone has solved?
    Thanks, regards.

    Hi ,
    Okay, you want to create an alternaive sequence only.
    Standard sequence is   10  20 30
    Alternate Sequence:
    1.Branch operation : 10
    Number of the operation from which an alternative sequence is to replace the reference sequence.
    2. Return operation: 30
    (number of the operation up to which an alternative sequence is to replace the reference sequence)
    Operations: 20, 25
    This should work.
    Please check and confirm.
    Regards
    Datta

  • Alternative sequence

    hello,
    any body please give me idea. how to create alternative sequence of operation in recipe. i 10 - 50 sequential operation. if necessary as per customer i want to run 60th operation other wise i want to stop at 50th operation. so that i want to use alternative operation sequence. how to do this.
    thanks advance
    bhakta

    hI bhakta vatsalam
    you can do this by creating an alternate routing in CA01 for the 2nd sequence for 10 to 60 steps and another one for 10- 50 operations
    next after this you need make sure you create 2 different production versions 1 and 2 and assign alternate 1 and alternate routing  =2 so this is the different for each customer
    and in the config for order type dependant parameters, you need to maintain the setting for selection by production version and similarly in MRP-4 also for BOM Explosion by production versions
    so when you create a production order, then the system will prompt you to select which production version you want to use and for that customer, you can select the productiion version which contain the alternate routing with operations 10- 60 in it
    if helpful pls reward points
    thanks
    chakri

  • Alternative Sequence in Routing

    Dear All,
    I have a routing with 2 operations, and an alternative sequence branching in/out for operation 0020.
    Now I have created a Production order, finished operation number 0010, finished half of operation 0020 and confirmed half the quantity, now the machine stops and I want to use the alternative machine.
    How can I do that?
    It wouldn't allow me to use the alternative in confirmation, only allows me to choose it while creating the production order. How can I fix this issue?
    In my origional routing I have 1 standard sequence, and once the machine brakes, I go to CO02 and create a new alternative?
    However, in my original routing I dont want to state that I'll be manufacturing this production on 50% on machine 1 and 50% on machine 2.
    The problem only occurs if the workcenter I'm working in develops a downtime. Where can I list the other work center I will use respecting the capacity, etc..?
    Edited by: Rafik Wassef on May 21, 2009 12:01 PM

    Rafik,
    There are three types of sequences you can maintain in the routing, i.e. standard, alternative & parallel.
    As soon as the order is created in which this routing is the master data, any one sequence either standard or alternative sequence gets copied to the order.
    Parallel sequences will be copied to the order.
    That means the sequences which are alternative to each other never be a part of the order i.e. you can maintain those in the routing but while order creation only one out of them gets part of the order. Also you can not maintain alternative sequence in the order.
    Only parallel sequence can be maintained in the order.
    That's the reason I suggested you to maintain the same to tackle this issue..
    If the main work center is under maintenance then you can replace the work center with the desired work center in the order itself. Why secific need to maintain the another sequence?
    Hope this helps you.
    SmanS

  • Purcahse document cannot be released after PO reject using ME29N

    Hi gurus/experts,
    is it SAP standard behaviour that once PO was rejected using ME9N, the PO document cannot be release anymore ?
    if that is tha case, how can an approval reject the approval so that the release status can go back to previous release code ?
    TQ

    Hi,
    It is possible to go back into ME29N and cancel the rejection, then the purchase order is available for approval again.  The reject icon will change to a reverse rejection button after the rejection is done..
    Normal process is after rejection the buyer will cancel the rejection, make any necessary changes and save.  This will return the purchase order for approval.  The buyers changes may reset the entire approval process if they exceed the conditions configured for resetting the approvals.
    James

  • Purchasing Document cannot be released Urgent ?????

    hi
    when i try to unrelease the PO thru Txn ME29N
    the system gives the said message
    Purchasing document 4800003821 cannot be released
        Message no. MEPO823                          
    even when i enter the po no it on starts give the message
    wat may be the reason
    its urgent

    may be missing of Authorizations ?
    check ur SU53.
    regards
    Prabhu

  • Alternative Sequences in Routings

    Hi Friends,
    I have a question for altenative sequnces in Shop Floor (Confirmation screen:CO11N).
    For a material I have a routing and it has two oprtaions (0010-0020). Operation 0010 has an alternative sequence. In standart sequence the work center ise A and in alternative sequence it is B.
    I created an production order.  Users confirm production with standart sequences. But if the machine ( Workcenter: A) breaks down they will go on producing with workcenter B. I dont want to create a new production order.
    But during confirmation via CO11N I get an error  : "Sequence 4 is not defined in order 4011105, check entry" (Message no. RU005)
    Infact I have a sequnce number 4 which is alternative to the standart operation.
    Where am I wrong? or how can I hanndle this kind of stiuations?
    Thanks for your answers.

    Dear ,
    Check the set up in Order Type Dependent parameters -OPL8 wether u have clicked Alternative Sequence in Impementation Tab  under Master Data Setting .Routing will copied to Production Order  based on the set up in Order Type Dependent Parametrs 
    Regards
    JH
    Edited by: Jiaul Haque on Feb 16, 2010 8:14 AM

  • Selection Of Alternative Sequence Automatically By Operation Quantity

    Dear All,
    We are Using Discrete Manufacturing Scenario, In That Scenario Routing Contains Six Operation and One or Two Operations having alternative Sequence , My client required during production Order Creation , If Operation quantity is more than 250
    system should select std sequence else system should select alternative sequence, But i am not getting to mantain lot size for std sequence for operation even I maintaining lot size for alternative sequence , system should not considering alternative sequence. Pls Suggest me how to Resolve Issue
    Thanks

    Vipin,
    It is not possible to control the  routing sequence selection based on lot size.
    As suggested by forum experts, create mulitple group counters for the same material routing group and you can use them based on lot size.
    You can also create production versions for different lot sizes.
    Check and revert,
    Santosh Sarda

  • Inbound Queue blocked: Parallel and alternative sequences are not supported

    Hi,
    Just now, I checked the Inbound Queue in SCM system through SMQ2 and found which was blocked by error message "Parallel and alternative sequences are not supported". Could you please tell me what does it mean? How to fix it?
    Thanks,
    Quanyin Su

    Hi Quanyin Su,
    Parallel and Alternative sequences are used in routing.
    I believe you are trying to CIF PPM/PDS from ECC to APO and you are getting this queue stuck at inbound of APO.
    Both the alternative and parallel sequences are supported in APO.
    Alternative sequence is used as alternative modes in APO.
    I can think of this as a master data issue.
    At least one of your work center used in either of the sequences is not available in APO or is not APO relevant.
    Could you please check your master data such as all the work centers used and make sure your parallel and alternative sequences are consistent.
    Once you made sure that master is available in ECC, you can CIF it to APO by using CURTO_CREATE transaction in ECC.
    Please see below link for Routing and its usage in APO:
    http://help.sap.com/saphelp_apo/helpdata/en/99/ed3a981d0f11d5b3fc0050dadf0791/content.htm
    You also need to activate a BADI in order to sent alternative sequences to APO.
    Below thread has all the details regarding this.
    Re: /SAPAPO/CURTO 103 : Mode .. is not assigned to an activity
    Regards,
    Abhay Kapase
    Edited by: AbhayKapase on Aug 5, 2011 2:24 PM

  • Error message "one or more sequences cannot be opened"

    Premiere won't open a saved file - error message "one or more sequences cannot be opened" - no options given.
    This has happened several times, after Premiere crashes. Has anyone had this same problem, or know what to do about it?

    FAQ: Why are some codecs and sequence presets missing from my installation of Premiere Pro?

Maybe you are looking for

  • Unable to access any file on my iPod after a problem with a pics transfer

    Hi, I was downloading the pictures from my camera to my iPod video 30Go when something happened. After that, I was (and still am) unable to play music or watch movies or the pictures in the library. Actually, all the names still remain but when I sel

  • Downloader

    As im new to this ( Yesterday ) just finding my feet just downloaded Skype its all working however how do i delete the files in Downloader? is it right click remove from list? douse this delete the file downloaded ? Thanks

  • Asus eee pc 900a

    Hello everyone, I am considering purchasing a Asus eee 900a model for budget and spec reasons; I have read overall good reviews about this machine besides some battery issues. Does anyone out there own the 900a model and are using Arch? If so, how is

  • IPod Touch 4G - Trouble Syncing and Playing Through Other Speaker Systems

    I can open iTunes and listen to music just fine on my computer, but when I plug in my iPod Touch 4G, an error comes up. At first, iTunes would simply crash and it would give me the generic "iTunes has stopped working, we we will notify you if we find

  • Iphone 09 crashes every time when importing from an external hard drive

    Just bought a mac mini and I wanted to import my jpgs from my windows external disk (disconnected it from the pc temporarily.) However, I do not have enough hard drive on the mini to hold all of the pictures, so I moved the iphoto library (using the