Amplitude and level

Dear sir
What is the difference between amplitude & level measurement with vibration level measurement? I found both has measurement such as RMS and Peak value, but it gave a quite different value when I try it simultaneously.
Can I used the amplitude & level measurement to measure vibration level?

Product differences:
Amplitude and Levels Step is activated by SignalExpress
Vibration Level Step is activated by Sound and Vibration
Functional differences:
Amplitude and Levels Step gives a new result for every block (Step will hold peaks if you check that option)
Amplitude and Levels Step supports measurement of DC
Vibration Level Step always returns the result from the last reset
Vibration Level Step does not measure nor remove DC component; instead this step assumes vibration around equilibrium and/or that the data was acquired with AC coupling
Vibration Level Step supports time-domain integration (to convert acceleration --> velocity --> displacement) prior to the level computation.
Vibration Level Step supports industry-standard (fast, slow, impulse) and custom time constants for exponential level measurements.
What types of vibration are you trying to measure?
Vibration during shock event --> Amplitude and Levels
RMS level of an arbitrary signal --> Amplitude and Levels
Machine or structural vibration --> Vibration Level
In many cases, both steps can be used simultaneously Amplitude and Levels Step outputs can be used for trigger conditions. Vibration Level output (such as Exponential Level and Max-Min) can be used for logging and tracking of industry-standard levels.
Doug
NI Sound and Vibration

Similar Messages

  • Amplitude and level measurements for stereo signal

    Hi,
    If I input  my attached stereo file into Express Amplitude and level measurement (blue icon) it does not give me output value as an array. I want to measure peak to peak value for both left and right channels. I get only left channel value. (No array)
    But if I use amplitude and levels.vi I get array as an output for both channels. So i have what I need but I thought I would just post here anyways.
    I have attached my audio file.
    Sheetal
    Thanks.
    CVI 2010
    LabVIEW 2011 SP1
    Vision Builder AI 2011 SP1
    Attachments:
    AUX_HP1_RSA_OFF.zip ‏13 KB

    Sheetal,
    The output of that express vis is of dynamic data type. You need to convert it to a waveform (use the "from ddt.vi") which will then give you the waveform data type. You can then use the "Get Waveform components" to access the "Y" array data.
    Post to let us know if this helped out.
    Chris C
    Chris Cilino
    National Instruments
    LabVIEW Product Marketing Manager
    Certified LabVIEW Architect

  • Error 20312 with Amplitude and Levels vi

    Hello,
           I have been having a frequent error with a VI in a program I am using. The specific error is:
    Error-20312 occurred at "ma_ptmFetch.vi" when called from "Amplitude and Levels N chan.vi"(waveform index 0 of 4)
    Possible reasons: The input waveform is zero.
    I am using the amplitude and Levels vi to measure the amplitude of 4 current waveforms that are being read into the DAQ card. The error message occurs usually right when the program begins to run, but does not always occur. The DAQ card that is being used for this measurement is a PCI-6071E, and it initially measures many curents and voltages, and then splits them up before sending them to the amplitude and levels vi. When the error does not come up the vi works properly and measures the correct current, so I am not sure what the problem is. If anyone could give me any insight as to what may be the cause of this error, or how to troubleshoot it it would be greatly appreciated.
    Thanks,
    Steve

    Hello Mike,
           I believe you are right, and that this error occurs because the vi is receiving an empty set. When using the generate signal vi, I receive no errors at all, its only when trying to take input from the DAQmx read. I am reading continuous samples from multiple channels in a waveform, and then splitting it up into different sets. I made a small program to bar out any other factors from the large program it is in, and the problem still persists. Also, I tried changing to read only 1 channel. The problem still occurs at this setting, but less frequently than when using multiple channels.
           I believe I have found a workaround for this problem, but I'm not sure if there is a better way to go about doing this. I made a sequence with the Start Task vi in the first frame, and the while loop and clear task in the 2nd frame. The while loop contains the DAQmx read vi and the amplitude and levels vi. If I place a Wait vi in the first frame for a short amount of time, say 50ms, the problem disappears. Is it possible the Amplitude and Levels vi is trying to read values before the DAQ is finished starting the task and reading?
           I can attach a copy of the small test program I made if you want to see for yourself as well.
    Thanks,
    Steve

  • Amplitude and level measurement two signals

    Hello,
    I am delveloping a data aquisition VI, I am using the DAQmx and it works fine. I am using the amplitude and measurement express vi to obtain data such as peak to peak etc... I can aquire up to eight channels using the DAQmx, just by selecting the physical channels, but the amplitude and level measurement vi only seems to give me the value of one of the signals (the first one aquired), even though two are being displayed on the graph or even three. How can I display all the peak to peak values for all waveform simultaneously. I am aware that the measurement express is a dynamic data type and conversting the output into an array would work, but I keep on getting errors. Any advice. Attached is the VI and a snapshot of the VI. I also tried splitting the signal with no luck.
    Thank you
    Attachments:
    run.JPG ‏152 KB
    Cont-Acq-and-Graph-Voltage-Int-Clk6.vi ‏144 KB

    HI Tareq,
    Well I think I tired what you said but it is still not working, here is a snapshot of my VI and the VI itself. I still get the same output
    Thank you for your help
    Alloush
    Attachments:
    Cont-Acq-and-Graph-Voltage-Int-Clk7mod.vi ‏145 KB
    run.JPG ‏160 KB

  • How should I set the parameters of PID Autotuning such as relay amplitude and PV noise level?

    I want to control the temperature of a room by changing the hot water flow of a radiator with a control valve. The desirable control accuracy is +/- 0.5 degree of centigrade.
    What number should I set for relay amplitude? And what number should I set for PV noise level?

    Hello loghmani,
    If your output is saturating try to reduce your relay amplitude and/or reduce the gain Kc of the PID controller before starting the autotuning procedure.  You can find more information about each of the parameters that you've inquired about at this KnowledgeBase article.
    I would recommend taking a look at the General Auto PID Simulator.vi example.  You can find this example by doing a search in the example finder or by clicking linked example at the bottom of the detailed help page of the Autotuning PID.vi.
    If you haven't looked at the PID user manual that also contains useful information on setting up PID algorithims and Autotuning.
    David A
    National Instruments
    FlexRIO Product Support Engineer

  • What are the "Profile" and "Level" Settings in AME?

    One thing I never understood is the option for the Profile and Level when I'm exporting a clip in AME.  Not sure if those are options for most codecs but it is for the MainConcept H.264 Video Codec.  For Profile, there is an option of "Baseline", "Main", and "High".  For Level, starting from 3.1 and up, it's 3.1, 3.2, 4.0, 4.1, 4.2, 5.0, 5.1.  I don't know what these are and therefore don't know which to choose.  I know that the level has something to do with resolution so if I'm exporting in 720p, which level should I choose?
    **While on the video encoding topic, in terms of quality, best to worst, what would the order be for the types of bitrates?  Is it VBR 2-pass, CBR, then VBR 1-Pass?
    -Sorry if this is a bit off-topic for Premiere CS4.  There just wasn't any specific location for AME or Video-encoding..

    Profiles outline/suggest certain encoding/decoding capabilities of a given video compression standard, like H.264. For example, the High profile enables B-frames and CABAC encoding. Levels are a means of ensuring that a hardware decoder can properly decode a stream. For example, an iPod can play back Baseline profile, Level 3.0 encoded video, but nothing higher. Higher profiles and levels enable other hardware, like Blu-Ray players. For the most part, you can ignore levels when encoding for computer playback, and only concern yourself with profile. I pretty much stick with [email protected]
    The link Eddie posted has a ton of information, but here's a good article from Jan Ozer that puts it in more accessible terms.

  • Default Pay scale group and Level in infotype-0008

    Hi,
    While hiring should display the default Pay scale group and Level in infotype-0008 or the pay scale group and level can default from the Job or position. Itu2019s possible? Thanks in advance.
    Regards

    No there is no standard Feature to default PSG and PSL. TARIFF is for PSA and PST.
    Wait for some body may have some information.
    Afrasyab

  • Defaulting PayScale Group and Level in IT0008.

    The System is configured as that the Payscale Group and Level will get defaulted in IT0008 from the Planned Compensation maintained for the Job.
    This is working fine for all personnel areas except one.
    Can anyone pls explain what all tables/SPRO nodes I have to check for the same?

    Hi,
    Check the Indirect valuation A, B, C & D config in the Reiumbursement Allownace & Perqusities( RAP's )config for the combination of PSArea, PSType, PSGroup, PSlevel
    Regards,
    Hemant V. Mahale

  • Hello!!!ho​w can I control an omron plc (sysmac cqm1)with an OPC server?I want to adquire a signal controllin​g its amplitude and frecuency.​How can it be done with OPC server?I already have the NI CD of OPC drivers.Th​ank you

    Hello!!!how can I control an omron plc (sysmac cqm1)with an OPC server?I want to adquire a signal controlling its amplitude and frecuency.How can it be done with OPC server?I already have the NI CD of OPC drivers.Thank you

    Hola Jose David, que OPC estas utilizando?, Si tienes comunicación entre tu computadora y PLC pero falla la comunicación entre el OPC y el PLC? La configuración y direcciones entre los dos es correcta? La comunicación es por cable serial?
    Espero tus respuestas
    Saludos
    Benjamin C
    Senior Systems Engineer // CLA // CLED // CTD

  • Rman backup full then level 0 and level 1 Weekly

    Please share your thoughts of backups.
    Friday -> Take a full rman backup
    Saturday -> Take a level 0 rman backup -> If recovery needed restore full and apply level 0 ?
    Sunday -> Take a level 1 rman backup -> If recovery needed restore full and apply incremental 1 ?
    Monday -> Take a level 2 rman backup -> If recover needed restore full and apply incremental 1 ?
    Tuesday -> Take a level 1 rman backup -> If recover needed restore full and apply incremental 2 ?
    Wednesday -> Take a level 2 rman backup -> If recovery needed restore full and apply incremental 1 ?
    Thursday -> Take a level 1 rman backup -> If recovery need restore full and apply incremental 2 ?
    Thanks

    Please note that Full and level 0 backs are same...
    Sunday -> Take a level 0 rman backup
    Monday -> Take a level 1 rman backup
    Tuesday -> Take a level 1 rman backup
    Wednesday -> Take a level 2 rman backup
    Thursday -> Take a level 1 rman backup
    Friday-> Take a level 1 rman backup
    Saturday -> Take a level 1 rman backup
    Taking level 2 in the middle of the week, so that in case of any recovery you need ao apply changes since the last level 0, 1 or 2

  • Rman Level 0 and Level 1

    Hi Everybody
    I have to schedule my rman backup in the following manner.
    1. Weekly once level 0 backup has to run
    2. Rest of the other days level 1 backup has to run to disk
    3. In between the week if we moved all backup to some other destination, the backup schedule has to run the level 0 instead of incremental backup automatically.
    Then level 1 backup follows the level 0 backup.
    Can anyone help me out how to schedule this task that satisfies the above three condition.

    Thanks Aman
    My manager he needs like windows backup that level 0 run at once in a week and level 1 follows till end of the week if we remove the backup or moved within the week then backup folder will be empty that time level 0 has to run instead of next incremental backup.
    For example: I am schedule the rman by following manner by windows schedule task with script.
    1. Level 0 is scheduled at saturday only
    2. level 1 is scheduled from sunday to thursday.
    My manager he don't want like this. level 0 should not run by day like saturday. he wants script will check the disk if level 0 is existing or not
    if existing it will replace the level 0 with new one.
    if not existing it will create the new one.
    Is there possible to run level 0 and level 1 in the same script.

  • Defaulting Pay Scale Group and Level

    Dear All,
    Is there any way of defaulting Pay Scale Group and Level as they are fixed for Employee Sub-Groups?
    Regards,
    Ahsan Zaidi

    TARIF: Default Pay Scale Type and Area in the Basic Pay                                                                               
    Object                                                                               
    Feature                                                                               
    Task                                                                               
    With this feature you control whether the default value is determined                                                  
         from the T001P from the personnel area and personnel subarea, or whether                                               
         the default value is determined direct from the feature.                                                                               
    The return value must have the form xx/yy, when xx is the pay scale                                                    
         type, and yy the pay scale area.                                                                               
    If the feature returns SPACE as a value, then the value pay scale type                                                 
         or pay scale area is determined by table T001P. If the value does not                                                  
         equal SPACE, then this value will be taken as the pay scale type or pay                                                
         scale area.                                                                               
    You can either enter return both values or only one of the two values.                                                 
         The missing value is determined from table T001P.

  • CAT2 - Payscale group and level

    Does anyone know how to get project systems / finance to read the payscale group and levels from HR (instead of reading the rate from Project Systems - CP26).
    Thanks.
    (we have too many rates to store in Project systems and would prefer to store them in HR, any ideas?)

    Hi Dianna,
    Do you want to get payscale groups and level on CAT2 screen(time entry screen).
    If thats your question,yes you can get that.For that you have change the settings of the CATS profile you are using.
    The Display IMG path is
    Cross-Application Components->Time Sheet->Time Recording--->Choose Fields
    And in that click on DataEntry selection and uncheck the hide radio button for the Payscale area and group.
    Hope this helps
    Pl let me know if you have any questions

  • Default Payscale group and level

    Hi Experts,
    Is there any way by which i can default the Payscale Group and Payscale Level? My payscale group is same as Employee Group and level is same as Employee Sub-group.
    Plz advice.
    regards
    TS

    Hi
    You ca use tariff to default the payscale group and level for particular payroll area
    you can maintain a parameter transaction for PC00_M10_CALC_SIMU inn SE93.to maintain payroll schema and payroll area as default
    Reward Points

  • In adobe premiere cc 2014 , in the version for Apple , there is the " dynamics" in the audiometer / amplitude and compression/dynamics. In the same version for PC , there is no option. Somebody is also having this problem ? tks

    In adobe premiere cc 2014 , in the version for Apple , there is the " dynamics" in the audiometer / amplitude and compression/dynamics. In the same version for PC , there is no option. Somebody is also having this problem ? tks

    are you referring to the audio meters panel?  im on windows, and i can right click the meters panel and get options for "dynamic peaks".   there are audio effects, from the effects panel if thats what you are looking for?  i have one named "Dynamics" as well as several compressors.

Maybe you are looking for

  • How do i stop notifications from ringing while im on a phone call on the iphone 4s

    how do i stop notifications from ringing while im on a phone call on the iphone 4s?

  • Creation of Tree View in CRM web ui

    Hi All,   How to create a Tree View in CRM web ui.Please let me know the step by step procedure. Thanks, Santhosh.

  • Email template error

    Hi All,     Can anyone help me on this errro in CAF GP Design Time When I am trying to clickon CAF GP->administration->Email Template I am getting the following error: "The following error occured while populating the list: The language dependent mim

  • External Bank Reconciliation

    Hello I am trying to use the external Bank reconciliation in SAP Business One 2007. I want to import the bank statement from my bank to the: Process External Bank Statement window. I will develop a special add-on. But the question is, i have around 1

  • Transactional replication update causing deadlock

    Hello, I am using sql server 2012 SE. I am using Transactional replication and noticed that we have been receiving deadlocks lately. The select statement that is inserting data into a temptable is getting deadlocked by the transactionalreplication up