Another techincal system for SRM is getting created in SLD

Hello All,
I have a problem with duplicate Technical System being created automatically in our SLD. Since, there is no business system assigned to that, I am deleting that every day though It keeps on getting created every day. I understand that there could be a job which does this periodically.
Because of this, we encounter NO BUSINESS SYSTEM assigned error all the time. The work around is to delete that Duplicate Technical System in SLD.
What I observed is that we have three s/w compenent versions imported for SAP APPL. It might be funny in asking, Is these multiple SWCs for SAP APPL has anything to do with this issue ? And I also imported SRM Server 7.01 SWCV, there is no other version for this SC.
Please throw some light and give me some idea.
Regards,
Lakshman V.

I also noticed that there is a difference in the Installation numbers of both the Technical Systems.
Hi Lakshman,
Which Technical system has got correct SRM installation number? Existing Technical system or new Technical system which is getting created eveyday?
Scheduled SLD Data supplier job in SRM collects the data(SAP products, database parameters, hosts, clients, and so on) and send it to the SLD Server.

Similar Messages

  • MATERIAL LINK TO ONE SAP SYSTEM TO ANOTHER SAP SYSTEM FOR IDOC TRANSFER

    Hi Experts,
    How the  MATERIAL LINK TO ONE SAP SYSTEM TO ANOTHER SAP SYSTEM FOR IDOC TRANSFER?
    Scenario : when 2nd system create the invoice,it will create a po in the 1st system.
    51 error msg we are getting material does not exists.but the material is available in the receiving plant.
    Please suggest

    If you say the material master is available in the 1st system (where you create the order), then the material number in the IDOC  may not match with the material number in your database.
    leading zeros. material number stored as alphanumeris instead of numeric.

  • Ideas as a backend system for SRM

    Hi All,
    Please tell me wether I can use( r/3) ideas system as a backend system for SRM System.
    Thanks & regards
    SATYA

    You can do that. Can connect an IDES(ECC) to SRM
    Thanks,
    Surya

  • Automitic source of supply assignment in backend system for SRM

    Hello Experts,
    I am facing one issue regarding source of supply for SRM purchase Requisitions in backend ECC system.
    When we create a shopping cart in SRM 5.0, a purchase requisition is created in backend and has source of supply assigned to it.
    I donu2019t want to assign source of supply to purchase requisitions created for SRM.
    Can you please suggest how to achieve this?
    Also I think, SRM is internally using BAPI u201CBAPI_REQUISITION_CREATEu201D from backend ECC system for creation of requisition. This BAPI has an importing parameter u2018AUTOMATIC_SOURCEu2019, and if we pass space to this parameter, it creates requisition without assigning source of supply.
    If this is correct, then can I use any BADI or customization in SRM to set the value of this parameter as space when SRM calls this BAPI?
    Thanks in Advance.
    Thanks and Regards,
    Sanjay

    SPRO--> SRM > SRM server> cross application basic settings --> Define objects in backend system (PR,RS,PO)
    waht is the settings you maintained for your product category / purchase group - external procurement .
    the above setting determines your follow on documents in the backend systems.
    as discuused in the thread are you using any BADI ?
    Unable to create PO in backend system for a text material in Shopping cart
    peter offers how to debug to ..in the above link.
    br
    muthu

  • Listening for new cachings getting created?

    I'd like to be able to register my own MBeans on each distributed CacheServer for each cache that lives on that server. Is it possible to register a listener anywhere that gets called when a new cache gets created? Alternatively, is it possible to register a listener that is called after the cache factory has finished starting all the "autostart" caches?
    I'm using version 3.3
    thanks
    sam
    ps - I'm already registering my own custom global mbeans... but they are created before any of the caches get created.

    Sam
    You can specify your custom CacheFactory class in the override file so you can still use DefaultCacheServer
    When I needed to intercept cache creation I extended DefaultConfigurableCacheFactory and overrode this method:
    public NamedCache configureCache(CacheInfo cacheInfo, XmlElement xmlScheme, ClassLoader classLoader)
    Then just call the super class version before or after doing whatever you need to.
    The XML for the override file looks like this
    <coherence>
         <configurable-cache-factory-config>
              <class-name>com.oracle.coherence.common.configuration.AdvancedConfigurableCacheFactory</class-name>
              <init-params>
                   <init-param>
                          <param-type>java.lang.String</param-type>
                          <param-value system-property="tangosol.coherence.cacheconfig">coherence-cache-config.xml</param-value>
                   </init-param>
              </init-params>
         </configurable-cache-factory-config>
    </coherence>The above snippet is taken from the Incubator common library. You would replace com.oracle.coherence.common.configuration.AdvancedConfigurableCacheFactory with the name of your class.
    You need to call the override file tangosol-coherence-override.xml and put it on the class path or if you call it anything else then specify the name as a JVM argument with -Dtangosol.coherence.override=<name of your file>
    Jonathan

  • 2 system PLM setup question - Connecting to another ECC system for master data

    I have been tasked with setting up the latest version of PLM in our environment.  We have a free standing PLM Server (ECC 6.0 EHP7, SP2 with PLMWUI 747, SP3) that we would like to connect to another ECC system (ECC 6.0 EHP5, SP4 with PLMWUI 701, SP4) for its master data.  In trolling around google and the marketplace, there isn't any setup guide or anything that really explains what the options are.  Does anyone know what the possible setup options are or even better provide links to documents that show how to set this up?  Can PLM be setup in the way that we want it to be?
    Thanks in advance.

    Hello Steve,
    Unfortunately there isn't a lot of PLM documentation available.
    I'm not sure I really understand what you need, but in essence, the PLM framework was developed using the SPI technology. That is, the Service Provider Infrastructure, which is a technology to split the UI from the business logic behind it. The idea is, in the end, you can have one single DB, connected to multiple systems and different types of UIs. (you can find some more details here: http://wiki.scn.sap.com/wiki/display/SPI/Home)
    As far as I know, you have to do some customization in SPRO and maintain views /PLMB/V_RFC_DEST and /PLMB/V_RFC_LSYS. Everything else is done by the PLM framework via RFC connections.
    Hope this helps you...
    Tudor

  • How to add another operating system for Dual boot in Windows 7 boot configuration

    Hi,
    I have dell laptop with excellent configuration. On which i had windows 7 Home premium on C Drive and Windows server 2008 on D Drive.
    Now i upgraded my Windows 7 Home Premium 32 bit to Windows 7 Ultimate 64 bit. But after fresh installation of Win 7 Ultimate my dual boot screen has gone and Win 7 is getting start directly.
    Now i want to add my Windows server 2008 again for dual boot which is still on D Drive.
    Can anyone please tell me how to add windows 2008 boot option in boot configuration to active my dual boot options.
    Thanks

    1) Using bcdedit.exe /enum
    To enable the computer to also boot Windows 7 you again use bcdedit.exe with the following command which will copy the current Windows
    Boot Loader details for Windows Server 2008 to Windows 7.
     bcdedit.exe /copy
    {current} /d "Microsoft Windows 7"
     bcdedit.exe will
    respond with something like the following.
    The
    entry was successfully copied to {................................}.
    Using
    bcdedit.exe /enum to again enumerate through the current entries within the BCD store you'll see the newly added entry.
    Before you can use the newly created Windows boot loader configuration, you'll need to change the partition for Windows 7 using
    the following two bcdedit.exe commands.
    bcdedit.exe /set {.................................} device partition=D:
    bcdedit.exe /set {.................................} osdevice partition=D:
    If you now reboot the system you should now be able to boot into either Windows Server 2008 or Windows 7.

  • How do I add another operating system for Dual boot in Windows 8.1 boot configuration?

    Hello,
    I am trying to create a dual-boot Windows 8.1 Pro system to allow both 32bit and 64 bit Windows 8.1 versions.  I currently have Windows 8.1 32bit installed.  Appreciate some background on how to add 64bit Windows 8.1.
    Thanks, in advance.

    The easiest way is to do this (this assumes some technical knowledge as well as access to the currently installed operating system and the 64bit install files)
    1: launch diskpart from run or cmd
    2: select the current OS disk using "select disk 0"
    3: select the current OS volume using "select partition x" where x is the number of partition (you can use "list partition" to see all current partitions)
    4: enter "shrink minimum=xxxxx" where xxxxx is the size in megabytes you want to new OS to have
    5: Enter "create partition primary"
    6: Enter "format quick fs=ntfs label="Windows x64""
    7: Enter "assign letter y"
    8: select your current system partition using "select partition x" where x is the number of partition. If you have a UEFI install on a GPT disk, this partition will be formatted in fat32. Otherwise, it will be a 100mb NTFS partition
    9: Enter "assign letter s"
    10: exit diskpart, and open up an administrator cmd prompt
    11: Enter "dism /get-imageinfo /imagefile:e:\sources\install.wim" where e: is the drive letter that you have your .iso mounted in. If you have the iso extracted, you can just point to the current extracted area then \sources.install.wim. This will
    show you a list of indexes that the .wim file supports. A standard retail version of the .iso will have Windows 8 Pro be index 1. If it is not, just change the index number in the next command.
    12: Enter "dism /apply-image /imagefile:e:\sources\install.wim /index:1 /applydir:y:"
    13: Enter "bcdboot y:\windows /s s: /f UEFI" (if you are using a MBR disk and not UEFI with a GPT disk, enter /f BIOS instead)
    14: Reboot, select the x64 partition in the menu that comes up, and you are good to go!
    You can also just create a new partition using disk manager then boot to the x64 disk and install it to the new partition, but that runs the risk of accidentally installing over something that shouldn't be if you select the wrong disk.

  • From R/3 to CRM create one logical system for CRM client 300.

    Suppose i create one logical system for CRM in R/3 TO CRM scenario for client 300.another user wants to work on jdbc to CRM client 300 for this he wants to create another logical system for client 300 it is not possible,so,it is ok if he assign same logical system when he was working for CRM client 300 when he wants to create business system for CRM in JDBC to CRM.

    Hi,
    Business Systems are te logical system name for a CLient in the SAP.
    These can be reused again for different configuration scnario that you must have created for different interface.
    All you need to do is assing the Business system to your configuration scenario and Communication channel to the same.
    Regards
    Vijaya

  • Create a client and logical system for BW

    Hi all,
    Can anyone show me how to create a BW client?
         create a BW client and logical system for BW client.
         create sourcesystems for the other clients in BW.
    I have follow some documents
    B84: BI Connectivity
    B03: General Settings BI Integration
    But it's not working the data can't flow to BW server.

    hi,
    check out the following thread's. it will guide you
    Connection steps for SAP BW and R/3
    Info required  while  creating source system
    R/3 Source system creation error in BW 7.0
    regards
    harikrishna N

  • Transfer Requirement not getting created

    Hi All,
    My query as below;
    Production order is created using KANBAN (Control Cycle/Supply Area is defined) using classic KANBAN.
    WM is in place and all the setting related to TR/TO creation for WM movement type 103 is in place.
    When i am trying to receive this Production after completion it is not creating the TR/TO, while as material document is getting generated and shows the stock directly in interim storage type 901 without creating TR and TO.
    Further i checked there is indicator in Production order i.e "Kanban indicator" that gets checked automatically when Production order is created using KANBAN Processs and if i remove that indicator forcefully, TR and TO is getting created normally.
    Please provide some inputs where can be the problem and how TR and TO can be created normally eventhough KANBAN indicator is checked in Production order and where i can found the setting related to "KANBAN INDICATOR".
    Appreciate your help.

    Hi Maddy
    Thanks very much for your response.
    1. When you use KANBAN, you define separate KANBAN storage location, which is different from WM-managed replenishment storage locations, and separate KANBAN interim storage area with storage bin.
    Yes different storage location is defined which is not WM-managed in supply area.
    As you said Control Cycle is defined, see if the interface is properly defined for both of these Sloc.
    Where i can check whether interface is properly defined or not.
    2. See if you have defined the KANBAN replenishment strategy with Control type Transfer Requirements from a Storage Location which is being controlled by WM in the Customizing for Production under KANBAN > Replenishment Strategies > Define Stock Transfer Strategies
    Actually for a material two strategies are defined like;
    1) In-house Production strategies-0003-
    supply area is defined with storage location which is IM managed.
    And when this order is completed and i am trying to receive this in WM SLOC (usally whatever SLOC we have defined in supply area it proposes that SLOC at the time of receipt but i am changing this manually to WM managed SLOC) using transaction MIGO, it is directly taking the stock to 901 interim storage type and in total the stock increases but the problem is when TR is not getting created i am not able to take this to the storage bin as per strategies defined.
    2) Stock Transfer Strategies-This is working fine and in that TR/TO is working fine.
    3. For TO to get created automatically by the system from the transfer requirement, see if an indicator Automatic TO creation in the replenishment strategy is set or not. Yes this is set for stock transfer strategies but i didn't find option to check the TO creation automatically for in-house production strategy
    4. Also, check that you have set up a suitable replenishment movement type for KANBAN in the Customizing for Warehouse Management under Activities > Transfers > Define Movement Types (i.e.standard is 350 for KANBAN replenishment)-Yes this is also defined correctly.
    Appreciate your more inputs on this.

  • MDM Server Password Parameter in SRM Web Service for SRM MDM Catalog 2.0

    Hi Experts,
    We have password set on our MDM server. I am little confused about how to define MDM server password parameter in external Web service Call structure in SRM System for SRM MDM Catalog 2.0.
    Will Catalog webservice work, if we don;t define password for MDM server in webservice??if No, then please let me know how to define MDM server password in SRM websevice.
    Any help will be highly appreciated.
    Thanks,
    Shiv

    Hi Shiv,
       The MDM Server password is needed when you are changing Webdynpro UI Configuration.
      For catalogs, all you need is the repository userid/password parameters in the call structutre.
    SG

  • Business system for Mail adapters

    Hi Experts,
    DO we need to have a Business system assinged to a techincal system for configuring either Sender or Receiver Mail adapters???. If so should the technical system points to the IP address of the Email server ???.
    I though since we specify the URL for the email server, we can manage the same uisng the Busniess service. Please advice.
    Regards,
    Rajesh

    Hi,
    >>>>DO we need to have a Business system assinged to a techincal system for configuring either Sender or Receiver Mail adapters???.
    no, you can use a <b>business service</b> for that - configured only in ID
    Regards,
    michal
    <a href="/people/michal.krawczyk2/blog/2005/06/28/xipi-faq-frequently-asked-questions"><b>XI / PI FAQ - Frequently Asked Questions</b></a>

  • EREC: Multipal IDOC are getting created in receiver system for one IDOC

    Hello Experts,
    I ran in to one wearied issue in IDOC creation in Receiver system. I am running PFAL in sender system for only Person but 10 IDOC are getting created in receiver system. I don't know why is this happening.
    This issue started popping up after we ran RBDAPP01-Inbound Processing of IDocs Ready for Transfer. We ran this to change IDOC to 53 status. Now I don't know what went wrong but Perner distribution is behaving
    Appreciate your help.
    Regards,
    Krishna Bidwai
    Losangeles USA.
    818 527 0204.

    Yes, employee is getting created after adding 0003 into the filter, but can u please answer my another question, i.e. PERNR in sender and receiver system should be same.
    So in Receiver system (ECC) do i need to maintain external number range for PERNR?
    Thanks

  • Which are the tables updated in SRM and R/3 System for SC created?

    Hi,
    I want to know which are the tables updated in SRM system and also in R/3 system, when a Shopping Cart is created. Also how do i get the PO number for the Shopping Cart created.
    Thanks.
    Regards.
    Rahul

    Hello Rahul,
    All list of tables for eg. SC You can find in transaction BBP_PD on SRM side.
    These tables are (SRM):
    - CRMD_ORDERADM_H - for Header (Business Transactions Header)
    - BBP_PDHGP - Business Transaction Purchasing Information
    - CRMD_ORDERADM_I - for Item - Business Transaction Item
    - BBP_PDIGP - Business transaction item-Purchasing information
    - BBP_PDBEI - Backend Specific Item Data
    On R/3 side:
    EBAN - purchase requisition
    EBKN - purch. req. account assignment
    Regards,
    Marcin Gajewski
    please reward points for helpful answer

Maybe you are looking for

  • MSS isnt working in SAP R/3 46C

    Hi Experts, I needed some inputs and confirmation on some points. We have a SAP 46C HR Patch 52 as backend and i have installed MSS Business Package 6.01 and EP 60 SP14 and KMC SP14 and TREX 6.1. But the MSS Iviews in Portals are coming blank. We hav

  • Load-balancing and fail-over between web containers and EJB containers

    When web components and EJB components are run in different OC4J instances, can we achieve load-balancing and fail-over between web containers and EJB containers? null

  • What are exit code 6 and exit code 7

    Since the event this afternoon, I have been trying to update the products in CC to 2014.  I keep getting an error without being able to finish installation and get either of the exit codes 6 or 7.  I have tried to troubleshoot by changing to IE (my d

  • Why not more quad band phones? Please!

    Does anyone know why Nokia doesn't make more quad band handsets? I live in the Caribbean where Cable and Wireless operates on a pretty useless 850/1800/1900 frequency, so the best suited phones for where I live are really the less feature rich handse

  • AppleWorks not opening saved files

    AppleWorks (on OS 9) can still open files, but now when it saves any new document, it won't allow it to open again. When I try to open any newly saved file, it throws up a dialog box that says "Unexpected end of file." twice. Old documents can be ope