Any additional configuration require to achieve TAF in 11.2.0.4 RAC along with scan listener

Hi
We have 2 node RAC database of version 11.2.0.4 running on Linux platform.
There are 2 SCAN listener running on DB instead of 3 which usually recommenced by oracle.
When one of instance brought down as scheduled activity, sessions which connected to same instance, received ORA-03113: end-of-file on communication channel.
They were doing some select activity in db.
When user reconnected, it got connected to available instance.
tns entry which users are using (description=(address=(protocol=tcp)(host=p1bds1d4-scan.sldc.sbc.com)(port=1521))(connect_data=(server=dedicated)(service_name=p1bds1d4)))
Do we need to do any additional configuration to achieve TAF in 11.2.0.4 along with SCAN listener.
Do we need to change tns to include clause like "FAILOVER_MODE=(TYPE=SELECT)(METHOD=BASIC)(RETRIES=180)(DELAY=5)" ?
Please help.
Thanks
Ashish

You could enable TAF from the cient side by adding a clause such as that you suggest to your connect strings, but in a GI envirinment you would normally do it by adjusting the way the sevice is registered in the OCR. Run
srvctl modify service -h
and look up the -e and -m switches.
John Watson
Oracle Certified Master DBA

Similar Messages

  • If syteem has 2 or 4 processors and when you install server 2012 do you have to make additional configurations to take advantage of extra processors?

    hi,
    1-whan I install eseentials server 2012 on a systeem with 2 processors , do I hav to make additional configurations to take advantage of 2 processors , or there is no need for any additional configuration?
    2- I ask the same question for standaard edition for example when I install this version on a systeem with 4 or 8 processors do I have to make additional configurations ? if yes what are those steps or configurations?
    thanks
    johan
    h.david

    Hi
    1- dont need any additional configuration for second processors.
    Essentials spec
    https://technet.microsoft.com/en-us/library/dn383626.aspx?f=255&mspperror=-2147217396
    2-no need also
    standard spec
    http://blogs.technet.com/b/matthts/archive/2012/10/14/windows-server-sockets-logical-processors-symmetric-multi-threading.aspx

  • Additional Hardware Requirement after Upgrade

    Hi,
    Is there any additional hardware requirements if we do a upgrade to ECC6 from SAP R3 Enterprise Ext Set 2?
    Regards,
    Cs

    Hi Cherry,
    Before the upgrade, check whether you have sufficient hardware resources, such as CPU, main memory, disk
    space, etc
    Sizing depends upon your database size.
    For more information about sizing, please follow the mentioned link
    http://service.sap.com/sizing.
    Also, please download the guide from http://service.sap.com/instguide follow the hardware requirement.
    Regards,
    Imran

  • Which routers allow iChat AV videoconferences w/o any special configuration

    As others have noted, getting iChat AV to work across third-party routers is often no picnic. Apple gives an outdated list of compatible routers (meaning no additional configuration required) here:
    http://docs.info.apple.com/article.html?artnum=93333
    Can anyone add to this list of self-configuring routers?

    I've had good luck with UPnP with my Linksys WRT54G (Ver 5). It comes enabled with uPnP and have had overall good luck.

  • Does BPIM configuration require any licensing ?

    Dear All,
    We are involving system study of Business process interface monitoring (BPIM) in our landscape and BPA also,Our Interfaces are from systems ECC, PI, even some of the Legacy etc. In this kind of setup of BPIM, does any licensing is involved?
    any addition cost is required?
    Please provide the details.
    Thanks,
    Jansi

    Jansi,
    as far as I know there is no licensing involved, if you have a variety of interfaces as long as they are documented in Solar01/02 you should be fine. Just have a structure in place at some place so that you can scope the function easily.
    That is my take on it.
    Cheers!.

  • CONCURRENT MANAGER SETUP AND CONFIGURATION REQUIREMENTS IN AN 11I RAC ENVIR

    제품 : AOL
    작성날짜 : 2004-05-13
    PURPOSE
    RAC-PCP 구성에 대한 Setup 사항을 기술한 문서입니다.
    PCP 구현은 CM의 workload 분산, Failover등을 목적으로 합니다.
    Explanation
    Failure sceniro 는 다음 3가지로 구분해 볼수 있습니다.
    1. The database instance that supports the CP, Applications, and Middle-Tier
    processes such as Forms, or iAS can fail.
    2. The Database node server that supports the CP, Applications, and Middle-
    Tier processes such as Forms, or iAS can fail.
    3. The Applications/Middle-Tier server that supports the CP (and Applications)
    base can fail.
    아래부분은 CM,AP 구성과
    CM과 GSM(Global Service Management)과의 관계를 설명하고 있습니다.
    The concurrent processing tier can reside on either the Applications, Middle-
    Tier, or Database Tier nodes. In a single tier configuration, non PCP
    environment, a node failure will impact Concurrent Processing operations do to
    any of these failure conditions. In a multi-node configuration the impact of
    any these types of failures will be dependent upon what type of failure is
    experienced, and how concurrent processing is distributed among the nodes in
    the configuration. Parallel Concurrent Processing provides seamless failover
    for a Concurrent Processing environment in the event that any of these types of
    failures takes place.
    In an Applications environment where the database tier utilizes Listener (
    server) load balancing is implemented, and in a non-load balanced environment,
    there are changes that must be made to the default configuration generated by
    Autoconfig so that CP initialization, processing, and PCP functionality are
    initiated properly on their respective/assigned nodes. These changes are
    described in the next section - Concurrent Manager Setup and Configuration
    Requirements in an 11i RAC Environment.
    The current Concurrent Processing architecture with Global Service Management
    consists of the following processes and communication model, where each process
    is responsible for performing a specific set of routines and communicating with
    parent and dependent processes.
    아래 내용은 PCP환경에서 ICM, FNDSM, IM, Standard Manager의 역활을 설명하고
    있습니다.
    Internal Concurrent Manager (FNDLIBR process) - Communicates with the Service
    Manager.
    The Internal Concurrent Manager (ICM) starts, sets the number of active
    processes, monitors, and terminates all other concurrent processes through
    requests made to the Service Manager, including restarting any failed processes.
    The ICM also starts and stops, and restarts the Service Manager for each node.
    The ICM will perform process migration during an instance or node failure.
    The ICM will be
    active on a single node. This is also true in a PCP environment, where the ICM
    will be active on at least one node at all times.
    Service Manager (FNDSM process) - Communicates with the Internal Concurrent
    Manager, Concurrent Manager, and non-Manager Service processes.
    The Service Manager (SM) spawns, and terminates manager and service processes (
    these could be Forms, or Apache Listeners, Metrics or Reports Server, and any
    other process controlled through Generic Service Management). When the ICM
    terminates the SM that
    resides on the same node with the ICM will also terminate. The SM is ?hained?
    to the ICM. The SM will only reinitialize after termination when there is a
    function it needs to perform (start, or stop a process), so there may be
    periods of time when the SM is not active, and this would be normal. All
    processes initialized by the SM
    inherit the same environment as the SM. The SM environment is set by APPSORA.
    env file, and the gsmstart.sh script. The TWO_TASK used by the SM to connect
    to a RAC instance must match the instance_name from GV$INSTANCE. The apps_<sid>
    listener must be active on each CP node to support the SM connection to the
    local instance. There
    should be a Service Manager active on each node where a Concurrent or non-
    Manager service process will reside.
    Internal Monitor (FNDIMON process) - Communicates with the Internal Concurrent
    Manager.
    The Internal Monitor (IM) monitors the Internal Concurrent Manager, and
    restarts any failed ICM on the local node. During a node failure in a PCP
    environment the IM will restart the ICM on a surviving node (multiple ICM's may
    be started on multiple nodes, but only the first ICM started will eventually
    remain active, all others will gracefully terminate). There should be an
    Internal Monitor defined on each node
    where the ICM may migrate.
    Standard Manager (FNDLIBR process) - Communicates with the Service Manager and
    any client application process.
    The Standard Manager is a worker process, that initiates, and executes client
    requests on behalf of Applications batch, and OLTP clients.
    Transaction Manager - Communicates with the Service Manager, and any user
    process initiated on behalf of a Forms, or Standard Manager request. See Note:
    240818.1 regarding Transaction Manager communication and setup requirements for
    RAC.
    Concurrent Manager Setup and Configuration Requirements in an 11i RAC
    Environment
    PCP를 사용하기위한 기본적인 Setup 절차를 설명하고 있습니다.
    In order to set up Setup Parallel Concurrent Processing Using AutoConfig with
    GSM,
    follow the instructions in the 11.5.8 Oracle Applications System Administrators
    Guide
    under Implementing Parallel Concurrent Processing using the following steps:
    1. Applications 11.5.8 and higher is configured to use GSM. Verify the
    configuration on each node (see WebIV Note:165041.1).
    2. On each cluster node edit the Applications Context file (<SID>.xml), that
    resides in APPL_TOP/admin, to set the variable <APPLDCP oa_var="s_appldcp">
    ON </APPLDCP>. It is normally set to OFF. This change should be performed
    using the Context Editor.
    3. Prior to regenerating the configuration, copy the existing tnsnames.ora,
    listener.ora and sqlnet.ora files, where they exist, under the 8.0.6 and iAS
    ORACLE_HOME locations on the each node to preserve the files (i.e./<some_
    directory>/<SID>ora/$ORACLE_HOME/network/admin/<SID>/tnsnames.ora). If any of
    the Applications startup scripts that reside in COMMON_TOP/admin/scripts/<SID>
    have been modified also copy these to preserve the files.
    4. Regenerate the configuration by running adautocfg.sh on each cluster node as
    outlined in Note:165195.1.
    5. After regenerating the configuration merge any changes back into the
    tnsnames.ora, listener.ora and sqlnet.ora files in the network directories,
    and the startup scripts in the COMMON_TOP/admin/scripts/<SID> directory.
    Each nodes tnsnames.ora file must contain the aliases that exist on all
    other nodes in the cluster. When merging tnsnames.ora files ensure that each
    node contains all other nodes tnsnames.ora entries. This includes tns
    entries for any Applications tier nodes where a concurrent request could be
    initiated, or request output to be viewed.
    6. In the tnsnames.ora file of each Concurrent Processing node ensure that
    there is an alias that matches the instance name from GV$INSTANCE of each
    Oracle instance on each RAC node in the cluster. This is required in order
    for the SM to establish connectivity to the local node during startup. The
    entry for the local node will be the entry that is used for the TWO_TASK in
    APPSORA.env (also in the APPS<SID>_<HOSTNAME>.env file referenced in the
    Applications Listener [APPS_<SID>] listener.ora file entry "envs='MYAPPSORA=<
    some directory>/APPS<SID>_<HOSTNAME>.env)
    on each node in the cluster (this is modified in step 12).
    7. Verify that the FNDSM_<SID> entry has been added to the listener.ora file
    under the 8.0.6 ORACLE_HOME/network/admin/<SID> directory. See WebiV Note:
    165041.1 for instructions regarding configuring this entry. NOTE: With the
    implementation of GSM the 8.0.6 Applications, and 9.2.0 Database listeners
    must be active on all PCP nodes in the cluster during normal operations.
    8. AutoConfig will update the database profiles and reset them for the node
    from which it was last run. If necessary reset the database profiles back to
    their original settings.
    9. Ensure that the Applications Listener is active on each node in the cluster
    where Concurrent, or Service processes will execute. On each node start the
    database and Forms Server processes as required by the configuration that
    has been implemented.
    10. Navigate to Install > Nodes and ensure that each node is registered. Use
    the node name as it appears when executing a nodename?from the Unix prompt on
    the server. GSM will add the appropriate services for each node at startup.
    11. Navigate to Concurrent > Manager > Define, and set up the primary and
    secondary node names for all the concurrent managers according to the
    desired configuration for each node workload. The Internal Concurrent
    Manager should be defined on the primary PCP node only. When defining the
    Internal Monitor for the secondary (target) node(s), make the primary node (
    local node) assignment, and assign a secondary node designation to the
    Internal Monitor, also assign a standard work shift with one process.
    12. Prior to starting the Manager processes it is necessary to edit the APPSORA.
    env file on each node in order to specify a TWO_TASK entry that contains
    the INSTANCE_NAME parameter for the local nodes Oracle instance, in order
    to bind each Manager to the local instance. This should be done regardless
    of whether Listener load balancing is configured, as it will ensure the
    configuration conforms to the required standards of having the TWO_TASK set
    to the instance name of each node as specified in GV$INSTANCE. Start the
    Concurrent Processes on their primary node(s). This is the environment
    that the Service Manager passes on to each process that it initializes on
    behalf of the Internal Concurrent Manager. Also make the same update to
    the file referenced by the Applications Listener APPS_<SID> in the
    listener.ora entry "envs='MYAPPSORA= <some directory>/APPS<SID>_<HOSTNAME>.
    env" on each node.
    13. Navigate to Concurrent > Manager > Administer and verify that the Service
    Manager and Internal Monitor are activated on the secondary node, and any
    other addititional nodes in the cluster. The Internal Monitor should not be
    active on the primary cluster node.
    14. Stop and restart the Concurrent Manager processes on their primary node(s),
    and verify that the managers are starting on their appropriate nodes. On
    the target (secondary) node in addition to any defined managers you will
    see an FNDSM process (the Service Manager), along with the FNDIMON process (
    Internal Monitor).
    Reference Documents
    Note 241370.1

    What is your database version? OS?
    We are using VCP suite for Planning Purpose. We are using VCP environment (12.1.3) in Decentralized structure connecting to 3 differect source environment ( consisting 11i and R12). As per the Oracle Note {RAC Configuration Setup For Running MRP Planning, APS Planning, and Data Collection Processes [ID 279156]} we have implemented RAC in our test environment to get better performance.
    But after doing all the setups and concurrent programs assignment to different nodes, we are seeing huge performance issue. The Complete Collection which takes generally on an avg 180 mins in Production, is taking more than 6 hours to complete in RAC.
    So I would like to get suggestion from this forum, if anyone has implemented RAC in pure VCP (decentralized) environment ? Will there be any improvement if we make our VCP Instance in RAC ?Do you PCP enabled? Can you reproduce the issue when you stop the CM?
    Have you reviewed these docs?
    Value Chain Planning - VCP - Implementation Notes & White Papers [ID 280052.1]
    Concurrent Processing - How To Ensure Load Balancing Of Concurrent Manager Processes In PCP-RAC Configuration [ID 762024.1]
    How to Setup and Run Data Collections [ID 145419.1]
    12.x - Latest Patches and Installation Requirements for Value Chain Planning (aka APS Advanced Planning & Scheduling) [ID 746824.1]
    APSCHECK.sql Provides Information Needed for Diagnosing VCP and GOP Applications Issues [ID 246150.1]
    Thanks,
    Hussein

  • Oracle apps configuration required to install oracle lite database

    Hi,
    Can any one suggest me the oracle apps setups and configuration required for installing the oracle lite databse in my laptop.
    The olite databse must sink with my existing oracle apps.
    thanks in advance...

    user596857 wrote:
    Dear Experts, (I'm far from expert, but I possess enough shreds of knowledge to answer your question, so here goes. ;-) )
    1a)
    My server has Oracle version 11.1.0.6.0, but the matrix says it wants 11.1.0.7.
    I should get a warning right?
    Can I just proceed with the install, over-riding the warning?
    1b)
    If so, what is the procedure to install into the existing database?
    It wasn't obvious in the (150 page) install docs. The EBS install delivers its own ORACLE_HOME for the database. There isn't an option to install into an existing database as far I know. The installer will ask where to put the new ORACLE_HOME for the EBS database. You might get a warning if you try to install to a pre-existing ORACLE_HOME, and I don't recommend ignoring that warning. The result will either be ugly immediately or, even worse, ugly later when it's harder to figure out why. ;-)
    Do an upgrade?Won't really help. The ORACLE_HOME that's bundled with the installer usually comes with additional patches pre-installed, as well as EBS-friendly configuration options. You're much better off taking what it gives you so you can get down to the real fun of learning EBS. :-)
    Or, do regular install, but not Express/Rapid Install?I recommend doing a Vision install for learning EBS.
    Can I choose not to install the database software?Nope (unless my memory is really that bad), and there's no real benefit to doing so. All you'd save is a couple GB of disk, and as a percentage of the total install footprint of EBS, the database ORACLE_HOME is relatively tiny.
    Regards,
    John P.
    http://only4left.jpiwowar.com

  • Dynamic configuration required in sender file - Adapter Module

    Hi Everybody,
    I am developing an Adapter Module in the file adapter (sender) using Adapter Specific Message Attributes.
    I am using Dynamic configuration inside the Module Process method in the adapter module.
    We are getting an error saying Dynamic Configuration cannot be resolved.
    Can anybody tell me the package to be used.
    Thanks,
    Zabiulla

    You can access the dynamic configuration in adapter module like this:
    Message msg = (Message) inputModuleData.getPrincipalData();
    String fileName = msg.getMessageProperty("http://sap.com/xi/XI/System/File", "FileName");
    You do not need any addition library besides the adapter module API.
    Hope that helps
    Stefan

  • What additional software requirements are needed when using Captivate with RoboHelp?

    Hello,
    I use RoboHelp HTML 6 & 8 for developing online manuals for our government business.  We are currently exploring eLearning options for our training needs, and I am considering the idea of implementing Captivate features (PP slides, simulations, animations) directly into the manuals. We would not need the collaborative/review aspects of Captivate, so I believe we wouldn't need to purchase Adobe Air additionally. However, would anyone be willing to give me the lowdown on what additional software either I would need as a developer, or end-users would need (Adobe Flash, I assume) if we decided on Captivate? Would we need addtional software (Connect Pro/ LMS) to publish the Captivate content?
    I have conducted an extensive online search and explored the forum threads with some success, but there is a lot of convoluted information out there!
    Thanks in advance for your help!!

    Hi there
    Speaking as one who regularly combines Captivate and RoboHelp...
    Unless you really want some functionality that Captivate alone simply does not provide, you really shouldn't need any additional software whatsoever. You record the eLearning bits in Captivate, then you use that content in your RoboHelp projects.
    Are you seeking to host things in a Learning Management System (LMS)? If so, you probably should abandon the thought of RoboHelp, as it serves a bit of the functionality the LMS would provide.
    Note that AIR is a functionality similar to the Flash Player or the PDF Reader. It is free for the taking by the end user. There is nothing one would need to purchase. Now if you want to *AUTHOR* something in AIR, that's a different story. RoboHelp HTML version 8 will produce an AIRHelp output. But it sounds to me that you may be somewhat unfamiliar with what AIR gives you. So here's the skinny.
    If you were to produce AIRHelp output from RoboHelp, you end up with a .AIR file that each of your end users must *INSTALL* just as they would have to install an application. That's just to view the help. Prior to installing your AIR output, they would also need to first *INSTALL* the AIR viewer. So if they had no AIR capability whatsoever, they would need to perform two different installs. One of the AIR runtime, and a second of your AIR output. Additionally, creating the AIR output will also require a digital certificate. Now RoboHelp will allow you to create one, but it's an untrusted certificate and the end user will be forced to acknowledge whether they wish to continue installing with an untrusted certificate.
    Anyhoo, hopefully that helps you with at least some of what you were looking for.
    Cheers... Rick
    Helpful and Handy Links
    Captivate Wish Form/Bug Reporting Form
    Adobe Certified Captivate Training
    SorcerStone Blog
    Captivate eBooks

  • Additional charge along with interest on customer due items - France legal requirment

    Hi All
    We have requirement from France, where in we need to charge additional amount  along with Interest for customers on Overdue invoices
    Say for example, if the customer is having an invoice amount of 10000 and it is due by more than a 20 days, we will charge interest of 2 % along with the 2 % we will also charge a fixed amount of 40 EUR
    For the above requirement SAP has suggested to implement the below notes
    1826317
    1823964
    1844171
    After deploying the above notes along with their dependency notes, we were unable to access the FINT transaction code itself. Right now SAP is investigating this
    However as the deadline is approaching. i would like to know if any one of us has already had this kind of requirement  and how they have dealt with it
    Please do let me know if there is any other alternate available for this kind of requirement
    Thanks
    Prasad

    I am totally guessing that you were calling a VZ landline thinking it was ok to call and not be billed. The literature is very clear it is Mobile 2 mobile or Verizon wireless customers to Verizon wireless customers that you can call without using minutes.
    As for Friends and Family. Be happy they are letting you have numbers to call for free. There is no need for them to give you the information. Lets say you have a family plan and they choose all your teenage kids friends and not anyone you want.

  • Sql Server configuration requirements for SAP ECC 6.0

    Dear  All,
    I am using Sql server 2005 Enterprise as data store for Sap ecc 6.0.There are certain configuration requirements to be done while installing it so that sapinst.exe (sap installer) is able to use it to create its own DB's.
    For eg it requires a collation of SQL_Latin1_General_CP850_BIN2 whereas the default that gets installed is SQL_Latin1_General_CP1_CI_AS.
    Like this there are other requirements which I am not aware of.Most of the docs available on the Internet are talking of ecc 6.0  with Oracle 10.2G which is the most common combination.I am having docs for this combination.
    I am installing ecc for the first time.
    *I am unable to download docs from sap. marketplace as it requires a login given to certified users or sap purchasers.I am neither.*
    Can anyone help me with this.If anyone has ECC 6.0 installation guide with sql server it will be serve my purpose.
    Thanks for your efforts.

    "Excuse me?
    What he is doing is illegal , you know what that means, right? If you don't believe me, read the license that comes on the first installation DVD.
    Actually, I even think it's kind of barefaced to ask in the forum of the software vendor for help! I mean, it's like asking in a bank forum how to rob and fraud the bank! You - and many others - may think that it's right and ok to do that. I tell you: it is not. Not for "home use", not for personal use, not at all.
    You can use the software available here in the SDN to lean and study, that's why it's there.
    If you deal at all with copied software, then just be smart enough to make other people not notice. He can be happy if he's not prosecuted (which would legally be possible)."
    Do u understand what is legal or illegal? Have u read the license in full?
    The license does not put any limit on the number of users.So if I am using it means that one more user has been added by the license holder.
    Therefore there is nothing illegal about it.
    It would have unethical (not illegal) if the software is being used for a business purpose other than for which it has been purchased.
    Since it being used for training purpose the above does not hold good.
    In fact it is SAP who is benefited in the long run bec' after a person learns it technology because  he is going to implement it somewhere, for which the concerned user will have to purchase a license.Therefore I am helping SAP to increase its business.
    But there are some stupid people who don't understand these things but are ready to shout at the top of their voice thinking themselves to be intelligent.
    Edited by: coolmind26 on Jun 5, 2011 10:57 AM

  • Configurations required for IDOC to File

    Can any body suggest me the configuration required for integrating remote R/3 system with the XI Server.
    I want to know the following.
    1) How and where to configure R/3 with the XI server.
    2) What are the configurations required for Outbound and Inbound IDocs in R/3 and XI Servers.

    Hi Rajeshwar,
    take a look over here:
    https://www.sdn.sap.com/sdn/weblogs.sdn?blog=/weblogs/topic/16
    you'll find at least 5 weblogs that show the idoc configuration
    Regards,
    michal
    XI FAQ - http://www.bcc.com.pl/netweaver/sapxifaq

  • Error during Checking Network Configurations Requirements in RHEL3 VM

    Hi,
    I have a Red Hat Enterprise Linux Image Virtual Machine on my desktop which uses Fedora Linux. I have set this up using VMplayer.
    I need to install Oracle 10g on the RHEL VM.
    As the RHEL VM does not have X Windows, I am connecting to it from the Fedora Linux to do the installation.
    During the Product-specific Prerequisite checks:
    Checking Network Configurations Requirements throws an error,
    Please find it below:
    Actual Result: Unknown Host Exception has Occured :rhel3vm:rhel3vm
    Check complete: The overall result of this check is: Not executed <<<<
    Recommendations: Oracle supports installations on systems with DHCP-assigned public IP addresses. However, the primary network interface on the system should be configured with a static IP address in order for the Oracle software to function properly.
    The Fedora Linux gets the IP address from the DHCP and allocates an IP address to the VM.
    However, when we set both of them as static and the problem still persists, and also when we set the fedora as dynamic and RHEL VM as static, the issue is not resolved.
    Any help will be truely appreciated. Thank you.

    We were running a non-DHCP (static IP) configuration and ran into this issue. We discovered that the hostname and FQDN were not correctly specified in the /etc/hosts file.
    Fixing the hosts file to correctly reference the IP resolved the issue.
    Hope this helps...
    -john

  • Network Configuration requirements not executed, why?

    During installation all checks are passed but this one, is there any particular reason for this check not to be executed? Should I worry over it not beein executed?
    Checking Network Configuration requirements ...
    Check complete. The overall result of this check is: Not executed <<<<
    Recommendation: Oracle supports installations on systems with DHCP-assigned public IP addresses. However, the primary network interface on the system should be configured with a static IP address in order for the Oracle Software to function properly. See the Installation Guide for more details on installing the software on systems configured with DHCP.
    I'm trying to install Oracle 10g 2 on a Red Hat 4 server with a static IP.

    Hi!
    Either your machine is setup to use DHCP after all or the installer just has trouble to find the correct information.
    Recheck the network settings of your machine (redhat-config-network).
    Just ignore the warning and continue.
    cu
    Andreas

  • Why do i get a daq hardware configuration required window when trying to run the daq solution wizard?

    i have recently installed the ni 4552 for pci dynamic signal analyser, and am attempting to configure my system and teach myself labview. when attempting to run the daq solution wizard i am presented with the daq hardware configuration required window.
    Attachments:
    DAQ_Hardware_Configuration_Required.ppt ‏38 KB

    hi brian, thanks for your help. i have recently received version 6.1, and done a complete re-install. i have also downloaded the latest ni daq (6.9.2) and ni dsa (6.11) versions and installed them, but still i get the same error message when trying to open the solutions wizard (please see attached powerpoint presentation).
    upon selecting the "go to ni daq config utility" option MAX opens. everything appears to be in order (device passes test, test panels run ok and virtual channels are configured correctly). i am unable to go any further.
    i would appreciate any guidance that you are able to give me in this matter. many thanks in advance of your help.
    best regards,
    ben halkon

Maybe you are looking for

  • Difference between FS10N and FBL3N

    Friends, When we run the FS10N report for a G/L a/c in a company code for the year 2007, it only shows an open balance of X amount. This amount is only for a particular business area. I have checked the settings and the report is not restricted for t

  • How to restrict the attribute values for the user in query designer

    Hi All, I have a requirment where certain user would see certain vailes in the query desiner of the attribute. The requirment is we have planing material which is attribute of material When X user want to restrict the  values for planning material ,w

  • The network location profile changes from "Domain" to "Private" in Windows 8.1.

    I have a network which is centered around a Server 2012R2 installation with the Server Essentials Role installed. I have installed and configured a DNS server which points to the router and open DNS as forwarders. There are 3 physical computers on my

  • Itunes has stopped working when starting up trying to access itunes store

    Have a windows 7 and since installing the newest version of iTunes (12 I think), it has not worked. It always freezes on startup while trying to access the iTunes store. I have tried everything apple suggests including opening in a different user, op

  • Raid Admin will no longer discover Xserve Raids

    We have 6 Xserve Raids and as of the late I can no longer discover all of them using Raid Admin. I have gone through the reset procedure several times on 2 of the 6, and they are still undiscovered. Supposedly that resets them to DHCP (no fixed addre